Galaxy
Deedo IDDP-PUN-SPFRMahaRERA shows it completed, after its date was pushed back 1 year; no MahaRERA orders on record; 86% of its units are booked.
Wakad, Pune 411057 · Property rates in Wakad · by Aswani Paradise
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed, after its date was pushed back 1 year
- This projectRegistered 24 Aug 2018, completion promised 30 Dec 2023, revised to 29 Dec 2024.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
9 buildings
Open a building to see every flat, floor by floor.
- 6bSize not on record100% booked
- 6dSize not on record100% booked
- 8bSize not on record100% booked
- Ab12 floors · 40 units98% booked
- Building (P52100017540)Size not on record85% booked
- C12 floors · 43 units100% booked
- D10 floors · 35 units34% booked
- E12 floors · 54 units93% booked
- F12 floors · 54 units94% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100017540
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100017540 | 24 Aug 2018 | 30 Dec 2023 | 29 Dec 2024 | Aswani Paradise | Project page |
Documents144
3 documents held by Deedo, 141 filings listed on MahaRERA's project page
Other
- OtherDate not statedView
Finance
- PAN CardASWANI PARADISE PAN CARD .pdf · uploaded 31 Jul 2018Source
Legal
Migrated
- 1 PAN CardASWANI PARADISE PAN CARD .pdf · uploaded 31 Jul 2018Source
Show all 144 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportSearch Report.pdf · uploaded 31 Jul 2018Source
- 2 Copy of the legal title reportSearch Report II.pdf · uploaded 31 Jul 2018Source
- 1 Details of encumbrancesEncumbrance certificate .pdf · uploaded 31 Jul 2018Source
- 1 Copy of Layout Approval (in case of layout)Layout PLan.pdf · uploaded 31 Jul 2018Source
- 1 Building Plan Approval (IOD)A B Wing FP-min.pdf · uploaded 31 Jul 2018Source
- 2 Building Plan Approval (IOD)A Wing Terrace FP.pdf · uploaded 31 Jul 2018Source
- 3 Building Plan Approval (IOD)C Wing Terrace FP.pdf · uploaded 31 Jul 2018Source
- 4 Building Plan Approval (IOD)D Wing Terrace FP.pdf · uploaded 31 Jul 2018Source
- 5 Building Plan Approval (IOD)E Wing FP.pdf · uploaded 31 Jul 2018Source
- 6 Building Plan Approval (IOD)E Wing Terrace FP.pdf · uploaded 31 Jul 2018Source
- 7 Building Plan Approval (IOD)F Wing FP.pdf · uploaded 31 Jul 2018Source
- 8 Building Plan Approval (IOD)F Wing Terrace FP.pdf · uploaded 31 Jul 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement.pdf · uploaded 31 Jul 2018Source
- 1 Declaration in FORM BForm B.pdf · uploaded 31 Jul 2018Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE.pdf · uploaded 31 Jul 2018Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate.pdf · uploaded 31 Jul 2018Source
- 1 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 31 Jul 2018Source
- 1 Proforma of Allotment letterAswani's Galaxy Master Draft Sr No 201-2 04072018 (1).pdf · uploaded 31 Jul 2018Source
- 2 Proforma of Allotment letterAllotment Letter.pdf · uploaded 31 Jul 2018Source
- 2 Copy of Layout Approval (in case of layout)LAYOUT 1.pdf · uploaded 23 Sep 2019Source
- 9 Building Plan Approval (IOD)COMM AB.pdf · uploaded 23 Sep 2019Source
- 10 Building Plan Approval (IOD)AB1.pdf · uploaded 23 Sep 2019Source
- 11 Building Plan Approval (IOD)C WING.pdf · uploaded 23 Sep 2019Source
- 12 Building Plan Approval (IOD)C 1.pdf · uploaded 23 Sep 2019Source
- 13 Building Plan Approval (IOD)D WING.pdf · uploaded 23 Sep 2019Source
- 14 Building Plan Approval (IOD)D 1.pdf · uploaded 23 Sep 2019Source
- 15 Building Plan Approval (IOD)D 2.pdf · uploaded 23 Sep 2019Source
- 16 Building Plan Approval (IOD)E WING.pdf · uploaded 23 Sep 2019Source
- 17 Building Plan Approval (IOD)E 1.pdf · uploaded 23 Sep 2019Source
- 18 Building Plan Approval (IOD)E 2.pdf · uploaded 23 Sep 2019Source
- 19 Building Plan Approval (IOD)F WING.pdf · uploaded 23 Sep 2019Source
- 20 Building Plan Approval (IOD)F 1.pdf · uploaded 23 Sep 2019Source
- 21 Building Plan Approval (IOD)F 1.pdf · uploaded 23 Sep 2019Source
- 22 Building Plan Approval (IOD)F 2.pdf · uploaded 23 Sep 2019Source
- 2 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT.pdf · uploaded 23 Sep 2019Source
- 3 Proforma of Allotment letterAgreement Draft.pdf · uploaded 23 Sep 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form5_Project Galaxy.pdf · uploaded 2 Jul 2021Source
- 1 Declaration about Commencement CertificateDeclaration Commencement Certificates.pdf · uploaded 13 Nov 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A - MARCH 2020.PDF · uploaded 20 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A - MARCH 2021.PDF · uploaded 20 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A- MARCH 2022.PDF · uploaded 20 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A- MARCH 2023.PDF · uploaded 20 Jan 2024Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)1.PDF · uploaded 23 Jan 2024Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2.PDF · uploaded 23 Jan 2024Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)3.PDF · uploaded 23 Jan 2024Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)4.PDF · uploaded 23 Jan 2024Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)5.PDF · uploaded 23 Jan 2024Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)6.PDF · uploaded 23 Jan 2024Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)7.PDF · uploaded 23 Jan 2024Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)8.PDF · uploaded 23 Jan 2024Source
- 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)9.PDF · uploaded 23 Jan 2024Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)1.pdf · uploaded 23 Jan 2024Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2.PDF · uploaded 23 Jan 2024Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)3.PDF · uploaded 23 Jan 2024Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)4.PDF · uploaded 23 Jan 2024Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)5.PDF · uploaded 23 Jan 2024Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)6.PDF · uploaded 23 Jan 2024Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)7.PDF · uploaded 23 Jan 2024Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)8.PDF · uploaded 23 Jan 2024Source
- 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)9.PDF · uploaded 23 Jan 2024Source
- 2 Certificates of CA (Form 3)1.pdf · uploaded 24 Jan 2024Source
- 3 Certificates of CA (Form 3)2.pdf · uploaded 24 Jan 2024Source
- 4 Certificates of CA (Form 3)4.pdf · uploaded 24 Jan 2024Source
- 5 Certificates of CA (Form 3)5.pdf · uploaded 24 Jan 2024Source
- 6 Certificates of CA (Form 3)3.pdf · uploaded 24 Jan 2024Source
- 7 Certificates of CA (Form 3)6.pdf · uploaded 24 Jan 2024Source
- 8 Certificates of CA (Form 3)7.pdf · uploaded 24 Jan 2024Source
- 9 Certificates of CA (Form 3)8.pdf · uploaded 24 Jan 2024Source
- 10 Certificates of CA (Form 3)9.pdf · uploaded 24 Jan 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration format A on Seperate bank account.pdf · uploaded 25 Jan 2024Source
- 3 Copy of Layout Approval (in case of layout)Layout Approval.pdf · uploaded 30 Jan 2024Source
- 23 Building Plan Approval (IOD)Building Plan AB.pdf · uploaded 30 Jan 2024Source
- 24 Building Plan Approval (IOD)Building Plan C.pdf · uploaded 30 Jan 2024Source
- 25 Building Plan Approval (IOD)Building Plan D-1.pdf · uploaded 30 Jan 2024Source
- 26 Building Plan Approval (IOD)Building Plan D-2.pdf · uploaded 30 Jan 2024Source
- 27 Building Plan Approval (IOD)Building Plan E-1.pdf · uploaded 30 Jan 2024Source
- 28 Building Plan Approval (IOD)Building Plan E-2.pdf · uploaded 30 Jan 2024Source
- 29 Building Plan Approval (IOD)Building Plan F-1.pdf · uploaded 30 Jan 2024Source
- 30 Building Plan Approval (IOD)Building Plan F-2.pdf · uploaded 30 Jan 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 30 Jan 2024Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Inventory December 2021.pdf · uploaded 30 Jan 2024Source
- 2 Disclosure of sold/ booked inventoryDisclosure of Inventory March 2022.pdf · uploaded 30 Jan 2024Source
- 3 Disclosure of sold/ booked inventoryDisclosure of Inventory June 2022.pdf · uploaded 30 Jan 2024Source
- 4 Disclosure of sold/ booked inventoryDisclosure of Inventory September 2022.pdf · uploaded 30 Jan 2024Source
- 5 Disclosure of sold/ booked inventoryDisclosure of Inventory December 2022.pdf · uploaded 30 Jan 2024Source
- 6 Disclosure of sold/ booked inventoryDisclosure of Inventory March 2023.pdf · uploaded 30 Jan 2024Source
- 7 Disclosure of sold/ booked inventoryDisclosure of Inventory June 2023.pdf · uploaded 30 Jan 2024Source
- 8 Disclosure of sold/ booked inventoryDisclosure of Inventory October 2023.pdf · uploaded 30 Jan 2024Source
- 9 Disclosure of sold/ booked inventoryDisclosure of Inventory December 2023.pdf · uploaded 31 Jan 2024View
- 2 Declaration about Commencement CertificateDECLRATION ABOUT COMMENCEMENT CERTIFICATE.PDF · uploaded 3 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM 5 2018-19.PDF · uploaded 3 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 2020-21.PDF · uploaded 3 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 2021-22.PDF · uploaded 3 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 2022-23.PDF · uploaded 3 Feb 2024Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration Format A on Seperate bank account.pdf · uploaded 22 Feb 2024Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentAswani Paradise PCMC Completion Certificate 30March2024.pdf · uploaded 14 Dec 2024Source
- 1 Architect’s Certificate on Completion of Project (Form 4)Form 4.PDF · uploaded 11 Feb 2025Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentVerification Email to Corporation.pdf · uploaded 12 Feb 2025Source
- 1 Other – TechnicalAswani Paradise PCMC_RERA Email.pdf · uploaded 12 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)RERA Form 5 Aswani Galaxy.pdf · uploaded 26 Feb 2025Source
Technical
- DocumentLayout PLan.pdf · uploaded 31 Jul 2018Source
- DocumentA B Wing FP-min.pdf · uploaded 31 Jul 2018Source
- DocumentA Wing Terrace FP.pdf · uploaded 31 Jul 2018Source
- DocumentC Wing Terrace FP.pdf · uploaded 31 Jul 2018Source
- DocumentD Wing Terrace FP.pdf · uploaded 31 Jul 2018Source
- DocumentE Wing FP.pdf · uploaded 31 Jul 2018Source
- DocumentE Wing Terrace FP.pdf · uploaded 31 Jul 2018Source
- DocumentF Wing FP.pdf · uploaded 31 Jul 2018Source
- DocumentF Wing Terrace FP.pdf · uploaded 31 Jul 2018Source
- DocumentLAYOUT 1.pdf · uploaded 23 Sep 2019Source
- DocumentCOMM AB.pdf · uploaded 23 Sep 2019Source
- DocumentAB1.pdf · uploaded 23 Sep 2019Source
- DocumentC WING.pdf · uploaded 23 Sep 2019Source
- DocumentC 1.pdf · uploaded 23 Sep 2019Source
- DocumentD WING.pdf · uploaded 23 Sep 2019Source
- DocumentD 1.pdf · uploaded 23 Sep 2019Source
- DocumentD 2.pdf · uploaded 23 Sep 2019Source
- DocumentE WING.pdf · uploaded 23 Sep 2019Source
- DocumentE 1.pdf · uploaded 23 Sep 2019Source
- DocumentE 2.pdf · uploaded 23 Sep 2019Source
- DocumentF WING.pdf · uploaded 23 Sep 2019Source
- DocumentF 1.pdf · uploaded 23 Sep 2019Source
- DocumentF 1.pdf · uploaded 23 Sep 2019Source
- DocumentF 2.pdf · uploaded 23 Sep 2019Source
- DocumentLayout Approval.pdf · uploaded 30 Jan 2024Source
- DocumentBuilding Plan AB.pdf · uploaded 30 Jan 2024Source
- DocumentBuilding Plan C.pdf · uploaded 30 Jan 2024Source
- DocumentBuilding Plan D-1.pdf · uploaded 30 Jan 2024Source
- DocumentBuilding Plan D-2.pdf · uploaded 30 Jan 2024Source
- DocumentBuilding Plan E-1.pdf · uploaded 30 Jan 2024Source
- DocumentBuilding Plan E-2.pdf · uploaded 30 Jan 2024Source
- DocumentBuilding Plan F-1.pdf · uploaded 30 Jan 2024Source
- DocumentBuilding Plan F-2.pdf · uploaded 30 Jan 2024Source
- Other – TechnicalAswani Paradise PCMC_RERA Email.pdf · uploaded 12 Feb 2025Source
Technical (Architect)
- Document9.PDF · uploaded 23 Jan 2024Source
Technical (Engineer)
- Document9.PDF · uploaded 23 Jan 2024Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 201/2
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, Showroom226 units in all
- Address
- 201/2, Pink City Road, WakadPIN 411057
- Village
- Wakad, Mulshi taluka
- Location
- 18.59674, 73.76543
- Land area for this project
- 4,987 sq m (53,677 sq ft)
- Permissible built-up area
- 10,202 sq m (1,09,815 sq ft)
- Sanctioned built-up area
- 5,317 sq m (57,234 sq ft)
- Recreational open space
- 501 sq m (5,392 sq ft)
- Designated bank account
- 220
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
201/2
Boundaries
- North
- Mi Casa Bella Apartment
- South
- Open Plot
- East
- Apartment
- West
- Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking226 units
195 of 226 units booked (86%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Ab | 1BHK | 29.51 sq m · 318 sq ft | 1 | 1 |
| Ab | 1BHK | 33.93 sq m · 365 sq ft | 1 | 1 |
| Ab | 1BHK | 35.19 sq m · 379 sq ft | 9 | 9 |
| Ab | 1BHK | 35.21 sq m · 379 sq ft | 9 | 9 |
| Ab | 1BHK | 40.44 sq m · 435 sq ft | 9 | 9 |
| Ab | 2BHK | 42.8 sq m · 461 sq ft | 1 | 1 |
| Ab | 2BHK | 51.07 sq m · 550 sq ft | 9 | 9 |
| Ab | Showroom | 122.18 sq m · 1,315 sq ft | 1 | 0 |
Show all 73 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| C | 1BHK | 32.38 sq m · 349 sq ft | 5 | 5 |
| C | 1BHK | 32.39 sq m · 349 sq ft | 5 | 5 |
| C | 1BHK | 32.41 sq m · 349 sq ft | 1 | 1 |
| C | 1BHK | 32.42 sq m · 349 sq ft | 5 | 5 |
| C | 1BHK | 32.45 sq m · 349 sq ft | 5 | 5 |
| C | 1BHK | 35.31 sq m · 380 sq ft | 5 | 5 |
| C | 1BHK | 35.34 sq m · 380 sq ft | 1 | 1 |
| C | 1BHK | 35.36 sq m · 381 sq ft | 5 | 5 |
| C | 1BHK | 37.38 sq m · 402 sq ft | 5 | 5 |
| C | 1BHK | 37.43 sq m · 403 sq ft | 5 | 5 |
| C | 2BHK | 37.36 sq m · 402 sq ft | 1 | 1 |
| D | 1BHK | 30.91 sq m · 333 sq ft | 1 | 1 |
| D | 1BHK | 30.92 sq m · 333 sq ft | 1 | 1 |
| D | 1BHK | 30.95 sq m · 333 sq ft | 2 | 2 |
| D | 1BHK | 30.97 sq m · 333 sq ft | 1 | 1 |
| D | 1BHK | 30.98 sq m · 333 sq ft | 1 | 1 |
| D | 1BHK | 31.07 sq m · 334 sq ft | 2 | 1 |
| D | 1BHK | 32.75 sq m · 353 sq ft | 2 | 0 |
| D | 1BHK | 32.78 sq m · 353 sq ft | 2 | 0 |
| D | 1BHK | 32.79 sq m · 353 sq ft | 1 | 0 |
| D | 1BHK | 32.81 sq m · 353 sq ft | 2 | 0 |
| D | 1BHK | 32.82 sq m · 353 sq ft | 2 | 0 |
| D | 1BHK | 32.85 sq m · 354 sq ft | 1 | 0 |
| D | 2BHK | 48.43 sq m · 521 sq ft | 1 | 1 |
| D | 2BHK | 48.49 sq m · 522 sq ft | 2 | 1 |
| D | 2BHK | 48.52 sq m · 522 sq ft | 1 | 1 |
| D | 2BHK | 48.53 sq m · 522 sq ft | 1 | 1 |
| D | 2BHK | 48.55 sq m · 523 sq ft | 2 | 1 |
| D | 2BHK | 51.13 sq m · 550 sq ft | 2 | 0 |
| D | 2BHK | 51.33 sq m · 553 sq ft | 2 | 0 |
| D | 2BHK | 51.35 sq m · 553 sq ft | 1 | 0 |
| D | 2BHK | 51.41 sq m · 553 sq ft | 2 | 0 |
| D | 2BHK | 51.46 sq m · 554 sq ft | 2 | 0 |
| D | 2BHK | 51.47 sq m · 554 sq ft | 1 | 0 |
| E | 2BHK | 36.18 sq m · 389 sq ft | 1 | 1 |
| E | 2BHK | 36.28 sq m · 391 sq ft | 1 | 1 |
| E | 2BHK | 37.95 sq m · 408 sq ft | 10 | 10 |
| E | 2BHK | 37.99 sq m · 409 sq ft | 1 | 1 |
| E | 2BHK | 38.1 sq m · 410 sq ft | 1 | 1 |
| E | 2BHK | 38.11 sq m · 410 sq ft | 1 | 1 |
| E | 2BHK | 38.15 sq m · 411 sq ft | 1 | 1 |
| E | 2BHK | 38.25 sq m · 412 sq ft | 1 | 1 |
| E | 2BHK | 38.32 sq m · 412 sq ft | 10 | 10 |
| E | 2BHK | 39.75 sq m · 428 sq ft | 5 | 5 |
| E | 2BHK | 39.88 sq m · 429 sq ft | 1 | 1 |
| E | 2BHK | 39.92 sq m · 430 sq ft | 1 | 1 |
| E | 2BHK | 51.5 sq m · 554 sq ft | 4 | 3 |
| E | 2BHK | 51.56 sq m · 555 sq ft | 4 | 3 |
| E | 2BHK | 51.77 sq m · 557 sq ft | 8 | 7 |
| E | 2BHK | 54.09 sq m · 582 sq ft | 4 | 3 |
| F | 2BHK | 41.42 sq m · 446 sq ft | 5 | 5 |
| F | 2BHK | 48.35 sq m · 520 sq ft | 5 | 5 |
| F | 2BHK | 48.47 sq m · 522 sq ft | 5 | 5 |
| F | 2BHK | 48.68 sq m · 524 sq ft | 3 | 3 |
| F | 2BHK | 48.74 sq m · 525 sq ft | 4 | 4 |
| F | 2BHK | 48.82 sq m · 525 sq ft | 1 | 1 |
| F | 2BHK | 49.11 sq m · 529 sq ft | 1 | 1 |
| F | 2BHK | 51.26 sq m · 552 sq ft | 5 | 3 |
| F | 2BHK | 51.35 sq m · 553 sq ft | 5 | 5 |
| F | 2BHK | 51.5 sq m · 554 sq ft | 5 | 5 |
| F | 2BHK | 51.67 sq m · 556 sq ft | 4 | 4 |
| F | 2BHK | 51.7 sq m · 556 sq ft | 1 | 1 |
| F | 2BHK | 51.75 sq m · 557 sq ft | 4 | 4 |
| F | 2BHK | 51.81 sq m · 558 sq ft | 5 | 4 |
| F | 2BHK | 51.82 sq m · 558 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Ankur Associates | — |
| Chartered accountant | A N J K & Co LLP | — |
| Engineer | Mayur Belose | — |
| Engineer | M/s. G. A. Bhilare Consultants Pvt. Ltd | — |
| Registered real estate agent | Black Topaz RealEstate Consultants LLP | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Wakad
- Maaisa GenesisRERA PR1260002602651
- PEBBLES BUSINESS BAY IT BuildingRERA PC1260002602561
- Wakad New ProjectRERA PR1260002602193
- Truspace Prima AltioraRERA PR1260002602057
- Arham PalazzoRERA PM1260002602013
- Austin AurusRERA PM1260002601438
- Jaijinendra NilayRERA PM1260002601417
- The Vantage A, B, C & DRERA PR1260002601066
All 314 projects in Wakad · Compare Galaxy with another project