Palmnest Phase III
Deedo IDDP-PUN-CDAGMahaRERA shows it completed, after its date was pushed back 2 years and 6 months; no MahaRERA orders on record; 95% of its units are booked.
Wagholi, Pune 412207 · Property rates in Wagholi · by Ng Rathi Properties Llp
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed, after its date was pushed back 2 years and 6 months
- This projectRegistered 16 Mar 2018, completion promised 30 Dec 2022, revised to 30 Jun 2025.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100015668
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100015668 | 16 Mar 2018 | 30 Dec 2022 | 30 Jun 2025 | Ng Rathi Properties LLP | Project page |
Documents202
3 documents held by Deedo, 199 filings listed on MahaRERA's project page
Show all 202 documentsShow fewer documents
Legal
- Legal Title reportSERACH TITLE REPORT(1-10).pdf · uploaded 12 Mar 2018Source
- Legal Title reportSEARCH TITLE REPORT(11-17).pdf · uploaded 12 Mar 2018Source
- Declaration Form BAFFIDAVITE CUM DECLERATION.pdf · uploaded 12 Mar 2018Source
- OtherDisclosure of interest in other real estate org.pdf · uploaded 1 Feb 2024Source
- OtherFormat-B Extention Declaration.pdf · uploaded 1 Feb 2024Source
- Declaration Form BForm B-as per Rera.pdf · uploaded 1 Feb 2024Source
- OtherRevised Format B-Extention Declaration.pdf · uploaded 16 Feb 2024Source
- Declaration Form BForm B as per Rera.pdf · uploaded 12 Feb 2025Source
- Declaration Form BForm B As per Rera (Colour)_compressed.pdf · uploaded 15 Mar 2025Source
Migrated
- 1 PAN CardPAN CARD.pdf · uploaded 12 Mar 2018Source
- 1 Copy of the legal title reportSERACH TITLE REPORT(1-10).pdf · uploaded 12 Mar 2018Source
- 2 Copy of the legal title reportSEARCH TITLE REPORT(11-17).pdf · uploaded 12 Mar 2018Source
- 1 Details of encumbrancesNO ENCUMBARANCE.pdf · uploaded 12 Mar 2018Source
- 1 Copy of Layout Approval (in case of layout)PALM NEST PHASE III -LAYOUT.pdf · uploaded 12 Mar 2018Source
- 1 Building Plan Approval (IOD)sanction plan(LLP).pdf · uploaded 12 Mar 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 12 Mar 2018Source
- 1 Declaration in FORM BAFFIDAVITE CUM DECLERATION.pdf · uploaded 12 Mar 2018Source
- 1 Certificates of CA (Form 3)Form_3_maha_rera_Palm Nest-III-1.pdf · uploaded 12 Mar 2018Source
- 1 OtherPALM NEST PHASE III -LAYOUT.pdf · uploaded 12 Mar 2018Source
- 2 OtherNA ORDER { SANAD}.pdf · uploaded 12 Mar 2018Source
- 3 OtherZONE CERTIFICATE.pdf · uploaded 12 Mar 2018Source
- 4 OtherSELF DECLARATION FOR PHASE WISE REGISTRATION1.pdf · uploaded 12 Mar 2018Source
- 1 Proforma of Allotment letterAOA 1-10.pdf · uploaded 13 Mar 2018Source
- 2 Proforma of Allotment letterAOA 11-20.pdf · uploaded 13 Mar 2018Source
- 3 Proforma of Allotment letterAOA 21-30.pdf · uploaded 13 Mar 2018Source
- 4 Proforma of Allotment letterAOA 31-40.pdf · uploaded 13 Mar 2018Source
- 5 Proforma of Allotment letterAOA 41-50.pdf · uploaded 13 Mar 2018Source
- 6 Proforma of Allotment letterAOA 51-56.pdf · uploaded 13 Mar 2018Source
- 7 Proforma of Allotment letterpossession letter.pdf · uploaded 13 Mar 2018Source
- 2 Details of encumbrancesIndex II of SBI MORTGAGE PG 1-2.pdf · uploaded 27 Oct 2018Source
- 8 Proforma of Allotment letterPAGE 1-10.pdf · uploaded 24 Nov 2020Source
- 9 Proforma of Allotment letterPAGE 11-20.pdf · uploaded 24 Nov 2020Source
- 10 Proforma of Allotment letterPAGE 21-30.pdf · uploaded 24 Nov 2020Source
- 11 Proforma of Allotment letterPAGE 31-40.pdf · uploaded 24 Nov 2020Source
- 12 Proforma of Allotment letterPAGE 41-50.pdf · uploaded 24 Nov 2020Source
- 13 Proforma of Allotment letterPAGE 51-56.pdf · uploaded 24 Nov 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERFICATE.pdf · uploaded 23 Dec 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineers certificates.pdf · uploaded 23 Dec 2020Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)engineers certificates.pdf · uploaded 23 Dec 2020Source
- 2 Commencement Certificates / NA Order for plotted developmentRevised Commencement Certificate.pdf · uploaded 6 Aug 2021Source
- 1 Declaration about Commencement CertificateDECLERATION ABOUT COMMENCMENT CERTIFICATE PALMNEST.pdf · uploaded 6 Aug 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARECHITECT CERTIFIACET JUNE 21_compressed.pdf · uploaded 6 Aug 2021Source
- 2 Certificates of CA (Form 3)Form3-PalmNest3-dt2021Mar31-DSC_compressed.pdf · uploaded 6 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form5-PalmNest3-dt2021Mar31-DSC.pdf · uploaded 6 Aug 2021Source
- 2 Copy of Layout Approval (in case of layout)206_compressed.pdf · uploaded 7 Aug 2021Source
- 3 Copy of Layout Approval (in case of layout)207_compressed.pdf · uploaded 7 Aug 2021Source
- 4 Copy of Layout Approval (in case of layout)208_compressed.pdf · uploaded 7 Aug 2021Source
- 5 Copy of Layout Approval (in case of layout)209_compressed.pdf · uploaded 7 Aug 2021Source
- 6 Copy of Layout Approval (in case of layout)210_compressed.pdf · uploaded 7 Aug 2021Source
- 7 Copy of Layout Approval (in case of layout)211_compressed.pdf · uploaded 7 Aug 2021Source
- 8 Copy of Layout Approval (in case of layout)212_compressed.pdf · uploaded 7 Aug 2021Source
- 9 Copy of Layout Approval (in case of layout)213_compressed.pdf · uploaded 7 Aug 2021Source
- 10 Copy of Layout Approval (in case of layout)214_compressed.pdf · uploaded 7 Aug 2021Source
- 11 Copy of Layout Approval (in case of layout)215_compressed.pdf · uploaded 7 Aug 2021Source
- 12 Copy of Layout Approval (in case of layout)216_compressed.pdf · uploaded 7 Aug 2021Source
- 13 Copy of Layout Approval (in case of layout)217_compressed.pdf · uploaded 7 Aug 2021Source
- 14 Copy of Layout Approval (in case of layout)218_compressed.pdf · uploaded 7 Aug 2021Source
- 15 Copy of Layout Approval (in case of layout)219_compressed.pdf · uploaded 7 Aug 2021Source
- 16 Copy of Layout Approval (in case of layout)220_compressed.pdf · uploaded 7 Aug 2021Source
- 17 Copy of Layout Approval (in case of layout)221_compressed.pdf · uploaded 7 Aug 2021Source
- 18 Copy of Layout Approval (in case of layout)222_compressed.pdf · uploaded 7 Aug 2021Source
- 19 Copy of Layout Approval (in case of layout)223_compressed.pdf · uploaded 7 Aug 2021Source
- 20 Copy of Layout Approval (in case of layout)224_compressed.pdf · uploaded 7 Aug 2021Source
- 21 Copy of Layout Approval (in case of layout)225_compressed.pdf · uploaded 7 Aug 2021Source
- 3 Details of encumbrancesEncumbrance Letter -Palm Nest.pdf · uploaded 26 Oct 2021Source
- 4 Details of encumbrancesMortgage Deed 17212-2022-3-4.pdf · uploaded 19 Sep 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)engineer certificate Oct 2022.pdf · uploaded 29 Dec 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200256137588_For_Asset_Based_Search_29_12_2022_13_16_58_406.pdf · uploaded 29 Dec 2022Source
- 3 Certificates of CA (Form 3)Form 3 MahaRERA-Palm Nest III.pdf · uploaded 29 Dec 2022Source
- 1 Proforma of Agreement for saleAgreement Draft ATS G building 27122020.pdf · uploaded 29 Dec 2022Source
- 14 Proforma of Allotment letterAllotment Letter ANNEXURE 1.pdf · uploaded 29 Dec 2022Source
- 5 a Details of encumbrances concerned to FinanceNon Encomrance Certificate-legal.pdf · uploaded 3 Jan 2023Source
- 6 a Details of encumbrances concerned to FinanceNon encomrance certificate-finance.pdf · uploaded 3 Jan 2023Source
- 1 b Details of encumbrances concerned to LegalNon Encomrance Certificate-legal.pdf · uploaded 3 Jan 2023Source
- 2 b Details of encumbrances concerned to LegalNon encomrance certificate-finance.pdf · uploaded 3 Jan 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Engineers Certificate Palm Nest 30-06-2021.pdf · uploaded 3 Jan 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDeclaration about separate bank account for real estate projects.pdf · uploaded 3 Jan 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form5-NGR Prop-PalmNest3-2022Mar31-DSC.pdf · uploaded 3 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form5-NGR Prop-PalmNest3-2022Mar31-DSC.pdf · uploaded 3 Jan 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration about separate bank account for real estate projects.pdf · uploaded 3 Jan 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation Report With Respect To allotment Letter.pdf · uploaded 3 Jan 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation report with respect to model copy of agreement.pdf · uploaded 3 Jan 2023Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold-Unsold Inventory.pdf · uploaded 4 Jan 2023View
- 2 Declaration in FORM BForm B-as per Rera.pdf · uploaded 1 Feb 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE FORM 1.pdf · uploaded 1 Feb 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate.pdf · uploaded 1 Feb 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2a engineers Certificate.pdf · uploaded 1 Feb 2024Source
- 2 Disclosure of sold/ booked inventorySold-Booked Inventory Disclosure 31-12-23.pdf · uploaded 1 Feb 2024Source
- 4 Certificates of CA (Form 3)Form3-Phase3-Mar23 (1).pdf · uploaded 1 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form5-PalmNest3-Mar23-DSC.pdf · uploaded 1 Feb 2024Source
- 5 OtherDisclosure of interest in other real estate org.pdf · uploaded 1 Feb 2024Source
- 6 OtherFormat-B Extention Declaration.pdf · uploaded 1 Feb 2024Source
- 7 Details of encumbrancesMORGAGE DEED 2727-2024-5.pdf · uploaded 15 Feb 2024Source
- 3 Disclosure of sold/ booked inventoryRevised Sold-Unsold Inventory 31-12-2023.pdf · uploaded 16 Feb 2024Source
- 5 Certificates of CA (Form 3)Revised Form3-PalmNest3-Dt2023Dec31.pdf · uploaded 16 Feb 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsRevised Disclosure of interest in other real estate projects.pdf · uploaded 16 Feb 2024Source
- 7 OtherRevised Format B-Extention Declaration.pdf · uploaded 16 Feb 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Cerificate-Form 1.pdf · uploaded 21 Feb 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate-Form 2.pdf · uploaded 21 Feb 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Engineers Certificate-Form 2.pdf · uploaded 21 Feb 2024Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Engineers Certificate Form 2a.pdf · uploaded 21 Feb 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5-31 March 2023.pdf · uploaded 21 Feb 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30-06-23.pdf · uploaded 28 Feb 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30-09-23.pdf · uploaded 28 Feb 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31-12-23.pdf · uploaded 28 Feb 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30-06-23.pdf · uploaded 28 Feb 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30-09-23.pdf · uploaded 28 Feb 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 31-12-23.pdf · uploaded 28 Feb 2024Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 30-06-23.pdf · uploaded 28 Feb 2024Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 30-09-23.pdf · uploaded 28 Feb 2024Source
- 6 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 31-12-23.pdf · uploaded 28 Feb 2024Source
- 8 a Details of encumbrances concerned to FinanceMortgage and Hyphothication Index II.pdf · uploaded 2 Jul 2024Source
- 3 b Details of encumbrances concerned to LegalMortgage and Hyphothication Index II.pdf · uploaded 2 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 17 Dec 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 17 Dec 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 17 Dec 2024Source
- 14 Certificates of CA (Form 3)PalmNest3-Form3-2024Jun_Signed.pdf · uploaded 17 Dec 2024Source
- 13 Certificates of CA (Form 3)PalmNest3-Form3-2024Mar_Signed.pdf · uploaded 17 Dec 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 17 Dec 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 17 Dec 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 17 Dec 2024Source
- 2 Disclosure of sold/ booked inventoryRevised disclosure of sold booked inventory.pdf · uploaded 17 Dec 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.pdf · uploaded 17 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form5-PalmNest3-2024Mar.pdf · uploaded 17 Dec 2024Source
- 2 Copy of Layout Approval (in case of layout)Sheet No 17 of 22 - G.pdf · uploaded 18 Dec 2024Source
- 1 Copy of Layout Approval (in case of layout)Sheet No 1 of 22 Layout.pdf · uploaded 18 Dec 2024Source
- 5 Copy of Layout Approval (in case of layout)Sheet No 20 of 22 - G.pdf · uploaded 18 Dec 2024Source
- 4 Copy of Layout Approval (in case of layout)Sheet No 19 of 22 - G.pdf · uploaded 18 Dec 2024Source
- 3 Copy of Layout Approval (in case of layout)Sheet No 18 of 22 - G.pdf · uploaded 18 Dec 2024Source
- 15 Certificates of CA (Form 3)PalmNest3-Form3-2024Sep_Signed.pdf · uploaded 18 Dec 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentPalmnest Commencement Certificate 09-12-2024.pdf · uploaded 18 Dec 2024Source
- 1 Building Plan Approval (IOD)Sheet No 1 of 22 Layout.pdf · uploaded 18 Dec 2024Source
- 1 Declaration in FORM BForm B as per Rera.pdf · uploaded 12 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 24.pdf · uploaded 12 Feb 2025Source
- 11 Certificates of CA (Form 3)Form3-PalmNest3-2024Dec-1.pdf · uploaded 12 Feb 2025Source
- 10 Certificates of CA (Form 3)Scanned Form 3 Dec 2024.pdf · uploaded 12 Feb 2025Source
- 9 Certificates of CA (Form 3)Scanned PalmNest3-Form3-2024Sep_Signed (1).pdf · uploaded 12 Feb 2025Source
- 8 Certificates of CA (Form 3)Scanned PalmNest3-Form3-2024Jun_Signed.pdf · uploaded 12 Feb 2025Source
- 6 Certificates of CA (Form 3)Scanned Revised Form3-PalmNest3-Dt2023Dec311.pdf · uploaded 12 Feb 2025Source
- 5 Certificates of CA (Form 3)Scanned Revised Form3-PalmNest3-Dt2023Jun30-DSC.pdf · uploaded 12 Feb 2025Source
- 4 Certificates of CA (Form 3)Scanned Form3-Phase3-Mar23 (1).pdf · uploaded 12 Feb 2025Source
- 3 Certificates of CA (Form 3)Scanned Form 3 MahaRERA-Palm Nest III-Jan 2023.pdf · uploaded 12 Feb 2025Source
- 2 Certificates of CA (Form 3)Scanned Form 3 MahaRERA-Palm Nest III.pdf · uploaded 12 Feb 2025Source
- 1 Certificates of CA (Form 3)Scanned Form3-PalmNest3-2022Jun30-DSC.pdf · uploaded 12 Feb 2025Source
- 7 Certificates of CA (Form 3)Scanned PalmNest3-Form3-2024Mar_Signed.pdf · uploaded 12 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec 24.pdf · uploaded 12 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold-Booked Inventory 30-12-24.pdf · uploaded 12 Feb 2025View
- 12 Certificates of CA (Form 3)Scanned Form 3 Sept 23.pdf · uploaded 14 Feb 2025Source
- 1 Declaration in FORM BForm B As per Rera (Colour)_compressed.pdf · uploaded 15 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 26 Jun 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 26 Jun 2025Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate - G Tower.pdf · uploaded 26 Jun 2025Source
- 1 Other – TechnicalForm 4.pdf · uploaded 1 Jul 2025Source
Technical
- Documentsanction plan(LLP).pdf · uploaded 12 Mar 2018Source
- DocumentPALM NEST PHASE III -LAYOUT.pdf · uploaded 12 Mar 2018Source
- Document206_compressed.pdf · uploaded 7 Aug 2021Source
- Document207_compressed.pdf · uploaded 7 Aug 2021Source
- Document208_compressed.pdf · uploaded 7 Aug 2021Source
- Document209_compressed.pdf · uploaded 7 Aug 2021Source
- Document210_compressed.pdf · uploaded 7 Aug 2021Source
- Document211_compressed.pdf · uploaded 7 Aug 2021Source
- Document212_compressed.pdf · uploaded 7 Aug 2021Source
- Document213_compressed.pdf · uploaded 7 Aug 2021Source
- Document214_compressed.pdf · uploaded 7 Aug 2021Source
- Document215_compressed.pdf · uploaded 7 Aug 2021Source
- Document216_compressed.pdf · uploaded 7 Aug 2021Source
- Document217_compressed.pdf · uploaded 7 Aug 2021Source
- Document218_compressed.pdf · uploaded 7 Aug 2021Source
- Document219_compressed.pdf · uploaded 7 Aug 2021Source
- Document220_compressed.pdf · uploaded 7 Aug 2021Source
- Document221_compressed.pdf · uploaded 7 Aug 2021Source
- Document222_compressed.pdf · uploaded 7 Aug 2021Source
- Document223_compressed.pdf · uploaded 7 Aug 2021Source
- Document224_compressed.pdf · uploaded 7 Aug 2021Source
- Document225_compressed.pdf · uploaded 7 Aug 2021Source
- DocumentSheet No 1 of 22 Layout.pdf · uploaded 18 Dec 2024Source
- DocumentSheet No 17 of 22 - G.pdf · uploaded 18 Dec 2024Source
- DocumentSheet No 18 of 22 - G.pdf · uploaded 18 Dec 2024Source
- DocumentSheet No 19 of 22 - G.pdf · uploaded 18 Dec 2024Source
- DocumentSheet No 20 of 22 - G.pdf · uploaded 18 Dec 2024Source
- DocumentSheet No 1 of 22 Layout.pdf · uploaded 18 Dec 2024Source
- Other – TechnicalForm 4.pdf · uploaded 1 Jul 2025Source
Technical (Architect)
- DocumentForm 1 31-12-23.pdf · uploaded 28 Feb 2024Source
- DocumentForm 1.pdf · uploaded 17 Dec 2024Source
- DocumentForm 1.pdf · uploaded 17 Dec 2024Source
- DocumentForm 1.pdf · uploaded 17 Dec 2024Source
- DocumentForm 1 Dec 24.pdf · uploaded 12 Feb 2025Source
- DocumentForm 1.pdf · uploaded 26 Jun 2025Source
Technical (Engineer)
- DocumentForm 2 31-12-23.pdf · uploaded 28 Feb 2024Source
- DocumentForm 2.pdf · uploaded 17 Dec 2024Source
- DocumentForm 2.pdf · uploaded 17 Dec 2024Source
- DocumentForm 2.pdf · uploaded 17 Dec 2024Source
- DocumentForm 2 Dec 24.pdf · uploaded 12 Feb 2025Source
- DocumentForm 2.pdf · uploaded 26 Jun 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel GAT NO 927
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK108 units in all
- Address
- Gat No 927, Kesnand Phata Road, Kesnand RoadPIN 412207
- Village
- Wagholi, Haveli taluka
- Location
- 18.57534, 73.99305
- Land area for this project
- 3,880 sq m (41,761 sq ft)
- Permissible built-up area
- 9,492 sq m (1,02,171 sq ft)
- Sanctioned built-up area
- 7,930 sq m (85,353 sq ft)
- Recreational open space
- 1,778 sq m (19,136 sq ft)
- Designated bank account
- 17
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
GAT NO 927
Boundaries
- North
- Open Space And 30mtr Wide Rp Road And Gat No 926
- South
- Bldg No F And Gat No 927
- East
- Gat No 927 Part
- West
- Gat No 1067 1068 1069 And 1061
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking108 units
103 of 108 units booked (95%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 49.23 sq m · 530 sq ft | 2 | 1 |
| 2BHK | 77.8 sq m · 837 sq ft | 13 | 13 |
| 2BHK | 78.24 sq m · 842 sq ft | 13 | 13 |
| 2BHK | 79.55 sq m · 856 sq ft | 28 | 28 |
| 2BHK | 82.4 sq m · 887 sq ft | 52 | 48 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Other projects in Wagholi
- Never Before Manjari Phase 1RERA PR1260002602570
- Ganga PavitraRERA PM1261012602430
- Rohan Yuva Bldg B & CRERA PC1260002602439
- The ElementRERA PM1260002602060
- Serene SpacesRERA PR1260002601339
- Omicron Tech ParkRERA PC1260002601259
- RTC Emerald SuitesRERA PR1260002601179
- T5E ApexRERA PR1260002601183
All 340 projects in Wagholi · Compare Palmnest Phase III with another project