Taksh Regency
Deedo IDDP-PUN-NVVKIt is due for completion in Sep 2027, with no extension on record; no MahaRERA orders on record; 51% of its units are booked.
Wagholi, Pune 412207 · Property rates in Wagholi · by Aziz Esmail Dhariwala
Buying a flat here?
See every deed registered on it.
It is due for completion in Sep 2027, with no extension on record
- This projectRegistered 5 Nov 2019, completion promised 15 Sep 2027.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100022930
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100022930 | 5 Nov 2019 | 15 Sep 2027 | 31 Dec 2025 | Aziz Esmail Dhariwala | Project page |
Documents127
3 documents held by Deedo, 124 filings listed on MahaRERA's project page
Registration certificate (2)
Finance
- PAN CardPAN.pdf · uploaded 12 Oct 2019Source
Show all 127 documentsShow fewer documents
Migrated
- 1 PAN CardPAN.pdf · uploaded 12 Oct 2019Source
- 1 Copy of the legal title reportTITLE REPORT.pdf · uploaded 12 Oct 2019Source
- 1 Building Plan Approval / NA Order for plotted developmentNA Order.pdf · uploaded 12 Oct 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement.pdf · uploaded 12 Oct 2019Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Swapnil Pisal170.pdf · uploaded 12 Oct 2019Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 rera.pdf · uploaded 12 Oct 2019Source
- 1 Proforma of Allotment letterFlat Ag - model-Wagholi (1).pdf · uploaded 12 Oct 2019Source
- 1 Details of encumbrancesencumbrances.pdf · uploaded 16 Oct 2019Source
- 1 Copy of Layout Approval (in case of layout)PLAN COPY.pdf · uploaded 16 Oct 2019Source
- 1 Declaration in FORM Bform b.pdf · uploaded 16 Oct 2019Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 2021.pdf · uploaded 7 Jan 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)From 5.pdf · uploaded 7 Jan 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect certificate.pdf · uploaded 8 Jan 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)From 5.pdf · uploaded 2 Mar 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A FY 19-20.pdf · uploaded 3 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A FY 20-21.pdf · uploaded 3 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A FY 21-22.pdf · uploaded 3 Apr 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 31 12 2019 signed.pdf · uploaded 4 Apr 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 31 03 2020 signed.pdf · uploaded 4 Apr 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 30 6 2020 signed.pdf · uploaded 4 Apr 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 30 09 2020 signed.pdf · uploaded 4 Apr 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 31 12 2020 signed.pdf · uploaded 4 Apr 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 31 03 2021 signed.pdf · uploaded 4 Apr 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 30 06 2021 signed.pdf · uploaded 4 Apr 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 30 09 2021 signed.pdf · uploaded 4 Apr 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 31 12 2021 signed.pdf · uploaded 4 Apr 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 31 03 2022 signed.pdf · uploaded 4 Apr 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 30 06 2022 SIGNED.pdf · uploaded 4 Apr 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 30 09 2022 SIGNED.pdf · uploaded 4 Apr 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 31 12 2022 SIGNED.pdf · uploaded 4 Apr 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 31 03 2023 SIGNED.pdf · uploaded 4 Apr 2024Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 30 06 2023 SIGND.pdf · uploaded 4 Apr 2024Source
- 18 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 30 09 2023 SIGND.pdf · uploaded 4 Apr 2024Source
- 19 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 31 12 2023 SIGNED.pdf · uploaded 4 Apr 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)31 12 2019.pdf · uploaded 10 Apr 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)2019 31 12.pdf · uploaded 10 Apr 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)2020 31 03.pdf · uploaded 10 Apr 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)2020 30 06.pdf · uploaded 10 Apr 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)2020 30 09.pdf · uploaded 10 Apr 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)2020 31 12.pdf · uploaded 10 Apr 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)2021 30 06.pdf · uploaded 10 Apr 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)2021 30 09.pdf · uploaded 10 Apr 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)2021 31 12.pdf · uploaded 10 Apr 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)2022 31 03.pdf · uploaded 10 Apr 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)2022 30 06.pdf · uploaded 10 Apr 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)2022 30 09.pdf · uploaded 10 Apr 2024Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)2022 31 12.pdf · uploaded 10 Apr 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)2023 31 03.pdf · uploaded 10 Apr 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)2023 30 06.pdf · uploaded 10 Apr 2024Source
- 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)2023 30 09.pdf · uploaded 10 Apr 2024Source
- 19 Architect’s Certificate of Percentage of Completion of Work (Form 1)2023 31 12.pdf · uploaded 10 Apr 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)31 12 2019.pdf · uploaded 10 Apr 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)31 03 2020.pdf · uploaded 10 Apr 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)30 06 2020.pdf · uploaded 10 Apr 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)30 09 2020.pdf · uploaded 10 Apr 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)31 12 2020.pdf · uploaded 10 Apr 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)31 03 2021.pdf · uploaded 10 Apr 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)30 06 2021.pdf · uploaded 10 Apr 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)30 09 2021.pdf · uploaded 10 Apr 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)31 12 2021.pdf · uploaded 10 Apr 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)31 03 2022.pdf · uploaded 10 Apr 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)30 06 2022.pdf · uploaded 10 Apr 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)30 09 2022.pdf · uploaded 10 Apr 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)31 12 2022.pdf · uploaded 10 Apr 2024Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)31 03 2023.pdf · uploaded 10 Apr 2024Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)30 06 2023.pdf · uploaded 10 Apr 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)30 09 2023.pdf · uploaded 10 Apr 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)31 12 2023.pdf · uploaded 10 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2 22 23.pdf · uploaded 10 Apr 2024Source
- 20 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 31 03 2023 signed.pdf · uploaded 18 Apr 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 for 31 03 2022.pdf · uploaded 18 Apr 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 for 31 03 2023.pdf · uploaded 18 Apr 2024Source
- 2 Declaration in FORM BForm B.pdf · uploaded 28 May 2024Source
- 1 Disclosure of sold/ booked inventoryQ 3 21-22Sold Circular.pdf · uploaded 30 May 2024Source
- 2 Disclosure of sold/ booked inventoryQ4 21-22Sold Circular 1-3-4.pdf · uploaded 30 May 2024Source
- 3 Disclosure of sold/ booked inventoryQ1 22-23Sold Circular 1-5-6.pdf · uploaded 30 May 2024Source
- 4 Disclosure of sold/ booked inventoryQ2 22-23 Sold Circular 1-7-8.pdf · uploaded 30 May 2024Source
- 5 Disclosure of sold/ booked inventoryQ3 22-23 Sold Circular 1-9-10.pdf · uploaded 30 May 2024Source
- 6 Disclosure of sold/ booked inventoryQ1 23-24Sold Circular 1-13-14.pdf · uploaded 30 May 2024Source
- 7 Disclosure of sold/ booked inventoryQ2 23-24 Sold Circular 1-15-16.pdf · uploaded 30 May 2024Source
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 31-03-2024.pdf · uploaded 4 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)form 2A FY 2023-24.pdf · uploaded 4 Jun 2024Source
- 8 Disclosure of sold/ booked inventoryQ3 23-24 Sold Circular.pdf · uploaded 4 Jun 2024Source
- 9 Disclosure of sold/ booked inventoryQ4 23-24 Sold Circular.pdf · uploaded 4 Jun 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 for 31-03-2021.pdf · uploaded 4 Jun 2024Source
- 21 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final Form 3.pdf · uploaded 5 Jun 2024Source
- 20 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 6 Jun 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 for March 2024.pdf · uploaded 16 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 for March 2024.pdf · uploaded 16 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30 06 2024.pdf · uploaded 28 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30 09 2024.pdf · uploaded 28 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 30 06 2024.pdf · uploaded 22 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 30 09 2024.pdf · uploaded 22 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect ceetficate 31 12 2024.pdf · uploaded 22 Feb 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30 06 2024.pdf · uploaded 22 Feb 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30 09 2024.pdf · uploaded 22 Feb 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31 12 2024.pdf · uploaded 22 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 JUN 24 NEW.pdf · uploaded 22 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SEPT 24 NEW.pdf · uploaded 22 Feb 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 31 12 2024.pdf · uploaded 22 Feb 2025Source
- 1 Copy of Layout Approval (in case of layout)scan_20250218102832 (1).pdf · uploaded 8 Apr 2025Source
- 1 Declaration in FORM Bform b (1) (1).pdf · uploaded 8 Apr 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCC- Taksh Regency_compressed.pdf · uploaded 8 Apr 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentscan_20250218102953 (1).pdf · uploaded 8 Apr 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentscan_20250218103251 jpeg_compressed.pdf · uploaded 8 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Taksh-F3.pdf · uploaded 16 May 2025Source
Technical
- DocumentNA Order.pdf · uploaded 12 Oct 2019Source
- DocumentPLAN COPY.pdf · uploaded 16 Oct 2019Source
- Documentscan_20250218102832 (1).pdf · uploaded 8 Apr 2025Source
- Documentscan_20250218102953 (1).pdf · uploaded 8 Apr 2025Source
- Documentscan_20250218103251 jpeg_compressed.pdf · uploaded 8 Apr 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel GAT NO. 1355, OLD GAT NO. 2341
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, Shop96 units in all
- Address
- Old Gat No. 2341, Gat No. 1355, At Wagholi, Tal - Haveli, Dist - Pune., Nagar Road, Ubale NagarPIN 412207
- Village
- Wagholi, Haveli taluka
- Land area for this project
- 2,188 sq m (23,551 sq ft)
- Permissible built-up area
- 2,337 sq m (25,155 sq ft)
- Sanctioned built-up area
- 2,187 sq m (23,541 sq ft)
- Recreational open space
- 250 sq m (2,691 sq ft)
- Designated bank account
- 85
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
OLD GAT NO. 2341, GAT NO. 1355, AT WAGHOLI, TAL - HAVELI, DIST - PUNE.
Boundaries
- North
- Adj Gat No 1358
- South
- 12 M Wide Dp Road
- East
- Adj Gat No 1355 Part
- West
- Adj Gat No 1355 Part
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking96 units
49 of 96 units booked (51%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 39.26 sq m · 423 sq ft | 35 | 20 |
| 1BHK | 41.05 sq m · 442 sq ft | 7 | 3 |
| 1BHK | 41.05 sq m · 442 sq ft | 7 | 6 |
| 1BHK | 41.19 sq m · 443 sq ft | 7 | 0 |
| 2BHK | 53.08 sq m · 571 sq ft | 28 | 20 |
| Shop | 14.04 sq m · 151 sq ft | 2 | 0 |
| Shop | 14.8 sq m · 159 sq ft | 4 | 0 |
| Shop | 15.56 sq m · 167 sq ft | 1 | 0 |
Show all 11 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Shop | 15.56 sq m · 167 sq ft | 2 | 0 |
| Shop | 21.27 sq m · 229 sq ft | 1 | 0 |
| Shop | 22.3 sq m · 240 sq ft | 2 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Ar Atitshrikant Admulwar | — |
| Chartered accountant | Rsms And Associates | — |
| Engineer | Govinda Gopi Chavan | — |
| Other | Taksh Housing | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Wagholi
- Never Before Manjari Phase 1RERA PR1260002602570
- Ganga PavitraRERA PM1261012602430
- Rohan Yuva Bldg B & CRERA PC1260002602439
- The ElementRERA PM1260002602060
- Serene SpacesRERA PR1260002601339
- Omicron Tech ParkRERA PC1260002601259
- RTC Emerald SuitesRERA PR1260002601179
- T5E ApexRERA PR1260002601183
All 340 projects in Wagholi · Compare Taksh Regency with another project
