Bhama Center
Deedo IDDP-PUN-62DSMahaRERA shows it completed; no MahaRERA orders on record; 13% of its units are booked.
Wakad, Pune 411057 · Property rates in Wakad · by Aastha Infra Buildcon
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 6 Nov 2019, completion promised 31 Mar 2026.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100022965
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100022965 | 6 Nov 2019 | 31 Mar 2026 | 31 Mar 2026 | Aastha Infra Buildcon | Project page |
Documents186
2 documents held by Deedo, 184 filings listed on MahaRERA's project page
Finance
- PAN Cardaastha infra buildcon.pdf · uploaded 24 Oct 2019Source
Legal
- Legal Title reportLEGAL SEARCH REPORT.pdf · uploaded 24 Oct 2019Source
- Declaration Form BForm B (2).pdf · uploaded 4 Nov 2019Source
- Declaration Form BForm B.pdf · uploaded 29 Jun 2023Source
- Declaration Form BForm b.pdf · uploaded 29 Jan 2024Source
- Declaration Form BTitle search report Final.pdf · uploaded 26 Jun 2026Source
Show all 186 documentsShow fewer documents
Migrated
- 1 PAN Cardaastha infra buildcon.pdf · uploaded 24 Oct 2019Source
- 1 Copy of the legal title reportLEGAL SEARCH REPORT.pdf · uploaded 24 Oct 2019Source
- 1 Details of encumbrancesnoe.pdf · uploaded 24 Oct 2019Source
- 1 Building Plan Approval / NA Order for plotted development08.pdf · uploaded 24 Oct 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentcom.pdf · uploaded 24 Oct 2019Source
- 1 Copy of Layout Approval (in case of layout)01.pdf · uploaded 30 Oct 2019Source
- 2 Copy of Layout Approval (in case of layout)02.pdf · uploaded 30 Oct 2019Source
- 3 Copy of Layout Approval (in case of layout)04.pdf · uploaded 30 Oct 2019Source
- 4 Copy of Layout Approval (in case of layout)05.pdf · uploaded 30 Oct 2019Source
- 5 Copy of Layout Approval (in case of layout)06.pdf · uploaded 30 Oct 2019Source
- 6 Copy of Layout Approval (in case of layout)07.pdf · uploaded 30 Oct 2019Source
- 7 Copy of Layout Approval (in case of layout)08.pdf · uploaded 30 Oct 2019Source
- 8 Copy of Layout Approval (in case of layout)09.pdf · uploaded 30 Oct 2019Source
- 9 Copy of Layout Approval (in case of layout)10.pdf · uploaded 30 Oct 2019Source
- 10 Copy of Layout Approval (in case of layout)11.pdf · uploaded 30 Oct 2019Source
- 2 Building Plan Approval / NA Order for plotted development05.pdf · uploaded 30 Oct 2019Source
- 3 Building Plan Approval / NA Order for plotted development03.pdf · uploaded 30 Oct 2019Source
- 4 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 30 Oct 2019Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate of Bhama Center.pdf · uploaded 30 Oct 2019Source
- 1 Proforma of Allotment letterDARFT.pdf · uploaded 30 Oct 2019Source
- 1 Declaration in FORM BForm B (2).pdf · uploaded 4 Nov 2019Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_compressed.pdf · uploaded 10 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A.pdf · uploaded 10 Feb 2023Source
- 1 Declaration about Commencement CertificateDeclaration of CC.pdf · uploaded 14 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)2019-20 2A.pdf · uploaded 14 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2020-21 2A.pdf · uploaded 14 Feb 2023Source
- 1 Disclosure of sold/ booked inventoryDisclosure.pdf · uploaded 14 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)19-20.pdf · uploaded 21 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)20-21.pdf · uploaded 21 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)21-22.pdf · uploaded 21 Feb 2023Source
- 2 Declaration in FORM BForm B.pdf · uploaded 29 Jun 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)IMG_20230921_161041334-merged_compressed.pdf · uploaded 29 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)RERA LETTER.pdf · uploaded 29 Sep 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Aastha Buildcon Form 3.pdf · uploaded 3 Oct 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 29 Dec 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 29 Dec 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Aastha Buildcon_Sept 23_.pdf · uploaded 30 Dec 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Aastha Buildcon_Form 1_Dec 23.pdf · uploaded 18 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Aastha Buildcon_compressed.pdf · uploaded 25 Jan 2024Source
- 3 Declaration in FORM BForm b.pdf · uploaded 29 Jan 2024Source
- 2 Disclosure of sold/ booked inventorySold Disclosure.pdf · uploaded 30 Jan 2024Source
- Form 1Architecture Cetificate 31 12 2019.pdf · uploaded 8 Nov 2025Source
- Form 1Architecture Cetificate 30 06 2020.pdf · uploaded 8 Nov 2025Source
- Form 1Architecture Cetificate 30 09 2020.pdf · uploaded 8 Nov 2025Source
- Form 1Architecture Cetificate 31 12 2020.pdf · uploaded 8 Nov 2025Source
- Form 1Architecture Cetificate 31 03 2021.pdf · uploaded 8 Nov 2025Source
- Form 1Architecture Cetificate 30 06 2021.pdf · uploaded 8 Nov 2025Source
- Form 1Architecture Cetificate 30 09 2021.pdf · uploaded 8 Nov 2025Source
- Form 1Architecture Cetificate 31 12 2021.pdf · uploaded 8 Nov 2025Source
- Form 1Architecture Cetificate 31 03 2022.pdf · uploaded 8 Nov 2025Source
- Form 1Architecture Cetificate 30 06 2022.pdf · uploaded 8 Nov 2025Source
- Form 1Architecture Cetificate 30 09 2022.pdf · uploaded 8 Nov 2025Source
- Form 1Architecture Cetificate 31 12 2022.pdf · uploaded 8 Nov 2025Source
- Form 1Architecture Cetificate 31 03 2023.pdf · uploaded 8 Nov 2025Source
- Form 1Architecture Cetificate 30 09 2023.pdf · uploaded 8 Nov 2025Source
- Form 1Architecture Cetificate 31 3 2024.pdf · uploaded 8 Nov 2025Source
- Form 1Architecture Cetificate 30 06 2023.pdf · uploaded 8 Nov 2025Source
- Form 1Architecture Cetificate 31 12 2023.pdf · uploaded 8 Nov 2025Source
- Form 1Architecture Cetificate 31 03 2020.pdf · uploaded 8 Nov 2025Source
- Form 2Engineera Cetificate 31 12 2019.pdf · uploaded 8 Nov 2025Source
- Form 2Engineera Cetificate 01 06 2020.pdf · uploaded 8 Nov 2025Source
- Form 2Engineera Cetificate 01 09 2020.pdf · uploaded 8 Nov 2025Source
- Form 2Engineera Cetificate 01 12 2020.pdf · uploaded 8 Nov 2025Source
- Form 2Engineera Cetificate 01 03 2021.pdf · uploaded 8 Nov 2025Source
- Form 2Engineera Cetificate 01 06 2021.pdf · uploaded 8 Nov 2025Source
- Form 2Engineera Cetificate 01 09 2021.pdf · uploaded 8 Nov 2025Source
- Form 2Engineera Cetificate 01 12 2021.pdf · uploaded 8 Nov 2025Source
- Form 2Engineera Cetificate 01 03 2022.pdf · uploaded 8 Nov 2025Source
- Form 2Engineera Cetificate 01 06 2022.pdf · uploaded 8 Nov 2025Source
- Form 2Engineera Cetificate 01 09 2022.pdf · uploaded 8 Nov 2025Source
- Form 2Engineera Cetificate 01 12 2022.pdf · uploaded 8 Nov 2025Source
- Form 2Engineera Cetificate 01 03 2023.pdf · uploaded 8 Nov 2025Source
- Form 2Engineera Cetificate 01 09 2023.pdf · uploaded 8 Nov 2025Source
- Form 2Engineera Cetificate 01 03 2024.pdf · uploaded 8 Nov 2025Source
- Form 2Engineera Cetificate 01 06 2023.pdf · uploaded 8 Nov 2025Source
- Form 2Engineera Cetificate 01 12 2023.pdf · uploaded 8 Nov 2025Source
- Form 2Engineera Cetificate 31 03 2020.pdf · uploaded 8 Nov 2025Source
- Form 3C A Cetificate 31 12 2019.pdf · uploaded 8 Nov 2025Source
- Form 3C A Cetificate 30 06 2020.pdf · uploaded 8 Nov 2025Source
- Form 3C A Cetificate 30 09 2020.pdf · uploaded 8 Nov 2025Source
- Form 3C A Cetificate 31 12 2020.pdf · uploaded 8 Nov 2025Source
- Form 3C A Cetificate 31 03 2021.pdf · uploaded 8 Nov 2025Source
- Form 3C A Cetificate 30 06 2021.pdf · uploaded 8 Nov 2025Source
- Form 3C A Cetificate 30 09 2021.pdf · uploaded 8 Nov 2025Source
- Form 3C A Cetificate 31 12 2021.pdf · uploaded 8 Nov 2025Source
- Form 3C A Cetificate 31 03 2022.pdf · uploaded 8 Nov 2025Source
- Form 3C A Cetificate 30 06 2022.pdf · uploaded 8 Nov 2025Source
- Form 3C A Cetificate 30 09 2022.pdf · uploaded 8 Nov 2025Source
- Form 3C A Cetificate 31 12 2022.pdf · uploaded 8 Nov 2025Source
- Form 3C A Cetificate 31 03 2023.pdf · uploaded 8 Nov 2025Source
- Form 3C A Cetificate 31 09 2023.pdf · uploaded 8 Nov 2025Source
- Form 3C A Cetificate 31 03 2024.pdf · uploaded 8 Nov 2025Source
- Form 3C A Cetificate 30 06 2023.pdf · uploaded 8 Nov 2025Source
- Form 3C A Cetificate 31 12 2023.pdf · uploaded 8 Nov 2025Source
- Form 3C A Cetificate 31 03 2020.pdf · uploaded 8 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure 31 12 2019.pdf · uploaded 8 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure 30 06 2020.pdf · uploaded 8 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure 30 09 2020.pdf · uploaded 8 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure 31 12 2020.pdf · uploaded 8 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure 31 03 2021.pdf · uploaded 8 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure 30 06 2021.pdf · uploaded 8 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure 30 09 2021.pdf · uploaded 8 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure 31 12 2021.pdf · uploaded 8 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure 31 03 2022.pdf · uploaded 8 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure 30 06 2022.pdf · uploaded 8 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure 30 09 2022.pdf · uploaded 8 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure 31 12 2022.pdf · uploaded 8 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure 31 03 2023.pdf · uploaded 8 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure 30 09 2023.pdf · uploaded 8 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure 31 03 2024.pdf · uploaded 8 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure 30 06 2023.pdf · uploaded 8 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure 31 12 2023.pdf · uploaded 8 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure 31 03 2020.pdf · uploaded 8 Nov 2025Source
- Withdrawal Update Form 1Architecture Cetificate 31 3 2024.pdf · uploaded 8 Nov 2025Source
- Withdrawal Update Form 2Engineera Cetificate 01 03 2024.pdf · uploaded 8 Nov 2025Source
- Withdrawal Update Form 3C A Cetificate 31 03 2024.pdf · uploaded 8 Nov 2025Source
- Form 2A (FY 2019-2020)Form 2A Fy 19-20 Aastha.pdf · uploaded 12 Nov 2025Source
- Form 2A (FY 2020-2021)Form 2A Fy 20-21.pdf · uploaded 12 Nov 2025Source
- Form 2A (FY 2021-2022)Form 2A Fy 21-22.pdf · uploaded 12 Nov 2025Source
- Form 2A (FY 2022-2023)Form 2A Fy 22-23 Aastha.pdf · uploaded 12 Nov 2025Source
- Form 2A (FY 2023-2024)Fy-23-24-Form-2A-12 (1).pdf · uploaded 12 Nov 2025Source
- Form 5 (FY 2019-2020)Fy 19-20 Form 5 Aastha.pdf · uploaded 12 Nov 2025Source
- Form 5 (FY 2020-2021)Fy 20-21 Aastha Form 5.pdf · uploaded 12 Nov 2025Source
- Form 5 (FY 2021-2022)Fy 21-22 Form 5 Aastha.pdf · uploaded 12 Nov 2025Source
- Form 5 (FY 2022-2023)Fy 22-23 Form 5 Aastha.pdf · uploaded 12 Nov 2025Source
- Form 5 (FY 2023-2024)Fy 23-24 Form 5.pdf · uploaded 12 Nov 2025Source
- Withdrawal Update Form 1Form 1 Jun 25.pdf · uploaded 7 Jan 2026Source
- Withdrawal Update Form 1Form 1 Jun 25.pdf · uploaded 7 Jan 2026Source
- Withdrawal Update Form 1Form 1 Sep 25.pdf · uploaded 7 Jan 2026Source
- Withdrawal Update Form 2Form 2 Jun 25.pdf · uploaded 7 Jan 2026Source
- Withdrawal Update Form 2Form 2 Jun 25.pdf · uploaded 7 Jan 2026Source
- Withdrawal Update Form 2Form 2 Sep 25.pdf · uploaded 7 Jan 2026Source
- Withdrawal Update Form 3C A Cetificate 31 03 2024.pdf · uploaded 7 Jan 2026Source
- Withdrawal Update Form 3Form 3 Jun 25.pdf · uploaded 7 Jan 2026Source
- Withdrawal Update Form 3Form 3 Sep 25.pdf · uploaded 7 Jan 2026Source
- Form 1Form 1 _Bhama center with declaration.pdf · uploaded 6 May 2026Source
- Form 2Form2 _Bhama center with declaration.pdf · uploaded 6 May 2026Source
- Form 3Form 3 _mar 25 Bhama center.pdf · uploaded 6 May 2026Source
- Disclosure of Sold and Booked InventorySold Disclosure Mar25.pdf · uploaded 6 May 2026Source
- Withdrawal Update Form 1Form 1 _Bhama center with declaration.pdf · uploaded 6 May 2026Source
- Withdrawal Update Form 2Form2 _Bhama center with declaration.pdf · uploaded 6 May 2026Source
- Withdrawal Update Form 3Form-3_Bhama Center_Dec25_signed.pdf · uploaded 6 May 2026Source
- Withdrawal Update Form 1Form 1 Bhama Center.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 2Form 2 Bhama Cenetr.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 3Form 3 Bhama Cenetr_merged.pdf · uploaded 11 Sep 2026Source
- Form 2A (FY 2024-2025)Form 2A Bhama Cenetr New.pdf · uploaded 11 Sep 2026Source
- Form 2A (FY 2025-2026)Form 2A Bhama Cenetr New.pdf · uploaded 11 Sep 2026Source
- Form 5 (FY 2024-2025)Form 5 Bhama Cenetr new.pdf · uploaded 11 Sep 2026Source
- Occupational CertificateFULL OC BHAMA CENTER.pdf · uploaded 11 Sep 2026Source
- Occupational CertificateCC Verification Bhama Center.pdf · uploaded 11 Sep 2026Source
- Form 5 (FY 2025-2026)Form 5 Bhama Center.pdf · uploaded 23 Sep 2026Source
Technical
- Document08.pdf · uploaded 24 Oct 2019Source
- Document01.pdf · uploaded 30 Oct 2019Source
- Document02.pdf · uploaded 30 Oct 2019Source
- Document04.pdf · uploaded 30 Oct 2019Source
- Document05.pdf · uploaded 30 Oct 2019Source
- Document06.pdf · uploaded 30 Oct 2019Source
- Document07.pdf · uploaded 30 Oct 2019Source
- Document08.pdf · uploaded 30 Oct 2019Source
- Document09.pdf · uploaded 30 Oct 2019Source
- Document10.pdf · uploaded 30 Oct 2019Source
- Document11.pdf · uploaded 30 Oct 2019Source
- Document05.pdf · uploaded 30 Oct 2019Source
- Document03.pdf · uploaded 30 Oct 2019Source
- Document11.pdf · uploaded 30 Oct 2019Source
- DocumentLayout 01.pdf · uploaded 8 Jan 2026Source
- DocumentPlan 02.pdf · uploaded 8 Jan 2026Source
- DocumentPlan 03.pdf · uploaded 8 Jan 2026Source
- DocumentPlan 04.pdf · uploaded 8 Jan 2026Source
- DocumentPlan 05.pdf · uploaded 8 Jan 2026Source
- DocumentPlan 06.pdf · uploaded 8 Jan 2026Source
- DocumentPlan 07.pdf · uploaded 8 Jan 2026Source
- DocumentPlan 08.pdf · uploaded 8 Jan 2026Source
- DocumentPlan 09.pdf · uploaded 8 Jan 2026Source
- DocumentPlan 10.pdf · uploaded 8 Jan 2026Source
- DocumentPlan 11.pdf · uploaded 8 Jan 2026Source
Technical (Architect)
- DocumentForm 1 Bhama Center.pdf · uploaded 11 Sep 2026Source
Technical (Engineer)
- DocumentForm 2 Bhama Cenetr.pdf · uploaded 11 Sep 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel S.NO-25, S.NO-25 at Mulshi
As registered with MahaRERA and published on its project page
- Project type
- Commercial
- Status on MahaRERA
- Certificate Signed
- Unit types
- Office space, Shop47 units in all
- Address
- S.no-25, Wakad, WakadPIN 411057
- Village
- Wakad, Mulshi taluka
- Location
- 18.06772, 73.87458
- Land area for this project
- 2,009 sq m (21,623 sq ft)
- Approved layout area
- 5,227 sq m (56,268 sq ft)
- Permissible built-up area
- 3,453 sq m (37,171 sq ft)
- Sanctioned built-up area
- 3,453 sq m (37,171 sq ft)
- Recreational open space
- 546 sq m (5,880 sq ft)
- Designated bank account
- 171
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S.NO-25
Boundaries
- North
- Hinjewadi MIDC Road
- South
- Bhama Pearl B Wing
- East
- Land Kaluram Bhujbal
- West
- Land Kaluram Bhujbal
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking47 units
6 of 47 units booked (13%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 58.12 sq m · 626 sq ft | 5 | 2 |
| Office space | 70.17 sq m · 755 sq ft | 5 | 1 |
| Office space | 73.76 sq m · 794 sq ft | 5 | 1 |
| Office space | 90.65 sq m · 976 sq ft | 5 | 2 |
| Office space | 131.91 sq m · 1,420 sq ft | 3 | 0 |
| Office space | 300.98 sq m · 3,240 sq ft | 3 | 0 |
| Shop | 12.37 sq m · 133 sq ft | 2 | 0 |
| Shop | 12.49 sq m · 134 sq ft | 2 | 0 |
Show all 18 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Shop | 12.66 sq m · 136 sq ft | 2 | 0 |
| Shop | 12.72 sq m · 137 sq ft | 2 | 0 |
| Shop | 12.76 sq m · 137 sq ft | 2 | 0 |
| Shop | 13.15 sq m · 142 sq ft | 2 | 0 |
| Shop | 13.3 sq m · 143 sq ft | 2 | 0 |
| Shop | 14.4 sq m · 155 sq ft | 1 | 0 |
| Shop | 14.61 sq m · 157 sq ft | 1 | 0 |
| Shop | 16.4 sq m · 177 sq ft | 2 | 0 |
| Shop | 22.28 sq m · 240 sq ft | 2 | 0 |
| Shop | 29.74 sq m · 320 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | j k design studio | — |
| Chartered accountant | SPAK & Co | — |
| Engineer | abhijeet desai | — |
| Engineer | pravin Kelkar | — |
| Other | Jay Shree Krisha | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Wakad
- Maaisa GenesisRERA PR1260002602651
- PEBBLES BUSINESS BAY IT BuildingRERA PC1260002602561
- Wakad New ProjectRERA PR1260002602193
- Truspace Prima AltioraRERA PR1260002602057
- Arham PalazzoRERA PM1260002602013
- Austin AurusRERA PM1260002601438
- Jaijinendra NilayRERA PM1260002601417
- The Vantage A, B, C & DRERA PR1260002601066
All 314 projects in Wakad · Compare Bhama Center with another project