Amulyam
Deedo IDDP-RAI-2DB9It is due for completion in Dec 2026, with no extension on record; no MahaRERA orders on record; 45% of its units are booked.
Pale Bk., Raigarh 410208 · by Space India Builders & Developer
Buying a flat here?
See every deed registered on it.
It is due for completion in Dec 2026, with no extension on record
- This projectRegistered 17 Mar 2022, completion promised 31 Dec 2026.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
3 buildings
Open a building to see every flat, floor by floor.
- Wing A7 floors · 35 units54% booked
- Wing B7 floors · 63 units43% booked
- Wing C7 floors · 56 units41% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52000034022
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52000034022 | 17 Mar 2022 | 31 Dec 2026 | 31 Dec 2026 | Space India Builders & Developer | Project page |
Documents125
1 document held by Deedo, 124 filings listed on MahaRERA's project page
Show all 125 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)Revised plan-1.pdf · uploaded 3 Feb 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentRevised plan-1.pdf · uploaded 3 Feb 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentRevised plan-2.pdf · uploaded 3 Feb 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentRevised plan-3_11zon.pdf · uploaded 3 Feb 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentRevised plan-4_11zon.pdf · uploaded 3 Feb 2022Source
- 5 Building Plan Approval / NA Order for plotted developmentRevised plan-5_11zon.pdf · uploaded 3 Feb 2022Source
- 6 Building Plan Approval / NA Order for plotted developmentRevised plan-6_11zon.pdf · uploaded 3 Feb 2022Source
- 7 Building Plan Approval / NA Order for plotted developmentRevised plan-7_11zon.pdf · uploaded 3 Feb 2022Source
- 8 Building Plan Approval / NA Order for plotted developmentRevised plan-8_11zon.pdf · uploaded 3 Feb 2022Source
- 9 Building Plan Approval / NA Order for plotted developmentRevised plan-9_11zon.pdf · uploaded 3 Feb 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 3 Feb 2022Source
- 1 Details of encumbrancesEncumbrance Letter.pdf · uploaded 7 Feb 2022Source
- 1 Declaration about Commencement CertificateForm D.pdf · uploaded 7 Feb 2022Source
- 1 Declaration in FORM BForm B Promoter Space India.pdf · uploaded 7 Feb 2022Source
- 1 CERSAI detailsAmulyam.pdf · uploaded 9 Feb 2022Source
- 1 Proforma of Allotment letterAMULYAM Final Draft Agreement.pdf · uploaded 10 Feb 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Space india.pdf · uploaded 22 Feb 2022Source
- 2 Proforma of Allotment letterAllotment Letter.pdf · uploaded 22 Feb 2022Source
- 1 OtherDocs 001.pdf · uploaded 7 Mar 2022Source
- 1 Copy of the legal title reportFinal Title - Space india_compressed.pdf · uploaded 10 Mar 2022Source
- 2 Copy of the legal title report1 Other.pdf · uploaded 14 Mar 2022Source
- 3 Proforma of Allotment letterAmulyam-Space India.pdf · uploaded 23 Jun 2022Source
- 1 Disclosure of sold/ booked inventory29 Amulyam.pdf · uploaded 15 Jul 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Pale RERA certifciate (5).pdf · uploaded 18 Jan 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Amulyam ENGINEER Certificate 31-12-2022.pdf · uploaded 18 Jan 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)2 Form 3 CA Certificate 30-09-2022.pdf · uploaded 18 Jan 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)3 Form 3 Amulyam CA Certificate 31-12-2022.pdf · uploaded 31 Jan 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 Form 1 Amulyam March 2023.pdf · uploaded 6 Oct 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 Form 1 Amulyam june 2023.pdf · uploaded 6 Oct 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Form 2 31-03-2023.pdf · uploaded 6 Oct 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 Form 2 30-06-2023.pdf · uploaded 6 Oct 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)3 CA Certificate 31-03-2023.pdf · uploaded 6 Oct 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)4 CA Certificate 30-06-2023.pdf · uploaded 6 Oct 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)4 Form 1 Amulyam Sep 2023.pdf · uploaded 3 Feb 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)5 Form 1 Amulyam Dec 2023.pdf · uploaded 3 Feb 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 Form 2 30-09-2023.pdf · uploaded 3 Feb 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)5 Form 2 31-12-2023.pdf · uploaded 3 Feb 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate 30-09-2023.pdf · uploaded 3 Feb 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate 31-12-2023.pdf · uploaded 3 Feb 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 Form 1 Amulyam March 2024.pdf · uploaded 30 Nov 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)7 Form 1 Amulyam June 2024.pdf · uploaded 30 Nov 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)8 Form 1 Amulyam September 2024.pdf · uploaded 30 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)8 CA Certificate 31-03-2024.pdf · uploaded 30 Nov 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)9 CA Certificate 30-06-2024.pdf · uploaded 30 Nov 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)10 CA Certificate 30-09-2024.pdf · uploaded 30 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 Form 2 31-03-2024.pdf · uploaded 30 Nov 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)7 Form 2 30-06-2024.pdf · uploaded 30 Nov 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)8 Form 2 30-09-2024.pdf · uploaded 30 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)9 Form 1 Amulyam Dec 2024.pdf · uploaded 1 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)11 Form 3 CA Certificate 31-12-2024.pdf · uploaded 1 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)9 Form 2 31-12-2024.pdf · uploaded 1 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)10 Form 1 Amulyam Mar 2025.pdf · uploaded 3 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)12 Form 3 CA Certificate 31-03-2025.pdf · uploaded 3 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)10 Form 2 31-03-2025.pdf · uploaded 3 May 2025Source
- Form 111 Form 1 Amulyam Jun 2025.pdf · uploaded 23 Jul 2025Source
- Form 211 Form 2 30-06-2025.pdf · uploaded 23 Jul 2025Source
- Form 313 Form 3 CA Certificate 30-06-2025.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked Inventory1 Disclosure of Sold-Booked Inventories.pdf · uploaded 23 Jul 2025Source
- Self-declaration of Quarterly ProgressSelf Declaration of Quarterly Progress.pdf · uploaded 23 Jul 2025Source
- Form 112 Form 1 Amulyam Sept 2025.pdf · uploaded 19 Nov 2025Source
- Form 212 Form 2 30-09-2025.pdf · uploaded 19 Nov 2025Source
- Form 314 Form 3 CA Certificate 30-09-2025.pdf · uploaded 19 Nov 2025Source
- Disclosure of Sold and Booked Inventory1 Disclosure of Sold-Booked Inventories - Amulyam.pdf · uploaded 19 Nov 2025Source
- Self-declaration of Quarterly ProgressSelf Declaration of Quarterly Progress Q2.pdf · uploaded 19 Nov 2025Source
- Form 5 (FY 2024-2025)Form 5 Amulyam FY 2024-25.pdf · uploaded 13 Dec 2025Source
- Withdrawal Update Form 15 Form 1 Amulyam Dec 2023.pdf · uploaded 23 Dec 2025Source
- Withdrawal Update Form 25 Form 2 31-12-2023.pdf · uploaded 23 Dec 2025Source
- Withdrawal Update Form 3Form 3 CA Certificate 31-12-2023.pdf · uploaded 23 Dec 2025Source
- Withdrawal Update Form 113 Form 1 Amulyam Dec 2025.pdf · uploaded 16 Apr 2026Source
- Withdrawal Update Form 213 Form 2 31-12-2025.pdf · uploaded 16 Apr 2026Source
- Withdrawal Update Form 3Form 3 CA Certificate 31-12-2023.pdf · uploaded 16 Apr 2026Source
- Withdrawal Update Form 113 Form 1 Amulyam Dec 2025.pdf · uploaded 21 Apr 2026Source
- Withdrawal Update Form 214 Form 2 31-03-2026.pdf · uploaded 21 Apr 2026Source
- Withdrawal Update Form 316 Form 3 CA Certificate 31-03-2026.pdf · uploaded 21 Apr 2026Source
- Form 2A (FY 2025-2026)Form-2A.PDF · uploaded 21 Apr 2026Source
- Form 5 (FY 2025-2026)Form 5 Amulyam FY 2025-26.pdf · uploaded 21 Apr 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 6 Oct 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 6 Oct 2026Source
- Withdrawal Update Form 3Form 3 CA.pdf · uploaded 6 Oct 2026Source
Technical
- DocumentRevised plan-1.pdf · uploaded 3 Feb 2022Source
- DocumentRevised plan-1.pdf · uploaded 3 Feb 2022Source
- DocumentRevised plan-2.pdf · uploaded 3 Feb 2022Source
- DocumentRevised plan-3_11zon.pdf · uploaded 3 Feb 2022Source
- DocumentRevised plan-4_11zon.pdf · uploaded 3 Feb 2022Source
- DocumentRevised plan-5_11zon.pdf · uploaded 3 Feb 2022Source
- DocumentRevised plan-6_11zon.pdf · uploaded 3 Feb 2022Source
- DocumentRevised plan-7_11zon.pdf · uploaded 3 Feb 2022Source
- DocumentRevised plan-8_11zon.pdf · uploaded 3 Feb 2022Source
- DocumentRevised plan-9_11zon.pdf · uploaded 3 Feb 2022Source
- Others1 Declaration about Commencement Certificate.pdf · uploaded 22 Dec 2025Source
- DocumentBP-275_Amm1_Amm3_CC Drawing New-1.pdf · uploaded 21 Apr 2026Source
- DocumentBP-275_Amm1_Amm3_CC Drawing New-2.pdf · uploaded 21 Apr 2026Source
- DocumentBP-275_Amm1_Amm3_CC Drawing New-3.pdf · uploaded 21 Apr 2026Source
- DocumentBP-275_Amm1_Amm3_CC Drawing New-4.pdf · uploaded 21 Apr 2026Source
- DocumentBP-275_Amm1_Amm3_CC Drawing New-5.pdf · uploaded 21 Apr 2026Source
- DocumentBP-275_Amm1_Amm3_CC Drawing New-6.pdf · uploaded 21 Apr 2026Source
- DocumentBP-275_Amm1_Amm3_CC Drawing New-8.pdf · uploaded 21 Apr 2026Source
- DocumentBP-275_Amm1_Amm3_CC Drawing New-9.pdf · uploaded 21 Apr 2026Source
- DocumentBP-275_Amm1_Amm3_CC Drawing New-7.pdf · uploaded 21 Apr 2026Source
- Others14 Form 1 Amulyam Mar 2026.pdf · uploaded 21 Apr 2026Source
- Others14 Form 2 31-03-2026.pdf · uploaded 21 Apr 2026Source
- OthersForm 2A.pdf · uploaded 21 Apr 2026Source
- OthersArchitect Declaration on Open Parking.pdf · uploaded 24 Apr 2026Source
- OthersAffidavit on change in Land Area.pdf · uploaded 24 Apr 2026Source
- OthersFinal Highlighted Drawing.pdf · uploaded 24 Apr 2026Source
Technical (Architect)
- Document6 Form 1 Amulyam March 2024.pdf · uploaded 30 Nov 2024Source
- Document7 Form 1 Amulyam June 2024.pdf · uploaded 30 Nov 2024Source
- Document8 Form 1 Amulyam September 2024.pdf · uploaded 30 Nov 2024Source
- Document9 Form 1 Amulyam Dec 2024.pdf · uploaded 1 Feb 2025Source
- Document10 Form 1 Amulyam Mar 2025.pdf · uploaded 3 May 2025Source
- DocumentForm 1.pdf · uploaded 6 Oct 2026Source
Technical (Engineer)
- Document6 Form 2 31-03-2024.pdf · uploaded 30 Nov 2024Source
- Document7 Form 2 30-06-2024.pdf · uploaded 30 Nov 2024Source
- Document8 Form 2 30-09-2024.pdf · uploaded 30 Nov 2024Source
- Document9 Form 2 31-12-2024.pdf · uploaded 1 Feb 2025Source
- Document10 Form 2 31-03-2025.pdf · uploaded 3 May 2025Source
- DocumentForm 2.pdf · uploaded 6 Oct 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 50/2, Survey No.53/1/A
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, 1 BHKT154 units in all
- Address
- Survey No.53/1/A & 50/2, Pale Budruk, Pale BudrukPIN 410208
- Village
- kolwadi, Panvel taluka
- Land area for this project
- 5,540 sq m (59,632 sq ft)
- Permissible built-up area
- 8,128 sq m (87,493 sq ft)
- Sanctioned built-up area
- 7,906 sq m (85,103 sq ft)
- Recreational open space
- 555 sq m (5,974 sq ft)
- Designated bank account
- 171
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Survey No.53/1/A & 50/2
Boundaries
- North
- Gut No-65 and 66
- South
- Gut No-67 2and 67 4
- East
- Gut No-66 and Gut No-105 2
- West
- Road 55
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking154 units
69 of 154 units booked (45%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing A | 1BHK | 28.83 sq m · 310 sq ft | 7 | 5 |
| Wing A | 1BHK | 33.21 sq m · 357 sq ft | 7 | 0 |
| Wing A | 2BHK | 42.21 sq m · 454 sq ft | 7 | 6 |
| Wing A | 2BHK | 42.69 sq m · 460 sq ft | 7 | 4 |
| Wing A | 2BHK | 43.62 sq m · 470 sq ft | 7 | 4 |
| Wing B | 1BHK | 28.25 sq m · 304 sq ft | 7 | 4 |
| Wing B | 1BHK | 29.93 sq m · 322 sq ft | 7 | 4 |
| Wing B | 1BHK | 32.07 sq m · 345 sq ft | 7 | 4 |
Show all 20 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing B | 1BHK | 32.08 sq m · 345 sq ft | 7 | 1 |
| Wing B | 1BHK | 32.33 sq m · 348 sq ft | 14 | 0 |
| Wing B | 1BHK | 37.72 sq m · 406 sq ft | 7 | 5 |
| Wing B | 1BHK | 39.1 sq m · 421 sq ft | 7 | 5 |
| Wing B | 1 BHKT | 39.29 sq m · 423 sq ft | 7 | 4 |
| Wing C | 1BHK | 30.03 sq m · 323 sq ft | 7 | 3 |
| Wing C | 1BHK | 30.36 sq m · 327 sq ft | 7 | 3 |
| Wing C | 1BHK | 31.64 sq m · 341 sq ft | 7 | 3 |
| Wing C | 1BHK | 32.32 sq m · 348 sq ft | 14 | 3 |
| Wing C | 1BHK | 32.62 sq m · 351 sq ft | 7 | 5 |
| Wing C | 1BHK | 32.82 sq m · 353 sq ft | 7 | 6 |
| Wing C | 1 BHKT | 30.02 sq m · 323 sq ft | 7 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Meenakshi and Associates | — |
| Chartered accountant | Rutuja Narsingh & Associates | — |
| Engineer | Abhijit Ashok Londhe | — |
| Engineer | Adharshila Consultants | — |
| Registered real estate agent | Amarantos Realtech LLP | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Pale Bk.
- Sai Sagar ResidencyRERA PR1270002500543
All 2 projects in Pale Bk. · Compare Amulyam with another project