Residential / Group Housing · 3 buildings · 154 unitsRERA P52000034022

Amulyam

Deedo IDDP-RAI-2DB9

It is due for completion in Dec 2026, with no extension on record; no MahaRERA orders on record; 45% of its units are booked.

Pale Bk., Raigarh 410208 · by Space India Builders & Developer

DeliveryDue Dec 2026No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales45% booked69 of 154 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

It is due for completion in Dec 2026, with no extension on record

  • This projectRegistered 17 Mar 2022, completion promised 31 Dec 2026.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

3 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52000034022
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5200003402217 Mar 202231 Dec 202631 Dec 2026Space India Builders & DeveloperProject page
Documents125

1 document held by Deedo, 124 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardSpace India Pan.pdf · uploaded 3 Feb 2022Source
  • OthersForm 5 Amulyam FY 2025-26.pdf · uploaded 25 Apr 2026Source

Legal

  • Declaration Form BForm B Promoter Space India.pdf · uploaded 7 Feb 2022Source
  • OtherDocs 001.pdf · uploaded 7 Mar 2022Source
  • Legal Title reportFinal Title - Space india_compressed.pdf · uploaded 10 Mar 2022Source
  • Legal Title report1 Other.pdf · uploaded 14 Mar 2022Source

Migrated

  • 1 PAN CardSpace India Pan.pdf · uploaded 3 Feb 2022Source
Show all 125 documentsShow fewer documents

Migrated

  • 1 Copy of Layout Approval (in case of layout)Revised plan-1.pdf · uploaded 3 Feb 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentRevised plan-1.pdf · uploaded 3 Feb 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentRevised plan-2.pdf · uploaded 3 Feb 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentRevised plan-3_11zon.pdf · uploaded 3 Feb 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentRevised plan-4_11zon.pdf · uploaded 3 Feb 2022Source
  • 5 Building Plan Approval / NA Order for plotted developmentRevised plan-5_11zon.pdf · uploaded 3 Feb 2022Source
  • 6 Building Plan Approval / NA Order for plotted developmentRevised plan-6_11zon.pdf · uploaded 3 Feb 2022Source
  • 7 Building Plan Approval / NA Order for plotted developmentRevised plan-7_11zon.pdf · uploaded 3 Feb 2022Source
  • 8 Building Plan Approval / NA Order for plotted developmentRevised plan-8_11zon.pdf · uploaded 3 Feb 2022Source
  • 9 Building Plan Approval / NA Order for plotted developmentRevised plan-9_11zon.pdf · uploaded 3 Feb 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 3 Feb 2022Source
  • 1 Details of encumbrancesEncumbrance Letter.pdf · uploaded 7 Feb 2022Source
  • 1 Declaration about Commencement CertificateForm D.pdf · uploaded 7 Feb 2022Source
  • 1 Declaration in FORM BForm B Promoter Space India.pdf · uploaded 7 Feb 2022Source
  • 1 CERSAI detailsAmulyam.pdf · uploaded 9 Feb 2022Source
  • 1 Proforma of Allotment letterAMULYAM Final Draft Agreement.pdf · uploaded 10 Feb 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Space india.pdf · uploaded 22 Feb 2022Source
  • 2 Proforma of Allotment letterAllotment Letter.pdf · uploaded 22 Feb 2022Source
  • 1 OtherDocs 001.pdf · uploaded 7 Mar 2022Source
  • 1 Copy of the legal title reportFinal Title - Space india_compressed.pdf · uploaded 10 Mar 2022Source
  • 2 Copy of the legal title report1 Other.pdf · uploaded 14 Mar 2022Source
  • 3 Proforma of Allotment letterAmulyam-Space India.pdf · uploaded 23 Jun 2022Source
  • 1 Disclosure of sold/ booked inventory29 Amulyam.pdf · uploaded 15 Jul 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Pale RERA certifciate (5).pdf · uploaded 18 Jan 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Amulyam ENGINEER Certificate 31-12-2022.pdf · uploaded 18 Jan 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)2 Form 3 CA Certificate 30-09-2022.pdf · uploaded 18 Jan 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)3 Form 3 Amulyam CA Certificate 31-12-2022.pdf · uploaded 31 Jan 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 Form 1 Amulyam March 2023.pdf · uploaded 6 Oct 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 Form 1 Amulyam june 2023.pdf · uploaded 6 Oct 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Form 2 31-03-2023.pdf · uploaded 6 Oct 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 Form 2 30-06-2023.pdf · uploaded 6 Oct 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)3 CA Certificate 31-03-2023.pdf · uploaded 6 Oct 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)4 CA Certificate 30-06-2023.pdf · uploaded 6 Oct 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)4 Form 1 Amulyam Sep 2023.pdf · uploaded 3 Feb 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)5 Form 1 Amulyam Dec 2023.pdf · uploaded 3 Feb 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 Form 2 30-09-2023.pdf · uploaded 3 Feb 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)5 Form 2 31-12-2023.pdf · uploaded 3 Feb 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate 30-09-2023.pdf · uploaded 3 Feb 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate 31-12-2023.pdf · uploaded 3 Feb 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 Form 1 Amulyam March 2024.pdf · uploaded 30 Nov 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)7 Form 1 Amulyam June 2024.pdf · uploaded 30 Nov 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)8 Form 1 Amulyam September 2024.pdf · uploaded 30 Nov 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)8 CA Certificate 31-03-2024.pdf · uploaded 30 Nov 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)9 CA Certificate 30-06-2024.pdf · uploaded 30 Nov 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)10 CA Certificate 30-09-2024.pdf · uploaded 30 Nov 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 Form 2 31-03-2024.pdf · uploaded 30 Nov 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)7 Form 2 30-06-2024.pdf · uploaded 30 Nov 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)8 Form 2 30-09-2024.pdf · uploaded 30 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)9 Form 1 Amulyam Dec 2024.pdf · uploaded 1 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)11 Form 3 CA Certificate 31-12-2024.pdf · uploaded 1 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)9 Form 2 31-12-2024.pdf · uploaded 1 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)10 Form 1 Amulyam Mar 2025.pdf · uploaded 3 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)12 Form 3 CA Certificate 31-03-2025.pdf · uploaded 3 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)10 Form 2 31-03-2025.pdf · uploaded 3 May 2025Source
  • Form 111 Form 1 Amulyam Jun 2025.pdf · uploaded 23 Jul 2025Source
  • Form 211 Form 2 30-06-2025.pdf · uploaded 23 Jul 2025Source
  • Form 313 Form 3 CA Certificate 30-06-2025.pdf · uploaded 23 Jul 2025Source
  • Disclosure of Sold and Booked Inventory1 Disclosure of Sold-Booked Inventories.pdf · uploaded 23 Jul 2025Source
  • Self-declaration of Quarterly ProgressSelf Declaration of Quarterly Progress.pdf · uploaded 23 Jul 2025Source
  • Form 112 Form 1 Amulyam Sept 2025.pdf · uploaded 19 Nov 2025Source
  • Form 212 Form 2 30-09-2025.pdf · uploaded 19 Nov 2025Source
  • Form 314 Form 3 CA Certificate 30-09-2025.pdf · uploaded 19 Nov 2025Source
  • Disclosure of Sold and Booked Inventory1 Disclosure of Sold-Booked Inventories - Amulyam.pdf · uploaded 19 Nov 2025Source
  • Self-declaration of Quarterly ProgressSelf Declaration of Quarterly Progress Q2.pdf · uploaded 19 Nov 2025Source
  • Form 5 (FY 2024-2025)Form 5 Amulyam FY 2024-25.pdf · uploaded 13 Dec 2025Source
  • Withdrawal Update Form 15 Form 1 Amulyam Dec 2023.pdf · uploaded 23 Dec 2025Source
  • Withdrawal Update Form 25 Form 2 31-12-2023.pdf · uploaded 23 Dec 2025Source
  • Withdrawal Update Form 3Form 3 CA Certificate 31-12-2023.pdf · uploaded 23 Dec 2025Source
  • Withdrawal Update Form 113 Form 1 Amulyam Dec 2025.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 213 Form 2 31-12-2025.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 3Form 3 CA Certificate 31-12-2023.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 113 Form 1 Amulyam Dec 2025.pdf · uploaded 21 Apr 2026Source
  • Withdrawal Update Form 214 Form 2 31-03-2026.pdf · uploaded 21 Apr 2026Source
  • Withdrawal Update Form 316 Form 3 CA Certificate 31-03-2026.pdf · uploaded 21 Apr 2026Source
  • Form 2A (FY 2025-2026)Form-2A.PDF · uploaded 21 Apr 2026Source
  • Form 5 (FY 2025-2026)Form 5 Amulyam FY 2025-26.pdf · uploaded 21 Apr 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 6 Oct 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 6 Oct 2026Source
  • Withdrawal Update Form 3Form 3 CA.pdf · uploaded 6 Oct 2026Source

Technical

  • DocumentRevised plan-1.pdf · uploaded 3 Feb 2022Source
  • DocumentRevised plan-1.pdf · uploaded 3 Feb 2022Source
  • DocumentRevised plan-2.pdf · uploaded 3 Feb 2022Source
  • DocumentRevised plan-3_11zon.pdf · uploaded 3 Feb 2022Source
  • DocumentRevised plan-4_11zon.pdf · uploaded 3 Feb 2022Source
  • DocumentRevised plan-5_11zon.pdf · uploaded 3 Feb 2022Source
  • DocumentRevised plan-6_11zon.pdf · uploaded 3 Feb 2022Source
  • DocumentRevised plan-7_11zon.pdf · uploaded 3 Feb 2022Source
  • DocumentRevised plan-8_11zon.pdf · uploaded 3 Feb 2022Source
  • DocumentRevised plan-9_11zon.pdf · uploaded 3 Feb 2022Source
  • Others1 Declaration about Commencement Certificate.pdf · uploaded 22 Dec 2025Source
  • DocumentBP-275_Amm1_Amm3_CC Drawing New-1.pdf · uploaded 21 Apr 2026Source
  • DocumentBP-275_Amm1_Amm3_CC Drawing New-2.pdf · uploaded 21 Apr 2026Source
  • DocumentBP-275_Amm1_Amm3_CC Drawing New-3.pdf · uploaded 21 Apr 2026Source
  • DocumentBP-275_Amm1_Amm3_CC Drawing New-4.pdf · uploaded 21 Apr 2026Source
  • DocumentBP-275_Amm1_Amm3_CC Drawing New-5.pdf · uploaded 21 Apr 2026Source
  • DocumentBP-275_Amm1_Amm3_CC Drawing New-6.pdf · uploaded 21 Apr 2026Source
  • DocumentBP-275_Amm1_Amm3_CC Drawing New-8.pdf · uploaded 21 Apr 2026Source
  • DocumentBP-275_Amm1_Amm3_CC Drawing New-9.pdf · uploaded 21 Apr 2026Source
  • DocumentBP-275_Amm1_Amm3_CC Drawing New-7.pdf · uploaded 21 Apr 2026Source
  • Others14 Form 1 Amulyam Mar 2026.pdf · uploaded 21 Apr 2026Source
  • Others14 Form 2 31-03-2026.pdf · uploaded 21 Apr 2026Source
  • OthersForm 2A.pdf · uploaded 21 Apr 2026Source
  • OthersArchitect Declaration on Open Parking.pdf · uploaded 24 Apr 2026Source
  • OthersAffidavit on change in Land Area.pdf · uploaded 24 Apr 2026Source
  • OthersFinal Highlighted Drawing.pdf · uploaded 24 Apr 2026Source

Technical (Architect)

  • Document6 Form 1 Amulyam March 2024.pdf · uploaded 30 Nov 2024Source
  • Document7 Form 1 Amulyam June 2024.pdf · uploaded 30 Nov 2024Source
  • Document8 Form 1 Amulyam September 2024.pdf · uploaded 30 Nov 2024Source
  • Document9 Form 1 Amulyam Dec 2024.pdf · uploaded 1 Feb 2025Source
  • Document10 Form 1 Amulyam Mar 2025.pdf · uploaded 3 May 2025Source
  • DocumentForm 1.pdf · uploaded 6 Oct 2026Source

Technical (Engineer)

  • Document6 Form 2 31-03-2024.pdf · uploaded 30 Nov 2024Source
  • Document7 Form 2 30-06-2024.pdf · uploaded 30 Nov 2024Source
  • Document8 Form 2 30-09-2024.pdf · uploaded 30 Nov 2024Source
  • Document9 Form 2 31-12-2024.pdf · uploaded 1 Feb 2025Source
  • Document10 Form 2 31-03-2025.pdf · uploaded 3 May 2025Source
  • DocumentForm 2.pdf · uploaded 6 Oct 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 50/2, Survey No.53/1/A

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, 1 BHKT154 units in all
Address
Survey No.53/1/A & 50/2, Pale Budruk, Pale BudrukPIN 410208
Village
kolwadi, Panvel taluka
Land area for this project
5,540 sq m (59,632 sq ft)
Permissible built-up area
8,128 sq m (87,493 sq ft)
Sanctioned built-up area
7,906 sq m (85,103 sq ft)
Recreational open space
555 sq m (5,974 sq ft)
Designated bank account
171
Developed in phases
Yes

Survey, CTS, gat or plot numbers

50/2Survey No.53/1/A

Land as published on MahaRERA's project page

Survey No.53/1/A & 50/2

Boundaries

North
Gut No-65 and 66
South
Gut No-67 2and 67 4
East
Gut No-66 and Gut No-105 2
West
Road 55

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking154 units

69 of 154 units booked (45%), as the promoter reported to MahaRERA

1BHK · 119 units2BHK · 21 units1 BHKT · 14 units
BuildingTypeCarpet areaUnitsBooked
Wing A1BHK28.83 sq m · 310 sq ft75
Wing A1BHK33.21 sq m · 357 sq ft70
Wing A2BHK42.21 sq m · 454 sq ft76
Wing A2BHK42.69 sq m · 460 sq ft74
Wing A2BHK43.62 sq m · 470 sq ft74
Wing B1BHK28.25 sq m · 304 sq ft74
Wing B1BHK29.93 sq m · 322 sq ft74
Wing B1BHK32.07 sq m · 345 sq ft74
Show all 20 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Wing B1BHK32.08 sq m · 345 sq ft71
Wing B1BHK32.33 sq m · 348 sq ft140
Wing B1BHK37.72 sq m · 406 sq ft75
Wing B1BHK39.1 sq m · 421 sq ft75
Wing B1 BHKT39.29 sq m · 423 sq ft74
Wing C1BHK30.03 sq m · 323 sq ft73
Wing C1BHK30.36 sq m · 327 sq ft73
Wing C1BHK31.64 sq m · 341 sq ft73
Wing C1BHK32.32 sq m · 348 sq ft143
Wing C1BHK32.62 sq m · 351 sq ft75
Wing C1BHK32.82 sq m · 353 sq ft76
Wing C1 BHKT30.02 sq m · 323 sq ft70

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals5

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMeenakshi and Associates—
Chartered accountantRutuja Narsingh & Associates—
EngineerAbhijit Ashok Londhe—
EngineerAdharshila Consultants—
Registered real estate agentAmarantos Realtech LLP—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Pale Bk.

All 2 projects in Pale Bk. · Compare Amulyam with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology