Residential / Group Housing · 3 buildings · 156 unitsRERA P52100047315

Gaikwad Nirvanas

Deedo IDDP-PUN-60Z0

MahaRERA shows it completed; no MahaRERA orders on record; 74% of its units are booked.

Wakad, Pune 411057 · Property rates in Wakad · by Gaikwad Developers

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales74% booked115 of 156 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • This projectRegistered 19 Oct 2022, completion promised 31 Mar 2026.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

3 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100047315
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210004731519 Oct 202231 Mar 202631 Mar 2026Gaikwad DevelopersProject page
Documents169

1 document held by Deedo, 168 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPancard.pdf · uploaded 27 Sep 2022Source
  • Other – FinanceAdobe Scan Dec 27, 2023.pdf · uploaded 15 Jan 2024Source

Legal

  • Legal Title reportT S 1.pdf · uploaded 27 Sep 2022Source
  • Legal Title reportT S 2.pdf · uploaded 27 Sep 2022Source
  • Legal Title reportT S 3.pdf · uploaded 27 Sep 2022Source
  • Declaration Form BForm B Promoter.pdf · uploaded 27 Sep 2022Source
  • Legal Title reportExplanation Ralated to Legal Search_compressed.pdf · uploaded 13 Oct 2022Source
Show all 169 documentsShow fewer documents

Migrated

  • 1 PAN CardPancard.pdf · uploaded 27 Sep 2022Source
  • 1 Copy of the legal title reportT S 1.pdf · uploaded 27 Sep 2022Source
  • 2 Copy of the legal title reportT S 2.pdf · uploaded 27 Sep 2022Source
  • 3 Copy of the legal title reportT S 3.pdf · uploaded 27 Sep 2022Source
  • 1 a Details of encumbrances concerned to FinanceNo Encumb Finance.pdf · uploaded 27 Sep 2022Source
  • 1 b Details of encumbrances concerned to LegalNo Encumbrances Concerned to Legal.pdf · uploaded 27 Sep 2022Source
  • 1 Copy of Layout Approval (in case of layout)1 Sheet.pdf · uploaded 27 Sep 2022Source
  • 1 Building Plan Approval / NA Order for plotted development3 Sheet.pdf · uploaded 27 Sep 2022Source
  • 2 Building Plan Approval / NA Order for plotted development4 Sheet.pdf · uploaded 27 Sep 2022Source
  • 3 Building Plan Approval / NA Order for plotted development2 Sheet.pdf · uploaded 27 Sep 2022Source
  • 4 Building Plan Approval / NA Order for plotted development5 Sheet.pdf · uploaded 27 Sep 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 27 Sep 2022Source
  • 1 Declaration about Commencement CertificateC C Declaration.pdf · uploaded 27 Sep 2022Source
  • 1 Declaration in FORM BForm B Promoter.pdf · uploaded 27 Sep 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 01.pdf · uploaded 27 Sep 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report_200248039978_For_Asset_Based_Search_24_09_2022_13_45_26_705.pdf · uploaded 27 Sep 2022Source
  • 2 CERSAI detailsCersai Report.pdf · uploaded 27 Sep 2022Source
  • 1 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 27 Sep 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA.pdf · uploaded 27 Sep 2022Source
  • 1 Proforma of Allotment letterAnnexure 1.pdf · uploaded 27 Sep 2022Source
  • 2 Proforma of Allotment letterDraft Agreement to Sale.pdf · uploaded 27 Sep 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBANK DECLARATION 70.pdf · uploaded 27 Sep 2022Source
  • 1 Deviation Report with respect to Allotment lettergaikwad developer allotment letter.pdf · uploaded 27 Sep 2022Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report.pdf · uploaded 27 Sep 2022Source
  • 4 Copy of the legal title reportExplanation Ralated to Legal Search_compressed.pdf · uploaded 13 Oct 2022Source
  • 1 Proforma of Agreement for sale09122022 Draft Agreement to Sale Model for GAIKWAD DEVELOPERS 16092022 -.pdf · uploaded 11 Dec 2022Source
  • 2 Copy of Layout Approval (in case of layout)scan031.pdf · uploaded 9 Feb 2023Source
  • 5 Building Plan Approval / NA Order for plotted developmentscan032.pdf · uploaded 9 Feb 2023Source
  • 6 Building Plan Approval / NA Order for plotted developmentscan033.pdf · uploaded 9 Feb 2023Source
  • 7 Building Plan Approval / NA Order for plotted developmentscan034.pdf · uploaded 9 Feb 2023Source
  • 8 Building Plan Approval / NA Order for plotted developmentscan035.pdf · uploaded 9 Feb 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentComencment.pdf · uploaded 9 Feb 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 01 31032023.pdf · uploaded 17 Apr 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 02 31032023.pdf · uploaded 17 Apr 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 03 31032023_11zon.pdf · uploaded 17 Apr 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 05 2022-23.pdf · uploaded 17 Apr 2023Source
  • 3 Copy of Layout Approval (in case of layout)Layout_organized.pdf · uploaded 8 May 2023Source
  • 9 Building Plan Approval / NA Order for plotted developmentscan 2-5_organized.pdf · uploaded 8 May 2023Source
  • 10 Building Plan Approval / NA Order for plotted developmentscan 3-5_organized.pdf · uploaded 8 May 2023Source
  • 11 Building Plan Approval / NA Order for plotted developmentscan 4-5_organized.pdf · uploaded 8 May 2023Source
  • 12 Building Plan Approval / NA Order for plotted developmentscan 5-5_organized.pdf · uploaded 8 May 2023Source
  • 4 Copy of Layout Approval (in case of layout)1-7.pdf · uploaded 21 Jun 2023Source
  • 13 Building Plan Approval / NA Order for plotted development2-7.pdf · uploaded 21 Jun 2023Source
  • 14 Building Plan Approval / NA Order for plotted development3-7.pdf · uploaded 21 Jun 2023Source
  • 15 Building Plan Approval / NA Order for plotted development4-7.pdf · uploaded 21 Jun 2023Source
  • 16 Building Plan Approval / NA Order for plotted development5-7.pdf · uploaded 21 Jun 2023Source
  • 17 Building Plan Approval / NA Order for plotted development6-7.pdf · uploaded 21 Jun 2023Source
  • 18 Building Plan Approval / NA Order for plotted development7-7.pdf · uploaded 21 Jun 2023Source
  • 3 Commencement Certificates / NA Order for plotted developmentcomencement copy.pdf · uploaded 21 Jun 2023Source
  • 2 a Details of encumbrances concerned to FinanceNo Encu Finance.pdf · uploaded 6 Jul 2023Source
  • 2 b Details of encumbrances concerned to LegalNo Encu Finance.pdf · uploaded 6 Jul 2023Source
  • 2 Declaration about Commencement CertificateC C Declaration.pdf · uploaded 6 Jul 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 6 Jul 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 6 Jul 2023Source
  • 3 CERSAI detailsCersai Undertaking.pdf · uploaded 6 Jul 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 8 Jul 2023Source
  • 5 Copy of Layout Approval (in case of layout)1-8.pdf · uploaded 20 Sep 2023Source
  • 19 Building Plan Approval / NA Order for plotted development2-8.pdf · uploaded 20 Sep 2023Source
  • 20 Building Plan Approval / NA Order for plotted development3-8.pdf · uploaded 20 Sep 2023Source
  • 21 Building Plan Approval / NA Order for plotted development4-8.pdf · uploaded 20 Sep 2023Source
  • 22 Building Plan Approval / NA Order for plotted development5-8.pdf · uploaded 20 Sep 2023Source
  • 23 Building Plan Approval / NA Order for plotted development6-8.pdf · uploaded 20 Sep 2023Source
  • 24 Building Plan Approval / NA Order for plotted development7-8.pdf · uploaded 20 Sep 2023Source
  • 25 Building Plan Approval / NA Order for plotted development8-8.pdf · uploaded 20 Sep 2023Source
  • 4 Commencement Certificates / NA Order for plotted developmentCommencement Copy.pdf · uploaded 20 Sep 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 05 2022-23.pdf · uploaded 30 Sep 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)New FORM 1 ARCHITECT 5th 2-10-2023.pdf · uploaded 13 Oct 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 13 Oct 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Sign_compressed.pdf · uploaded 13 Oct 2023Source
  • 1 Other – FinanceAdobe Scan Dec 27, 2023.pdf · uploaded 15 Jan 2024Source
  • 3 a Details of encumbrances concerned to FinanceEncumbrance letter 1 dt 15-01-24 for Rera.pdf · uploaded 17 Jan 2024Source
  • 3 b Details of encumbrances concerned to LegalEncumbrance letter 1 dt 15-01-24 for Rera.pdf · uploaded 17 Jan 2024Source
  • 4 CERSAI detailsEncumbrance letter 2 dt 15-01-24 for Rera.pdf · uploaded 17 Jan 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Gaikwad Nirvanas Form 3.pdf · uploaded 19 Jan 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 20 Jan 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 20 Jan 2024Source
  • 6 Copy of Layout Approval (in case of layout)1-8.pdf · uploaded 29 Feb 2024Source
  • 26 Building Plan Approval / NA Order for plotted development2-8.pdf · uploaded 29 Feb 2024Source
  • 27 Building Plan Approval / NA Order for plotted development3-8.pdf · uploaded 29 Feb 2024Source
  • 28 Building Plan Approval / NA Order for plotted development4-8.pdf · uploaded 29 Feb 2024Source
  • 29 Building Plan Approval / NA Order for plotted development5-8.pdf · uploaded 29 Feb 2024Source
  • 30 Building Plan Approval / NA Order for plotted development6-8.pdf · uploaded 29 Feb 2024Source
  • 31 Building Plan Approval / NA Order for plotted development7-8.pdf · uploaded 29 Feb 2024Source
  • 32 Building Plan Approval / NA Order for plotted development8-8.pdf · uploaded 29 Feb 2024Source
  • 5 Commencement Certificates / NA Order for plotted developmentcomencement copy.pdf · uploaded 29 Feb 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 16 Apr 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 15-04-2024.pdf · uploaded 16 Apr 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Gaikwad Nirwanas.pdf · uploaded 16 Apr 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Signed.pdf · uploaded 14 Jul 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Signed.pdf · uploaded 14 Jul 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Signed.pdf · uploaded 14 Jul 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)CA Form 5 09-07-2024_0001.pdf · uploaded 15 Jul 2024Source
  • 4 a Details of encumbrances concerned to FinanceENCUMBRANCES CONCERNED TO FINANCE.pdf · uploaded 5 Aug 2024Source
  • 4 b Details of encumbrances concerned to LegalENCUMBRANCES CONCERNED TO FINANCE.pdf · uploaded 5 Aug 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1, Architects Certificate.pdf · uploaded 16 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 C.pdf · uploaded 16 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 16 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 15 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 GAIKWAD NIRVANAS 1.pdf · uploaded 15 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 GAIKWAD NIRVANAS.pdf · uploaded 15 Jan 2025Source
  • Form 1FORM 1 1.pdf · uploaded 19 May 2025Source
  • Form 2FORM 2 10-04-2025_0001.pdf · uploaded 19 May 2025Source
  • Form 3FORM 3 19-04-2025_0001_compressed.pdf · uploaded 19 May 2025Source
  • Form 1Form 1_page-0001.pdf · uploaded 21 Jul 2025Source
  • Form 2Form 2.pdf · uploaded 21 Jul 2025Source
  • Form 3Form 3_organized_compressed.pdf · uploaded 21 Jul 2025Source
  • Disclosure of Sold and Booked InventoryGaikwad Nirvanas Sold Unsold List_0001_page-0001.pdf · uploaded 21 Jul 2025Source
  • Form 5 (FY 2024-2025)CA Form 5 01-04-24 to 31-03-25.pdf · uploaded 21 Sep 2025Source
  • Withdrawal Update Form 1Form 1_page-0001.pdf · uploaded 8 Jan 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 8 Jan 2026Source
  • Withdrawal Update Form 3Form 3_organized_compressed.pdf · uploaded 8 Jan 2026Source
  • Withdrawal Update Form 1Form 1_page-0001.pdf · uploaded 6 Mar 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 6 Mar 2026Source
  • Withdrawal Update Form 3Form 3_organized_compressed.pdf · uploaded 6 Mar 2026Source
  • Occupational CertificateCompletion Certificate.pdf · uploaded 6 Mar 2026Source
  • Occupational CertificateCompletion Email.pdf · uploaded 6 Mar 2026Source
  • Form 5 (FY 2025-2026)CA Form 5 25-26.pdf · uploaded 25 May 2026Source

Technical

  • Document1 Sheet.pdf · uploaded 27 Sep 2022Source
  • Document3 Sheet.pdf · uploaded 27 Sep 2022Source
  • Document4 Sheet.pdf · uploaded 27 Sep 2022Source
  • Document2 Sheet.pdf · uploaded 27 Sep 2022Source
  • Document5 Sheet.pdf · uploaded 27 Sep 2022Source
  • Documentscan031.pdf · uploaded 9 Feb 2023Source
  • Documentscan032.pdf · uploaded 9 Feb 2023Source
  • Documentscan033.pdf · uploaded 9 Feb 2023Source
  • Documentscan034.pdf · uploaded 9 Feb 2023Source
  • Documentscan035.pdf · uploaded 9 Feb 2023Source
  • Documentscan 2-5_organized.pdf · uploaded 8 May 2023Source
  • Documentscan 3-5_organized.pdf · uploaded 8 May 2023Source
  • Documentscan 4-5_organized.pdf · uploaded 8 May 2023Source
  • Documentscan 5-5_organized.pdf · uploaded 8 May 2023Source
  • DocumentLayout_organized.pdf · uploaded 8 May 2023Source
  • Document1-7.pdf · uploaded 21 Jun 2023Source
  • Document2-7.pdf · uploaded 21 Jun 2023Source
  • Document3-7.pdf · uploaded 21 Jun 2023Source
  • Document4-7.pdf · uploaded 21 Jun 2023Source
  • Document5-7.pdf · uploaded 21 Jun 2023Source
  • Document6-7.pdf · uploaded 21 Jun 2023Source
  • Document7-7.pdf · uploaded 21 Jun 2023Source
  • Document1-8.pdf · uploaded 20 Sep 2023Source
  • Document2-8.pdf · uploaded 20 Sep 2023Source
  • Document3-8.pdf · uploaded 20 Sep 2023Source
  • Document4-8.pdf · uploaded 20 Sep 2023Source
  • Document5-8.pdf · uploaded 20 Sep 2023Source
  • Document6-8.pdf · uploaded 20 Sep 2023Source
  • Document7-8.pdf · uploaded 20 Sep 2023Source
  • Document8-8.pdf · uploaded 20 Sep 2023Source
  • Document1-8.pdf · uploaded 29 Feb 2024Source
  • Document2-8.pdf · uploaded 29 Feb 2024Source
  • Document3-8.pdf · uploaded 29 Feb 2024Source
  • Document4-8.pdf · uploaded 29 Feb 2024Source
  • Document5-8.pdf · uploaded 29 Feb 2024Source
  • Document6-8.pdf · uploaded 29 Feb 2024Source
  • Document7-8.pdf · uploaded 29 Feb 2024Source
  • Document8-8.pdf · uploaded 29 Feb 2024Source

Technical (Architect)

  • DocumentFORM 1, Architects Certificate.pdf · uploaded 16 Oct 2024Source
  • DocumentForm 1.pdf · uploaded 15 Jan 2025Source
  • DocumentForm 1_page-0001.pdf · uploaded 8 Jan 2026Source

Technical (Engineer)

  • DocumentFORM 2.pdf · uploaded 16 Oct 2024Source
  • DocumentForm 2 GAIKWAD NIRVANAS.pdf · uploaded 15 Jan 2025Source
  • DocumentForm 2.pdf · uploaded 8 Jan 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 144/4(P), 144/5(P)

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
2BHK, 3BHK156 units in all
Address
144/4(P), 144/5(P), 144/6/1(P), Survey Number 144/4(P), 144/5(P), 144/6(P), Kemse Wasti, Bhumkar Nagar, WakadPIN 411057
Village
Wakad, Mulshi taluka
Land area for this project
4,059 sq m (43,686 sq ft)
Permissible built-up area
17,471 sq m (1,88,060 sq ft)
Sanctioned built-up area
17,471 sq m (1,88,060 sq ft)
Designated bank account
17
Developed in phases
Yes

Survey, CTS, gat or plot numbers

144/4(P)144/5(P)144/6/1(P)

Land as published on MahaRERA's project page

144/4(P), 144/5(P), 144/6/1(P)

Boundaries

North
Sr No 144 4 And Sr No 144 1
South
Sr No 144 7 Part Belongs To Try Developer Pvt Ltd
East
Sr No 143 Part To Shri Kailash Bhujbal
West
Sr No 144 4 Sr No 144 5 And 24 Mtr Dp Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking156 units

115 of 156 units booked (74%), as the promoter reported to MahaRERA

2BHK · 86 units3BHK · 70 units
BuildingTypeCarpet areaUnitsBooked
Wing A12BHK61.66 sq m · 664 sq ft2410
Wing A12BHK62.14 sq m · 669 sq ft22
Wing A12BHK62.16 sq m · 669 sq ft21
Wing A12BHK81.57 sq m · 878 sq ft22
Wing A13BHK81.68 sq m · 879 sq ft2217
Wing A22BHK61.14 sq m · 658 sq ft21
Wing A22BHK61.66 sq m · 664 sq ft2415
Wing A22BHK61.9 sq m · 666 sq ft21
Show all 15 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Wing A23BHK81.31 sq m · 875 sq ft2217
Wing A23BHK81.34 sq m · 876 sq ft22
Wing A32BHK61.87 sq m · 666 sq ft22
Wing A32BHK61.9 sq m · 666 sq ft2422
Wing A32BHK62.14 sq m · 669 sq ft22
Wing A33BHK81.57 sq m · 878 sq ft32
Wing A33BHK81.68 sq m · 879 sq ft2119

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals6

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectArcon Associates—
Chartered accountantCA Shubham S. Bora—
Chartered accountantMohmedyasir A Bagwan—
Chartered accountantVinit D Achha And Associates—
EngineerAJINKYA A Lahigude—
EngineerPradip Halake—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Wakad

All 314 projects in Wakad · Compare Gaikwad Nirvanas with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology