Residential / Group Housing · 2 buildings · 19 unitsRERA P52100034648

Dwarakadheesh

Deedo IDDP-PUN-8AVA

MahaRERA shows it completed; no MahaRERA orders on record; 53% of its units are booked.

Warje, Pune 411058 · Property rates in Warje · by Pruthak Developers

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales53% booked10 of 19 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • This projectRegistered 20 Apr 2022, completion promised 30 Jun 2026.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

All 37 deeds →
  • Rental · Oct 2026
  • Rental · Sep 2026
  • Rental · Aug 2026
  • Rental · Jun 2026
  • Rental · 11 mo · Feb 2026
  • Rental · Feb 2026
  • Rental · Dec 2025
  • Rental · Nov 2025
  • Rental · Jun 2025
  • Rental · Jan 2025
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Oct 2026Dwarkadheesh · 103Rental—View Rental, Oct 2026
Sep 2026DwarkadheeshRental—View Rental, Sep 2026
Aug 2026Not on recordRental—View Rental, Aug 2026
Jun 2026Main building · 102Rental—View Rental, Jun 2026
Feb 2026Main building · 204Rental—View Rental, Feb 2026
Feb 2026Main building · 308Rental—View Rental, Feb 2026
Dec 2025Main building · 405Rental—View Rental, Dec 2025
Nov 2025Dwarkadheesh · 203Rental—View Rental, Nov 2025
Jun 2025Dwarkadheesh · 101Rental—View Rental, Jun 2025
Jan 2025Main building · 2Rental—View Rental, Jan 2025

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100034648
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210003464820 Apr 202230 Jun 202630 Jun 2026Pruthak DevelopersProject page
Documents183

2 documents held by Deedo, 181 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardPAN CARD PRUTHAK.pdf · uploaded 15 Feb 2022Source

Legal

  • Legal Title reportFORMAT-A LEGAL TITLE REPORT_compressed_compressed.pdf · uploaded 15 Feb 2022Source
  • Declaration Form BForm B_Declaration_Pruthak Developers_Promoter.pdf · uploaded 11 Apr 2022Source
  • Declaration Form BForm B.pdf · uploaded 22 Dec 2023Source
  • Declaration Form BForm B.pdf · uploaded 22 Feb 2025Source
  • Declaration Form BP52100034648_FileName_1.pdf · uploaded 27 Feb 2025Source
Show all 183 documentsShow fewer documents

Migrated

  • 1 PAN CardPAN CARD PRUTHAK.pdf · uploaded 15 Feb 2022Source
  • 1 Copy of the legal title reportFORMAT-A LEGAL TITLE REPORT_compressed_compressed.pdf · uploaded 15 Feb 2022Source
  • 1 Copy of Layout Approval (in case of layout)Layout Plan_compressed.pdf · uploaded 15 Feb 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.PDF · uploaded 15 Feb 2022Source
  • 1 Building Plan Approval / NA Order for plotted development1 Copy of Layout Approval (in case of layout).pdf · uploaded 17 Feb 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report_Pruthak Developers.pdf · uploaded 17 Feb 2022Source
  • 1 Details of encumbrancesNO ENCUMBRANCE LETTER.pdf · uploaded 11 Apr 2022Source
  • 1 Declaration about Commencement CertificateDECL OF CC.pdf · uploaded 11 Apr 2022Source
  • 1 Declaration in FORM BForm B_Declaration_Pruthak Developers_Promoter.pdf · uploaded 11 Apr 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_CA Certificate_Dwarakadheesh_Awaited_Signed_Scanned.pdf · uploaded 11 Apr 2022Source
  • 1 Proforma of Allotment letterALLOTMENT.pdf · uploaded 11 Apr 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Pruthak Developer.pdf · uploaded 27 Sep 2023Source
  • 2 Declaration in FORM BForm B.pdf · uploaded 22 Dec 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 22 Dec 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 22 Dec 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 22 Dec 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 22 Dec 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 3 Jul 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 3 Jul 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 3 Jul 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 3 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.pdf · uploaded 3 Jul 2024Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold and Booked Flats.pdf · uploaded 25 Jul 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 (3)_compressed.pdf · uploaded 25 Jul 2024Source
  • 2 a Details of encumbrances concerned to Finance3 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf · uploaded 10 Aug 2024Source
  • 1 b Details of encumbrances concerned to Legal3 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf · uploaded 10 Aug 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf · uploaded 10 Aug 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf · uploaded 10 Aug 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf · uploaded 10 Aug 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf · uploaded 10 Aug 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf · uploaded 10 Aug 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf · uploaded 10 Aug 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1 Sep 2024.pdf · uploaded 9 Dec 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1 Mar 2023.pdf · uploaded 9 Dec 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1 Sep 2022.pdf · uploaded 9 Dec 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1 June 2022.pdf · uploaded 9 Dec 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3 Jun 2024.pdf · uploaded 9 Dec 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3 Sep 2024.pdf · uploaded 9 Dec 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3 Jun 2023.pdf · uploaded 9 Dec 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3 Mar 2023.pdf · uploaded 9 Dec 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3 Dec 2022.pdf · uploaded 9 Dec 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3 Sep 2022.pdf · uploaded 9 Dec 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2 Sep 2024.pdf · uploaded 9 Dec 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2 Sep 2022.pdf · uploaded 9 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2 Jun 2022.pdf · uploaded 9 Dec 2024Source
  • 2 Disclosure of sold/ booked inventorySold disclosure Sep 2024.pdf · uploaded 9 Dec 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2A Sep 2022.pdf · uploaded 9 Dec 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2A Mar 2023.pdf · uploaded 9 Dec 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2A Sep 2023.pdf · uploaded 9 Dec 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2A Dec 2023.pdf · uploaded 9 Dec 2024Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2A Mar 2024.pdf · uploaded 9 Dec 2024Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2A Sep 2024.pdf · uploaded 9 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)F5 2023-24.pdf · uploaded 9 Dec 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Pruthak F3 June 2024_11zon.pdf · uploaded 19 Dec 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Pruthak F3 June 2023_11zon.pdf · uploaded 19 Dec 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Pruthak F3 Mar 2023_11zon.pdf · uploaded 19 Dec 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Pruthak F3 Dec 2022_11zon.pdf · uploaded 19 Dec 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Pruthak F3 Sep 2022_11zon.pdf · uploaded 19 Dec 2024Source
  • 7 Disclosure of sold/ booked inventoryDisclosure of Sold Dec 2023.pdf · uploaded 19 Dec 2024Source
  • 8 Disclosure of sold/ booked inventoryDisclosure of Sold June 2024.pdf · uploaded 19 Dec 2024Source
  • 6 Disclosure of sold/ booked inventoryDisclosure of Sold 3 June 2023.pdf · uploaded 19 Dec 2024Source
  • 5 Disclosure of sold/ booked inventoryDisclosure of Sold Mar 2023.pdf · uploaded 19 Dec 2024Source
  • 4 Disclosure of sold/ booked inventoryDisclosure of Sold Dec 2022.pdf · uploaded 19 Dec 2024Source
  • 3 Disclosure of sold/ booked inventoryDisclosure of Sold Sep 2022.pdf · uploaded 19 Dec 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Pruthak Form 1 June 2024.pdf · uploaded 21 Dec 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Pruthak Form 1 June 2023.pdf · uploaded 21 Dec 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Pruthak Form 1 Dec 2022.pdf · uploaded 21 Dec 2024Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Pruthak Form 3 Sep 2024.pdf · uploaded 21 Dec 2024Source
  • 10 Disclosure of sold/ booked inventoryPruthak Sold Disclosure Sep 2023.pdf · uploaded 21 Dec 2024Source
  • 9 Disclosure of sold/ booked inventoryPruthak Sold Disclosure June 2022.pdf · uploaded 21 Dec 2024Source
  • 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)Pruthak Dec 2023 Form 3.pdf · uploaded 23 Dec 2024Source
  • 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Pruthak Jun 2022 Form 3.pdf · uploaded 23 Dec 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Pruthak Form 2 June 2024.pdf · uploaded 26 Dec 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Pruthak Form 2 June 2023.pdf · uploaded 26 Dec 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Pruthak Form 2 Mar 2023.pdf · uploaded 26 Dec 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Pruthak Form 2 Dec 2022.pdf · uploaded 26 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1 Dec 2024.pdf · uploaded 31 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3 Dec 2024.pdf · uploaded 31 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold.pdf · uploaded 31 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (1).pdf · uploaded 4 Feb 2025Source
  • 1 Declaration in FORM BForm B.pdf · uploaded 22 Feb 2025Source
  • 1 Declaration in FORM BP52100034648_FileName_1.pdf · uploaded 27 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Mar 25.pdf · uploaded 24 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 25.pdf · uploaded 24 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorySold Disclosure -Mar 25.pdf · uploaded 24 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 2024-25.pdf · uploaded 24 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Mar 25_compressed (1).pdf · uploaded 29 Apr 2025Source
  • Form 5 (FY 2024-2025)Pruthak Developers Fy 24-25 Final.pdf · uploaded 29 Sep 2025Source
  • Form 1F1 June 2022.pdf · uploaded 24 Jan 2026Source
  • Form 1Sep 2022.pdf · uploaded 24 Jan 2026Source
  • Form 1Pruthak Form 1 Dec 2022.pdf · uploaded 24 Jan 2026Source
  • Form 1Mar 2023.pdf · uploaded 24 Jan 2026Source
  • Form 1Pruthak Form 1 June 2023.pdf · uploaded 24 Jan 2026Source
  • Form 1F1 Sep 2023.pdf · uploaded 24 Jan 2026Source
  • Form 1F1 Dec 2023.pdf · uploaded 24 Jan 2026Source
  • Form 1F1 Mar 2024.pdf · uploaded 24 Jan 2026Source
  • Form 1Pruthak Form 1 June 2024.pdf · uploaded 24 Jan 2026Source
  • Form 1Form 1 Sep 2024.pdf · uploaded 24 Jan 2026Source
  • Form 1F1 Dec 2024.pdf · uploaded 24 Jan 2026Source
  • Form 1Form 1 Mar 25.pdf · uploaded 24 Jan 2026Source
  • Form 2F2 Jun 2022.pdf · uploaded 24 Jan 2026Source
  • Form 2Sep 2022.pdf · uploaded 24 Jan 2026Source
  • Form 2Pruthak Form 2 Dec 2022.pdf · uploaded 24 Jan 2026Source
  • Form 2Pruthak Form 2 Mar 2023.pdf · uploaded 24 Jan 2026Source
  • Form 2Pruthak Form 2 June 2023.pdf · uploaded 24 Jan 2026Source
  • Form 2F2 Sep 2023.pdf · uploaded 24 Jan 2026Source
  • Form 2F2 Dec 2023.pdf · uploaded 24 Jan 2026Source
  • Form 2F2 Mar 2024.pdf · uploaded 24 Jan 2026Source
  • Form 2Pruthak Form 2 June 2024.pdf · uploaded 24 Jan 2026Source
  • Form 2Form 2 Sep 2024.pdf · uploaded 24 Jan 2026Source
  • Form 2F2 Dec 2024.pdf · uploaded 24 Jan 2026Source
  • Form 2Form 2 - Mar25.pdf · uploaded 24 Jan 2026Source
  • Form 3Pruthak Jun 2022 Form 3.pdf · uploaded 24 Jan 2026Source
  • Form 3Pruthak F3 Sep 2022.pdf · uploaded 24 Jan 2026Source
  • Form 3Pruthak F3 Dec 2022.pdf · uploaded 24 Jan 2026Source
  • Form 3Pruthak F3 Mar 2023.pdf · uploaded 24 Jan 2026Source
  • Form 3Pruthak F3 June 2023.pdf · uploaded 24 Jan 2026Source
  • Form 3Sep 23(Form 3).pdf · uploaded 24 Jan 2026Source
  • Form 3Dec 2023.pdf · uploaded 24 Jan 2026Source
  • Form 3Form 3 Mar 2024.pdf · uploaded 24 Jan 2026Source
  • Form 3Pruthak F3 June 2024.pdf · uploaded 24 Jan 2026Source
  • Form 3Pruthak Form 3 Sep 2024.pdf · uploaded 24 Jan 2026Source
  • Form 3F3 Dec 2024.pdf · uploaded 24 Jan 2026Source
  • Form 3SIGNED Form 3 March 25.pdf · uploaded 24 Jan 2026Source
  • Disclosure of Sold and Booked InventoryPruthak Sold Disclosure June 2022.pdf · uploaded 24 Jan 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Sep 2022.pdf · uploaded 24 Jan 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Dec 2022.pdf · uploaded 24 Jan 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Mar 2023.pdf · uploaded 24 Jan 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold 3 June 2023.pdf · uploaded 24 Jan 2026Source
  • Disclosure of Sold and Booked InventoryPruthak Sold Disclosure Sep 2023.pdf · uploaded 24 Jan 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Dec 2023.pdf · uploaded 24 Jan 2026Source
  • Disclosure of Sold and Booked InventorySold disclosure Mar 2024.pdf · uploaded 24 Jan 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold June 2024.pdf · uploaded 24 Jan 2026Source
  • Disclosure of Sold and Booked InventorySold disclosure Sep 2024.pdf · uploaded 24 Jan 2026Source
  • Disclosure of Sold and Booked InventorySold disclosure Dec 2024.pdf · uploaded 24 Jan 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold - mar25.pdf · uploaded 24 Jan 2026Source
  • Form 5 (FY 2022-2023)Form 5 2022 23 Pruthak - Copy.pdf · uploaded 29 Jan 2026Source
  • Form 5 (FY 2023-2024)Form 5 2023 24 Pruthak.pdf · uploaded 29 Jan 2026Source
  • Withdrawal Update Form 1Form 1 - 30 06 2025.pdf · uploaded 19 Feb 2026Source
  • Withdrawal Update Form 1Form 1 - 30 09 2025.pdf · uploaded 19 Feb 2026Source
  • Withdrawal Update Form 2Form 2 - 30 06 2025.pdf · uploaded 19 Feb 2026Source
  • Withdrawal Update Form 2Form 2 - 30 09 2025.pdf · uploaded 19 Feb 2026Source
  • Withdrawal Update Form 3Jun 25 Dwarkadheesh Form 3.pdf · uploaded 19 Feb 2026Source
  • Withdrawal Update Form 3Sep 25 Dwarkadheesh Form 3.pdf · uploaded 19 Feb 2026Source
  • Withdrawal Update Form 1form 1_Dec 25_pruthak.pdf · uploaded 16 Mar 2026Source
  • Withdrawal Update Form 2form 2_Dec 25_pruthak.pdf · uploaded 16 Mar 2026Source
  • Withdrawal Update Form 3Pruthak Form 3 Dec 2025.pdf · uploaded 16 Mar 2026Source
  • Withdrawal Update Form 1form 1_Mar 26_pruthak.pdf · uploaded 21 Apr 2026Source
  • Withdrawal Update Form 2form 2_Mar 26_pruthak.pdf · uploaded 21 Apr 2026Source
  • Withdrawal Update Form 3Dwarkadheesh_Form 3_Mar-26.pdf · uploaded 21 Apr 2026Source
  • Occupational CertificateFull oc Pruthak Completion.pdf · uploaded 30 Apr 2026Source
  • Occupational CertificateScreenshot of PMC email.pdf · uploaded 30 Apr 2026Source

Technical

  • DocumentLayout Plan_compressed.pdf · uploaded 15 Feb 2022Source
  • Document1 Copy of Layout Approval (in case of layout).pdf · uploaded 17 Feb 2022Source
  • Documentscan22456.pdf · uploaded 17 Mar 2026Source

Technical (Architect)

  • DocumentF1 June 2022.pdf · uploaded 9 Dec 2024Source
  • DocumentF1 Sep 2022.pdf · uploaded 9 Dec 2024Source
  • DocumentF1 Mar 2023.pdf · uploaded 9 Dec 2024Source
  • DocumentF1 Sep 2024.pdf · uploaded 9 Dec 2024Source
  • DocumentPruthak Form 1 Dec 2022.pdf · uploaded 21 Dec 2024Source
  • DocumentPruthak Form 1 June 2023.pdf · uploaded 21 Dec 2024Source
  • DocumentPruthak Form 1 June 2024.pdf · uploaded 21 Dec 2024Source
  • DocumentF1 Dec 2024.pdf · uploaded 31 Jan 2025Source
  • DocumentForm 1 Mar 25.pdf · uploaded 24 Apr 2025Source
  • DocumentForm 1 _Jun 26.pdf · uploaded 14 Jul 2026Source

Technical (Engineer)

  • DocumentF2 Jun 2022.pdf · uploaded 9 Dec 2024Source
  • DocumentF2 Sep 2022.pdf · uploaded 9 Dec 2024Source
  • DocumentF2 Sep 2024.pdf · uploaded 9 Dec 2024Source
  • DocumentPruthak Form 2 Dec 2022.pdf · uploaded 26 Dec 2024Source
  • DocumentPruthak Form 2 Mar 2023.pdf · uploaded 26 Dec 2024Source
  • DocumentPruthak Form 2 June 2023.pdf · uploaded 26 Dec 2024Source
  • DocumentPruthak Form 2 June 2024.pdf · uploaded 26 Dec 2024Source
  • DocumentForm 2 (1).pdf · uploaded 4 Feb 2025Source
  • DocumentForm 2 March 25.pdf · uploaded 24 Apr 2025Source
  • DocumentForm 2 _jun 26.pdf · uploaded 14 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel CTS NO/S NO - 133/1A/1A/1/2

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK19 units in all
Address
CTS NO/S NO - 133/1A/1A/1/2, Trilok Society, WarjePIN 411058
Village
Warje, Haveli taluka
Land area for this project
379 sq m (4,084 sq ft)
Permissible built-up area
1,213 sq m (13,053 sq ft)
Sanctioned built-up area
1,213 sq m (13,053 sq ft)
Designated bank account
66
Developed in phases
No
Also registered as
Dwarkadhish Building

Survey, CTS, gat or plot numbers

CTS NO/S NO - 133/1A/1A/1/2

Land as published on MahaRERA's project page

CTS NO/S NO - 133/1A/1A/1/2

Boundaries

North
133 part
South
133 part
East
9 m wide Road
West
134 part

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking19 units

10 of 19 units booked (53%), as the promoter reported to MahaRERA

1BHK · 12 units2BHK · 7 units
TypeCarpet areaUnitsBooked
1BHK36.57 sq m · 394 sq ft128
2BHK59.81 sq m · 644 sq ft72

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectM/s Babasaheb Dhavale & Associates—
Chartered accountantCA Pushpak Bogati—
EngineerSangram Patil—

Source: MahaRERA project page. Contact details are not shown.

Dwarakadheesh in numbers

Registered deals, summarised

Deedo has 37 registered documents at Dwarakadheesh, from Jul 2019 to Oct 2026: 33 leave and licence agreements, 4 mortgages.

Are properties at Dwarakadheesh rented out?
Yes: 33 leave and licence agreements are registered at Dwarakadheesh, at a median rent since Jul 2019 of about ₹10,000 a month with a deposit of about ₹30,000.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Dwarakadheesh by Deedo, last updated with deals registered in Oct 2026.

Latest deal · Rental · Oct 2026

₹20–50k / month

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology