Residential / Group Housing · 1 building · 154 unitsRERA P52100034929

Top Towers - A

Deedo IDDP-PUN-CJ8W

MahaRERA shows it completed; no MahaRERA orders on record; 65% of its units are booked.

Wakad, Pune 411057 · by Raga Developers

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales65% booked100 of 154 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • This projectRegistered 28 Apr 2022, completion promised 30 Jun 2026.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100034929
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210003492928 Apr 202230 Jun 202630 Jun 2026Raga DevelopersProject page
Documents158

1 document held by Deedo, 157 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardRaga Developers Pan.pdf · uploaded 14 Apr 2022Source

Legal

  • Declaration Form BForm B.pdf · uploaded 15 Apr 2022Source
  • Legal Title reportLegal Search Report.pdf · uploaded 21 Apr 2022Source

Migrated

  • 1 PAN CardRaga Developers Pan.pdf · uploaded 14 Apr 2022Source
  • 1 Details of encumbrancesNo Encumbrance.pdf · uploaded 15 Apr 2022Source
  • 1 Copy of Layout Approval (in case of layout)Lay Out.pdf · uploaded 15 Apr 2022Source
  • 1 Building Plan Approval / NA Order for plotted development001.pdf · uploaded 15 Apr 2022Source
Show all 158 documentsShow fewer documents

Migrated

  • 2 Building Plan Approval / NA Order for plotted development002.pdf · uploaded 15 Apr 2022Source
  • 3 Building Plan Approval / NA Order for plotted development004.pdf · uploaded 15 Apr 2022Source
  • 4 Building Plan Approval / NA Order for plotted development006.pdf · uploaded 15 Apr 2022Source
  • 5 Building Plan Approval / NA Order for plotted development007.pdf · uploaded 15 Apr 2022Source
  • 6 Building Plan Approval / NA Order for plotted development009.pdf · uploaded 15 Apr 2022Source
  • 7 Building Plan Approval / NA Order for plotted development010.pdf · uploaded 15 Apr 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencment Certificate.pdf · uploaded 15 Apr 2022Source
  • 1 Declaration about Commencement CertificateC C Declaration.pdf · uploaded 15 Apr 2022Source
  • 1 Declaration in FORM BForm B.pdf · uploaded 15 Apr 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Commencment Certificate.pdf · uploaded 15 Apr 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 15 Apr 2022Source
  • 1 Disclosure of sold/ booked inventorySold Unsold 153.pdf · uploaded 15 Apr 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report_200235198222.pdf · uploaded 15 Apr 2022Source
  • 2 CERSAI detailsCersai Undertaking.pdf · uploaded 15 Apr 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)001 CA certificate Top Towers - Signed.pdf · uploaded 15 Apr 2022Source
  • 1 Proforma of Allotment letterProforma of the allotment letter.pdf · uploaded 15 Apr 2022Source
  • 2 Proforma of Allotment letterAGREEMENT TO SALE oK.pdf · uploaded 15 Apr 2022Source
  • 1 Copy of the legal title reportLegal Search Report.pdf · uploaded 21 Apr 2022Source
  • 2 Disclosure of sold/ booked inventorysold-unsoldunits.pdf · uploaded 15 Feb 2023Source
  • 1 Proforma of Agreement for saleTOP TOWERS- AGREEMENT TO SALE 15-02-2023.pdf · uploaded 15 Feb 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)DocScanner 16 Oct 2023 16-09 (2).pdf · uploaded 16 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)civil (1).pdf · uploaded 16 Oct 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)cacertificate.pdf · uploaded 16 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)RAGA DEVELOPERS FORM 5.pdf · uploaded 4 Mar 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 AC A.pdf · uploaded 17 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)ilovepdf_merged (2) (1)_compressed.pdf · uploaded 17 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 new_compressed.pdf · uploaded 18 Mar 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 (4)_compressed_compressed (1).pdf · uploaded 18 Mar 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)form 2 ec a (2)_compressed.pdf · uploaded 18 Mar 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect's Certificate - All Quarters_compressed.pdf · uploaded 22 Mar 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE ALL QUARTER_compressed.pdf · uploaded 22 Mar 2025Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A.pdf · uploaded 22 Mar 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FROM 5.pdf · uploaded 22 Mar 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)30-06-2023 (1).pdf · uploaded 14 Apr 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)30-09--2023 1.pdf · uploaded 14 Apr 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)23-11-2023 1.pdf · uploaded 14 Apr 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)31-03-24 1.pdf · uploaded 14 Apr 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)30-06-2024 1.pdf · uploaded 14 Apr 2025Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)30-09-2024 1.pdf · uploaded 14 Apr 2025Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)31-12-2024 (1).pdf · uploaded 14 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)31-03-2023 1.pdf · uploaded 14 Apr 2025Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)31-03-2024 (1).pdf · uploaded 14 Apr 2025Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)31-12-2024 2.pdf · uploaded 14 Apr 2025Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)30-09-2024 (1).pdf · uploaded 14 Apr 2025Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)30-06-2024 (1).pdf · uploaded 14 Apr 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)31-12-2023 (1).pdf · uploaded 14 Apr 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)26-11-2023.pdf · uploaded 14 Apr 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)30-06-2023 to 31-08-2023.pdf · uploaded 14 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)30-03-2023 to 31-07-2023.pdf · uploaded 14 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD UNDOLD A.pdf · uploaded 14 Apr 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)31-03-2023 55.pdf · uploaded 14 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)31-03-2023 55.pdf · uploaded 14 Apr 2025Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A 01-04-2023 (1).pdf · uploaded 14 Apr 2025Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A 01-04-2024 (1).pdf · uploaded 14 Apr 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)31-03-2023 55.pdf · uploaded 14 Apr 2025Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)31-03-2024 5.pdf · uploaded 14 Apr 2025Source
  • 1 Disclosure for secured/unsecured finance availed for the project30-09-2024 1.pdf · uploaded 14 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)3-31-03-2023_compressed.pdf · uploaded 17 Apr 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)3-30-06-2023_compressed.pdf · uploaded 17 Apr 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)3 - 30-09-2023_compressed.pdf · uploaded 17 Apr 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)3-31-03-2024_compressed.pdf · uploaded 17 Apr 2025Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)3-30-06-2024_compressed.pdf · uploaded 17 Apr 2025Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)3-30-09-2024_compressed.pdf · uploaded 17 Apr 2025Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)3-31-12-2024_compressed.pdf · uploaded 17 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 31-4.pdf · uploaded 20 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)TOP TOWERS A FORM 3_compressed.pdf · uploaded 20 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engg Certificate Tower A (1).pdf · uploaded 20 May 2025Source
  • Withdrawal Update Form 1Form 1 June 25.pdf · uploaded 3 Dec 2025Source
  • Withdrawal Update Form 1Form 1 June 25.pdf · uploaded 3 Dec 2025Source
  • Withdrawal Update Form 1Form 1_Sep 25.pdf · uploaded 3 Dec 2025Source
  • Withdrawal Update Form 2Form 2 June 25.pdf · uploaded 3 Dec 2025Source
  • Withdrawal Update Form 2Form 2 June 25.pdf · uploaded 3 Dec 2025Source
  • Withdrawal Update Form 2Form 2_Sep 25.pdf · uploaded 3 Dec 2025Source
  • Withdrawal Update Form 3Form 3 June 25 - 1.pdf · uploaded 3 Dec 2025Source
  • Withdrawal Update Form 3Form 3 June 25 - 1.pdf · uploaded 3 Dec 2025Source
  • Withdrawal Update Form 3Form 3_Sep 25.pdf · uploaded 3 Dec 2025Source
  • Form 2A (FY 2022-2023)Form 2A_FY 2022-23.pdf · uploaded 10 Dec 2025Source
  • Form 2A (FY 2023-2024)Form 2A_FY 2023-24.pdf · uploaded 10 Dec 2025Source
  • Form 2A (FY 2024-2025)form 2A_FY 2024-25.pdf · uploaded 10 Dec 2025Source
  • Form 5 (FY 2022-2023)Form 5_FY 2022-23.pdf · uploaded 10 Dec 2025Source
  • Form 5 (FY 2023-2024)Form 5_FY 2023-24.pdf · uploaded 10 Dec 2025Source
  • Form 5 (FY 2024-2025)Form 5_FY 2024-25.pdf · uploaded 10 Dec 2025Source
  • Withdrawal Update Form 1Form 1 Dec-25.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 1Form 1 Dec-25.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 1Form 1 Dec-25.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 1Form 1 Dec-25.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 1Form 1 Mar 26.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 1Form 1 Mar 26.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 1Form 1 Mar 26.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 1Form 1 Mar 26.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 2Form 2 Dec 25.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 2Form 2 Dec 25.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 2Form 2 Dec 25.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 2Form 2 Dec 25.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 2Form 2 Mar 26.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 2Form 2 Mar 26.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 2Form 2 Mar 26.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 2Form 2 Mar 26.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 3Form-3 Dec 25.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 3Form-3 Dec 25.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 3Form-3 Dec 25.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 3Form-3 Dec 25.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 3Form 3 Mar 26.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 3Form 3 Mar 26.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 3Form 3 Mar 26.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 3Form 3 Mar 26.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 1Form 1 Jun 26.pdf · uploaded 4 Jul 2026Source
  • Withdrawal Update Form 2Form 2 Jun 26.pdf · uploaded 4 Jul 2026Source
  • Withdrawal Update Form 3Form 3 Jun 2026.pdf · uploaded 4 Jul 2026Source
  • Form 2A (FY 2025-2026)form 2A_FY 2025-26.pdf · uploaded 8 Jul 2026Source
  • Occupational CertificateOccupancy Certificate.pdf · uploaded 10 Aug 2026Source
  • Occupational CertificateOC Conformation.pdf · uploaded 10 Aug 2026Source
  • Occupational CertificateForm 4.pdf · uploaded 10 Aug 2026Source
  • Occupational CertificateCC.pdf · uploaded 10 Aug 2026Source
  • Occupational CertificateBuilding Plan 1-4.pdf · uploaded 10 Aug 2026Source
  • Occupational CertificateBuilding Plan 5-8.pdf · uploaded 10 Aug 2026Source
  • Occupational CertificateBuilding Plan 9-12.pdf · uploaded 10 Aug 2026Source
  • Occupational CertificateBuilding Plan 13-17.pdf · uploaded 10 Aug 2026Source

Technical

  • DocumentLay Out.pdf · uploaded 15 Apr 2022Source
  • Document001.pdf · uploaded 15 Apr 2022Source
  • Document002.pdf · uploaded 15 Apr 2022Source
  • Document004.pdf · uploaded 15 Apr 2022Source
  • Document006.pdf · uploaded 15 Apr 2022Source
  • Document007.pdf · uploaded 15 Apr 2022Source
  • Document009.pdf · uploaded 15 Apr 2022Source
  • Document010.pdf · uploaded 15 Apr 2022Source

Technical (Architect)

  • DocumentFORM 1 AC A.pdf · uploaded 17 Feb 2025Source
  • Documentform 1 new_compressed.pdf · uploaded 18 Mar 2025Source
  • DocumentForm 1 - Architect's Certificate - All Quarters_compressed.pdf · uploaded 22 Mar 2025Source
  • Document31-03-2023 1.pdf · uploaded 14 Apr 2025Source
  • Document30-06-2023 (1).pdf · uploaded 14 Apr 2025Source
  • Document30-09--2023 1.pdf · uploaded 14 Apr 2025Source
  • Document23-11-2023 1.pdf · uploaded 14 Apr 2025Source
  • Document31-03-24 1.pdf · uploaded 14 Apr 2025Source
  • Document30-06-2024 1.pdf · uploaded 14 Apr 2025Source
  • Document30-09-2024 1.pdf · uploaded 14 Apr 2025Source
  • Document31-12-2024 (1).pdf · uploaded 14 Apr 2025Source
  • DocumentFORM 1 31-4.pdf · uploaded 20 May 2025Source
  • DocumentForm 1 Jun 26.pdf · uploaded 4 Jul 2026Source

Technical (Engineer)

  • DocumentENGINEER CERTIFICATE ALL QUARTER_compressed.pdf · uploaded 22 Mar 2025Source
  • Document30-03-2023 to 31-07-2023.pdf · uploaded 14 Apr 2025Source
  • Document30-06-2023 to 31-08-2023.pdf · uploaded 14 Apr 2025Source
  • Document26-11-2023.pdf · uploaded 14 Apr 2025Source
  • Document31-12-2023 (1).pdf · uploaded 14 Apr 2025Source
  • Document31-03-2024 (1).pdf · uploaded 14 Apr 2025Source
  • Document30-06-2024 (1).pdf · uploaded 14 Apr 2025Source
  • Document30-09-2024 (1).pdf · uploaded 14 Apr 2025Source
  • Document31-12-2024 2.pdf · uploaded 14 Apr 2025Source
  • DocumentForm 2 - Engg Certificate Tower A (1).pdf · uploaded 20 May 2025Source
  • DocumentForm 2 Jun 26.pdf · uploaded 4 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel SURVEY NUMBER 134/1 PART

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, 3BHK154 units in all
Address
Survey Number 134/1 Part, Near Sayaji Hotel, WakadPIN 411057
Village
Wakad, Mulshi taluka
Designated bank account
109
Developed in phases
No

Survey, CTS, gat or plot numbers

SURVEY NUMBER 134/1 PART

Boundaries

North
Survey Number 134 Part
South
Survey Number 143
East
Survey Number 133
West
Survey Number 135

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking154 units

100 of 154 units booked (65%), as the promoter reported to MahaRERA

1BHK · 36 units2BHK · 80 units3BHK · 38 units
TypeCarpet areaUnitsBooked
1BHK35.15 sq m · 378 sq ft170
1BHK35.3 sq m · 380 sq ft190
2BHK54.99 sq m · 592 sq ft2018
2BHK55.33 sq m · 596 sq ft2016
2BHK56.45 sq m · 608 sq ft2014
2BHK56.55 sq m · 609 sq ft2015
3BHK59.91 sq m · 645 sq ft1919
3BHK59.96 sq m · 645 sq ft1918

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals5

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectHrishikesh Kulkarni—
Chartered accountantDhiraj Manoj Baldota—
Chartered accountantVinit D Achha And Associates—
EngineerPanav Kulkarni—
EngineerU S Purndare—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology