Skip to content
Others · 11 buildings · 280 unitsRERA P52100022594

Opus 76

Deedo IDDP-PUN-FPJP

Its promised completion date, Oct 2024, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 52% of its units are booked.

Wakad, Pune 411057 · Property rates in Wakad · by Om Sai Properties

Delivery2 yrs 1 mo past duePromised Oct 2024 · no extension on record · not shown completedRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales52% booked145 of 280 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Its promised completion date, Oct 2024, has passed and MahaRERA does not show it completed

  • This projectRegistered 9 Oct 2019, completion promised 15 Oct 2024, and still not shown completed today.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

11 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100022594
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000225949 Oct 201915 Oct 202415 Oct 2024Om Sai PropertiesProject page
Documents119

2 documents held by Deedo, 117 filings listed on MahaRERA's project page

Registration certificate

Other

  • OtherDate not statedView

Finance

  • PAN CardCOMPANY PAN opus 76.pdf · uploaded 2 Oct 2019Source

Legal

  • Legal Title reportsearch title report.pdf · uploaded 2 Oct 2019Source
  • Declaration Form Bform B.pdf · uploaded 2 Oct 2019Source
  • Legal Title reportOSP_POA_compressed-1-12.pdf · uploaded 11 Dec 2020Source
  • Legal Title reportOSP_POA_compressed-13-25.pdf · uploaded 11 Dec 2020Source
  • Legal Title reportOSP_Kararnama_compressed-1-25-1-12.pdf · uploaded 11 Dec 2020Source
Show all 119 documentsShow fewer documents

Legal

  • Legal Title reportOSP_Kararnama_compressed-1-25-13-25.pdf · uploaded 11 Dec 2020Source
  • Legal Title reportOSP_Kararnama_compressed-26-35.pdf · uploaded 11 Dec 2020Source
  • Legal Title reportSearch title 1-7.pdf · uploaded 16 Dec 2020Source
  • Legal Title reportSearch title 8-14.pdf · uploaded 16 Dec 2020Source
  • Legal Title reportscan0001483_compressed (1).pdf · uploaded 3 Jul 2021Source
  • Legal Title reportsearch title opus76 1.pdf · uploaded 16 Jul 2021Source
  • Legal Title reportsearch title opus76 2.pdf · uploaded 16 Jul 2021Source

Migrated

  • 1 PAN CardCOMPANY PAN opus 76.pdf · uploaded 2 Oct 2019Source
  • 1 Copy of the legal title reportsearch title report.pdf · uploaded 2 Oct 2019Source
  • 1 Details of encumbrancesencumbrance certificate.pdf · uploaded 2 Oct 2019Source
  • 1 Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 2 Oct 2019Source
  • 1 Building Plan Approval / NA Order for plotted developmentIOD.pdf · uploaded 2 Oct 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 2 Oct 2019Source
  • 1 Declaration in FORM Bform B.pdf · uploaded 2 Oct 2019Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 2 Oct 2019Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 opus 76.pdf · uploaded 2 Oct 2019Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A)Form 2A.pdf · uploaded 2 Oct 2019Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 2 Oct 2019Source
  • 1 Proforma of Allotment letterAgreement draft.pdf · uploaded 2 Oct 2019Source
  • 2 Proforma of Allotment letterAllotment-Draft.pdf · uploaded 2 Oct 2019Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 29 Feb 2020Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Certificate_compressed.pdf · uploaded 29 Feb 2020Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)C A Certificate.pdf · uploaded 29 Feb 2020Source
  • 2 Copy of the legal title reportOSP_POA_compressed-1-12.pdf · uploaded 11 Dec 2020Source
  • 3 Copy of the legal title reportOSP_POA_compressed-13-25.pdf · uploaded 11 Dec 2020Source
  • 4 Copy of the legal title reportOSP_Kararnama_compressed-1-25-1-12.pdf · uploaded 11 Dec 2020Source
  • 5 Copy of the legal title reportOSP_Kararnama_compressed-1-25-13-25.pdf · uploaded 11 Dec 2020Source
  • 6 Copy of the legal title reportOSP_Kararnama_compressed-26-35.pdf · uploaded 11 Dec 2020Source
  • 7 Copy of the legal title reportSearch title 1-7.pdf · uploaded 16 Dec 2020Source
  • 8 Copy of the legal title reportSearch title 8-14.pdf · uploaded 16 Dec 2020Source
  • 3 Proforma of Allotment letterAGREEMENT-oppus 76 Agreement Draft 14-12-2020 (1).pdf · uploaded 16 Dec 2020Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)AR CERTIFICATE -corrected.pdf · uploaded 19 Dec 2020Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)AR CERTIFICATE -corrected.pdf · uploaded 19 Dec 2020Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)opus july form 2.pdf · uploaded 19 Dec 2020Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)opus sep form 2.pdf · uploaded 19 Dec 2020Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)27 july_compressed.pdf · uploaded 13 Jan 2021Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)21 sep_compressed.pdf · uploaded 13 Jan 2021Source
  • 9 Copy of the legal title reportscan0001483_compressed (1).pdf · uploaded 3 Jul 2021Source
  • 2 Building Plan Approval / NA Order for plotted developmentscan0001486_compressed.pdf · uploaded 3 Jul 2021Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 3 Jul 2021Source
  • 1 Declaration about Commencement Certificatecommencment.pdf · uploaded 3 Jul 2021Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)AR CERTIFICATE.pdf · uploaded 3 Jul 2021Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 3 Jul 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 3 Jul 2021Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 3 Jul 2021Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD_compressed.pdf · uploaded 5 Jul 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)OSP - OPUS 76 - RERA Form 5 - FY 2019-20.pdf · uploaded 13 Jul 2021Source
  • 10 Copy of the legal title reportsearch title opus76 1.pdf · uploaded 16 Jul 2021Source
  • 11 Copy of the legal title reportsearch title opus76 2.pdf · uploaded 16 Jul 2021Source
  • 4 Proforma of Allotment letterOpus76 revised draft.pdf · uploaded 16 Jul 2021Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 9 Apr 2022Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_compressed.pdf · uploaded 9 Apr 2022Source
  • 5 Proforma of Allotment letteropus76 mhada draft.pdf · uploaded 26 Sep 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)OSP_OPUS 76_RERA _Form 5_FY 2020-21_signed.pdf · uploaded 13 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)OSP_OPUS 76_RERA_Form 5_FY 2021-22_signed.pdf · uploaded 13 Feb 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)2-Form 2.pdf · uploaded 18 Feb 2023Source
  • 2 Disclosure of sold/ booked inventory4-sold_compressed.pdf · uploaded 20 Feb 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)3-form 3_compressed.pdf · uploaded 20 Feb 2023Source
  • 3 Disclosure of sold/ booked inventoryOpus 76 Sold Unsold Inventory.pdf · uploaded 17 Jul 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architecture Certificate Opus 76 March 24.pdf · uploaded 24 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Opus 76.pdf · uploaded 24 Jan 2025Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Rera Letter for December 2023.pdf · uploaded 24 Jan 2025Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Rera Letter for Month september 2023.pdf · uploaded 24 Jan 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Rera Letter for Month June 2023.pdf · uploaded 24 Jan 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Rera letter for march 2023.pdf · uploaded 24 Jan 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)1-Form 1_compressed (1).pdf · uploaded 24 Jan 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Rera Letter for Month september 2023.pdf · uploaded 24 Jan 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Opus 76.pdf · uploaded 24 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Opus 76.pdf · uploaded 24 Jan 2025Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)OPUS 76 -SOCIETY REGISTRATION CERTIFICATE.pdf · uploaded 24 Jan 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 2019-2020.pdf · uploaded 24 Jan 2025Source
  • 15 Disclosure of sold/ booked inventorySold-Unsold Dec 2023.pdf · uploaded 24 Jan 2025View
  • 14 Disclosure of sold/ booked inventorySold-Unsold Sept 2023.pdf · uploaded 24 Jan 2025Source
  • 13 Disclosure of sold/ booked inventorySold-Unsold June 2023.pdf · uploaded 24 Jan 2025Source
  • 12 Disclosure of sold/ booked inventorySold-Unsold March 2023.pdf · uploaded 24 Jan 2025Source
  • 11 Disclosure of sold/ booked inventorySold-Unsold Sept 2022.pdf · uploaded 24 Jan 2025Source
  • 10 Disclosure of sold/ booked inventorySold-Unsold June 2022.pdf · uploaded 24 Jan 2025Source
  • 9 Disclosure of sold/ booked inventorySold-Unsold March 2022.pdf · uploaded 24 Jan 2025Source
  • 8 Disclosure of sold/ booked inventorySold-Unsold Dec 2021.pdf · uploaded 24 Jan 2025Source
  • 7 Disclosure of sold/ booked inventorySold-Unsold Sept 2021.pdf · uploaded 24 Jan 2025Source
  • 6 Disclosure of sold/ booked inventorySold-Unsold March 2021.pdf · uploaded 24 Jan 2025Source
  • 5 Disclosure of sold/ booked inventorySold-Unsold Dec 2020.pdf · uploaded 24 Jan 2025Source
  • 4 Disclosure of sold/ booked inventorySold-Unsold Sept 2020.pdf · uploaded 24 Jan 2025Source
  • 3 Disclosure of sold/ booked inventorySold-Unsold June 2020.pdf · uploaded 24 Jan 2025Source
  • 2 Disclosure of sold/ booked inventorySold-Unsold March 2020.pdf · uploaded 24 Jan 2025Source
  • 1 Disclosure of sold/ booked inventorySold-Unsold Dec 2019.pdf · uploaded 24 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)June 2022.pdf · uploaded 25 Jan 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)march 2023.pdf · uploaded 25 Jan 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)June 2023.pdf · uploaded 25 Jan 2025Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)0pus dec 2024.pdf · uploaded 25 Jan 2025Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)sep 2023.pdf · uploaded 25 Jan 2025Source

Technical

  • DocumentLayout Plan.pdf · uploaded 2 Oct 2019Source
  • DocumentIOD.pdf · uploaded 2 Oct 2019Source
  • Documentscan0001486_compressed.pdf · uploaded 3 Jul 2021Source

Technical (Architect)

  • DocumentForm 1.pdf · uploaded 9 Apr 2022Source
  • DocumentForm 1- Opus 76.pdf · uploaded 24 Jan 2025Source
  • DocumentForm 1- Opus 76.pdf · uploaded 24 Jan 2025Source
  • DocumentRera Letter for Month september 2023.pdf · uploaded 24 Jan 2025Source
  • Document1-Form 1_compressed (1).pdf · uploaded 24 Jan 2025Source
  • DocumentRera letter for march 2023.pdf · uploaded 24 Jan 2025Source
  • DocumentRera Letter for Month June 2023.pdf · uploaded 24 Jan 2025Source
  • DocumentRera Letter for Month september 2023.pdf · uploaded 24 Jan 2025Source
  • DocumentRera Letter for December 2023.pdf · uploaded 24 Jan 2025Source
  • DocumentArchitecture Certificate Opus 76 March 24.pdf · uploaded 24 Jan 2025Source

Technical (Engineer)

  • Document2-Form 2.pdf · uploaded 18 Feb 2023Source
  • DocumentForm 2- Opus 76.pdf · uploaded 24 Jan 2025Source
  • DocumentJune 2022.pdf · uploaded 25 Jan 2025Source
  • Documentmarch 2023.pdf · uploaded 25 Jan 2025Source
  • DocumentJune 2023.pdf · uploaded 25 Jan 2025Source
  • Document0pus dec 2024.pdf · uploaded 25 Jan 2025Source
  • Documentsep 2023.pdf · uploaded 25 Jan 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel Survey no 762

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, 3BHK, Shop280 units in all
Address
Survey no 76-2, Bhumkar chowk Vinode wasti, WakadPIN 411057
Village
Wakad, Mulshi taluka
Land area for this project
10,000 sq m (1,07,639 sq ft)
Permissible built-up area
15,776 sq m (1,69,811 sq ft)
Sanctioned built-up area
15,776 sq m (1,69,811 sq ft)
Recreational open space
1,000 sq m (10,764 sq ft)
Designated bank account
171
Developed in phases
Yes

Survey, CTS, gat or plot numbers

Survey no 762

Land as published on MahaRERA's project page

Survey no 76-2

Boundaries

North
By property of Survey no 77 P
South
By property of Jael park society
East
By property of Survey no 76-1
West
By boundary of village Hinjewadi

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking280 units

145 of 280 units booked (52%), as the promoter reported to MahaRERA

1BHK · 77 units2BHK · 171 units3BHK · 26 unitsShop · 6 units
BuildingTypeCarpet areaUnitsBooked
A Building1BHK33.02 sq m · 355 sq ft2424
A Building2BHK55.26 sq m · 595 sq ft112
A Building2BHK55.98 sq m · 603 sq ft2420
A Building2BHK56.2 sq m · 605 sq ft125
B Building1BHK33.02 sq m · 355 sq ft241
B Building2BHK55.26 sq m · 595 sq ft112
B Building2BHK55.98 sq m · 603 sq ft245
B Building2BHK56.2 sq m · 605 sq ft121
Show all 19 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
C Building2BHK53.05 sq m · 571 sq ft5150
C Building2BHK59.54 sq m · 641 sq ft2615
C Building3BHK73.64 sq m · 793 sq ft1310
C Building3BHK75.41 sq m · 812 sq ft1310
D Mhada Building1BHK38.35 sq m · 413 sq ft290
D Mhada BuildingShop13.11 sq m · 141 sq ft10
D Mhada BuildingShop16.21 sq m · 174 sq ft10
D Mhada BuildingShop16.22 sq m · 175 sq ft10
D Mhada BuildingShop16.74 sq m · 180 sq ft10
D Mhada BuildingShop19.72 sq m · 212 sq ft10
D Mhada BuildingShop20.36 sq m · 219 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr Vikas Achalkar—
Chartered accountantCA Sumeet Kate—
EngineerMr Kailas Badgujar—
OtherSachin Jawalkar—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Wakad

All 314 projects in Wakad · Compare Opus 76 with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology