Rohan Viti
Deedo IDDP-PUN-G9Z7It is due for completion in Dec 2027, with no extension on record; no MahaRERA orders on record; 95% of its units are booked.
Wakad, Pune 411057 · Property rates in Wakad · by Rohan Builders & Developers Private Limited · 100% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
It is due for completion in Dec 2027, with no extension on record
- This projectRegistered 1 Sep 2022, completion promised 31 Dec 2027.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
3 buildings
Open a building to see every flat, floor by floor.
- Wing A10 floors · 28 units82% booked
- Wing B10 floors · 36 units100% booked
- Wing C10 floors · 29 units100% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100046719
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100046719 | 1 Sep 2022 | 31 Dec 2027 | 31 Dec 2027 | Rohan Builders & Developers Private Limited | Project page |
Documents180
2 documents held by Deedo, 178 filings listed on MahaRERA's project page
Finance
- PAN CardRBDPL PAN.pdf · uploaded 1 Aug 2022Source
Legal
Show all 180 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)Layout small.pdf · uploaded 1 Aug 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentLayout small.pdf · uploaded 1 Aug 2022Source
- 1 Commencement Certificates / NA Order for plotted development1st CC Rohan Viti.pdf · uploaded 1 Aug 2022Source
- 1 Declaration about Commencement CertificateCommencement Declaration.pdf · uploaded 1 Aug 2022Source
- 1 Declaration in FORM BForm B RBDPL.pdf · uploaded 1 Aug 2022Source
- 1 CERSAI detailsNo Encumbrance Certificate.pdf · uploaded 1 Aug 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Viti CA Cert Project Registration.pdf · uploaded 1 Aug 2022Source
- 1 Proforma of Allotment letterAllotment Letter RERA Complied.pdf · uploaded 1 Aug 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameForm A.pdf · uploaded 1 Aug 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentA Wing 1,3,5.pdf · uploaded 9 Aug 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentA Wing 2,4,6,7,8,9.pdf · uploaded 9 Aug 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentA Wing 10th.pdf · uploaded 9 Aug 2022Source
- 5 Building Plan Approval / NA Order for plotted developmentB Wing 1st.pdf · uploaded 9 Aug 2022Source
- 6 Building Plan Approval / NA Order for plotted developmentB Wing 2,3,4.pdf · uploaded 9 Aug 2022Source
- 7 Building Plan Approval / NA Order for plotted developmentC Wing 1st.pdf · uploaded 9 Aug 2022Source
- 8 Building Plan Approval / NA Order for plotted developmentC Wing Parking Basement.pdf · uploaded 9 Aug 2022Source
- 2 Declaration in FORM BForm B Affidavit Cum Declaration Rohan Viti.pdf · uploaded 9 Aug 2022Source
- 2 Proforma of Allotment letterRohan Viti - Final Agreement 1.pdf · uploaded 9 Aug 2022Source
- 1 Copy of the legal title reportTSR Revised.pdf · uploaded 24 Aug 2022Source
- 1 b Details of encumbrances concerned to LegalRevised No Encumbrance Certificate.pdf · uploaded 24 Aug 2022Source
- 1 Deviation Report with respect to Allotment letterNo Deviations Declaration.pdf · uploaded 24 Aug 2022Source
- 1 Deviation Report with respect to model copy of AgreementNo deviation report Model agreement.pdf · uploaded 24 Aug 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Cert Viti Sep 22.pdf · uploaded 7 Oct 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Cert Viti Sep 22.pdf · uploaded 7 Oct 2022Source
- 1 Disclosure of sold/ booked inventoryInv R Viti Sep 22.pdf · uploaded 7 Oct 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Cert Viti Sep 22.pdf · uploaded 7 Oct 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Cert Viti Dec 22.pdf · uploaded 20 Jan 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Cert Viti Dec 22.pdf · uploaded 20 Jan 2023Source
- 2 Disclosure of sold/ booked inventoryInv update Viti Dec 22.pdf · uploaded 20 Jan 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Cert VITI Dec 22.pdf · uploaded 20 Jan 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Cert Viti Q4.pdf · uploaded 20 Apr 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Cert Viti Q4.pdf · uploaded 20 Apr 2023Source
- 3 Disclosure of sold/ booked inventoryInv Update Q4 Viti.pdf · uploaded 20 Apr 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Cert Viti Q4.pdf · uploaded 20 Apr 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Arch Cert Viti.pdf · uploaded 20 Jul 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Viti.pdf · uploaded 20 Jul 2023Source
- 4 Disclosure of sold/ booked inventoryInventory Update Rohan Viti.pdf · uploaded 20 Jul 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Inventory Update Rohan Viti.pdf · uploaded 20 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 FY 23 VITI.pdf · uploaded 30 Sep 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Cert Viti Sep 23.pdf · uploaded 19 Oct 2023Source
- 5 Disclosure of sold/ booked inventoryInventory Update Viti Sep 23.pdf · uploaded 19 Oct 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Cert Rohan Viti Sep 23.pdf · uploaded 19 Oct 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Cert Rohan Viti.pdf · uploaded 20 Oct 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate - Rohan Viti (1).pdf · uploaded 7 Dec 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 23 Dec 2023Source
- 2 Declaration about Commencement CertificateFormat D Commencement Declaration_Rohan Viti.pdf · uploaded 23 Dec 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Cert_Rohan Viti.pdf · uploaded 23 Dec 2023Source
- 6 Disclosure of sold/ booked inventoryInventory Update_Sanctioned Units_Rohan Viti.pdf · uploaded 23 Dec 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate - Rohan Viti.pdf · uploaded 23 Dec 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2A Quality Assurance_Rohan Viti.pdf · uploaded 25 Dec 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2 Engg Cert_Rohan Viti.pdf · uploaded 25 Dec 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3 (1).pdf · uploaded 25 Dec 2023Source
- 2 Copy of Layout Approval (in case of layout)1.pdf · uploaded 29 Dec 2023Source
- 9 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 29 Dec 2023Source
- 10 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 29 Dec 2023Source
- 11 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 29 Dec 2023Source
- 12 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 29 Dec 2023Source
- 13 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 29 Dec 2023Source
- 14 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 29 Dec 2023Source
- 15 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 29 Dec 2023Source
- 16 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 29 Dec 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Cert Rohan Viti Dec 23.pdf · uploaded 20 Jan 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Cert Rohan Viti Dec 23.pdf · uploaded 20 Jan 2024Source
- 7 Disclosure of sold/ booked inventoryInventory Update Viti Dec 23.pdf · uploaded 20 Jan 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Cert Rohan Viti Dec 23.pdf · uploaded 20 Jan 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Cert Rohan Viti Mar 24.pdf · uploaded 20 Apr 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Quality Assurance Rohan Viti Mar 24.pdf · uploaded 20 Apr 2024Source
- 8 Disclosure of sold/ booked inventoryInventory Update Viti Mar 24.pdf · uploaded 20 Apr 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Cert Rohan Viti Mar 24.pdf · uploaded 20 Apr 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Cert Rohan Viti Mar 24.pdf · uploaded 26 Apr 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Rohan Viti June 24.pdf · uploaded 20 Jul 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Rohan Viti.pdf · uploaded 20 Jul 2024Source
- 9 Disclosure of sold/ booked inventoryRohan Viti.pdf · uploaded 20 Jul 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Rohan Viti June 24.pdf · uploaded 20 Jul 2024Source
- 1 Copy of Layout Approval (in case of layout)01 Layout.pdf · uploaded 7 Oct 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate No 113-2024.pdf · uploaded 7 Oct 2024Source
- 4 Building Plan Approval / NA Order for plotted development05 A Wing.pdf · uploaded 7 Oct 2024Source
- 10 Building Plan Approval / NA Order for plotted development11 C Wing.pdf · uploaded 7 Oct 2024Source
- 9 Building Plan Approval / NA Order for plotted development10 C Wing.pdf · uploaded 7 Oct 2024Source
- 8 Building Plan Approval / NA Order for plotted development09 C Wing.pdf · uploaded 7 Oct 2024Source
- 7 Building Plan Approval / NA Order for plotted development08 B Wing.pdf · uploaded 7 Oct 2024Source
- 6 Building Plan Approval / NA Order for plotted development07 B Wing.pdf · uploaded 7 Oct 2024Source
- 5 Building Plan Approval / NA Order for plotted development06 B Wing.pdf · uploaded 7 Oct 2024Source
- 3 Building Plan Approval / NA Order for plotted development04 A Wing.pdf · uploaded 7 Oct 2024Source
- 2 Building Plan Approval / NA Order for plotted development03 A Wing.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted development02 Parking.pdf · uploaded 7 Oct 2024Source
- 1 Declaration about Commencement CertificateFormat D - VITI.pdf · uploaded 9 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Viti FY 23-24.pdf · uploaded 9 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Viti.pdf · uploaded 19 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Viti.pdf · uploaded 19 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Viti.pdf · uploaded 19 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryViti.pdf · uploaded 19 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Cert Viti Dec 24.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Cert Viti Dec 24.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Cert Viti Dec 24.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryInv Update Viti Dec 24.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Rohan Viti.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Rohan Viti.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Rohan Viti.pdf · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryRohan Viti.pdf · uploaded 19 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Rohan Viti.pdf · uploaded 21 May 2025Source
- Withdrawal Update Form 1Rohan Viti.pdf · uploaded 19 Jul 2025Source
- Withdrawal Update Form 2Form 2 R Viti June 25.pdf · uploaded 19 Jul 2025Source
- Withdrawal Update Form 3Rohan Viti.pdf · uploaded 19 Jul 2025Source
- Form 2A (FY 2024-2025)Rohan Viti.pdf · uploaded 24 Jul 2025Source
- Form 5 (FY 2024-2025)Rohan Viti.pdf · uploaded 15 Sep 2025Source
- Withdrawal Update Form 1Rohan Viti.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 1Rohan Viti.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 2Rohan Viti.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 2Rohan Viti.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 3Rohan viti.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 3Rohan viti.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 1Rohan Viti.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2Rohan Viti.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3Rohan Viti.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1Rohan Viti.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2Rohan Viti.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3Rohan Viti.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1Rohan Viti.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2Rohan Viti.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3Rohan Viti.pdf · uploaded 20 Jul 2026Source
- Form 2A (FY 2025-2026)Rohan Viti.pdf · uploaded 2 Sep 2026Source
- Form 5 (FY 2025-2026)Rohan Viti.pdf · uploaded 29 Sep 2026Source
Technical
- DocumentLayout small.pdf · uploaded 1 Aug 2022Source
- DocumentLayout small.pdf · uploaded 1 Aug 2022Source
- DocumentA Wing 1,3,5.pdf · uploaded 9 Aug 2022Source
- DocumentA Wing 2,4,6,7,8,9.pdf · uploaded 9 Aug 2022Source
- DocumentA Wing 10th.pdf · uploaded 9 Aug 2022Source
- DocumentB Wing 1st.pdf · uploaded 9 Aug 2022Source
- DocumentB Wing 2,3,4.pdf · uploaded 9 Aug 2022Source
- DocumentC Wing 1st.pdf · uploaded 9 Aug 2022Source
- DocumentC Wing Parking Basement.pdf · uploaded 9 Aug 2022Source
- Document1.pdf · uploaded 29 Dec 2023Source
- Document2.pdf · uploaded 29 Dec 2023Source
- Document3.pdf · uploaded 29 Dec 2023Source
- Document4.pdf · uploaded 29 Dec 2023Source
- Document5.pdf · uploaded 29 Dec 2023Source
- Document6.pdf · uploaded 29 Dec 2023Source
- Document7.pdf · uploaded 29 Dec 2023Source
- Document8.pdf · uploaded 29 Dec 2023Source
- Document9.pdf · uploaded 29 Dec 2023Source
- Document01 Layout.pdf · uploaded 7 Oct 2024Source
- Document02 Parking.pdf · uploaded 7 Oct 2024Source
- Document03 A Wing.pdf · uploaded 7 Oct 2024Source
- Document04 A Wing.pdf · uploaded 7 Oct 2024Source
- Document05 A Wing.pdf · uploaded 7 Oct 2024Source
- Document06 B Wing.pdf · uploaded 7 Oct 2024Source
- Document07 B Wing.pdf · uploaded 7 Oct 2024Source
- Document08 B Wing.pdf · uploaded 7 Oct 2024Source
- Document09 C Wing.pdf · uploaded 7 Oct 2024Source
- Document10 C Wing.pdf · uploaded 7 Oct 2024Source
- Document11 C Wing.pdf · uploaded 7 Oct 2024Source
- Document01.pdf · uploaded 9 Sep 2025Source
- DocumentPlans 1 - 17-07-2025 - highlighted.pdf · uploaded 25 Nov 2025Source
- DocumentPlans 2 - 17-07-2025.pdf · uploaded 25 Nov 2025Source
- DocumentPlans 3 - 17-07-2025 - parking highlighted (A wing).pdf · uploaded 25 Nov 2025Source
- DocumentPlans 4 - 17-07-2025.pdf · uploaded 25 Nov 2025Source
- DocumentPlans 5 - 17-07-2025.pdf · uploaded 25 Nov 2025Source
- DocumentPlans 6 - 17-07-2025 - parking highlighted (B wing).pdf · uploaded 25 Nov 2025Source
- DocumentPlans 7 - 17-07-2025.pdf · uploaded 25 Nov 2025Source
- DocumentPlans 8 - 17-07-2025.pdf · uploaded 25 Nov 2025Source
- DocumentPlans 9 - 17-07-2025 - parking highlighted (C wing).pdf · uploaded 25 Nov 2025Source
- DocumentPlans 10 - 17-07-2025.pdf · uploaded 25 Nov 2025Source
- DocumentPlans 11 - 17-07-2025.pdf · uploaded 25 Nov 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel S NO 1/3/3 (P)
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- —93 units in all
- Address
- S NO 1/3/3 (P), Wakad, WakadPIN 411057
- Village
- Wakad, Mulshi taluka
- Location
- 18.59133, 73.76194
- Land area for this project
- 3,620 sq m (38,965 sq ft)
- Permissible built-up area
- 10,921 sq m (1,17,549 sq ft)
- Sanctioned built-up area
- 10,721 sq m (1,15,400 sq ft)
- Recreational open space
- 0 sq m (0 sq ft)
- Designated bank account
- 99
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S NO 1/3/3 (P)
Boundaries
- North
- By remaining part of S No 1 and area under reserva
- South
- By part of S No 1-3-1 and 1-3-2 and 1-4
- East
- By area under road widening out of S No 1-3-3
- West
- By remaining part of S No 1 and area under reserva
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking93 units
93 units registered
| Building | Type | Carpet area | Units |
|---|---|---|---|
| Wing A | — | — | 28 |
| Wing B | — | — | 36 |
| Wing C | — | — | 29 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals7
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Ankur Associates | — |
| Architect | Rajas Associates | — |
| Chartered accountant | Golesha & Company | — |
| Engineer | Jitendra Kumar Jain | — |
| Engineer | Mahesh Balurgi | — |
| Engineer | Paresh Vartak | — |
| Engineer | Pratik Deepak Bhatewara | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Wakad
- Maaisa GenesisRERA PR1260002602651
- PEBBLES BUSINESS BAY IT BuildingRERA PC1260002602561
- Wakad New ProjectRERA PR1260002602193
- Truspace Prima AltioraRERA PR1260002602057
- Arham PalazzoRERA PM1260002602013
- Austin AurusRERA PM1260002601438
- Jaijinendra NilayRERA PM1260002601417
- The Vantage A, B, C & DRERA PR1260002601066
All 314 projects in Wakad · Compare Rohan Viti with another project