Panvel Pride Phase 2
Deedo IDDP-RAI-G7P2Completion was pushed back 4 months, to Apr 2028; no MahaRERA orders on record; 0% of its units are booked.
Kevale, Raigarh 410206 · by Elysian Spaces Private Limited
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2028
- This projectRegistered 14 Sep 2021, completion promised 31 Dec 2027, revised to 30 Apr 2028.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52000030827
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52000030827 | 14 Sep 2021 | 31 Dec 2027 | 30 Apr 2028 | Elysian Spaces Private Limited | Project page |
Documents163
1 document held by Deedo, 162 filings listed on MahaRERA's project page
Finance
- PAN CardPan Card Elysian.pdf · uploaded 3 Sep 2021Source
Legal
- Declaration Form BForm B-min.pdf · uploaded 3 Sep 2021Source
- Legal Title reportFormat A-min.pdf · uploaded 9 Sep 2021Source
- Legal Title reportTitle Report_compressed.pdf · uploaded 9 Sep 2021Source
- DocumentForm 2 June 2025.pdf · uploaded 6 Aug 2025Source
- OthersForm 2 (1).pdf · uploaded 11 Oct 2025Source
Migrated
- 1 PAN CardPan Card Elysian.pdf · uploaded 3 Sep 2021Source
Show all 163 documentsShow fewer documents
Migrated
- 1 Details of encumbrancesNo Encumbrances Certificate-min.pdf · uploaded 3 Sep 2021Source
- 1 Declaration in FORM BForm B-min.pdf · uploaded 3 Sep 2021Source
- 1 Declaration about Commencement CertificateForm D.pdf · uploaded 4 Sep 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 4 Sep 2021Source
- 1 Proforma of Allotment letterDraft Agreement Kevale PSH - II_compressed.pdf · uploaded 4 Sep 2021Source
- 2 Proforma of Allotment letterDraft Allottment kevale Psh - II-1.pdf · uploaded 4 Sep 2021Source
- 1 Copy of the legal title reportFormat A-min.pdf · uploaded 9 Sep 2021Source
- 2 Copy of the legal title reportTitle Report_compressed.pdf · uploaded 9 Sep 2021Source
- 1 Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 9 Sep 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentApproval Plan.pdf · uploaded 9 Sep 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentCIDCO_NAINA_BP-00531_2021_CCLetter.pdf · uploaded 9 Sep 2021Source
- 1 CERSAI detailsCERSAI certificate.pdf · uploaded 13 Jan 2023Source
- 1 Other – Technicalrera disclosure.pdf · uploaded 13 Jan 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 19 Jan 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Ely form 2A Dec 2022_.pdf · uploaded 7 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5.pdf · uploaded 27 Mar 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 23.pdf · uploaded 10 May 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 22 May 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 24 May 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 24 May 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)From 5.pdf · uploaded 29 Sep 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM - 1 Sep 23.pdf · uploaded 14 Oct 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 14 Oct 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 14 Oct 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_JAN2024.pdf · uploaded 13 Jan 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_JAN2024.pdf · uploaded 11 May 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_JULY2K24.pdf · uploaded 5 Jul 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_JULY2K24 2.pdf · uploaded 11 Jul 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 25 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A jun 24.pdf · uploaded 25 Jul 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectDisclosure Of Sold Unsold.pdf · uploaded 25 Jul 2024Source
- 1 Disclosure of sold/ booked inventoryDisclosure Of Sold Unsold.pdf · uploaded 25 Jul 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 25 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5.pdf · uploaded 25 Jul 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM1_Dec 24.pdf · uploaded 18 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 .pdf · uploaded 18 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryDiscloser of Sold Flat1.pdf · uploaded 18 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 _c.pdf · uploaded 24 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Ely .pdf · uploaded 24 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 LATEST.pdf · uploaded 24 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)E Form 1.pdf · uploaded 17 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 17 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_.pdf · uploaded 17 May 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)Elys Form 5 .pdf · uploaded 17 May 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold.pdf · uploaded 19 May 2025Source
- Self-declaration of Quarterly ProgressUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 1Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 2Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 3Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 1Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 2Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 3Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 1Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 2Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 3form 3 March 22.pdf · uploaded 13 Oct 2025Source
- Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 1Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 2Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 3Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 1Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 2Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 3Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 1form -1 Dec 22.pdf · uploaded 13 Oct 2025Source
- Form 2form 2A Dec 2022_.pdf · uploaded 13 Oct 2025Source
- Form 3Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 1form - 1 March 23.pdf · uploaded 13 Oct 2025Source
- Form 2form 2 March 23.pdf · uploaded 13 Oct 2025Source
- Form 3form 3 March 23.pdf · uploaded 13 Oct 2025Source
- Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 1Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 2Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 3form 3 Jun 23.pdf · uploaded 13 Oct 2025Source
- Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 1form - 1 Sep 23.pdf · uploaded 13 Oct 2025Source
- Form 2Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 3form 3 Sep 23.pdf · uploaded 13 Oct 2025Source
- Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 1form - 1 Dec 23 .pdf · uploaded 13 Oct 2025Source
- Form 2Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 3Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 1form - 1 March 24.pdf · uploaded 13 Oct 2025Source
- Form 2Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 3Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 1Form - 1 Jun 24 .pdf · uploaded 13 Oct 2025Source
- Form 2form 2 Jun 24 .pdf · uploaded 13 Oct 2025Source
- Form 3form 3 Jun 24.pdf · uploaded 13 Oct 2025Source
- Disclosure of Sold and Booked InventoryDisclosure Of Sold Unsold Jun 24.pdf · uploaded 13 Oct 2025Source
- Form 1Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 2Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 3Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
- Form 1form - 1 Dec 24.pdf · uploaded 13 Oct 2025Source
- Form 2form 2 Dec 24.pdf · uploaded 13 Oct 2025Source
- Form 3form 3 Dec 24 .pdf · uploaded 13 Oct 2025Source
- Disclosure of Sold and Booked InventoryDiscloser of Sold Flat Dec 24.pdf · uploaded 13 Oct 2025Source
- Form 1form -1 March 25.pdf · uploaded 13 Oct 2025Source
- Form 2form 2 March 25.pdf · uploaded 13 Oct 2025Source
- Form 3form 3 March 25.pdf · uploaded 13 Oct 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold March 25.pdf · uploaded 13 Oct 2025Source
- Withdrawal Update Form 1FORM 1 UPTO SEPT .pdf · uploaded 14 Oct 2025Source
- Withdrawal Update Form 1FORM 1 UPTO SEPT .pdf · uploaded 14 Oct 2025Source
- Withdrawal Update Form 1FORM 1 UPTO SEPT .pdf · uploaded 14 Oct 2025Source
- Withdrawal Update Form 1FORM 1 UPTO SEPT .pdf · uploaded 14 Oct 2025Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 14 Oct 2025Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 14 Oct 2025Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 14 Oct 2025Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 14 Oct 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 14 Oct 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 14 Oct 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 14 Oct 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 14 Oct 2025Source
- Form 2A (FY 2021-2022)2A March 22.pdf · uploaded 10 Nov 2025Source
- Form 2A (FY 2022-2023)2A March 23.pdf · uploaded 10 Nov 2025Source
- Form 2A (FY 2023-2024)2A March 24.pdf · uploaded 10 Nov 2025Source
- Form 2A (FY 2024-2025)2A March 25.pdf · uploaded 10 Nov 2025Source
- Form 5 (FY 2021-2022)Form 05 March 22.pdf · uploaded 10 Nov 2025Source
- Form 5 (FY 2022-2023)Form 05 March 23.pdf · uploaded 10 Nov 2025Source
- Form 5 (FY 2023-2024)Form 05 March 24.pdf · uploaded 10 Nov 2025Source
- Form 5 (FY 2024-2025)Form 05 March 25.pdf · uploaded 10 Nov 2025Source
- Withdrawal Update Form 1FORM 1 DEC 25.pdf · uploaded 24 Apr 2026Source
- Withdrawal Update Form 2Form 2 Dec 25.pdf · uploaded 24 Apr 2026Source
- Withdrawal Update Form 3Form 3 Dec 25.pdf · uploaded 24 Apr 2026Source
- Withdrawal Update Form 1Form 1 Mar 26.pdf · uploaded 27 Apr 2026Source
- Withdrawal Update Form 1Form 1 Mar 26.pdf · uploaded 27 Apr 2026Source
- Withdrawal Update Form 2Form 02 March 26.pdf · uploaded 27 Apr 2026Source
- Withdrawal Update Form 2Form 02 March 26.pdf · uploaded 27 Apr 2026Source
- Withdrawal Update Form 3Form 03 March 26.pdf · uploaded 27 Apr 2026Source
- Withdrawal Update Form 3Form 03 March 26.pdf · uploaded 27 Apr 2026Source
- Form 5 (FY 2025-2026)ESPL Form 05 March 26.pdf · uploaded 27 Apr 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 3FORM-3.pdf · uploaded 14 Aug 2026Source
Technical
- DocumentLayout Plan.pdf · uploaded 9 Sep 2021Source
- DocumentApproval Plan.pdf · uploaded 9 Sep 2021Source
- Other – Technicalrera disclosure.pdf · uploaded 13 Jan 2023Source
- OthersFORM 1 June 2025.pdf · uploaded 6 Aug 2025Source
- DocumentApprovel PLan.pdf · uploaded 4 Nov 2025Source
- OthersACC BP.pdf · uploaded 10 Nov 2025Source
- OthersCCLetter (1).pdf · uploaded 10 Nov 2025Source
- OthersMail confirmation.pdf · uploaded 10 Nov 2025Source
- OthersACC Plan.pdf · uploaded 10 Nov 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 74/2/A/2/B/2 74/2/A/2/B/3
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- Type 1 1BHK.T, Type2 1BHK, Type3 1BHK, Type4 1BHK, 1BHK, 2BHK36 units in all
- Address
- 74/2/A/2/B/2 74/2/A/2/B/3, Near Vidhyadhiraj Charitable Trust, Harigram RoadPIN 410206
- Village
- Kevale, Panvel taluka
- Location
- 19.02511, 73.14894
- Land area for this project
- 1,275 sq m (13,721 sq ft)
- Permissible built-up area
- 2,034 sq m (21,895 sq ft)
- Sanctioned built-up area
- 2,008 sq m (21,611 sq ft)
- Designated bank account
- 88
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
74/2/A/2/B/2 74/2/A/2/B/3
Boundaries
- North
- Survey No 74-2-A-2-B-4
- South
- Survey No 74-2-A-2-B-1
- East
- Survey No 75-1-A
- West
- 9 Mtr NA Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking36 units
0 of 36 units booked (0%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A | Type 1 1BHK.T | 38.32 sq m · 412 sq ft | 4 | 0 |
| A | Type2 1BHK | 32.54 sq m · 350 sq ft | 4 | 0 |
| A | Type3 1BHK | 35.51 sq m · 382 sq ft | 4 | 0 |
| A | Type4 1BHK | 32.54 sq m · 350 sq ft | 4 | 0 |
| B | 1BHK | 28.17 sq m · 303 sq ft | 6 | 0 |
| B | 1BHK | 28.76 sq m · 310 sq ft | 6 | 0 |
| B | 1BHK | 29.52 sq m · 318 sq ft | 2 | 0 |
| B | 1BHK | 30.11 sq m · 324 sq ft | 2 | 0 |
| B | 2BHK | 41.9 sq m · 451 sq ft | 2 | 0 |
| B | 2BHK | 42.02 sq m · 452 sq ft | 2 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Ar Rushabh Rathod Rushav Rathod | — |
| Chartered accountant | M H Kachhara | — |
| Chartered accountant | Tarun Tater | — |
| Engineer | B S Sukthankar | — |
| Engineer | Satish Hirkrishna Pandit | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Kevale
- Rising SunRERA PM1270002600457
- Arham OneRERA P52000055460
- Govind GreensRERA P52000029833
- Praradi PearlRERA P52000027439
- Abhinandan ClorisRERA P52000022977
- Panvel PrideRERA P52000021424
All 7 projects in Kevale · Compare Panvel Pride Phase 2 with another project