Equa
Deedo IDDP-PUN-WZF3Completion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 83% of its units are booked.
Wagholi, Pune 412207 · Property rates in Wagholi · by Amco Landmark Realty, Amco Landmark Realty
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2027
- This projectRegistered 6 Dec 2021, completion promised 31 Dec 2026, revised to 30 Apr 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
4 buildings
Open a building to see every flat, floor by floor.
- F 12 And 13 Floor2 floors · 12 units25% booked
- F 1 To 11 Floor13 floors · 64 units91% booked
- G 12 And 13 Floor2 floors · 12 units42% booked
- G 1 To 11 Floor14 floors · 64 units94% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100032093
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100032093 | 6 Dec 2021 | 31 Dec 2026 | 30 Apr 2027 | Amco Landmark Realty | Project page |
Documents165
1 document held by Deedo, 164 filings listed on MahaRERA's project page
Finance
Legal
Show all 165 documentsShow fewer documents
Migrated
- 1 Declaration in FORM BDeclaration Form B.pdf · uploaded 9 Nov 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed form 3 Equa_compressed.pdf · uploaded 9 Nov 2021Source
- 1 Proforma of Allotment letterApplication form AFS.pdf · uploaded 13 Nov 2021Source
- 1 Copy of the legal title reportRERA-Format A-Legal Title Report__29 Nov.pdf · uploaded 29 Nov 2021Source
- 1 Copy of Layout Approval (in case of layout)1-4 Layout Amco.pdf · uploaded 29 Nov 2021Source
- 1 Building Plan Approval / NA Order for plotted development1-4 Layout Amco.pdf · uploaded 29 Nov 2021Source
- 1 Declaration about Commencement CertificateDeclaration about commencement_V1.pdf · uploaded 29 Nov 2021Source
- 1 CERSAI detailsCERSAI_Search_Report.pdf · uploaded 29 Nov 2021Source
- 2 CERSAI detailsAmco.pdf · uploaded 7 Jan 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)AMCO LANDMARK REALTY FORM 3.pdf · uploaded 7 Jan 2022Source
- 1 Disclosure of sold/ booked inventoryAmco Inventory Declaration.pdf · uploaded 14 Jan 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Amco Landmark Realty.pdf · uploaded 18 Jan 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Equa Engineer Certifcate Dec 21.pdf · uploaded 21 Jan 2022Source
- 3 CERSAI detailsCERSAI_Search_Report_200234305457_For_Debtor_Based_Search_04_04_2022_18_20_32_932.pdf · uploaded 6 Apr 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect_Amco.pdf · uploaded 7 Apr 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2_Amco.pdf · uploaded 7 Apr 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Amco.pdf · uploaded 7 Apr 2022Source
- 2 Disclosure of sold/ booked inventoryInventory Declaration Amco Equa.pdf · uploaded 12 Apr 2022Source
- 4 CERSAI detailsCERSAI_Search_Report_200241265808_For_Debtor_Based_Search_02_07_2022_12_33_09_134.pdf · uploaded 4 Jul 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Amco Architect Certificate.pdf · uploaded 7 Jul 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Equa Wagholi Form 2_Jun'22_Signed_compressed.pdf · uploaded 7 Jul 2022Source
- 3 Disclosure of sold/ booked inventoryInventory Declaration Amco_compressed.pdf · uploaded 7 Jul 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Equa Form 3.pdf · uploaded 7 Jul 2022Source
- 1 Other – FinanceAmco Landmark Realty.pdf · uploaded 29 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Amco Landmark Realty.pdf · uploaded 30 Sep 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Amco Realty Form 3_Signed_compressed.pdf · uploaded 12 Oct 2022Source
- 5 CERSAI detailsCERSAI_Search_Report_200249954334_For_Debtor_Based_Search_17_10_2022_17_06_03_580.pdf · uploaded 18 Oct 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Realty Architect Certificate.pdf · uploaded 20 Oct 2022Source
- 4 Disclosure of sold/ booked inventoryAmco Equa.pdf · uploaded 20 Oct 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)AMCO Form 2 Q2.pdf · uploaded 2 Nov 2022Source
- 5 Disclosure of sold/ booked inventoryInventory Declaration Equa Amco.pdf · uploaded 13 Jan 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Cetificate Amco.pdf · uploaded 18 Jan 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Amco FORM 2.pdf · uploaded 18 Jan 2023Source
- 6 CERSAI detailsCERSAI.pdf · uploaded 18 Jan 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA-Amco Equa.pdf · uploaded 18 Jan 2023Source
- 7 CERSAI detailsCERSAI_Search_Report_200266327570_For_Debtor_Based_Search_17_04_2023_17_46_20_935.pdf · uploaded 17 Apr 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Equa Architect Certificate _compressed.pdf · uploaded 20 Apr 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Equa.pdf · uploaded 20 Apr 2023Source
- 6 Disclosure of sold/ booked inventoryEqua.pdf · uploaded 20 Apr 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Equa - Form 3.pdf · uploaded 20 Apr 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Equa.pdf · uploaded 20 Jul 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Equa.pdf · uploaded 20 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Equa.pdf · uploaded 29 Sep 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Equa.pdf · uploaded 19 Oct 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Amco Landmark Realty Form 2.pdf · uploaded 20 Oct 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Equa.pdf · uploaded 20 Oct 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Amco Equa G and F Building.pdf · uploaded 20 Jan 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Amco F and G.pdf · uploaded 20 Jan 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Amco-F and G.pdf · uploaded 20 Jan 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Equa - F G.pdf · uploaded 17 Apr 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Amco F and G.pdf · uploaded 19 Apr 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Amco FG.pdf · uploaded 20 Jul 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Amco- FG.pdf · uploaded 20 Jul 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Amco F G.pdf · uploaded 20 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)AMCO F G.pdf · uploaded 9 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Equa - F G.pdf · uploaded 16 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Amco-F G.pdf · uploaded 17 Oct 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Amco-F G.pdf · uploaded 17 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Amco-F G.pdf · uploaded 17 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Equa F G.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Equa F G.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Equa FG.pdf · uploaded 17 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Amco FG.pdf · uploaded 18 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Signed Form-2 Amco FG.pdf · uploaded 18 Apr 2025Source
- Form 11Architect_31122021.pdf · uploaded 4 Jul 2026Source
- Form 21Engineer_31122021.pdf · uploaded 4 Jul 2026Source
- Form 31Form 3 31-12-2021.pdf · uploaded 4 Jul 2026Source
- Disclosure of Sold and Booked Inventory1Disclosure_31-12-2021.pdf · uploaded 4 Jul 2026Source
- Form 12Architect_31032022.pdf · uploaded 4 Jul 2026Source
- Form 22Engineer_31032022.pdf · uploaded 4 Jul 2026Source
- Form 32Form 3 31-03-2022.pdf · uploaded 4 Jul 2026Source
- Disclosure of Sold and Booked Inventory2Disclosure_31-03-2022.pdf · uploaded 4 Jul 2026Source
- Form 13Architect_30062022.pdf · uploaded 4 Jul 2026Source
- Form 23Engineer_30062022.pdf · uploaded 4 Jul 2026Source
- Form 33Form 3 30-06-2022.pdf · uploaded 4 Jul 2026Source
- Disclosure of Sold and Booked Inventory3Disclosure_30-06-2022.pdf · uploaded 4 Jul 2026Source
- Form 14Architect_30092022.pdf · uploaded 4 Jul 2026Source
- Form 24Engineer_30092022.pdf · uploaded 4 Jul 2026Source
- Form 34Form 3 30-09-2022.pdf · uploaded 4 Jul 2026Source
- Disclosure of Sold and Booked Inventory4Disclosure_30-09-2022.pdf · uploaded 4 Jul 2026Source
- Form 15Architect_31122022.pdf · uploaded 4 Jul 2026Source
- Form 25Engineer_31122022.pdf · uploaded 4 Jul 2026Source
- Form 35Form 3 31-12-2022.pdf · uploaded 4 Jul 2026Source
- Disclosure of Sold and Booked Inventory5Disclosure_31-12-2022.pdf · uploaded 4 Jul 2026Source
- Form 16Architect_31032023.pdf · uploaded 4 Jul 2026Source
- Form 26Engineer_31032023.pdf · uploaded 4 Jul 2026Source
- Form 36Form 3 31-03-2023.pdf · uploaded 4 Jul 2026Source
- Disclosure of Sold and Booked Inventory6Disclosure_31-03-2023.pdf · uploaded 4 Jul 2026Source
- Withdrawal Update Form 115Architect_30062025.pdf · uploaded 6 Jul 2026Source
- Withdrawal Update Form 1Form 1 Equa F G 30092025.pdf · uploaded 6 Jul 2026Source
- Withdrawal Update Form 1Form 1 - 31122025.pdf · uploaded 6 Jul 2026Source
- Withdrawal Update Form 1Form 1 31032026.pdf · uploaded 6 Jul 2026Source
- Withdrawal Update Form 215Engineer_30062025.pdf · uploaded 6 Jul 2026Source
- Withdrawal Update Form 2Form 2 Equa FG 30092025.pdf · uploaded 6 Jul 2026Source
- Withdrawal Update Form 2Form 2 - 31122025.pdf · uploaded 6 Jul 2026Source
- Withdrawal Update Form 2Form 2 31032026.pdf · uploaded 6 Jul 2026Source
- Withdrawal Update Form 315Form 3 30-06-2025.pdf · uploaded 6 Jul 2026Source
- Withdrawal Update Form 3Form 3 Equa F G 30092025-compressed.pdf · uploaded 6 Jul 2026Source
- Withdrawal Update Form 3Form 3 - 31122025 Final.pdf · uploaded 6 Jul 2026Source
- Withdrawal Update Form 3Form 3 31032026.pdf · uploaded 6 Jul 2026Source
- Form 17Architect_30062023.pdf · uploaded 6 Aug 2026Source
- Form 27Engineer_30062023.pdf · uploaded 6 Aug 2026Source
- Form 37Form 3 30-06-2023-compressed.pdf · uploaded 6 Aug 2026Source
- Disclosure of Sold and Booked Inventory7Disclosure_30-06-2023.pdf · uploaded 6 Aug 2026Source
- Form 18Architect_30092023.pdf · uploaded 6 Aug 2026Source
- Form 28Engineer_30092023.pdf · uploaded 6 Aug 2026Source
- Form 38Form 3 30-09-2023.pdf · uploaded 6 Aug 2026Source
- Disclosure of Sold and Booked Inventory8Disclosure_30-09-2023.pdf · uploaded 6 Aug 2026Source
- Form 19Architect_31122023.pdf · uploaded 6 Aug 2026Source
- Form 29Engineer_31122023.pdf · uploaded 6 Aug 2026Source
- Form 39Form 3 31-12-2023.pdf · uploaded 6 Aug 2026Source
- Disclosure of Sold and Booked Inventory9Disclosure_31-12-2023.pdf · uploaded 6 Aug 2026Source
- Form 110Architect_31032024.pdf · uploaded 6 Aug 2026Source
- Form 210Engineer_31032024.pdf · uploaded 6 Aug 2026Source
- Form 310Form 3 31-03-2024.pdf · uploaded 6 Aug 2026Source
- Disclosure of Sold and Booked Inventory10Disclosure_31-03-2024.pdf · uploaded 6 Aug 2026Source
- Form 111Architect_30062024.pdf · uploaded 23 Aug 2026Source
- Form 211Engineer_30062024.pdf · uploaded 23 Aug 2026Source
- Form 311Form 3 30-06-2024.pdf · uploaded 23 Aug 2026Source
- Disclosure of Sold and Booked Inventory11Disclosure_30-06-2024.pdf · uploaded 23 Aug 2026Source
- Form 112Architect_30092024.pdf · uploaded 23 Aug 2026Source
- Form 212Engineer_30092024.pdf · uploaded 23 Aug 2026Source
- Form 312Form 3 30-09-2024.pdf · uploaded 23 Aug 2026Source
- Disclosure of Sold and Booked Inventory12Disclosure_30-09-2024.pdf · uploaded 23 Aug 2026Source
- Form 113Architect_31122024.pdf · uploaded 28 Aug 2026Source
- Form 213Engineer_31122024.pdf · uploaded 28 Aug 2026Source
- Form 313Form 3 31-12-2024.pdf · uploaded 28 Aug 2026Source
- Disclosure of Sold and Booked Inventory13Disclosure_31-12-2024.pdf · uploaded 28 Aug 2026Source
- Form 114Architect_31032025.pdf · uploaded 28 Aug 2026Source
- Form 214Engineer_31032025.pdf · uploaded 28 Aug 2026Source
- Form 314Form 3 31-03-2025.pdf · uploaded 28 Aug 2026Source
- Disclosure of Sold and Booked Inventory14Disclosure_31-03-2025.pdf · uploaded 28 Aug 2026Source
- Withdrawal Update Form 1Form 1 - FG -Architect Certificate - For June 2026.pdf · uploaded 28 Aug 2026Source
- Withdrawal Update Form 2Form 2 Engineer Certificate FG Wing.pdf · uploaded 28 Aug 2026Source
- Withdrawal Update Form 3Form 3 CA Certificate FG Wing-compressed.pdf · uploaded 28 Aug 2026Source
Technical
- Document1-4 Layout Amco.pdf · uploaded 29 Nov 2021Source
- Document1-4 Layout Amco.pdf · uploaded 29 Nov 2021Source
- Document01-12 Layout plan Flatwise Carpet Area.pdf · uploaded 6 Jul 2026Source
- Document02-12 C Wing Floor Plan - Parking.pdf · uploaded 6 Jul 2026Source
- Document03-12 C Wing Elevation.pdf · uploaded 6 Jul 2026Source
- Document04-12 D Wing Floor Plan - Parking.pdf · uploaded 6 Jul 2026Source
- Document05-12 D Wing Elevation.pdf · uploaded 6 Jul 2026Source
- Document06-12 E Wing Floor Plan - Parking.pdf · uploaded 6 Jul 2026Source
- Document07-12 E Wing Elevation.pdf · uploaded 6 Jul 2026Source
- Document08-12 F Wing Floor Plan - Parking.pdf · uploaded 6 Jul 2026Source
- Document09-12 F Wing Elevation.pdf · uploaded 6 Jul 2026Source
- Document10-12 G Wing Floor Plan - Parking.pdf · uploaded 6 Jul 2026Source
- Document11-12 G Wing Elevation.pdf · uploaded 6 Jul 2026Source
- Document12-12 Clubhouse.pdf · uploaded 6 Jul 2026Source
- DocumentBHA-HAV-Wagholi-2616-24-25 Dt 03_06_25.pdf · uploaded 6 Jul 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 2 Gat No 1185B, Plot no 1
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- —152 units in all
- Address
- Plot no 1 and 2 Gat No 1185B, BAIF Road, WagholiPIN 412207
- Village
- Wagholi, Haveli taluka
- Location
- 18.52043, 73.85674
- Land area for this project
- 1,325 sq m (14,257 sq ft)
- Permissible built-up area
- 8,400 sq m (90,414 sq ft)
- Sanctioned built-up area
- 7,107 sq m (76,500 sq ft)
- Recreational open space
- 1,441 sq m (15,515 sq ft)
- Designated bank account
- 85
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Plot no 1 and 2 Gat No 1185B
Boundaries
- North
- Adjacent Gat no 1185 part
- South
- Adjacent Gat no 1185 part
- East
- Adjacent Gat No 2200
- West
- 15 meter wide road and Gat no 1185 part
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking152 units
152 units registered
| Building | Type | Carpet area | Units |
|---|---|---|---|
| F 12 And 13 Floor | — | — | 12 |
| F 1 To 11 Floor | — | — | 64 |
| G 12 And 13 Floor | — | — | 12 |
| G 1 To 11 Floor | — | — | 64 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Chartered accountant | Ca | — |
| Engineer | Balbhim Namdev Sadgire | — |
| Engineer | Mitesh Jayavant Shah | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Wagholi
- Never Before Manjari Phase 1RERA PR1260002602570
- Ganga PavitraRERA PM1261012602430
- Rohan Yuva Bldg B & CRERA PC1260002602439
- The ElementRERA PM1260002602060
- Serene SpacesRERA PR1260002601339
- Omicron Tech ParkRERA PC1260002601259
- RTC Emerald SuitesRERA PR1260002601179
- T5E ApexRERA PR1260002601183
All 340 projects in Wagholi · Compare Equa with another project