Residential / Group Housing · 2 buildings · 36 unitsRERA P52000030827

Panvel Pride Phase 2

Deedo IDDP-RAI-G7P2

Completion was pushed back 4 months, to Apr 2028; no MahaRERA orders on record; 0% of its units are booked.

Kevale, Raigarh 410206 · by Elysian Spaces Private Limited

DeliveryExtended 4 moPromised Dec 2027 · now due Apr 2028RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales0% booked0 of 36 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2028

  • This projectRegistered 14 Sep 2021, completion promised 31 Dec 2027, revised to 30 Apr 2028.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52000030827
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5200003082714 Sep 202131 Dec 202730 Apr 2028Elysian Spaces Private LimitedProject page
Documents163

1 document held by Deedo, 162 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPan Card Elysian.pdf · uploaded 3 Sep 2021Source

Legal

  • Declaration Form BForm B-min.pdf · uploaded 3 Sep 2021Source
  • Legal Title reportFormat A-min.pdf · uploaded 9 Sep 2021Source
  • Legal Title reportTitle Report_compressed.pdf · uploaded 9 Sep 2021Source
  • DocumentForm 2 June 2025.pdf · uploaded 6 Aug 2025Source
  • OthersForm 2 (1).pdf · uploaded 11 Oct 2025Source

Migrated

  • 1 PAN CardPan Card Elysian.pdf · uploaded 3 Sep 2021Source
Show all 163 documentsShow fewer documents

Migrated

  • 1 Details of encumbrancesNo Encumbrances Certificate-min.pdf · uploaded 3 Sep 2021Source
  • 1 Declaration in FORM BForm B-min.pdf · uploaded 3 Sep 2021Source
  • 1 Declaration about Commencement CertificateForm D.pdf · uploaded 4 Sep 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 4 Sep 2021Source
  • 1 Proforma of Allotment letterDraft Agreement Kevale PSH - II_compressed.pdf · uploaded 4 Sep 2021Source
  • 2 Proforma of Allotment letterDraft Allottment kevale Psh - II-1.pdf · uploaded 4 Sep 2021Source
  • 1 Copy of the legal title reportFormat A-min.pdf · uploaded 9 Sep 2021Source
  • 2 Copy of the legal title reportTitle Report_compressed.pdf · uploaded 9 Sep 2021Source
  • 1 Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 9 Sep 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentApproval Plan.pdf · uploaded 9 Sep 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentCIDCO_NAINA_BP-00531_2021_CCLetter.pdf · uploaded 9 Sep 2021Source
  • 1 CERSAI detailsCERSAI certificate.pdf · uploaded 13 Jan 2023Source
  • 1 Other – Technicalrera disclosure.pdf · uploaded 13 Jan 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 19 Jan 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Ely form 2A Dec 2022_.pdf · uploaded 7 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5.pdf · uploaded 27 Mar 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 23.pdf · uploaded 10 May 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 22 May 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 24 May 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 24 May 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)From 5.pdf · uploaded 29 Sep 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM - 1 Sep 23.pdf · uploaded 14 Oct 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 14 Oct 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 14 Oct 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_JAN2024.pdf · uploaded 13 Jan 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_JAN2024.pdf · uploaded 11 May 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_JULY2K24.pdf · uploaded 5 Jul 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_JULY2K24 2.pdf · uploaded 11 Jul 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 25 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A jun 24.pdf · uploaded 25 Jul 2024Source
  • 1 Disclosure for secured/unsecured finance availed for the projectDisclosure Of Sold Unsold.pdf · uploaded 25 Jul 2024Source
  • 1 Disclosure of sold/ booked inventoryDisclosure Of Sold Unsold.pdf · uploaded 25 Jul 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 25 Jul 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5.pdf · uploaded 25 Jul 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM1_Dec 24.pdf · uploaded 18 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 .pdf · uploaded 18 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDiscloser of Sold Flat1.pdf · uploaded 18 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 _c.pdf · uploaded 24 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Ely .pdf · uploaded 24 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 LATEST.pdf · uploaded 24 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)E Form 1.pdf · uploaded 17 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 17 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_.pdf · uploaded 17 May 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)Elys Form 5 .pdf · uploaded 17 May 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold.pdf · uploaded 19 May 2025Source
  • Self-declaration of Quarterly ProgressUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 1Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 2Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 3Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 1Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 2Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 3Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 1Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 2Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 3form 3 March 22.pdf · uploaded 13 Oct 2025Source
  • Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 1Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 2Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 3Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 1Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 2Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 3Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 1form -1 Dec 22.pdf · uploaded 13 Oct 2025Source
  • Form 2form 2A Dec 2022_.pdf · uploaded 13 Oct 2025Source
  • Form 3Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 1form - 1 March 23.pdf · uploaded 13 Oct 2025Source
  • Form 2form 2 March 23.pdf · uploaded 13 Oct 2025Source
  • Form 3form 3 March 23.pdf · uploaded 13 Oct 2025Source
  • Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 1Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 2Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 3form 3 Jun 23.pdf · uploaded 13 Oct 2025Source
  • Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 1form - 1 Sep 23.pdf · uploaded 13 Oct 2025Source
  • Form 2Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 3form 3 Sep 23.pdf · uploaded 13 Oct 2025Source
  • Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 1form - 1 Dec 23 .pdf · uploaded 13 Oct 2025Source
  • Form 2Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 3Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 1form - 1 March 24.pdf · uploaded 13 Oct 2025Source
  • Form 2Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 3Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 1Form - 1 Jun 24 .pdf · uploaded 13 Oct 2025Source
  • Form 2form 2 Jun 24 .pdf · uploaded 13 Oct 2025Source
  • Form 3form 3 Jun 24.pdf · uploaded 13 Oct 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure Of Sold Unsold Jun 24.pdf · uploaded 13 Oct 2025Source
  • Form 1Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 2Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 3Untitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Disclosure of Sold and Booked InventoryUntitled (2) 66.pdf · uploaded 13 Oct 2025Source
  • Form 1form - 1 Dec 24.pdf · uploaded 13 Oct 2025Source
  • Form 2form 2 Dec 24.pdf · uploaded 13 Oct 2025Source
  • Form 3form 3 Dec 24 .pdf · uploaded 13 Oct 2025Source
  • Disclosure of Sold and Booked InventoryDiscloser of Sold Flat Dec 24.pdf · uploaded 13 Oct 2025Source
  • Form 1form -1 March 25.pdf · uploaded 13 Oct 2025Source
  • Form 2form 2 March 25.pdf · uploaded 13 Oct 2025Source
  • Form 3form 3 March 25.pdf · uploaded 13 Oct 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold March 25.pdf · uploaded 13 Oct 2025Source
  • Withdrawal Update Form 1FORM 1 UPTO SEPT .pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 1FORM 1 UPTO SEPT .pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 1FORM 1 UPTO SEPT .pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 1FORM 1 UPTO SEPT .pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 14 Oct 2025Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 14 Oct 2025Source
  • Form 2A (FY 2021-2022)2A March 22.pdf · uploaded 10 Nov 2025Source
  • Form 2A (FY 2022-2023)2A March 23.pdf · uploaded 10 Nov 2025Source
  • Form 2A (FY 2023-2024)2A March 24.pdf · uploaded 10 Nov 2025Source
  • Form 2A (FY 2024-2025)2A March 25.pdf · uploaded 10 Nov 2025Source
  • Form 5 (FY 2021-2022)Form 05 March 22.pdf · uploaded 10 Nov 2025Source
  • Form 5 (FY 2022-2023)Form 05 March 23.pdf · uploaded 10 Nov 2025Source
  • Form 5 (FY 2023-2024)Form 05 March 24.pdf · uploaded 10 Nov 2025Source
  • Form 5 (FY 2024-2025)Form 05 March 25.pdf · uploaded 10 Nov 2025Source
  • Withdrawal Update Form 1FORM 1 DEC 25.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 2Form 2 Dec 25.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 3Form 3 Dec 25.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 1Form 1 Mar 26.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 1Form 1 Mar 26.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 2Form 02 March 26.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 2Form 02 March 26.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 3Form 03 March 26.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 3Form 03 March 26.pdf · uploaded 27 Apr 2026Source
  • Form 5 (FY 2025-2026)ESPL Form 05 March 26.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 14 Aug 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 14 Aug 2026Source
  • Withdrawal Update Form 3FORM-3.pdf · uploaded 14 Aug 2026Source

Technical

  • DocumentLayout Plan.pdf · uploaded 9 Sep 2021Source
  • DocumentApproval Plan.pdf · uploaded 9 Sep 2021Source
  • Other – Technicalrera disclosure.pdf · uploaded 13 Jan 2023Source
  • OthersFORM 1 June 2025.pdf · uploaded 6 Aug 2025Source
  • DocumentApprovel PLan.pdf · uploaded 4 Nov 2025Source
  • OthersACC BP.pdf · uploaded 10 Nov 2025Source
  • OthersCCLetter (1).pdf · uploaded 10 Nov 2025Source
  • OthersMail confirmation.pdf · uploaded 10 Nov 2025Source
  • OthersACC Plan.pdf · uploaded 10 Nov 2025Source

Technical (Architect)

  • DocumentFORM1_Dec 24.pdf · uploaded 18 Jan 2025Source
  • DocumentFORM 1 LATEST.pdf · uploaded 24 Apr 2025Source
  • DocumentE Form 1.pdf · uploaded 17 May 2025Source
  • DocumentForm 1.pdf · uploaded 14 Aug 2026Source

Technical (Engineer)

  • DocumentForm 2 .pdf · uploaded 18 Jan 2025Source
  • DocumentForm 2_.pdf · uploaded 17 May 2025Source
  • DocumentFORM 2.pdf · uploaded 14 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 74/2/A/2/B/2 74/2/A/2/B/3

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
Type 1 1BHK.T, Type2 1BHK, Type3 1BHK, Type4 1BHK, 1BHK, 2BHK36 units in all
Address
74/2/A/2/B/2 74/2/A/2/B/3, Near Vidhyadhiraj Charitable Trust, Harigram RoadPIN 410206
Village
Kevale, Panvel taluka
Land area for this project
1,275 sq m (13,721 sq ft)
Permissible built-up area
2,034 sq m (21,895 sq ft)
Sanctioned built-up area
2,008 sq m (21,611 sq ft)
Designated bank account
88
Developed in phases
Yes

Survey, CTS, gat or plot numbers

74/2/A/2/B/2 74/2/A/2/B/3

Land as published on MahaRERA's project page

74/2/A/2/B/2 74/2/A/2/B/3

Boundaries

North
Survey No 74-2-A-2-B-4
South
Survey No 74-2-A-2-B-1
East
Survey No 75-1-A
West
9 Mtr NA Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking36 units

0 of 36 units booked (0%), as the promoter reported to MahaRERA

Type 1 1BHK.T · 4 unitsType2 1BHK · 4 unitsType3 1BHK · 4 unitsType4 1BHK · 4 units1BHK · 16 units2BHK · 4 units
BuildingTypeCarpet areaUnitsBooked
AType 1 1BHK.T38.32 sq m · 412 sq ft40
AType2 1BHK32.54 sq m · 350 sq ft40
AType3 1BHK35.51 sq m · 382 sq ft40
AType4 1BHK32.54 sq m · 350 sq ft40
B1BHK28.17 sq m · 303 sq ft60
B1BHK28.76 sq m · 310 sq ft60
B1BHK29.52 sq m · 318 sq ft20
B1BHK30.11 sq m · 324 sq ft20
B2BHK41.9 sq m · 451 sq ft20
B2BHK42.02 sq m · 452 sq ft20

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals5

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr Rushabh Rathod Rushav Rathod—
Chartered accountantM H Kachhara—
Chartered accountantTarun Tater—
EngineerB S Sukthankar—
EngineerSatish Hirkrishna Pandit—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Kevale

All 7 projects in Kevale · Compare Panvel Pride Phase 2 with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology