Residential / Group Housing · 1 building · 102 unitsRERA P52000055069

Sapphire

Deedo IDDP-RAI-6863

Completion was pushed back 4 months, to Oct 2028; no MahaRERA orders on record; 35% of its units are booked.

Kharghar, Raigarh 410210 · by Ak Hitech Associates

DeliveryExtended 4 moPromised Jun 2028 · now due Oct 2028RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales35% booked36 of 102 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Oct 2028

  • This projectRegistered 29 Feb 2024, completion promised 30 Jun 2028, revised to 30 Oct 2028.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52000055069
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5200005506929 Feb 202430 Jun 202830 Oct 2028Ak Hitech AssociatesProject page
Documents130

1 document held by Deedo, 129 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPan Card A k hitech asso.pdf · uploaded 5 Jan 2024Source
  • OthersDisclosure of Sold Unsold- Sapphire.pdf · uploaded 19 Dec 2025Source

Legal

  • Legal Title reportilovepdf_merged (13)_compressed.pdf · uploaded 26 Jan 2024Source
  • Declaration Form BAffidavit Cum Declaration_Signed NEW.pdf · uploaded 12 Feb 2024Source
  • Other – LegalLease Agreement.pdf · uploaded 13 Feb 2024Source
  • Other – LegalTripartite Agreement_compressed.pdf · uploaded 13 Feb 2024Source

Migrated

  • 1 PAN CardPan Card A k hitech asso.pdf · uploaded 5 Jan 2024Source
Show all 130 documentsShow fewer documents

Migrated

  • 1 Copy of Layout Approval (in case of layout)CC DRW-1.pdf · uploaded 5 Jan 2024Source
  • 2 Copy of Layout Approval (in case of layout)CC DRW-2.pdf · uploaded 5 Jan 2024Source
  • 3 Copy of Layout Approval (in case of layout)CC DRW-3.pdf · uploaded 5 Jan 2024Source
  • 4 Copy of Layout Approval (in case of layout)CC DRW-4.pdf · uploaded 5 Jan 2024Source
  • 5 Copy of Layout Approval (in case of layout)CC DRW-5.pdf · uploaded 5 Jan 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentCC DRW-1.pdf · uploaded 5 Jan 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentCC DRW-2.pdf · uploaded 5 Jan 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentCC DRW-3.pdf · uploaded 5 Jan 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentCC DRW-4.pdf · uploaded 5 Jan 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentCC DRW-5.pdf · uploaded 5 Jan 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC COPY.pdf · uploaded 5 Jan 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT'S CERTIFICATE.pdf · uploaded 5 Jan 2024Source
  • 1 Copy of the legal title reportilovepdf_merged (13)_compressed.pdf · uploaded 26 Jan 2024Source
  • 1 a Details of encumbrances concerned to FinanceDECLARATION FINANCE.pdf · uploaded 30 Jan 2024Source
  • 2 a Details of encumbrances concerned to FinanceDECLARATION LEGAL.pdf · uploaded 30 Jan 2024Source
  • 1 b Details of encumbrances concerned to LegalDECLARATION FINANCE.pdf · uploaded 30 Jan 2024Source
  • 2 b Details of encumbrances concerned to LegalDECLARATION LEGAL.pdf · uploaded 30 Jan 2024Source
  • 1 Declaration about Commencement CertificateDECLARATION ABOUT CC.pdf · uploaded 30 Jan 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate (2).pdf · uploaded 30 Jan 2024Source
  • 1 CERSAI detailsDECLARATION CERSAI.pdf · uploaded 30 Jan 2024Source
  • 1 Disclosure of Interest in Other Real Estate Organizationsilovepdf_merged (4).pdf · uploaded 30 Jan 2024Source
  • 1 Proforma of Allotment letterDAL.pdf · uploaded 30 Jan 2024Source
  • 1 Deviation Report with respect to Allotment letterDEVIATION DAL.pdf · uploaded 30 Jan 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA CERTIFICATE_Signed01.pdf · uploaded 31 Jan 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameA K Hitech Associates.pdf · uploaded 31 Jan 2024Source
  • 1 Other – Technical240207063223_0001.pdf · uploaded 9 Feb 2024Source
  • 1 Declaration in FORM BAffidavit Cum Declaration_Signed NEW.pdf · uploaded 12 Feb 2024Source
  • 1 Other – LegalLease Agreement.pdf · uploaded 13 Feb 2024Source
  • 2 Other – LegalTripartite Agreement_compressed.pdf · uploaded 13 Feb 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentcc verification mail.pdf · uploaded 21 Feb 2024Source
  • 1 Proforma of Agreement for sale1 Proforma of Agreement for sale (6) (1).pdf · uploaded 21 Feb 2024Source
  • 1 Deviation Report with respect to model copy of AgreementAK Hitech Associates_Declaration_compressed.pdf · uploaded 21 Feb 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June.pdf · uploaded 5 Dec 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sept.pdf · uploaded 5 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 Nov.pdf · uploaded 5 Dec 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 2024.pdf · uploaded 9 Dec 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sep 2024.pdf · uploaded 9 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_compressed.pdf · uploaded 9 Dec 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_compressed.pdf · uploaded 9 Dec 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form -2A_compressed.pdf · uploaded 9 Dec 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate(Sapphire)-Final.pdf · uploaded 12 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Dec 24 [Final].pdf · uploaded 20 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_compressed.pdf · uploaded 20 Jan 2025Source
  • 1 Disclosure of sold/ booked inventorySapphire Disclosure.pdf · uploaded 21 Jan 2025Source
  • 2 Disclosure of sold/ booked inventorySold Booked - Dec 24_compressed (1).pdf · uploaded 1 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Sep 24 [Final]_compressed.pdf · uploaded 24 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Sapphire Form 2_compressed.pdf · uploaded 19 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sapphire Form 1.pdf · uploaded 21 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sapphire Form Mar 25 final.pdf · uploaded 3 May 2025Source
  • 1 Disclosure of sold/ booked inventorySold Book 25_compressed.pdf · uploaded 8 May 2025Source
  • Form 1Form 1 Sep 2024.pdf · uploaded 19 Aug 2025Source
  • Form 2Form 2 - Sep 24 [Final]_compressed.pdf · uploaded 19 Aug 2025Source
  • Form 3FORM 3 SEPT 24.pdf · uploaded 19 Aug 2025Source
  • Disclosure of Sold and Booked InventorySapphire Disclosure.pdf · uploaded 19 Aug 2025Source
  • Form 1Form 1 - Dec 24 [Final].pdf · uploaded 19 Aug 2025Source
  • Form 2Form 2_compressed.pdf · uploaded 19 Aug 2025Source
  • Form 3FORM 3 DEC 24.pdf · uploaded 19 Aug 2025Source
  • Disclosure of Sold and Booked InventorySold Booked - Dec 24_compressed (1).pdf · uploaded 19 Aug 2025Source
  • Form 1Sapphire Form 1.pdf · uploaded 19 Aug 2025Source
  • Form 2Sapphire Form 2_compressed.pdf · uploaded 19 Aug 2025Source
  • Form 3FORM 3 MARCH 25.pdf · uploaded 19 Aug 2025Source
  • Disclosure of Sold and Booked InventorySold Book 25_compressed.pdf · uploaded 19 Aug 2025Source
  • Withdrawal Update Form 1FORM 1 Sapphire with Sign and Stamp (1).pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 2Form 2 June 2025.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 3Form 3_Sapphire_Signed.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 1FORM 1 Sapphire with Sign and Stamp (1).pdf · uploaded 23 Aug 2025Source
  • Withdrawal Update Form 2Form 2 June 2025.pdf · uploaded 23 Aug 2025Source
  • Withdrawal Update Form 3Form 3_Sapphire_Signed.pdf · uploaded 23 Aug 2025Source
  • Withdrawal Update Form 1FORM 1 Sapphire with Sign and Stamp (1).pdf · uploaded 25 Aug 2025Source
  • Withdrawal Update Form 1FORM 1 Sapphire with Sign and Stamp (1).pdf · uploaded 25 Aug 2025Source
  • Withdrawal Update Form 2Form 2 June 2025.pdf · uploaded 25 Aug 2025Source
  • Withdrawal Update Form 2Form 2 June 2025.pdf · uploaded 25 Aug 2025Source
  • Withdrawal Update Form 3Form 3_Sapphire_Signed.pdf · uploaded 25 Aug 2025Source
  • Withdrawal Update Form 3Form 3_Sapphire_Signed.pdf · uploaded 25 Aug 2025Source
  • Form 5 (FY 2024-2025)Form 5_Sapphire_FY2024-25.pdf · uploaded 31 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Sapphire 30-09-2025.pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 2Form 2 Sapphire..pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 3Form 3_Sapphire_30-09-2025_Scanned.pdf · uploaded 24 Nov 2025Source
  • Form 2A (FY 2024-2025)Sapphire Form 2A 2024-25.pdf · uploaded 29 Dec 2025Source
  • Withdrawal Update Form 1Sapphire - Form 1.pdf · uploaded 18 Feb 2026Source
  • Withdrawal Update Form 2Sapphire - Form 2.pdf · uploaded 18 Feb 2026Source
  • Withdrawal Update Form 3Form 3 - Sapphire Q3.pdf · uploaded 18 Feb 2026Source
  • Withdrawal Update Form 1Sapphire - Form 1.pdf · uploaded 20 Mar 2026Source
  • Withdrawal Update Form 2Sapphire - Form 2.pdf · uploaded 20 Mar 2026Source
  • Withdrawal Update Form 3Form 3 - Sapphire Q3.pdf · uploaded 20 Mar 2026Source
  • Withdrawal Update Form 1FORM 1 - SAPPHIRE - March Quarter.pdf · uploaded 8 May 2026Source
  • Withdrawal Update Form 2FORM 2 - SAPPHIRE - March Quarter.pdf · uploaded 8 May 2026Source
  • Withdrawal Update Form 3FORM 3 - SAPPHIRE - March Quarter.pdf · uploaded 8 May 2026Source
  • Withdrawal Update Form 1Form 1 - Sapphire - June Quarter.pdf · uploaded 29 Jul 2026Source
  • Withdrawal Update Form 2Form 2 - Sapphire - June Quarter.pdf · uploaded 29 Jul 2026Source
  • Withdrawal Update Form 3Form 3 - Sapphire - June Quarter.pdf · uploaded 29 Jul 2026Source
  • Withdrawal Update Form 1Form 1 -Sapphire -30-07-2026.pdf · uploaded 31 Jul 2026Source
  • Withdrawal Update Form 2Form 2 - Sapphire - June Quarter.pdf · uploaded 31 Jul 2026Source
  • Withdrawal Update Form 3Form 3 - Sapphire - June Quarter.pdf · uploaded 31 Jul 2026Source
  • Withdrawal Update Form 1Form 1 -Sapphire -30-07-2026.pdf · uploaded 22 Aug 2026Source
  • Withdrawal Update Form 2Form 2 - Sapphire - June Quarter.pdf · uploaded 22 Aug 2026Source
  • Withdrawal Update Form 3Form 3 - Sapphire - June Quarter.pdf · uploaded 22 Aug 2026Source
  • Form 2A (FY 2025-2026)Sapphire - FORM 2A.pdf · uploaded 7 Sep 2026Source
  • Form 5 (FY 2025-2026)Sapphire - Form 5 2025-26.pdf · uploaded 15 Sep 2026Source

Technical

  • DocumentCC DRW-5.pdf · uploaded 5 Jan 2024Source
  • DocumentCC DRW-1.pdf · uploaded 5 Jan 2024Source
  • DocumentCC DRW-2.pdf · uploaded 5 Jan 2024Source
  • DocumentCC DRW-3.pdf · uploaded 5 Jan 2024Source
  • DocumentCC DRW-4.pdf · uploaded 5 Jan 2024Source
  • DocumentCC DRW-5.pdf · uploaded 5 Jan 2024Source
  • DocumentCC DRW-1.pdf · uploaded 5 Jan 2024Source
  • DocumentCC DRW-2.pdf · uploaded 5 Jan 2024Source
  • DocumentCC DRW-3.pdf · uploaded 5 Jan 2024Source
  • DocumentCC DRW-4.pdf · uploaded 5 Jan 2024Source
  • Other – Technical240207063223_0001.pdf · uploaded 9 Feb 2024Source

Technical (Architect)

  • DocumentForm 1 June.pdf · uploaded 5 Dec 2024Source
  • DocumentForm 1 Sept.pdf · uploaded 5 Dec 2024Source
  • DocumentForm 1 June 2024.pdf · uploaded 9 Dec 2024Source
  • DocumentForm 1 Sep 2024.pdf · uploaded 9 Dec 2024Source
  • DocumentForm 1 - Dec 24 [Final].pdf · uploaded 20 Jan 2025Source
  • DocumentSapphire Form 1.pdf · uploaded 21 Apr 2025Source
  • DocumentForm 1 -Sapphire -30-07-2026.pdf · uploaded 31 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2_compressed.pdf · uploaded 9 Dec 2024Source
  • DocumentForm 2_compressed.pdf · uploaded 9 Dec 2024Source
  • DocumentForm 2 - Sep 24 [Final]_compressed.pdf · uploaded 24 Feb 2025Source
  • DocumentSapphire Form 2_compressed.pdf · uploaded 19 Apr 2025Source
  • DocumentForm 2 - Sapphire - June Quarter.pdf · uploaded 29 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel PLOT NO. 1, SECTOR 34 C

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
2BHK, 3BHK, 4BHK, Shop102 units in all
Address
Plot No. 1, Sector 34 C, Kharghar Road, Navi MumbaiPIN 410210
Village
Kharghar, Panvel taluka
Land area for this project
2,050 sq m (22,064 sq ft)
Permissible built-up area
11,521 sq m (1,24,009 sq ft)
Sanctioned built-up area
11,521 sq m (1,24,009 sq ft)
Designated bank account
220
Developed in phases
No

Survey, CTS, gat or plot numbers

PLOT NO. 1SECTOR 34 C

Land as published on MahaRERA's project page

PLOT NO. 1 , SECTOR 34 C

Boundaries

North
Plot No 32
South
Plot No 18 And 19
East
3 Mt Wide Pathway
West
Plot No 02

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking102 units

36 of 102 units booked (35%), as the promoter reported to MahaRERA

2BHK · 32 units3BHK · 46 units4BHK · 16 unitsShop · 8 units
TypeCarpet areaUnitsBooked
2BHK55.67 sq m · 599 sq ft1812
2BHK58.08 sq m · 625 sq ft145
3BHK83.74 sq m · 901 sq ft4617
4BHK127.21 sq m · 1,369 sq ft162
Shop45.51 sq m · 490 sq ft20
Shop45.52 sq m · 490 sq ft20
Shop45.75 sq m · 492 sq ft40

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
Chartered accountantCA Rishabh Lodaya—
Chartered accountantSandesh Ghodke—
EngineerRutu Kapupara—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Kharghar

All 145 projects in Kharghar · Compare Sapphire with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology