Aarohi Complex
Deedo IDDP-RAI-H1SKMahaRERA shows it completed; no MahaRERA orders on record; 31% of its units are booked.
Navade, Raigarh 410208 · by Today Shyam Developers
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 15 Feb 2018, completion promised 10 Jul 2025.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52000015331
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52000015331 | 15 Feb 2018 | 10 Jul 2025 | 10 Jul 2025 | M/S Today Shyam Developers | Project page |
Documents110
1 document held by Deedo, 109 filings listed on MahaRERA's project page
Finance
- PAN CardAAROHI- PAN OF FIRM.PDF · uploaded 15 Nov 2017Source
Legal
- Legal Title reportAAROHI- TITLE REPORT.pdf · uploaded 15 Nov 2017Source
- Declaration Form BAAROHI- FORM B.PDF · uploaded 3 Feb 2018Source
- Declaration Form BFORM B.pdf · uploaded 11 Jan 2024Source
- Declaration Form B2 FORM B.pdf · uploaded 21 Mar 2025Source
- Declaration Form BFORM B-new.pdf · uploaded 21 Mar 2025Source
Migrated
- 1 PAN CardAAROHI- PAN OF FIRM.PDF · uploaded 15 Nov 2017Source
Show all 110 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportAAROHI- TITLE REPORT.pdf · uploaded 15 Nov 2017Source
- 1 Copy of Layout Approval (in case of layout)AAROHI- LAYOUT 1.pdf · uploaded 15 Nov 2017Source
- 2 Copy of Layout Approval (in case of layout)AAROHI- LAYOUT 2.pdf · uploaded 15 Nov 2017Source
- 3 Copy of Layout Approval (in case of layout)AAROHI- LAYOUT 3.pdf · uploaded 15 Nov 2017Source
- 4 Copy of Layout Approval (in case of layout)AAROHI- LAYOUT 4.pdf · uploaded 15 Nov 2017Source
- 5 Copy of Layout Approval (in case of layout)AAROHI- LAYOUT 5.pdf · uploaded 15 Nov 2017Source
- 1 Building Plan Approval (IOD)AAROHI- BUILDING IOD.pdf · uploaded 15 Nov 2017Source
- 1 Proforma of Allotment letterAAROHI- ALLOTMENT LETTER.pdf · uploaded 15 Nov 2017Source
- 2 Proforma of Allotment letterAAROHI- SALE AGREEMENT.pdf · uploaded 15 Nov 2017Source
- 1 Details of encumbrancesAAROHI- NO ENCUMBRANCE.PDF · uploaded 16 Nov 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentAAROHI- CC COPY.PDF · uploaded 30 Jan 2018Source
- 1 Declaration in FORM BAAROHI- FORM B.PDF · uploaded 3 Feb 2018Source
- 1 Certificates of CA (Form 3)AAROHI- CA CERTIFICATE.PDF · uploaded 7 Feb 2018Source
- 1 Certificates of CA (Form 5)FORM 5- TODAY SHYAM DEVLP.PDF · uploaded 30 Sep 2018Source
- 2 Certificates of CA (Form 5)FORM 5.pdf · uploaded 25 Oct 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)TODAY SHYAM FORM 5_compressed.pdf · uploaded 21 Jan 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5.PDF · uploaded 31 Dec 2021Source
- 1 Disclosure of sold/ booked inventoryINVENTORY LETTER.pdf · uploaded 29 Jan 2022Source
- 2 a Details of encumbrances concerned to FinanceDeclaration.pdf · uploaded 24 Nov 2022Source
- 1 b Details of encumbrances concerned to LegalDeclaration.pdf · uploaded 24 Nov 2022Source
- 1 Declaration about Commencement CertificateDeclaration of CC.pdf · uploaded 24 Nov 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 (1).pdf · uploaded 24 Nov 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Today Shyam (3).PDF · uploaded 24 Nov 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration of Sprate bank (2).pdf · uploaded 24 Nov 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2.pdf · uploaded 1 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)19-20 Form 2A.pdf · uploaded 1 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)20-21 Form 2A.pdf · uploaded 1 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)21-22 Form 2A.pdf · uploaded 1 Feb 2023Source
- 2 Certificates of CA (Form 3)FORM-3-nEW.pdf · uploaded 1 Feb 2023Source
- 2 Disclosure of sold/ booked inventorysold inventory-dec 22.pdf · uploaded 1 Mar 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (for RERA)TODAY SHYAM.pdf · uploaded 15 Apr 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2.pdf · uploaded 15 Apr 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 with sign.pdf · uploaded 30 Sep 2023Source
- 2 Declaration in FORM BFORM B.pdf · uploaded 11 Jan 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 11 Jan 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 11 Jan 2024Source
- 3 Disclosure of sold/ booked inventoryInventory sold letter.pdf · uploaded 11 Jan 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 19 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 19 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)11zon_merged-Files (1).pdf · uploaded 19 Jan 2024Source
- 4 Disclosure of sold/ booked inventoryInventory sold letter.pdf · uploaded 19 Jan 2024Source
- 3 Certificates of CA (Form 3)FORM 3 with sign.pdf · uploaded 19 Jan 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (for RERA)TODAY SHYAM.pdf · uploaded 25 Apr 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Arohi Complex ---- EC 03-04-24.pdf · uploaded 25 Apr 2024Source
- 5 Disclosure of sold/ booked inventorysold inevntory.pdf · uploaded 25 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.pdf · uploaded 7 May 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 10 Jul 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 10 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Final Form 1.pdf · uploaded 19 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Final FORM 2.pdf · uploaded 22 Oct 2024Source
- 2 Certificates of CA (Form 3)Final FORM 3_.pdf · uploaded 27 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Final FORM 5.pdf · uploaded 27 Nov 2024Source
- 3 Certificates of CA (Form 3)Final Form 3.pdf · uploaded 16 Dec 2024Source
- 4 Certificates of CA (Form 3)Final Form 3.pdf · uploaded 16 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FInal FORM 1.pdf · uploaded 21 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FInal FORM 2.pdf · uploaded 21 Jan 2025Source
- 1 Certificates of CA (Form 3)Final form 3_.pdf · uploaded 29 Jan 2025Source
- 1 Disclosure of sold/ booked inventory3 Inventory Sold Letter.pdf · uploaded 29 Jan 2025Source
- 1 Declaration in FORM B2 FORM B.pdf · uploaded 21 Mar 2025Source
- 2 Declaration in FORM BFORM B-new.pdf · uploaded 21 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Final FORM 1.pdf · uploaded 23 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Final FORM 2.pdf · uploaded 23 Apr 2025Source
- 1 Certificates of CA (Form 3)Final FORM 3.pdf · uploaded 25 Apr 2025Source
- Form 1Form 1.pdf · uploaded 26 May 2025Source
- Form 1Form 1.pdf · uploaded 26 May 2025Source
- Form 1FORM 1.pdf · uploaded 26 May 2025Source
- Form 1Final Form 1.pdf · uploaded 26 May 2025Source
- Form 1Final FORM 1.pdf · uploaded 26 May 2025Source
- Form 2Form 2.pdf · uploaded 26 May 2025Source
- Form 2FORM 2.pdf · uploaded 26 May 2025Source
- Form 2FORM 2.pdf · uploaded 26 May 2025Source
- Form 2Final FORM 2.pdf · uploaded 26 May 2025Source
- Form 2Final FORM 2.pdf · uploaded 26 May 2025Source
- Form 3FORM 3 with sign.pdf · uploaded 26 May 2025Source
- Form 3Final FORM 3.pdf · uploaded 26 May 2025Source
- Form 3Final Form 3.pdf · uploaded 26 May 2025Source
- Form 3Final Form 3.pdf · uploaded 26 May 2025Source
- Form 3Final FORM 3.pdf · uploaded 26 May 2025Source
- Disclosure of Sold and Booked InventoryInventory sold letter.pdf · uploaded 26 May 2025Source
- Disclosure of Sold and Booked Inventorysold inevntory.pdf · uploaded 26 May 2025Source
- Occupational CertificateOC COPY.pdf · uploaded 28 Jul 2025Source
- Occupational CertificateForm 4.pdf · uploaded 2 Aug 2025Source
- Form 5 (FY 2023-2024)Final FORM 5.pdf · uploaded 17 Nov 2025Source
- Form 5 (FY 2024-2025)Form 5..pdf · uploaded 19 Nov 2025Source
- Withdrawal Update Form 1Form1.pdf · uploaded 21 May 2026Source
- Withdrawal Update Form 2FORM2.pdf · uploaded 21 May 2026Source
- Withdrawal Update Form 3Form3..pdf · uploaded 21 May 2026Source
- Occupational CertificateOC Mail.pdf · uploaded 21 May 2026Source
Technical
- DocumentAAROHI- LAYOUT 1.pdf · uploaded 15 Nov 2017Source
- DocumentAAROHI- LAYOUT 2.pdf · uploaded 15 Nov 2017Source
- DocumentAAROHI- LAYOUT 3.pdf · uploaded 15 Nov 2017Source
- DocumentAAROHI- LAYOUT 4.pdf · uploaded 15 Nov 2017Source
- DocumentAAROHI- LAYOUT 5.pdf · uploaded 15 Nov 2017Source
- DocumentAAROHI- BUILDING IOD.pdf · uploaded 15 Nov 2017Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel PLOT NO 156
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- Wing a flat 1, Wing a flat 10, Wing a flat 11, Wing a flat 2, Wing a flat 3, Wing a flat 4, Wing a flat 5, Wing a flat 6, Wing a flat 7, Wing a flat 8, Wing a flat 9, Wing a shop 1, Wing a shop 2, Wing a shop 3, Wing a shop 4, Wing a shop 5, Wing b flat 1, Wing b flat 10, Wing b flat 11, Wing b flat 12, Wing b flat 13, Wing b flat 14, Wing b flat 15, Wing b flat 16, Wing b flat 17, Wing b flat 18, Wing b flat 19, Wing b flat 2, Wing b flat 20, Wing b flat 21, Wing b flat 22, Wing b flat 23, Wing b flat 3, Wing b flat 4, Wing b flat 5, Wing b flat 6, Wing b flat 7, Wing b flat 8, Wing b flat 9, Wing b shop 1, Wing b shop 2, Wing b shop 4, Wing b shop 5147 units in all
- Address
- Plot No 156, Sector Phase II, Navi MumbaiPIN 410208
- Village
- Navade, Panvel taluka
- Location
- 19.05176, 73.10293
- Land area for this project
- 2,448 sq m (26,351 sq ft)
- Permissible built-up area
- 3,666 sq m (39,458 sq ft)
- Sanctioned built-up area
- 3,666 sq m (39,458 sq ft)
- Designated bank account
- 21
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
PLOT NO 156
Boundaries
- North
- Plot No 158 And 152
- South
- Plot No 155
- East
- Plot No 153
- West
- 15 Mtr Wide Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking147 units
45 of 147 units booked (31%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Wing a flat 1 | 16.38 sq m · 176 sq ft | 1 | 1 |
| Wing a flat 10 | 31.67 sq m · 341 sq ft | 1 | 0 |
| Wing a flat 11 | 36.52 sq m · 393 sq ft | 6 | 2 |
| Wing a flat 2 | 17.13 sq m · 184 sq ft | 1 | 0 |
| Wing a flat 3 | 17.91 sq m · 193 sq ft | 1 | 0 |
| Wing a flat 4 | 18.52 sq m · 199 sq ft | 1 | 0 |
| Wing a flat 5 | 22.55 sq m · 243 sq ft | 6 | 2 |
| Wing a flat 6 | 23.31 sq m · 251 sq ft | 7 | 6 |
Show all 43 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Wing a flat 7 | 23.78 sq m · 256 sq ft | 6 | 1 |
| Wing a flat 8 | 24.21 sq m · 261 sq ft | 6 | 0 |
| Wing a flat 9 | 24.72 sq m · 266 sq ft | 6 | 0 |
| Wing a shop 1 | 10.2 sq m · 110 sq ft | 1 | 1 |
| Wing a shop 2 | 10.53 sq m · 113 sq ft | 2 | 2 |
| Wing a shop 3 | 10.73 sq m · 115 sq ft | 2 | 1 |
| Wing a shop 4 | 12.01 sq m · 129 sq ft | 2 | 1 |
| Wing a shop 5 | 15.6 sq m · 168 sq ft | 1 | 1 |
| Wing b flat 1 | 17.03 sq m · 183 sq ft | 1 | 0 |
| Wing b flat 10 | 21.96 sq m · 236 sq ft | 1 | 0 |
| Wing b flat 11 | 23.34 sq m · 251 sq ft | 6 | 1 |
| Wing b flat 12 | 23.58 sq m · 254 sq ft | 6 | 0 |
| Wing b flat 13 | 23.64 sq m · 254 sq ft | 6 | 0 |
| Wing b flat 14 | 23.78 sq m · 256 sq ft | 6 | 3 |
| Wing b flat 15 | 23.95 sq m · 258 sq ft | 12 | 1 |
| Wing b flat 16 | 24.23 sq m · 261 sq ft | 6 | 3 |
| Wing b flat 17 | 24.63 sq m · 265 sq ft | 7 | 4 |
| Wing b flat 18 | 24.72 sq m · 266 sq ft | 6 | 2 |
| Wing b flat 19 | 26.1 sq m · 281 sq ft | 6 | 2 |
| Wing b flat 2 | 17.06 sq m · 184 sq ft | 1 | 0 |
| Wing b flat 20 | 27.02 sq m · 291 sq ft | 6 | 2 |
| Wing b flat 21 | 28.32 sq m · 305 sq ft | 6 | 2 |
| Wing b flat 22 | 31.93 sq m · 344 sq ft | 1 | 0 |
| Wing b flat 23 | 32.86 sq m · 354 sq ft | 6 | 4 |
| Wing b flat 3 | 17.13 sq m · 184 sq ft | 1 | 0 |
| Wing b flat 4 | 17.38 sq m · 187 sq ft | 2 | 0 |
| Wing b flat 5 | 17.65 sq m · 190 sq ft | 1 | 0 |
| Wing b flat 6 | 18.01 sq m · 194 sq ft | 1 | 0 |
| Wing b flat 7 | 18.17 sq m · 196 sq ft | 1 | 0 |
| Wing b flat 8 | 18.94 sq m · 204 sq ft | 1 | 0 |
| Wing b flat 9 | 20.24 sq m · 218 sq ft | 1 | 0 |
| Wing b shop 1 | 8.39 sq m · 90 sq ft | 2 | 0 |
| Wing b shop 2 | 9.56 sq m · 103 sq ft | 1 | 1 |
| Wing b shop 4 | 10.73 sq m · 115 sq ft | 1 | 1 |
| Wing b shop 5 | 15.6 sq m · 168 sq ft | 2 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Dharmesh Bhavlani | — |
| Chartered accountant | Ca Hitesh M Shah | — |
| Chartered accountant | Ca Jyoti B Gajra | — |
| Engineer | Samarth Agrawal Pradeep Kumar Agarwal | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Navade
- Shree NiketanRERA P52000080051
- Maitri ResidencyRERA P52000054260
- Sai Vishwa ResidencyRERA P52000029617
- Maya ResidencyRERA P52000027163
- Shiv Shankar CornerRERA P52000026879
- Shiv Shankar TulipRERA P52000025766
- Pranjal ResidencyRERA P52000023985
- Sai KrupaRERA P52000022396
All 15 projects in Navade · Compare Aarohi Complex with another project