Residential / Group Housing · 84 buildings · 88 unitsRERA P52600015244

Hari Har Residency

Deedo IDDP-SOL-7GS1

MahaRERA shows it completed; no MahaRERA orders on record; 0% of its units are booked.

Isbavi, Solapur 413304 · by Shri Swami Samarth Construciton

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales0% booked0 of 88 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • This projectRegistered 8 Feb 2018, completion promised 15 Dec 2023.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

84 buildings

Open a building to see every flat, floor by floor.

Show all 84 buildingsShow fewer buildings

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52600015244
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P526000152448 Feb 201815 Dec 202315 Dec 2023Shri Swami Samarth ConstrucitonProject page
Documents236

1 document held by Deedo, 235 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Cardpan card.pdf · uploaded 28 Jan 2018Source

Legal

  • Legal Title reportsearch report.pdf · uploaded 30 Jan 2018Source
  • Declaration Form Bform B.pdf · uploaded 31 Jan 2018Source
  • Othercomple 1.pdf · uploaded 4 Apr 2019Source
  • Othercomple 2.pdf · uploaded 4 Apr 2019Source
  • Othercomple 3.pdf · uploaded 4 Apr 2019Source
  • Othercomple 4.pdf · uploaded 4 Apr 2019Source
Show all 236 documentsShow fewer documents

Legal

  • Othercomple 5.pdf · uploaded 4 Apr 2019Source
  • Other18.pdf · uploaded 19 Jan 2023Source
  • Other19.pdf · uploaded 19 Jan 2023Source
  • Other20.pdf · uploaded 19 Jan 2023Source
  • Other21.pdf · uploaded 19 Jan 2023Source
  • Other22.pdf · uploaded 19 Jan 2023Source
  • Other23.pdf · uploaded 19 Jan 2023Source
  • Other24.pdf · uploaded 19 Jan 2023Source
  • Other25 (2).pdf · uploaded 19 Jan 2023Source
  • Other29.pdf · uploaded 19 Jan 2023Source
  • Other50.pdf · uploaded 19 Jan 2023Source
  • Other51.pdf · uploaded 19 Jan 2023Source
  • Other53.pdf · uploaded 19 Jan 2023Source
  • Other54.pdf · uploaded 19 Jan 2023Source
  • Other56.pdf · uploaded 19 Jan 2023Source
  • Other57.pdf · uploaded 19 Jan 2023Source
  • Other83.pdf · uploaded 19 Jan 2023Source
  • Other85.pdf · uploaded 19 Jan 2023Source
  • Other86.pdf · uploaded 19 Jan 2023Source
  • Other88.pdf · uploaded 19 Jan 2023Source
  • Other91.pdf · uploaded 19 Jan 2023Source
  • Other95.pdf · uploaded 19 Jan 2023Source
  • Other101.pdf · uploaded 19 Jan 2023Source
  • OtherG_PLOT_NO_48.pdf · uploaded 3 Nov 2023Source

Migrated

  • 1 PAN Cardpan card.pdf · uploaded 28 Jan 2018Source
  • 1 Copy of Layout Approval (in case of layout)IMG_0001.pdf · uploaded 29 Jan 2018Source
  • 1 Copy of the legal title reportsearch report.pdf · uploaded 30 Jan 2018Source
  • 1 Building Plan Approval (IOD)plan merged-ilovepdf-compressed.pdf · uploaded 30 Jan 2018Source
  • 2 Building Plan Approval (IOD)plan merged 1-ilovepdf-compressed.pdf · uploaded 30 Jan 2018Source
  • 1 Commencement Certificates / NA Order for plotted developmentcommencement certificate.pdf · uploaded 30 Jan 2018Source
  • 2 Commencement Certificates / NA Order for plotted developmentcommencement certificate (1).pdf · uploaded 30 Jan 2018Source
  • 3 Commencement Certificates / NA Order for plotted developmentcommencement certificate(2).pdf · uploaded 30 Jan 2018Source
  • 4 Commencement Certificates / NA Order for plotted developmentcommencement certificate (3).pdf · uploaded 30 Jan 2018Source
  • 1 Proforma of Allotment letterharihar agreement to sale.pdf · uploaded 30 Jan 2018Source
  • 1 Details of encumbrancesEncumbrance Certificate.pdf · uploaded 31 Jan 2018Source
  • 1 Declaration in FORM Bform B.pdf · uploaded 31 Jan 2018Source
  • 1 Certificates of CA (Form 3)ca form 3.pdf · uploaded 31 Jan 2018Source
  • 2 Proforma of Allotment letterallotment letter (2).pdf · uploaded 31 Jan 2018Source
  • 1 Othercomple 1.pdf · uploaded 4 Apr 2019Source
  • 2 Othercomple 2.pdf · uploaded 4 Apr 2019Source
  • 3 Othercomple 3.pdf · uploaded 4 Apr 2019Source
  • 4 Othercomple 4.pdf · uploaded 4 Apr 2019Source
  • 5 Othercomple 5.pdf · uploaded 4 Apr 2019Source
  • 1 Status of Conveyanceoccuupancy.pdf · uploaded 15 Jun 2019Source
  • 3 Building Plan Approval (IOD)27P.pdf · uploaded 25 Aug 2019Source
  • 4 Building Plan Approval (IOD)28P.pdf · uploaded 25 Aug 2019Source
  • 5 Building Plan Approval (IOD)30P.pdf · uploaded 25 Aug 2019Source
  • 6 Building Plan Approval (IOD)33P.pdf · uploaded 25 Aug 2019Source
  • 7 Building Plan Approval (IOD)40P.pdf · uploaded 25 Aug 2019Source
  • 8 Building Plan Approval (IOD)91P.pdf · uploaded 25 Aug 2019Source
  • 9 Building Plan Approval (IOD)100P.pdf · uploaded 25 Aug 2019Source
  • 5 Commencement Certificates / NA Order for plotted development27.pdf · uploaded 25 Aug 2019Source
  • 6 Commencement Certificates / NA Order for plotted development28.pdf · uploaded 25 Aug 2019Source
  • 7 Commencement Certificates / NA Order for plotted development29.pdf · uploaded 25 Aug 2019Source
  • 8 Commencement Certificates / NA Order for plotted development30.pdf · uploaded 25 Aug 2019Source
  • 9 Commencement Certificates / NA Order for plotted development33.pdf · uploaded 25 Aug 2019Source
  • 10 Commencement Certificates / NA Order for plotted development40.pdf · uploaded 25 Aug 2019Source
  • 11 Commencement Certificates / NA Order for plotted development100.pdf · uploaded 25 Aug 2019Source
  • 10 Building Plan Approval (IOD)100P.pdf · uploaded 26 Aug 2019Source
  • 11 Building Plan Approval (IOD)100P.pdf · uploaded 26 Aug 2019Source
  • 1 Annual Audit Report of Statutory CA (Form 5)hari har audit.pdf · uploaded 22 Oct 2019Source
  • 12 Building Plan Approval (IOD)plans 1.pdf · uploaded 23 Feb 2020Source
  • 13 Building Plan Approval (IOD)plans 2.pdf · uploaded 23 Feb 2020Source
  • 14 Building Plan Approval (IOD)plans 3.pdf · uploaded 23 Feb 2020Source
  • 15 Building Plan Approval (IOD)plans 4.pdf · uploaded 23 Feb 2020Source
  • 16 Building Plan Approval (IOD)plan 5.pdf · uploaded 23 Feb 2020Source
  • 17 Building Plan Approval (IOD)92P.pdf · uploaded 23 Feb 2020Source
  • 18 Building Plan Approval (IOD)93P.pdf · uploaded 23 Feb 2020Source
  • 12 Commencement Certificates / NA Order for plotted developmentcc_compressed.pdf · uploaded 23 Feb 2020Source
  • 19 Building Plan Approval (IOD)plan 29.pdf · uploaded 4 Jun 2021Source
  • 20 Building Plan Approval (IOD)plan 41.pdf · uploaded 4 Jun 2021Source
  • 21 Building Plan Approval (IOD)plan 88.pdf · uploaded 4 Jun 2021Source
  • 22 Building Plan Approval (IOD)94 plan_compressed.pdf · uploaded 4 Jun 2021Source
  • 23 Building Plan Approval (IOD)83.pdf · uploaded 4 Jun 2021Source
  • 24 Building Plan Approval (IOD)89.pdf · uploaded 4 Jun 2021Source
  • 25 Building Plan Approval (IOD)66.pdf · uploaded 4 Jun 2021Source
  • 26 Building Plan Approval (IOD)72.pdf · uploaded 4 Jun 2021Source
  • 27 Building Plan Approval (IOD)80.pdf · uploaded 4 Jun 2021Source
  • 28 Building Plan Approval (IOD)78.pdf · uploaded 4 Jun 2021Source
  • 29 Building Plan Approval (IOD)74.pdf · uploaded 4 Jun 2021Source
  • 13 Commencement Certificates / NA Order for plotted developmentcc 41.pdf · uploaded 4 Jun 2021Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development27.pdf · uploaded 4 Jun 2021Source
  • 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development31.pdf · uploaded 4 Jun 2021Source
  • 3 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development35.pdf · uploaded 4 Jun 2021Source
  • 4 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development39.pdf · uploaded 4 Jun 2021Source
  • 5 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development56.pdf · uploaded 4 Jun 2021Source
  • 6 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development91.pdf · uploaded 4 Jun 2021Source
  • 7 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development95.pdf · uploaded 4 Jun 2021Source
  • 8 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development99.pdf · uploaded 4 Jun 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Harihar audit report 19-20.pdf · uploaded 10 Jul 2021Source
  • 14 Commencement Certificates / NA Order for plotted developmentCC 74 75.pdf · uploaded 13 Oct 2021Source
  • 30 Building Plan Approval (IOD)42-4_compressed.pdf · uploaded 3 Dec 2021Source
  • 31 Building Plan Approval (IOD)43-4_compressed.pdf · uploaded 3 Dec 2021Source
  • 32 Building Plan Approval (IOD)44-4_compressed.pdf · uploaded 3 Dec 2021Source
  • 33 Building Plan Approval (IOD)45-4_compressed.pdf · uploaded 3 Dec 2021Source
  • 34 Building Plan Approval (IOD)46-4_compressed.pdf · uploaded 3 Dec 2021Source
  • 35 Building Plan Approval (IOD)47-4_compressed.pdf · uploaded 3 Dec 2021Source
  • 36 Building Plan Approval (IOD)49-4_compressed.pdf · uploaded 3 Dec 2021Source
  • 37 Building Plan Approval (IOD)58-4_compressed.pdf · uploaded 3 Dec 2021Source
  • 38 Building Plan Approval (IOD)59-4_compressed.pdf · uploaded 3 Dec 2021Source
  • 39 Building Plan Approval (IOD)60-4_compressed.pdf · uploaded 3 Dec 2021Source
  • 40 Building Plan Approval (IOD)61-4_compressed.pdf · uploaded 3 Dec 2021Source
  • 41 Building Plan Approval (IOD)62-4_compressed.pdf · uploaded 3 Dec 2021Source
  • 42 Building Plan Approval (IOD)63-4_compressed.pdf · uploaded 3 Dec 2021Source
  • 43 Building Plan Approval (IOD)64-4_compressed.pdf · uploaded 3 Dec 2021Source
  • 44 Building Plan Approval (IOD)65-4_compressed.pdf · uploaded 3 Dec 2021Source
  • 15 Commencement Certificates / NA Order for plotted development42-2-3.pdf · uploaded 3 Dec 2021Source
  • 16 Commencement Certificates / NA Order for plotted development43-2-3.pdf · uploaded 3 Dec 2021Source
  • 17 Commencement Certificates / NA Order for plotted development44-2-3.pdf · uploaded 3 Dec 2021Source
  • 18 Commencement Certificates / NA Order for plotted development45-2-3.pdf · uploaded 3 Dec 2021Source
  • 19 Commencement Certificates / NA Order for plotted development46-2-3.pdf · uploaded 3 Dec 2021Source
  • 20 Commencement Certificates / NA Order for plotted development47-2-3.pdf · uploaded 3 Dec 2021Source
  • 21 Commencement Certificates / NA Order for plotted development49-2-3.pdf · uploaded 3 Dec 2021Source
  • 22 Commencement Certificates / NA Order for plotted development58-2-3.pdf · uploaded 3 Dec 2021Source
  • 23 Commencement Certificates / NA Order for plotted development59-2-3.pdf · uploaded 3 Dec 2021Source
  • 24 Commencement Certificates / NA Order for plotted development60-2-3.pdf · uploaded 3 Dec 2021Source
  • 25 Commencement Certificates / NA Order for plotted development61-2-3.pdf · uploaded 3 Dec 2021Source
  • 26 Commencement Certificates / NA Order for plotted development62-2-3.pdf · uploaded 3 Dec 2021Source
  • 27 Commencement Certificates / NA Order for plotted development63-2-3.pdf · uploaded 3 Dec 2021Source
  • 28 Commencement Certificates / NA Order for plotted development64-2-3.pdf · uploaded 3 Dec 2021Source
  • 29 Commencement Certificates / NA Order for plotted development65-2-3.pdf · uploaded 3 Dec 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)annual report harihar.pdf · uploaded 6 Apr 2022Source
  • 1 Architect’s Certificate on Completion of Project (Form 4)architects completion certificate_compressed.pdf · uploaded 6 Apr 2022Source
  • 45 Building Plan Approval (IOD)48plan_compressed.pdf · uploaded 12 Apr 2022Source
  • 46 Building Plan Approval (IOD)68-69plan_compressed.pdf · uploaded 12 Apr 2022Source
  • 47 Building Plan Approval (IOD)70-71plan_compressed.pdf · uploaded 12 Apr 2022Source
  • 48 Building Plan Approval (IOD)76-77plan_compressed.pdf · uploaded 12 Apr 2022Source
  • 30 Commencement Certificates / NA Order for plotted development48cc_compressed.pdf · uploaded 12 Apr 2022Source
  • 31 Commencement Certificates / NA Order for plotted development68-69cc.pdf · uploaded 12 Apr 2022Source
  • 32 Commencement Certificates / NA Order for plotted development70-71cc.pdf · uploaded 12 Apr 2022Source
  • 33 Commencement Certificates / NA Order for plotted development76-77cc_compressed.pdf · uploaded 12 Apr 2022Source
  • 9 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development66 67.pdf · uploaded 13 Apr 2022Source
  • 10 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development72 73.pdf · uploaded 13 Apr 2022Source
  • 11 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development74 75.pdf · uploaded 13 Apr 2022Source
  • 12 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development78 79.pdf · uploaded 13 Apr 2022Source
  • 13 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development80 81.pdf · uploaded 13 Apr 2022Source
  • 14 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentimg012.pdf · uploaded 26 Dec 2022Source
  • 15 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentimg013.pdf · uploaded 26 Dec 2022Source
  • 16 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentimg014.pdf · uploaded 26 Dec 2022Source
  • 6 Other18.pdf · uploaded 19 Jan 2023Source
  • 7 Other19.pdf · uploaded 19 Jan 2023Source
  • 8 Other20.pdf · uploaded 19 Jan 2023Source
  • 9 Other21.pdf · uploaded 19 Jan 2023Source
  • 10 Other22.pdf · uploaded 19 Jan 2023Source
  • 11 Other23.pdf · uploaded 19 Jan 2023Source
  • 12 Other24.pdf · uploaded 19 Jan 2023Source
  • 13 Other25 (2).pdf · uploaded 19 Jan 2023Source
  • 14 Other29.pdf · uploaded 19 Jan 2023Source
  • 15 Other50.pdf · uploaded 19 Jan 2023Source
  • 16 Other51.pdf · uploaded 19 Jan 2023Source
  • 17 Other53.pdf · uploaded 19 Jan 2023Source
  • 18 Other54.pdf · uploaded 19 Jan 2023Source
  • 19 Other56.pdf · uploaded 19 Jan 2023Source
  • 20 Other57.pdf · uploaded 19 Jan 2023Source
  • 21 Other83.pdf · uploaded 19 Jan 2023Source
  • 22 Other85.pdf · uploaded 19 Jan 2023Source
  • 23 Other86.pdf · uploaded 19 Jan 2023Source
  • 24 Other88.pdf · uploaded 19 Jan 2023Source
  • 25 Other91.pdf · uploaded 19 Jan 2023Source
  • 26 Other95.pdf · uploaded 19 Jan 2023Source
  • 27 Other101.pdf · uploaded 19 Jan 2023Source
  • 17 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentG_PLOT_NO_42_merged.pdf · uploaded 10 Aug 2023Source
  • 18 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentG_PLOT_NO_46_merged.pdf · uploaded 10 Aug 2023Source
  • 28 OtherG_PLOT_NO_48.pdf · uploaded 3 Nov 2023Source
  • 2 Certificates of CA (Form 3)Form 3.pdf · uploaded 12 Dec 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Annual Report 2018-19.pdf · uploaded 12 Dec 2023Source
  • 3 Certificates of CA (Form 3)form 3 jun 23_compressed.pdf · uploaded 16 Dec 2023Source
  • 4 Certificates of CA (Form 3)form 3 sep 23_compressed.pdf · uploaded 16 Dec 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)form 5 21-22.pdf · uploaded 16 Dec 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)form 5 22-23.pdf · uploaded 16 Dec 2023Source
  • 19 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoc 58.pdf · uploaded 16 Dec 2023Source
  • 20 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoc 59.pdf · uploaded 16 Dec 2023Source
  • 21 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoc 60.pdf · uploaded 16 Dec 2023Source
  • 22 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoc 61.pdf · uploaded 16 Dec 2023Source
  • 23 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoc 62.pdf · uploaded 16 Dec 2023Source
  • 24 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoc 63.pdf · uploaded 16 Dec 2023Source
  • 25 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoc 64.pdf · uploaded 16 Dec 2023Source
  • 26 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoc 65.pdf · uploaded 16 Dec 2023Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)oc 60.pdf · uploaded 16 Dec 2023Source

Technical

  • DocumentIMG_0001.pdf · uploaded 29 Jan 2018Source
  • Documentplan merged-ilovepdf-compressed.pdf · uploaded 30 Jan 2018Source
  • Documentplan merged 1-ilovepdf-compressed.pdf · uploaded 30 Jan 2018Source
  • Document27P.pdf · uploaded 25 Aug 2019Source
  • Document28P.pdf · uploaded 25 Aug 2019Source
  • Document30P.pdf · uploaded 25 Aug 2019Source
  • Document33P.pdf · uploaded 25 Aug 2019Source
  • Document40P.pdf · uploaded 25 Aug 2019Source
  • Document91P.pdf · uploaded 25 Aug 2019Source
  • Document100P.pdf · uploaded 25 Aug 2019Source
  • Document100P.pdf · uploaded 26 Aug 2019Source
  • Document100P.pdf · uploaded 26 Aug 2019Source
  • Documentplans 1.pdf · uploaded 23 Feb 2020Source
  • Documentplans 2.pdf · uploaded 23 Feb 2020Source
  • Documentplans 3.pdf · uploaded 23 Feb 2020Source
  • Documentplans 4.pdf · uploaded 23 Feb 2020Source
  • Documentplan 5.pdf · uploaded 23 Feb 2020Source
  • Document92P.pdf · uploaded 23 Feb 2020Source
  • Document93P.pdf · uploaded 23 Feb 2020Source
  • Documentplan 29.pdf · uploaded 4 Jun 2021Source
  • Documentplan 41.pdf · uploaded 4 Jun 2021Source
  • Documentplan 88.pdf · uploaded 4 Jun 2021Source
  • Document94 plan_compressed.pdf · uploaded 4 Jun 2021Source
  • Document83.pdf · uploaded 4 Jun 2021Source
  • Document89.pdf · uploaded 4 Jun 2021Source
  • Document66.pdf · uploaded 4 Jun 2021Source
  • Document72.pdf · uploaded 4 Jun 2021Source
  • Document80.pdf · uploaded 4 Jun 2021Source
  • Document78.pdf · uploaded 4 Jun 2021Source
  • Document74.pdf · uploaded 4 Jun 2021Source
  • Document42-4_compressed.pdf · uploaded 3 Dec 2021Source
  • Document43-4_compressed.pdf · uploaded 3 Dec 2021Source
  • Document44-4_compressed.pdf · uploaded 3 Dec 2021Source
  • Document45-4_compressed.pdf · uploaded 3 Dec 2021Source
  • Document46-4_compressed.pdf · uploaded 3 Dec 2021Source
  • Document47-4_compressed.pdf · uploaded 3 Dec 2021Source
  • Document49-4_compressed.pdf · uploaded 3 Dec 2021Source
  • Document58-4_compressed.pdf · uploaded 3 Dec 2021Source
  • Document59-4_compressed.pdf · uploaded 3 Dec 2021Source
  • Document60-4_compressed.pdf · uploaded 3 Dec 2021Source
  • Document61-4_compressed.pdf · uploaded 3 Dec 2021Source
  • Document62-4_compressed.pdf · uploaded 3 Dec 2021Source
  • Document63-4_compressed.pdf · uploaded 3 Dec 2021Source
  • Document64-4_compressed.pdf · uploaded 3 Dec 2021Source
  • Document65-4_compressed.pdf · uploaded 3 Dec 2021Source
  • Document48plan_compressed.pdf · uploaded 12 Apr 2022Source
  • Document68-69plan_compressed.pdf · uploaded 12 Apr 2022Source
  • Document70-71plan_compressed.pdf · uploaded 12 Apr 2022Source
  • Document76-77plan_compressed.pdf · uploaded 12 Apr 2022Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 76/1B/2A/76/2B/2B

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
Row Bunglow, Row Bunglo, Twin Bunglow88 units in all
Address
76 1B 2A 76 2B 2B, near pune pandharpur road, IsbaviPIN 413304
Village
Isbavi, Pandharpur taluka
Land area for this project
6,208 sq m (66,826 sq ft)
Permissible built-up area
4,378 sq m (47,124 sq ft)
Sanctioned built-up area
1,272 sq m (13,693 sq ft)
Recreational open space
1,875 sq m (20,178 sq ft)
Designated bank account
171
Developed in phases
Yes

Survey, CTS, gat or plot numbers

76/1B/2A/76/2B/2B

Land as published on MahaRERA's project page

76 1B 2A 76 2B 2B

Boundaries

North
Gat no 76
South
Gat no 64 65 73
East
Gat no 76
West
Gat no 76

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking88 units

0 of 88 units booked (0%), as the promoter reported to MahaRERA

Row Bunglow · 67 unitsRow Bunglo · 1 unitTwin Bunglow · 20 units
BuildingTypeCarpet areaUnitsBooked
Row Bunglow 18Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow 19Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 20Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 21Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 22Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 23Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 24Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 25Row Bunglow45.33 sq m · 488 sq ft10
Show all 88 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Row Bunglow no 26Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 27Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 28Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 28Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 29Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 30Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 31Row Bunglo45.33 sq m · 488 sq ft10
Row Bunglow no 32Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 33Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 34Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 35Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 36Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 37Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 38Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 39Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 40Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 41Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 42Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 43Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 44Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 45Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 46Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 46Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 46Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 47Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 48Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 49Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 50Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 51Row Bunglow54.32 sq m · 585 sq ft10
Row Bunglow no 52Row Bunglow54.32 sq m · 585 sq ft10
Row Bunglow no 53Row Bunglow54.32 sq m · 585 sq ft10
Row Bunglow no 54Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 54Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 55Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 56Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 57Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 58Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 59Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 60Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 61Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 62Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 63Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 64Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 65Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 66Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 67Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 68Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 69Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 70Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 71Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 72Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 73Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 74Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 75Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 76Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 77Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 78Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 79Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 80Row Bunglow45.33 sq m · 488 sq ft10
Row Bunglow no 81Row Bunglow45.33 sq m · 488 sq ft10
Twin Bunglow no 100Twin Bunglow52.69 sq m · 567 sq ft10
Twin Bunglow no 101Twin Bunglow52.69 sq m · 567 sq ft10
Twin Bunglow no 82Twin Bunglow52.69 sq m · 567 sq ft10
Twin Bunglow no 83Twin Bunglow52.69 sq m · 567 sq ft10
Twin Bunglow no 84Twin Bunglow52.69 sq m · 567 sq ft10
Twin Bunglow no 85Twin Bunglow52.69 sq m · 567 sq ft10
Twin Bunglow no 86Twin Bunglow52.69 sq m · 567 sq ft10
Twin Bunglow no 87Twin Bunglow52.69 sq m · 567 sq ft10
Twin Bunglow no 88Twin Bunglow52.69 sq m · 567 sq ft10
Twin Bunglow no 89Twin Bunglow52.69 sq m · 567 sq ft10
Twin Bunglow no 90Twin Bunglow52.69 sq m · 567 sq ft10
Twin Bunglow no 91Twin Bunglow52.69 sq m · 567 sq ft10
Twin Bunglow no 92Twin Bunglow52.69 sq m · 567 sq ft10
Twin Bunglow no 93Twin Bunglow52.69 sq m · 567 sq ft10
Twin Bunglow no 94Twin Bunglow52.69 sq m · 567 sq ft10
Twin Bunglow no 95Twin Bunglow52.69 sq m · 567 sq ft10
Twin Bunglow no 96Twin Bunglow52.69 sq m · 567 sq ft10
Twin Bunglow no 97Twin Bunglow52.69 sq m · 567 sq ft10
Twin Bunglow no 98Twin Bunglow52.69 sq m · 567 sq ft10
Twin Bunglow no 99Twin Bunglow52.69 sq m · 567 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals10

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRupesh E Phule—
Engineersakshi kedar samangadkar—
OtherDevkar nagnath chandrakant—
OtherKamble Baburao Anant—
OtherKantilal Ramji Dubal—
OtherKiran Popat Kore—
OtherKorke Dhanaji Sambhaji—
OtherSachin Bhausaheb Somvanshi—
OtherUmakant Surendraprasad Das—
OtherVaijanath raghoba bhosale—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Isbavi

All 24 projects in Isbavi · Compare Hari Har Residency with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology