Deedo IDDP-PUN-DNCEMahaRERA shows it completed; no MahaRERA orders on record; 74% of its units are booked.
Wakad, Pune 411057 · Property rates in Wakad · by Sukhwani Chawla Developers
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 14 Jun 2019, completion promised 30 Dec 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
9 buildings
Open a building to see every flat, floor by floor.
- A16 floors · 133 units99% booked
- B16 floors · 107 units100% booked
- C16 floors · 109 units100% booked
- D17 floors · 120 units85% booked
- E17 floors · 60 units37% booked
- F17 floors · 118 units68% booked
- G17 floors · 118 units0% booked
- H - MHADA and Commercial15 floors · 88 units90% booked
- I - Community Building4 floors
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100021183
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100021183 | 14 Jun 2019 | 30 Dec 2027 | 30 Dec 2027 | Sukhwani Chawla Developers | Project page |
Documents306
1 document held by Deedo, 305 filings listed on MahaRERA's project page
Legal
- OtherA Bldg Even Floors.pdf · uploaded 3 Jun 2019Source
- OtherA Bldg Odd Floors.pdf · uploaded 3 Jun 2019Source
- OtherB Bldg Even Floors.pdf · uploaded 3 Jun 2019Source
- OtherB Bldg Odd Floors.pdf · uploaded 3 Jun 2019Source
- OtherH Bldg Commercial.pdf · uploaded 3 Jun 2019Source
- Legal Title reportTitel Report.pdf · uploaded 3 Jun 2019Source
- Declaration Form BForm B Declaration.pdf · uploaded 3 Jun 2019Source
Show all 306 documentsShow fewer documents
Legal
- Legal Title reportCertificate-S-No-113-Wakad-Adv-Prasanna Darade-Dtd-31-01-2020.pdf · uploaded 13 Feb 2020Source
- Declaration Form BForm B Declaration by Promoter.pdf · uploaded 30 May 2026Source
- Declaration Form BSale Deed - Survey No 113 1 2_Part 1.pdf · uploaded 1 Jun 2026Source
- Declaration Form BSale Deed - Survey No 113 1 2_Part 2.pdf · uploaded 1 Jun 2026Source
- Declaration Form BSale Deed - Survey No 113 1 2_Part 3.pdf · uploaded 1 Jun 2026Source
- Declaration Form BSale Deed - Survey No 113 2 1 and 113 2 2.pdf · uploaded 1 Jun 2026Source
- Declaration Form B7 12 Extract - Survey No 113 1 2.pdf · uploaded 1 Jun 2026Source
- Declaration Form B7 12 Extract - Survey No 113 2 1.pdf · uploaded 1 Jun 2026Source
- Declaration Form B7 12 Extract - Survey No 113 2 2.pdf · uploaded 1 Jun 2026Source
Migrated
- 1 Copy of the legal title reportTitel Report.pdf · uploaded 3 Jun 2019Source
- 1 Details of encumbrancesNo Encumbrance Certificate.pdf · uploaded 3 Jun 2019Source
- 1 Copy of Layout Approval (in case of layout)BP Layout.pdf · uploaded 3 Jun 2019Source
- 1 Building Plan Approval (IOD)IoD Plan.pdf · uploaded 3 Jun 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Letter.pdf · uploaded 3 Jun 2019Source
- 1 Declaration in FORM BForm B Declaration.pdf · uploaded 3 Jun 2019Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 3 Jun 2019Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engg Certificate.pdf · uploaded 3 Jun 2019Source
- 1 Certificates of CA (Form 3)CA Certifcate.pdf · uploaded 3 Jun 2019Source
- 1 OtherA Bldg Even Floors.pdf · uploaded 3 Jun 2019Source
- 2 OtherA Bldg Odd Floors.pdf · uploaded 3 Jun 2019Source
- 3 OtherB Bldg Even Floors.pdf · uploaded 3 Jun 2019Source
- 4 OtherB Bldg Odd Floors.pdf · uploaded 3 Jun 2019Source
- 5 OtherH Bldg Commercial.pdf · uploaded 3 Jun 2019Source
- 1 Proforma of Allotment letterAgreement to Sale - Sukhwani Skylines 1-min.pdf · uploaded 4 Jun 2019Source
- 2 Proforma of Allotment letterAllotment Letter Sukhwani Skylines.pdf · uploaded 4 Jun 2019Source
- 2 Copy of the legal title reportCertificate-S-No-113-Wakad-Adv-Prasanna Darade-Dtd-31-01-2020.pdf · uploaded 13 Feb 2020Source
- 3 Proforma of Allotment letterd bldg.pdf · uploaded 23 Sep 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5_Sukhwani Chawala Developers (Skylines)_March 21_compressed.pdf · uploaded 16 Jul 2022Source
- 2 Details of encumbrancesSukhwani chawla developers encrumbances.pdf · uploaded 4 Nov 2022Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form- 1-ARCHITECTS CERTIFICATE_compressed (2).pdf · uploaded 11 Nov 2022Source
- 1 Disclosure of sold/ booked inventorySkylines Sold Unsold Compressed.pdf · uploaded 19 Nov 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 - Sukhwani Skylines_compressed.pdf · uploaded 9 Dec 2022Source
- 1 Other – Technical1-36_compressed.pdf · uploaded 23 Dec 2022Source
- 2 Other – Technical2-36_compressed.pdf · uploaded 23 Dec 2022Source
- 3 Other – Technical3-36_compressed.pdf · uploaded 23 Dec 2022Source
- 4 Other – Technical4-36_compressed.pdf · uploaded 23 Dec 2022Source
- 5 Other – Technical5-36_compressed.pdf · uploaded 23 Dec 2022Source
- 6 Other – Technical6-36_compressed.pdf · uploaded 23 Dec 2022Source
- 7 Other – Technical7-36_compressed.pdf · uploaded 23 Dec 2022Source
- 8 Other – Technical8-36_compressed.pdf · uploaded 23 Dec 2022Source
- 9 Other – Technical9-36_compressed.pdf · uploaded 23 Dec 2022Source
- 10 Other – Technical10-36_compressed.pdf · uploaded 23 Dec 2022Source
- 11 Other – Technical11-36_compressed.pdf · uploaded 23 Dec 2022Source
- 12 Other – Technical12-36_compressed.pdf · uploaded 23 Dec 2022Source
- 13 Other – Technical13-36_compressed.pdf · uploaded 23 Dec 2022Source
- 14 Other – Technical14-36_compressed.pdf · uploaded 23 Dec 2022Source
- 15 Other – Technical15-36_compressed.pdf · uploaded 23 Dec 2022Source
- 16 Other – Technical16-36_compressed.pdf · uploaded 23 Dec 2022Source
- 17 Other – Technical17-36_compressed.pdf · uploaded 23 Dec 2022Source
- 18 Other – Technical18-36_compressed.pdf · uploaded 23 Dec 2022Source
- 19 Other – Technical19-36_compressed.pdf · uploaded 23 Dec 2022Source
- 20 Other – Technical20-36_compressed.pdf · uploaded 23 Dec 2022Source
- 21 Other – Technical21-36_compressed.pdf · uploaded 23 Dec 2022Source
- 22 Other – Technical22-36_compressed.pdf · uploaded 23 Dec 2022Source
- 23 Other – Technical23-36_compressed.pdf · uploaded 23 Dec 2022Source
- 24 Other – Technical24-36_compressed.pdf · uploaded 23 Dec 2022Source
- 25 Other – Technical25-36_compressed.pdf · uploaded 23 Dec 2022Source
- 26 Other – Technical26-36_compressed.pdf · uploaded 23 Dec 2022Source
- 27 Other – Technical27-36_compressed.pdf · uploaded 23 Dec 2022Source
- 28 Other – Technical28-36_compressed.pdf · uploaded 23 Dec 2022Source
- 29 Other – Technical29-36_compressed.pdf · uploaded 23 Dec 2022Source
- 30 Other – Technical30-36_compressed.pdf · uploaded 23 Dec 2022Source
- 31 Other – Technical31-36_compressed.pdf · uploaded 23 Dec 2022Source
- 32 Other – Technical32-36_compressed.pdf · uploaded 23 Dec 2022Source
- 33 Other – Technical33-36_compressed.pdf · uploaded 23 Dec 2022Source
- 34 Other – Technical34-36_compressed.pdf · uploaded 23 Dec 2022Source
- 35 Other – Technical35-36_compressed.pdf · uploaded 23 Dec 2022Source
- 36 Other – Technical36-36_compressed.pdf · uploaded 23 Dec 2022Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate_compressed.pdf · uploaded 11 Jan 2023Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM-1-ARCHITECT CERTIFICATE FOR SUKHWANI SKYLINE DATED 12-01-2023_compressed.pdf · uploaded 4 Feb 2023Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-2 Eng Cer-Sukhwani Skylines.pdf · uploaded 4 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form -2a Engg Certificate-Sukhwani Skylines.pdf · uploaded 4 Feb 2023Source
- 2 Disclosure of sold/ booked inventorySold-Unsold Inventory-Sukhwani Skylines_compressed.pdf · uploaded 4 Feb 2023Source
- 2 Certificates of CA (Form 3)Form-3 CA Certificate Skyline Sukhwani.pdf · uploaded 4 Feb 2023Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Form - 1-Skylines.pdf · uploaded 9 Jun 2023Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sukhwani Skylines-Q-4-Form -2.pdf · uploaded 9 Jun 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Sukhwani Skyines - Form2A-19-20.pdf · uploaded 23 Jun 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Sukhwani Skylines -Form -2A-20-21.pdf · uploaded 23 Jun 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Sukhwani Skylines -form-2A-21-22.pdf · uploaded 23 Jun 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Sukhwani Skylines-Form2A-22-23.pdf · uploaded 23 Jun 2023Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-2- Engineers Certificate-Sukhwani Skyline-Q-1-23-24.pdf · uploaded 18 Aug 2023Source
- 3 Disclosure of sold/ booked inventoryDisclosure of Inventory Skylines.pdf · uploaded 18 Aug 2023Source
- 3 Certificates of CA (Form 3)Form-3 C A Certificate - Sukhwani Skylines-Q-1.pdf · uploaded 18 Aug 2023Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Revised-Form -1 - Architect Certificate - Sukhwani Skylines.pdf · uploaded 5 Sep 2023Source
- 2 Copy of Layout Approval (in case of layout)1495-1-23.PDF · uploaded 20 Sep 2023Source
- 2 Building Plan Approval (IOD)1495-2-23.PDF · uploaded 20 Sep 2023Source
- 3 Building Plan Approval (IOD)1495-3-23.PDF · uploaded 20 Sep 2023Source
- 4 Building Plan Approval (IOD)1495-4-23.PDF · uploaded 20 Sep 2023Source
- 5 Building Plan Approval (IOD)1495-5-23.PDF · uploaded 20 Sep 2023Source
- 6 Building Plan Approval (IOD)1495-6-23.PDF · uploaded 20 Sep 2023Source
- 7 Building Plan Approval (IOD)1495-7-23.PDF · uploaded 20 Sep 2023Source
- 8 Building Plan Approval (IOD)1495-8-23.PDF · uploaded 20 Sep 2023Source
- 9 Building Plan Approval (IOD)1495-9-23.PDF · uploaded 20 Sep 2023Source
- 10 Building Plan Approval (IOD)1495-10-23.PDF · uploaded 20 Sep 2023Source
- 11 Building Plan Approval (IOD)1495-11-23.PDF · uploaded 20 Sep 2023Source
- 12 Building Plan Approval (IOD)1495-12-23.PDF · uploaded 20 Sep 2023Source
- 13 Building Plan Approval (IOD)1495-13-23.PDF · uploaded 20 Sep 2023Source
- 14 Building Plan Approval (IOD)1495-14-23.PDF · uploaded 20 Sep 2023Source
- 15 Building Plan Approval (IOD)1495-15-23.PDF · uploaded 20 Sep 2023Source
- 16 Building Plan Approval (IOD)1495-16-23.PDF · uploaded 20 Sep 2023Source
- 17 Building Plan Approval (IOD)1495-17-23.PDF · uploaded 20 Sep 2023Source
- 18 Building Plan Approval (IOD)1495-18-23.PDF · uploaded 20 Sep 2023Source
- 19 Building Plan Approval (IOD)1495-19-23.PDF · uploaded 20 Sep 2023Source
- 20 Building Plan Approval (IOD)1495-20-23.PDF · uploaded 20 Sep 2023Source
- 21 Building Plan Approval (IOD)1495-21-23.PDF · uploaded 20 Sep 2023Source
- 22 Building Plan Approval (IOD)1495-22-23.PDF · uploaded 20 Sep 2023Source
- 23 Building Plan Approval (IOD)1495-23-23.PDF · uploaded 20 Sep 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentCC 22032023.pdf · uploaded 20 Sep 2023Source
- 1 Declaration about Commencement CertificateCC Declaration.pdf · uploaded 20 Sep 2023Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Q-2 - Form-1 Architect Certificate-Sukhwani Skylines.pdf · uploaded 30 Oct 2023Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Q-2 -Form-2 Engineers Certificate-Sukhwani Skylines.pdf · uploaded 30 Oct 2023Source
- 4 Certificates of CA (Form 3)Q-2-Form-3 CA Certificate New Sukhwani Kingley.pdf · uploaded 4 Nov 2023Source
- 4 Disclosure of sold/ booked inventoryDisclosure of Inventory_11zon.pdf · uploaded 21 Nov 2023Source
- 5 Certificates of CA (Form 3)CA Certificate New Format Sukhwani Skylines (1).pdf · uploaded 21 Nov 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Skylines - From-5 (FY 2022-23).pdf · uploaded 28 Dec 2023Source
- 3 Copy of Layout Approval (in case of layout)1495-1-23 new.pdf · uploaded 20 Mar 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentCC - 01-03-2024.pdf · uploaded 20 Mar 2024Source
- 24 Building Plan Approval (IOD)1495-2-23 new.pdf · uploaded 26 Mar 2024Source
- 25 Building Plan Approval (IOD)1495-3-23 new.pdf · uploaded 26 Mar 2024Source
- 26 Building Plan Approval (IOD)1495-4-23 new.pdf · uploaded 26 Mar 2024Source
- 27 Building Plan Approval (IOD)1495-5-23 new.pdf · uploaded 26 Mar 2024Source
- 28 Building Plan Approval (IOD)1495-6-23 new.pdf · uploaded 26 Mar 2024Source
- 29 Building Plan Approval (IOD)1495-7-23 new.pdf · uploaded 26 Mar 2024Source
- 30 Building Plan Approval (IOD)1495-8-23 new.pdf · uploaded 26 Mar 2024Source
- 31 Building Plan Approval (IOD)1495-9-23 new.pdf · uploaded 26 Mar 2024Source
- 32 Building Plan Approval (IOD)1495-10-23 new.pdf · uploaded 26 Mar 2024Source
- 33 Building Plan Approval (IOD)1495-11-23 new.pdf · uploaded 26 Mar 2024Source
- 34 Building Plan Approval (IOD)1495-12-23 new.pdf · uploaded 26 Mar 2024Source
- 35 Building Plan Approval (IOD)1495-13-23 new.pdf · uploaded 26 Mar 2024Source
- 36 Building Plan Approval (IOD)1495-14-23 new.pdf · uploaded 26 Mar 2024Source
- 37 Building Plan Approval (IOD)1495-15-23 new.pdf · uploaded 26 Mar 2024Source
- 38 Building Plan Approval (IOD)1495-16-23 new.pdf · uploaded 26 Mar 2024Source
- 39 Building Plan Approval (IOD)1495-17-23 new.pdf · uploaded 26 Mar 2024Source
- 40 Building Plan Approval (IOD)1495-18-23 new.pdf · uploaded 26 Mar 2024Source
- 41 Building Plan Approval (IOD)1495-19-23 new.pdf · uploaded 26 Mar 2024Source
- 42 Building Plan Approval (IOD)1495-20-23 new.pdf · uploaded 26 Mar 2024Source
- 43 Building Plan Approval (IOD)1495-21-23 new.pdf · uploaded 26 Mar 2024Source
- 44 Building Plan Approval (IOD)1495-22-23 new.pdf · uploaded 26 Mar 2024Source
- 45 Building Plan Approval (IOD)1495-23-23 new.pdf · uploaded 26 Mar 2024Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC.pdf · uploaded 19 Jul 2024Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer Certificate - Dec 2023.pdf · uploaded 13 Aug 2024Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer Certificate - March 2024.pdf · uploaded 13 Aug 2024Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer Certificate - June 2024.pdf · uploaded 13 Aug 2024Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Disclosure of Inventory - March 2024_11zon.pdf · uploaded 13 Aug 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Sukhwani Skylines-Form2A-23-24.pdf · uploaded 13 Aug 2024Source
- 5 Disclosure of sold/ booked inventoryDisclosure of Inventory - December 2023_11zon.pdf · uploaded 13 Aug 2024Source
- 6 Disclosure of sold/ booked inventoryDisclosure of Inventory - March 2024_11zon.pdf · uploaded 13 Aug 2024Source
- 7 Disclosure of sold/ booked inventoryDisclosure of Inventory - June 2024_11zon.pdf · uploaded 13 Aug 2024Source
- 6 Certificates of CA (Form 3)CA Certificate New Format Sukhwani Skylines December 2023 -Signed_11zon.pdf · uploaded 13 Aug 2024Source
- 7 Certificates of CA (Form 3)CA Certificate New Format Sukhwani Skylines March 2024 - Signed_11zon.pdf · uploaded 13 Aug 2024Source
- 8 Certificates of CA (Form 3)CA Certificate New Format Sukhwani Skylines June 2024 Signed_11zon.pdf · uploaded 13 Aug 2024Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect Certificate December 2023.pdf · uploaded 14 Aug 2024Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect Certificate - March 2024.pdf · uploaded 14 Aug 2024Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect Certificate - June 2024.pdf · uploaded 14 Aug 2024Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect Certificate - Sept 2024.pdf · uploaded 9 Nov 2024Source
- 1 Certificates of CA (Form 3)CA Certificate New Format Sukhwani Skylines September 2024 - Sign.pdf · uploaded 9 Nov 2024Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer Certificate - Sept 2024.pdf · uploaded 9 Nov 2024Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Inventory - September 2024.pdf · uploaded 9 Nov 2024Source
- 1 Architect’s Certificate on Completion of Project (Form 4)Form 4 Architect Certiifcate.pdf · uploaded 13 Nov 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFull OC - 30-09-2024.pdf · uploaded 13 Nov 2024Source
- 2 Architect’s Certificate on Completion of Project (Form 4)Form 4 Architect Certiifcate.pdf · uploaded 26 Nov 2024Source
- 3 Architect’s Certificate on Completion of Project (Form 4)Form 4 Architect Certiifcate.pdf · uploaded 7 Dec 2024Source
- 1 Other – TechnicalOC Verification Mail.pdf · uploaded 7 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)RERA Form 5 Sukhwani Skylines.pdf · uploaded 27 Feb 2025Source
- Form 5 (FY 2024-2025)Form 5 RERA Audit Report_FY 2024-25.pdf · uploaded 11 Nov 2025Source
- Form 1Form 1 Architect Certificate_September 2024.pdf · uploaded 22 Nov 2025Source
- Form 1Form 1 Architect Certificate_September 2024.pdf · uploaded 22 Nov 2025Source
- Form 2Form 2 Engineer Certificate_September 2024.pdf · uploaded 22 Nov 2025Source
- Form 2Form 2 Engineer Certificate_September 2024.pdf · uploaded 22 Nov 2025Source
- Form 3CA Certificate New Format Sukhwani Skylines September 2024 - Sign.pdf · uploaded 22 Nov 2025Source
- Form 3CA Certificate New Format Sukhwani Skylines September 2024 - Sign.pdf · uploaded 22 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Inventory - September 2024.pdf · uploaded 22 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Inventory - September 2024.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 1Form 1 Architect Certificate_September 2024.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 1Form 1 Architect Certificate_September 2024.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 1Form 1 Architect Certificate_September 2024.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 1Form 1 Architect Certificate_September 2024.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 1Form 1 Architect Certificate_September 2024.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 1Form 1 Architect Certificate_September 2024.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 2Form 2 Engineer Certificate_September 2024.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 2Form 2 Engineer Certificate_September 2024.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 2Form 2 Engineer Certificate_September 2024.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 2Form 2 Engineer Certificate_September 2024.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 2Form 2 Engineer Certificate_September 2024.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 2Form 2 Engineer Certificate_September 2024.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 3CA Certificate New Format Sukhwani Skylines September 2024 - Sign.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 3CA Certificate New Format Sukhwani Skylines September 2024 - Sign.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 3CA Certificate New Format Sukhwani Skylines September 2024 - Sign.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 3CA Certificate New Format Sukhwani Skylines September 2024 - Sign.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 3CA Certificate New Format Sukhwani Skylines September 2024 - Sign.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 3CA Certificate New Format Sukhwani Skylines September 2024 - Sign.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 1Form 1 Architect Certificate_September 2024.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 2Form 2 Engineer Certificate_September 2024.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 3CA Certificate New Format Sukhwani Skylines September 2024 - Sign.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 1Withdrawal Application Form1.pdf · uploaded 29 May 2026Source
- Withdrawal Update Form 2Withdrawal Application Form2.pdf · uploaded 29 May 2026Source
- Withdrawal Update Form 3Withdrawal Application Form3.pdf · uploaded 29 May 2026Source
- Withdrawal Update Form 1Withdrawal Application Form1.pdf · uploaded 8 Jul 2026Source
- Withdrawal Update Form 2Withdrawal Application Form2.pdf · uploaded 8 Jul 2026Source
- Withdrawal Update Form 3Withdrawal Application Form3.pdf · uploaded 8 Jul 2026Source
- Form 2A (FY 2024-2025)Form 2A Quality Assurance Certificate_March 2025.pdf · uploaded 17 Aug 2026Source
- Form 2A (FY 2025-2026)Form 2A Quality Assurance Certificate_March 2026.pdf · uploaded 17 Aug 2026Source
- Occupational CertificatePart OC 28-12-2022.pdf · uploaded 17 Aug 2026Source
- Occupational CertificatePart OC 31-03-2024.pdf · uploaded 17 Aug 2026Source
- Occupational CertificateFull OC - 30-09-2024.pdf · uploaded 17 Aug 2026Source
- Occupational CertificateForm 4 Architect Certiifcate.pdf · uploaded 17 Aug 2026Source
- Occupational CertificateOC Verification Mail.pdf · uploaded 17 Aug 2026Source
- Occupational CertificateDeclaration regarding the Project Completion..pdf · uploaded 17 Aug 2026Source
Technical
- DocumentBP Layout.pdf · uploaded 3 Jun 2019Source
- DocumentIoD Plan.pdf · uploaded 3 Jun 2019Source
- Other – Technical1-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical2-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical3-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical4-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical5-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical6-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical7-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical8-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical9-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical10-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical11-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical12-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical13-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical14-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical15-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical16-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical17-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical18-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical19-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical20-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical21-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical22-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical23-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical24-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical25-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical26-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical27-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical28-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical29-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical30-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical31-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical32-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical33-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical34-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical35-36_compressed.pdf · uploaded 23 Dec 2022Source
- Other – Technical36-36_compressed.pdf · uploaded 23 Dec 2022Source
- Document1495-1-23.PDF · uploaded 20 Sep 2023Source
- Document1495-2-23.PDF · uploaded 20 Sep 2023Source
- Document1495-3-23.PDF · uploaded 20 Sep 2023Source
- Document1495-4-23.PDF · uploaded 20 Sep 2023Source
- Document1495-5-23.PDF · uploaded 20 Sep 2023Source
- Document1495-6-23.PDF · uploaded 20 Sep 2023Source
- Document1495-7-23.PDF · uploaded 20 Sep 2023Source
- Document1495-8-23.PDF · uploaded 20 Sep 2023Source
- Document1495-9-23.PDF · uploaded 20 Sep 2023Source
- Document1495-10-23.PDF · uploaded 20 Sep 2023Source
- Document1495-11-23.PDF · uploaded 20 Sep 2023Source
- Document1495-12-23.PDF · uploaded 20 Sep 2023Source
- Document1495-13-23.PDF · uploaded 20 Sep 2023Source
- Document1495-14-23.PDF · uploaded 20 Sep 2023Source
- Document1495-15-23.PDF · uploaded 20 Sep 2023Source
- Document1495-16-23.PDF · uploaded 20 Sep 2023Source
- Document1495-17-23.PDF · uploaded 20 Sep 2023Source
- Document1495-18-23.PDF · uploaded 20 Sep 2023Source
- Document1495-19-23.PDF · uploaded 20 Sep 2023Source
- Document1495-20-23.PDF · uploaded 20 Sep 2023Source
- Document1495-21-23.PDF · uploaded 20 Sep 2023Source
- Document1495-22-23.PDF · uploaded 20 Sep 2023Source
- Document1495-23-23.PDF · uploaded 20 Sep 2023Source
- Document1495-1-23 new.pdf · uploaded 20 Mar 2024Source
- Document1495-2-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-3-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-4-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-5-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-6-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-7-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-8-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-9-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-10-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-11-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-12-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-13-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-14-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-15-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-16-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-17-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-18-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-19-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-20-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-21-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-22-23 new.pdf · uploaded 26 Mar 2024Source
- Document1495-23-23 new.pdf · uploaded 26 Mar 2024Source
- Other – TechnicalOC Verification Mail.pdf · uploaded 7 Dec 2024Source
- OthersDeclaration regarding the Project Completion.pdf · uploaded 22 Nov 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel S. No. 113/1/2 (PT.) S. No. 113/2/1 (PT.) S. No. 113/2/2 (PT.)
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 1BHK, 3BHK, Shop, Community Hall853 units in all
- Address
- S No 113/1/2 113/2/1 113/2/2, New Wakad Hinjewadi Link Road, Vinode NagarPIN 411057
- Village
- Wakad, Mulshi taluka
- Location
- 18.60502, 73.74409
- Land area for this project
- 25,000 sq m (2,69,098 sq ft)
- Permissible built-up area
- 69,172 sq m (7,44,565 sq ft)
- Sanctioned built-up area
- 69,172 sq m (7,44,565 sq ft)
- Recreational open space
- 2,397 sq m (25,797 sq ft)
- Designated bank account
- 76
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S. No. 113/1/2 (PT.) S. No. 113/2/1 (PT.) S. No. 113/2/2 (PT.)
Boundaries
- North
- S No 112 S No 113 Part
- South
- S No 114 Part S No 95 Part S No 96 Part
- East
- 18 Mtrs wide main road
- West
- S No 97 Part S No 102 Part S No 103 Part
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking853 units
631 of 853 units booked (74%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A | 2BHK | 51.16 sq m · 551 sq ft | 10 | 10 |
| A | 2BHK | 51.41 sq m · 553 sq ft | 8 | 8 |
| A | 2BHK | 51.45 sq m · 554 sq ft | 30 | 30 |
| A | 2BHK | 51.69 sq m · 556 sq ft | 10 | 10 |
| A | 2BHK | 51.85 sq m · 558 sq ft | 10 | 10 |
| A | 2BHK | 52.19 sq m · 562 sq ft | 36 | 35 |
| A | 2BHK | 56.43 sq m · 607 sq ft | 4 | 4 |
| A | 2BHK | 56.65 sq m · 610 sq ft | 2 | 2 |
Show all 59 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A | 2BHK | 56.72 sq m · 611 sq ft | 12 | 12 |
| A | 2BHK | 56.95 sq m · 613 sq ft | 6 | 6 |
| A | 2BHK | 57.15 sq m · 615 sq ft | 2 | 2 |
| A | 2BHK | 57.37 sq m · 618 sq ft | 3 | 3 |
| B | 2BHK | 51.13 sq m · 550 sq ft | 5 | 5 |
| B | 2BHK | 51.16 sq m · 551 sq ft | 4 | 4 |
| B | 2BHK | 51.48 sq m · 554 sq ft | 29 | 29 |
| B | 2BHK | 51.86 sq m · 558 sq ft | 10 | 10 |
| B | 2BHK | 52.22 sq m · 562 sq ft | 36 | 36 |
| B | 2BHK | 56.43 sq m · 607 sq ft | 3 | 3 |
| B | 2BHK | 56.67 sq m · 610 sq ft | 2 | 2 |
| B | 2BHK | 56.72 sq m · 611 sq ft | 12 | 12 |
| B | 2BHK | 56.95 sq m · 613 sq ft | 6 | 6 |
| C | 2BHK | 51.11 sq m · 550 sq ft | 29 | 29 |
| C | 2BHK | 51.83 sq m · 558 sq ft | 36 | 36 |
| C | 2BHK | 52.68 sq m · 567 sq ft | 6 | 6 |
| C | 2BHK | 52.7 sq m · 567 sq ft | 4 | 4 |
| C | 2BHK | 52.74 sq m · 568 sq ft | 6 | 6 |
| C | 2BHK | 52.77 sq m · 568 sq ft | 5 | 5 |
| C | 2BHK | 56.68 sq m · 610 sq ft | 1 | 1 |
| C | 2BHK | 56.72 sq m · 611 sq ft | 12 | 12 |
| C | 2BHK | 56.74 sq m · 611 sq ft | 1 | 1 |
| C | 2BHK | 56.89 sq m · 612 sq ft | 1 | 1 |
| C | 2BHK | 56.95 sq m · 613 sq ft | 6 | 6 |
| C | 2BHK | 56.96 sq m · 613 sq ft | 2 | 2 |
| D | 1BHK | 45.72 sq m · 492 sq ft | 4 | 0 |
| D | 2BHK | 56.93 sq m · 613 sq ft | 56 | 47 |
| D | 3BHK | 59.69 sq m · 642 sq ft | 60 | 55 |
| E | 1BHK | 43.81 sq m · 472 sq ft | 2 | 0 |
| E | 2BHK | 56.93 sq m · 613 sq ft | 30 | 19 |
| E | 3BHK | 59.34 sq m · 639 sq ft | 28 | 3 |
| F | 2BHK | 54.21 sq m · 584 sq ft | 58 | 41 |
| F | 3BHK | 59.72 sq m · 643 sq ft | 60 | 39 |
| G | 2BHK | 54.21 sq m · 584 sq ft | 58 | 0 |
| G | 3BHK | 59.74 sq m · 643 sq ft | 60 | 0 |
| H - MHADA and Commercial | 1BHK | 32.63 sq m · 351 sq ft | 3 | 3 |
| H - MHADA and Commercial | 2BHK | 45.26 sq m · 487 sq ft | 13 | 13 |
| H - MHADA and Commercial | 2BHK | 45.84 sq m · 493 sq ft | 11 | 11 |
| H - MHADA and Commercial | 2BHK | 45.92 sq m · 494 sq ft | 17 | 17 |
| H - MHADA and Commercial | 2BHK | 45.93 sq m · 494 sq ft | 22 | 22 |
| H - MHADA and Commercial | 2BHK | 46.1 sq m · 496 sq ft | 3 | 3 |
| H - MHADA and Commercial | 2BHK | 46.11 sq m · 496 sq ft | 10 | 10 |
| H - MHADA and Commercial | Shop | 13.6 sq m · 146 sq ft | 1 | 0 |
| H - MHADA and Commercial | Shop | 13.63 sq m · 147 sq ft | 1 | 0 |
| H - MHADA and Commercial | Shop | 14.37 sq m · 155 sq ft | 1 | 0 |
| H - MHADA and Commercial | Shop | 14.49 sq m · 156 sq ft | 1 | 0 |
| H - MHADA and Commercial | Shop | 14.64 sq m · 158 sq ft | 1 | 0 |
| H - MHADA and Commercial | Shop | 14.66 sq m · 158 sq ft | 1 | 0 |
| H - MHADA and Commercial | Shop | 16.27 sq m · 175 sq ft | 1 | 0 |
| H - MHADA and Commercial | Shop | 16.3 sq m · 175 sq ft | 2 | 0 |
| I - Community Building | Community Hall | 252.44 sq m · 2,717 sq ft | 0 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Milind Patil | — |
| Engineer | Rahul Agarkar | — |
| Engineer | Rahul Waghmare | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Wakad
- Maaisa GenesisRERA PR1260002602651
- PEBBLES BUSINESS BAY IT BuildingRERA PC1260002602561
- Wakad New ProjectRERA PR1260002602193
- Truspace Prima AltioraRERA PR1260002602057
- Arham PalazzoRERA PM1260002602013
- Austin AurusRERA PM1260002601438
- Jaijinendra NilayRERA PM1260002601417
- The Vantage A, B, C & DRERA PR1260002601066
All 314 projects in Wakad · Compare Sukhwani Skylines with another project