Spring Valley
Deedo IDDP-PUN-S688Completion was pushed back 4 months, to Apr 2030; no MahaRERA orders on record; 61% of its units are booked.
Wadmukhwadi, Pune 412105 · by Shubh Ganesh Properties
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2030
- P52100002725Registered 4 Aug 2017, completion promised 31 Dec 2019.
- P52100033571Registered 22 Feb 2022, completion promised 31 Dec 2029, revised to 30 Apr 2030.
No extension certificate on record.
2 registrations · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
4 buildings
Open a building to see every flat, floor by floor.
- A Wing16 floors · 85 units88% booked
- D Wing13 floors · 78 units99% booked
- E Wing13 floors · 104 units44% booked
- G Wing14 floors · 112 units29% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrations2
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100002725 | 4 Aug 2017 | 31 Dec 2019 | 31 Dec 2019 | Shubh Ganesh Properties | Project page |
| P52100033571 | 22 Feb 2022 | 31 Dec 2029 | 30 Apr 2030 | Shubh Ganesh Properties | Project page |
Documents208
2 documents held by Deedo, 206 filings listed on MahaRERA's project page
Registration certificate (2)
Finance
Legal
- Legal Title reportP52100002725 · SEARCH REPORT PDF FORMAT-ilovepdf-compressed.pdf · uploaded 5 Jul 2017Source
- Declaration Form BP52100002725 · Form B Developer.pdf · uploaded 27 Jul 2017Source
- Declaration Form BP52100033571 · form B , Affidavit cum declaration_11zon.pdf · uploaded 2 Feb 2022Source
- Legal Title reportP52100033571 · Search Report_1-converted.pdf · uploaded 12 Feb 2022Source
Show all 208 documentsShow fewer documents
Legal
- Other – LegalP52100033571 · D Wing Society Certificate (1).pdf · uploaded 4 Mar 2023Source
- Other – LegalP52100033571 · Shubh Ganesh Properties LEGAL Opinion_compressed.pdf · uploaded 9 Jul 2024Source
- OthersP52100033571 · Final order on IA.pdf · uploaded 23 Jun 2025Source
- OthersP52100033571 · E wing Society registration certificate.pdf · uploaded 27 Sep 2025Source
Migrated
- 1 Copy of the legal title reportP52100002725 · SEARCH REPORT PDF FORMAT-ilovepdf-compressed.pdf · uploaded 5 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)P52100002725 · Wing_A_B_C_FINAL_PHASES_TO_BE_DEFINED_IN_RERA.pdf · uploaded 22 Jul 2017Source
- 1 Building Plan Approval (IOD)P52100002725 · PLAN ( LAYOUT 1).pdf · uploaded 22 Jul 2017Source
- 2 Building Plan Approval (IOD)P52100002725 · PLAN 2.pdf · uploaded 22 Jul 2017Source
- 3 Building Plan Approval (IOD)P52100002725 · PLAN 3.pdf · uploaded 22 Jul 2017Source
- 4 Building Plan Approval (IOD)P52100002725 · PLAN 4.pdf · uploaded 22 Jul 2017Source
- 5 Building Plan Approval (IOD)P52100002725 · PLAN 5.pdf · uploaded 22 Jul 2017Source
- 6 Building Plan Approval (IOD)P52100002725 · PLAN 6.pdf · uploaded 22 Jul 2017Source
- 7 Building Plan Approval (IOD)P52100002725 · PLAN 7.pdf · uploaded 22 Jul 2017Source
- 8 Building Plan Approval (IOD)P52100002725 · PLAN 8.pdf · uploaded 22 Jul 2017Source
- 9 Building Plan Approval (IOD)P52100002725 · PLAN 9.pdf · uploaded 22 Jul 2017Source
- 10 Building Plan Approval (IOD)P52100002725 · PLAN 10.pdf · uploaded 22 Jul 2017Source
- 11 Building Plan Approval (IOD)P52100002725 · PLAN 11.pdf · uploaded 22 Jul 2017Source
- 12 Building Plan Approval (IOD)P52100002725 · PLAN 12.pdf · uploaded 22 Jul 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100002725 · COMMENCEMENT.pdf · uploaded 22 Jul 2017Source
- 1 PAN CardP52100002725 · SGP_PAN.pdf · uploaded 26 Jul 2017Source
- 1 Details of encumbrancesP52100002725 · ENCUMBRANCE.pdf · uploaded 26 Jul 2017Source
- 2 Copy of Layout Approval (in case of layout)P52100002725 · download.pdf · uploaded 26 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100002725 · ARCHITECT CERT.pdf · uploaded 26 Jul 2017Source
- 1 Proforma of Allotment letterP52100002725 · Model Fraft Final.pdf · uploaded 26 Jul 2017Source
- 1 Declaration in FORM BP52100002725 · Form B Developer.pdf · uploaded 27 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100002725 · Form 2.pdf · uploaded 28 Jul 2017Source
- 1 Certificates of CA (Form 3)P52100002725 · Form 3_sgp.pdf · uploaded 28 Jul 2017Source
- 1 Certificates of Architect (Form 4)P52100002725 · shubh ganesh properties.pdf · uploaded 3 Aug 2018Source
- 1 Certificates of CA (Form 5)P52100002725 · Form 5 Self Declaration.pdf · uploaded 1 Oct 2018Source
- 1 Form 2AP52100002725 · Form 2A.pdf · uploaded 15 Feb 2019Source
- 2 Certificates of CA (Form 5)P52100002725 · Shubh Ganesh Properties Phase I_.pdf · uploaded 14 Aug 2019Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100002725 · spring valley phase 1 CHS Certificate.pdf · uploaded 14 Sep 2020Source
- 13 Building Plan Approval (IOD)P52100002725 · Building Plan Aproval - IOD - 2021.pdf · uploaded 11 Oct 2021Source
- 2 Status of Formation of Legal Entity (Society/Co Op etc.)P52100002725 · SOCIETY FORMATION PHASE I.pdf · uploaded 20 Oct 2021Source
- 1 PAN CardP52100033571 · Shubh Ganesh Properties_PAN Card.pdf · uploaded 20 Jan 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100033571 · 1.pdf · uploaded 20 Jan 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100033571 · 2.pdf · uploaded 20 Jan 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100033571 · 3.pdf · uploaded 20 Jan 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100033571 · 4.pdf · uploaded 20 Jan 2022Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100033571 · 5.pdf · uploaded 20 Jan 2022Source
- 6 Building Plan Approval / NA Order for plotted developmentP52100033571 · 6.pdf · uploaded 20 Jan 2022Source
- 7 Building Plan Approval / NA Order for plotted developmentP52100033571 · 7.pdf · uploaded 20 Jan 2022Source
- 8 Building Plan Approval / NA Order for plotted developmentP52100033571 · 8.pdf · uploaded 20 Jan 2022Source
- 9 Building Plan Approval / NA Order for plotted developmentP52100033571 · 9.pdf · uploaded 20 Jan 2022Source
- 10 Building Plan Approval / NA Order for plotted developmentP52100033571 · 10.pdf · uploaded 20 Jan 2022Source
- 11 Building Plan Approval / NA Order for plotted developmentP52100033571 · 11.pdf · uploaded 20 Jan 2022Source
- 12 Building Plan Approval / NA Order for plotted developmentP52100033571 · 12.pdf · uploaded 20 Jan 2022Source
- 13 Building Plan Approval / NA Order for plotted developmentP52100033571 · 13.pdf · uploaded 20 Jan 2022Source
- 14 Building Plan Approval / NA Order for plotted developmentP52100033571 · 14.pdf · uploaded 20 Jan 2022Source
- 15 Building Plan Approval / NA Order for plotted developmentP52100033571 · 15.pdf · uploaded 20 Jan 2022Source
- 16 Building Plan Approval / NA Order for plotted developmentP52100033571 · 16.pdf · uploaded 20 Jan 2022Source
- 17 Building Plan Approval / NA Order for plotted developmentP52100033571 · 17.pdf · uploaded 20 Jan 2022Source
- 18 Building Plan Approval / NA Order for plotted developmentP52100033571 · 18.pdf · uploaded 20 Jan 2022Source
- 19 Building Plan Approval / NA Order for plotted developmentP52100033571 · 19.pdf · uploaded 20 Jan 2022Source
- 20 Building Plan Approval / NA Order for plotted developmentP52100033571 · 20.pdf · uploaded 20 Jan 2022Source
- 21 Building Plan Approval / NA Order for plotted developmentP52100033571 · 21.pdf · uploaded 20 Jan 2022Source
- 22 Building Plan Approval / NA Order for plotted developmentP52100033571 · 22.pdf · uploaded 20 Jan 2022Source
- 23 Building Plan Approval / NA Order for plotted developmentP52100033571 · 23.pdf · uploaded 20 Jan 2022Source
- 24 Building Plan Approval / NA Order for plotted developmentP52100033571 · 24.pdf · uploaded 20 Jan 2022Source
- 25 Building Plan Approval / NA Order for plotted developmentP52100033571 · 25.pdf · uploaded 20 Jan 2022Source
- 26 Building Plan Approval / NA Order for plotted developmentP52100033571 · 26.pdf · uploaded 20 Jan 2022Source
- 27 Building Plan Approval / NA Order for plotted developmentP52100033571 · 27.pdf · uploaded 20 Jan 2022Source
- 28 Building Plan Approval / NA Order for plotted developmentP52100033571 · 28.pdf · uploaded 20 Jan 2022Source
- 29 Building Plan Approval / NA Order for plotted developmentP52100033571 · 29.pdf · uploaded 20 Jan 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100033571 · WADMUKHWADI CC.pdf · uploaded 20 Jan 2022Source
- 1 Details of encumbrancesP52100033571 · Encumbrance Letter.pdf · uploaded 1 Feb 2022Source
- 1 Copy of Layout Approval (in case of layout)P52100033571 · 1.pdf · uploaded 1 Feb 2022Source
- 2 Copy of Layout Approval (in case of layout)P52100033571 · R0 SPRING VALLEY PHASES TO BE DEFINED IN RERA -20-01-2021 (1)_11zon.pdf · uploaded 1 Feb 2022Source
- 30 Building Plan Approval / NA Order for plotted developmentP52100033571 · NA-Order-compressed.pdf · uploaded 1 Feb 2022Source
- 1 Declaration about Commencement CertificateP52100033571 · Declaration About Commencement Certificate.pdf · uploaded 1 Feb 2022Source
- 1 Declaration in FORM BP52100033571 · form B , Affidavit cum declaration_11zon.pdf · uploaded 2 Feb 2022Source
- 1 CERSAI detailsP52100033571 · CERSAI_Search_Report_200229536344_For_Debtor_Based_Search_04_02_2022_15_39_25_439.pdf · uploaded 5 Feb 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100033571 · Form 3.pdf · uploaded 7 Feb 2022Source
- 1 Proforma of Allotment letterP52100033571 · Shubh Ganesh Properties-Allottment Letter.pdf · uploaded 11 Feb 2022Source
- 1 Copy of the legal title reportP52100033571 · Search Report_1-converted.pdf · uploaded 12 Feb 2022Source
- 2 Proforma of Allotment letterP52100033571 · Spring Valley Phase-III- Agreement Draft.pdf · uploaded 12 Feb 2022Source
- 1 Deviation Report with respect to model copy of AgreementP52100033571 · DEVIATION LETTER_11zon.pdf · uploaded 22 Aug 2022Source
- 2 Details of encumbrancesP52100033571 · Shubh Ganesh Properties NDC NOC.pdf · uploaded 29 Dec 2022Source
- 1 Other – LegalP52100033571 · D Wing Society Certificate (1).pdf · uploaded 4 Mar 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100033571 · Engg certificate.pdf · uploaded 27 Jun 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100033571 · Form3.pdf · uploaded 27 Jun 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100033571 · Form 5.pdf · uploaded 27 Jun 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100033571 · SPRING VALLEY PHASE-III RERA CERTIFICATE_11zon.pdf · uploaded 28 Jun 2024Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100033571 · D Wing Society Certificate.pdf · uploaded 28 Jun 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100033571 · Form 3.pdf · uploaded 29 Jun 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100033571 · Form 3.pdf · uploaded 4 Jul 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100033571 · Form 3.pdf · uploaded 4 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100033571 · FORM 5.pdf · uploaded 4 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100033571 · FORM 5.pdf · uploaded 4 Jul 2024Source
- 2 Other – LegalP52100033571 · Shubh Ganesh Properties LEGAL Opinion_compressed.pdf · uploaded 9 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100033571 · Form 1 Architect Certificate June 2024.pdf · uploaded 13 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100033571 · Form 1 Architect Certificate September 2024.pdf · uploaded 13 Feb 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100033571 · Form 1 Architect Certificate December 2024.pdf · uploaded 13 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100033571 · Form 1 Architect Certificate March 2024.pdf · uploaded 13 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100033571 · CA Certificate - March 2024 - Sign.pdf · uploaded 13 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100033571 · CA Certificate - June 2024 - Sign.pdf · uploaded 13 Feb 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100033571 · CA Certificate - September 2024 - Sign.pdf · uploaded 13 Feb 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100033571 · CA Certificate - December 2024 - Sign.pdf · uploaded 13 Feb 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100033571 · Form 2 Engineer Certificate - Sept 2024.pdf · uploaded 13 Feb 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100033571 · Form 2 Engineer Certificate - Dec 2024.pdf · uploaded 13 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100033571 · Form 2 Engineer Certificate - June 2024.pdf · uploaded 13 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100033571 · Form 2 Engineer Certificate - March 2024.pdf · uploaded 13 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryP52100033571 · Disclosure of Inventory March 2024.pdf · uploaded 13 Feb 2025Source
- 2 Disclosure of sold/ booked inventoryP52100033571 · Disclosure of Inventory June 2024.pdf · uploaded 13 Feb 2025Source
- 3 Disclosure of sold/ booked inventoryP52100033571 · Disclosure of Inventory September 2024.pdf · uploaded 13 Feb 2025Source
- 4 Disclosure of sold/ booked inventoryP52100033571 · Disclosure of Inventory December 2024.pdf · uploaded 13 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100033571 · Form 2A March 2022.pdf · uploaded 13 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100033571 · Form 2A March 2023.pdf · uploaded 13 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100033571 · Form 2A March 2024.pdf · uploaded 13 Feb 2025Source
- Form 1P52100033571 · Form 1 Architect Certificate - March 2025 - Sign.pdf · uploaded 9 Jun 2025Source
- Form 2P52100033571 · Form 2 Engineer Certificate - Sign.pdf · uploaded 9 Jun 2025Source
- Form 3P52100033571 · CA Certificate - March 2025 - Sign.pdf · uploaded 9 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100033571 · Disclosure of Inventory March 2025.pdf · uploaded 9 Jun 2025Source
- Self-declaration of Quarterly ProgressP52100033571 · RERA self declaration of QPR.pdf · uploaded 9 Jun 2025Source
- Withdrawal Update Form 1P52100033571 · Form 1 Architect Certificate - March 2025 - Sign.pdf · uploaded 9 Jun 2025Source
- Withdrawal Update Form 1P52100033571 · Form 1 Architect Certificate - March 2025 - Sign.pdf · uploaded 9 Jun 2025Source
- Withdrawal Update Form 1P52100033571 · Form 1 Architect Certificate - March 2025 - Sign.pdf · uploaded 9 Jun 2025Source
- Withdrawal Update Form 2P52100033571 · Form 2 Engineer Certificate - Sign.pdf · uploaded 9 Jun 2025Source
- Withdrawal Update Form 2P52100033571 · Form 2 Engineer Certificate - Sign.pdf · uploaded 9 Jun 2025Source
- Withdrawal Update Form 2P52100033571 · Form 2 Engineer Certificate - Sign.pdf · uploaded 9 Jun 2025Source
- Withdrawal Update Form 3P52100033571 · CA Certificate - March 2025 - Sign.pdf · uploaded 9 Jun 2025Source
- Withdrawal Update Form 3P52100033571 · CA Certificate - March 2025 - Sign.pdf · uploaded 9 Jun 2025Source
- Withdrawal Update Form 3P52100033571 · CA Certificate - March 2025 - Sign.pdf · uploaded 9 Jun 2025Source
- Withdrawal Update Form 1P52100033571 · Form 1 Architect Certificate - March 2025 - Sign.pdf · uploaded 23 Jun 2025Source
- Withdrawal Update Form 2P52100033571 · Form 2 Engineer Certificate - March 2025 - Sign.pdf · uploaded 23 Jun 2025Source
- Withdrawal Update Form 3P52100033571 · CA Certificate - March 2025 - Sign_11zon.pdf · uploaded 23 Jun 2025Source
- Withdrawal Update Form 1P52100033571 · Form 1 Architect Certificate - June 2025.pdf · uploaded 17 Sep 2025Source
- Withdrawal Update Form 2P52100033571 · Form 2 Engineer Certificate - June 2025.pdf · uploaded 17 Sep 2025Source
- Withdrawal Update Form 3P52100033571 · CA Certificate - June 2025 - Sign_11zon.pdf · uploaded 17 Sep 2025Source
- Withdrawal Update Form 1P52100033571 · Form 1 Architect Certificate Sept-2025.pdf · uploaded 14 Oct 2025Source
- Withdrawal Update Form 2P52100033571 · Form 2 Engineer Certificate - September 2025.pdf · uploaded 14 Oct 2025Source
- Withdrawal Update Form 3P52100033571 · CA Certificate - September 2025.pdf · uploaded 14 Oct 2025Source
- Withdrawal Update Form 1P52100033571 · FORM 1 Architect Certificate DEC 2025.pdf · uploaded 22 Jan 2026Source
- Withdrawal Update Form 2P52100033571 · FORM 2 ENGINEER CERTIFICATE DEC 2025.pdf · uploaded 22 Jan 2026Source
- Withdrawal Update Form 3P52100033571 · FORM 3 CA CERTIFICATE DEC 2025.pdf · uploaded 22 Jan 2026Source
- Withdrawal Update Form 1P52100033571 · SGP FORM 1 - March 2026.pdf · uploaded 30 Apr 2026Source
- Withdrawal Update Form 2P52100033571 · SGP Form2 - March 2026.pdf · uploaded 30 Apr 2026Source
- Withdrawal Update Form 3P52100033571 · SGP FORM3 march26.pdf · uploaded 30 Apr 2026Source
- Withdrawal Update Form 1P52100033571 · Form 1 Architect Certificate June 2026.pdf · uploaded 29 Jul 2026Source
- Withdrawal Update Form 2P52100033571 · Form 2 Engineer Certificate June 2026.pdf · uploaded 29 Jul 2026Source
- Withdrawal Update Form 3P52100033571 · Form 3 CA Certificate June 2026.pdf · uploaded 29 Jul 2026Source
Technical
- DocumentP52100002725 · Wing_A_B_C_FINAL_PHASES_TO_BE_DEFINED_IN_RERA.pdf · uploaded 22 Jul 2017Source
- DocumentP52100002725 · PLAN ( LAYOUT 1).pdf · uploaded 22 Jul 2017Source
- DocumentP52100002725 · PLAN 2.pdf · uploaded 22 Jul 2017Source
- DocumentP52100002725 · PLAN 3.pdf · uploaded 22 Jul 2017Source
- DocumentP52100002725 · PLAN 4.pdf · uploaded 22 Jul 2017Source
- DocumentP52100002725 · PLAN 5.pdf · uploaded 22 Jul 2017Source
- DocumentP52100002725 · PLAN 6.pdf · uploaded 22 Jul 2017Source
- DocumentP52100002725 · PLAN 7.pdf · uploaded 22 Jul 2017Source
- DocumentP52100002725 · PLAN 8.pdf · uploaded 22 Jul 2017Source
- DocumentP52100002725 · PLAN 9.pdf · uploaded 22 Jul 2017Source
- DocumentP52100002725 · PLAN 10.pdf · uploaded 22 Jul 2017Source
- DocumentP52100002725 · PLAN 11.pdf · uploaded 22 Jul 2017Source
- DocumentP52100002725 · PLAN 12.pdf · uploaded 22 Jul 2017Source
- DocumentP52100002725 · download.pdf · uploaded 26 Jul 2017Source
- DocumentP52100002725 · Building Plan Aproval - IOD - 2021.pdf · uploaded 11 Oct 2021Source
- DocumentP52100033571 · 1.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 2.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 3.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 4.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 5.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 6.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 7.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 8.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 9.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 10.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 11.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 12.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 13.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 14.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 15.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 16.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 17.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 18.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 19.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 20.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 21.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 22.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 23.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 24.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 25.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 26.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 27.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 28.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · 29.pdf · uploaded 20 Jan 2022Source
- DocumentP52100033571 · NA-Order-compressed.pdf · uploaded 1 Feb 2022Source
- DocumentP52100033571 · 1.pdf · uploaded 1 Feb 2022Source
- DocumentP52100033571 · R0 SPRING VALLEY PHASES TO BE DEFINED IN RERA -20-01-2021 (1)_11zon.pdf · uploaded 1 Feb 2022Source
Technical (Architect)
- DocumentP52100002725 · ARCHITECT CERT.pdf · uploaded 26 Jul 2017Source
- DocumentP52100033571 · Form 1 Architect Certificate March 2024.pdf · uploaded 13 Feb 2025Source
- DocumentP52100033571 · Form 1 Architect Certificate June 2024.pdf · uploaded 13 Feb 2025Source
- DocumentP52100033571 · Form 1 Architect Certificate September 2024.pdf · uploaded 13 Feb 2025Source
- DocumentP52100033571 · Form 1 Architect Certificate December 2024.pdf · uploaded 13 Feb 2025Source
- DocumentP52100033571 · Form 1 Architect Certificate June 2026.pdf · uploaded 29 Jul 2026Source
Technical (Engineer)
- DocumentP52100002725 · Form 2.pdf · uploaded 28 Jul 2017Source
- DocumentP52100033571 · Form 2 Engineer Certificate - March 2024.pdf · uploaded 13 Feb 2025Source
- DocumentP52100033571 · Form 2 Engineer Certificate - June 2024.pdf · uploaded 13 Feb 2025Source
- DocumentP52100033571 · Form 2 Engineer Certificate - Sept 2024.pdf · uploaded 13 Feb 2025Source
- DocumentP52100033571 · Form 2 Engineer Certificate - Dec 2024.pdf · uploaded 13 Feb 2025Source
- DocumentP52100033571 · Form 2 Engineer Certificate June 2026.pdf · uploaded 29 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 134/3, 134/3 At Wadhmukhwadi
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Phases
- 2
- Unit types
- 1BHK, 2BHK, 1RK, 3BHK379 units in all
- Address
- 134/3, WadmukhwadiPIN 412105
- Village
- Charholi, Haveli taluka
- Location
- 18.64977, 73.87684
- Land area for this project
- 1,362 sq m (14,658 sq ft)
- Permissible built-up area
- 6,187 sq m (66,593 sq ft)
- Sanctioned built-up area
- 5,437 sq m (58,520 sq ft)
- Designated bank account
- 109
- Developed in phases
- No
- Also registered as
- Spring Valley Phase I, Spring Valley Phase III
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
134/3, WADMUKHWADI
Boundaries
- North
- Open Space And Club House
- South
- Commercial Zone And S No 139 And 132
- East
- S No 134 Hissa No 6
- West
- Proposed 12 M Wide Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking379 units
231 of 379 units booked (61%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100002725 | A Wing | 1BHK | 33.35 sq m · 359 sq ft | 42 | 33 |
| P52100002725 | A Wing | 2BHK | 45.73 sq m · 492 sq ft | 9 | 9 |
| P52100002725 | A Wing | 2BHK | 45.91 sq m · 494 sq ft | 12 | 12 |
| P52100002725 | A Wing | 2BHK | 47.98 sq m · 516 sq ft | 10 | 9 |
| P52100002725 | A Wing | 2BHK | 48.14 sq m · 518 sq ft | 12 | 12 |
| P52100033571 | D Wing | 1RK | 42.51 sq m · 458 sq ft | 2 | 1 |
| P52100033571 | D Wing | 2BHK | 65.29 sq m · 703 sq ft | 14 | 14 |
| P52100033571 | D Wing | 2BHK | 65.41 sq m · 704 sq ft | 14 | 14 |
Show all 23 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100033571 | D Wing | 2BHK | 69.06 sq m · 743 sq ft | 12 | 12 |
| P52100033571 | D Wing | 2BHK | 69.17 sq m · 745 sq ft | 13 | 13 |
| P52100033571 | D Wing | 2BHK | 69.18 sq m · 745 sq ft | 12 | 12 |
| P52100033571 | D Wing | 2BHK | 70.36 sq m · 757 sq ft | 11 | 11 |
| P52100033571 | E Wing | 2BHK | 57.95 sq m · 624 sq ft | 2 | 0 |
| P52100033571 | E Wing | 2BHK | 69.43 sq m · 747 sq ft | 52 | 30 |
| P52100033571 | E Wing | 2BHK | 69.48 sq m · 748 sq ft | 13 | 1 |
| P52100033571 | E Wing | 2BHK | 70.1 sq m · 755 sq ft | 13 | 0 |
| P52100033571 | E Wing | 3BHK | 87.35 sq m · 940 sq ft | 24 | 15 |
| P52100033571 | G Wing | 2BHK | 71.46 sq m · 769 sq ft | 28 | 6 |
| P52100033571 | G Wing | 2BHK | 75.55 sq m · 813 sq ft | 16 | 0 |
| P52100033571 | G Wing | 2BHK | 76.97 sq m · 828 sq ft | 29 | 15 |
| P52100033571 | G Wing | 3BHK | 91.1 sq m · 981 sq ft | 14 | 1 |
| P52100033571 | G Wing | 3BHK | 92.69 sq m · 998 sq ft | 14 | 4 |
| P52100033571 | G Wing | 3BHK | 105.06 sq m · 1,131 sq ft | 11 | 7 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals7
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Swapnil Khirsagar | — | P52100033571 |
| Architect | Swapnil Kshirsagar | — | P52100002725 |
| Engineer | G A Bhilare | — | P52100002725 |
| Engineer | Sachin Lokhande | — | P52100033571 |
| Other | Govind Chavan | — | P52100002725 |
| Other | Nirakar Construction | — | P52100002725 |
| Registered real estate agent | Sudhaben Arvindbhai Patel | — | P52100002725 |
Source: MahaRERA project page. Contact details are not shown.