Skip to content
Residential / Group Housing · 4 buildings · 96 unitsRERA P52100009650

Mi Casa

Deedo IDDP-PUN-HG3K

MahaRERA shows it completed, after its date was pushed back 4 years and 6 months; no MahaRERA orders on record; 83% of its units are booked.

Undri, Pune 411060 · Property rates in Undri · by Marimagnum Constructions

DeliveryCompletedCompletion / occupancy certificate on MahaRERA · after a 4 yrs 6 mo extensionRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales83% booked80 of 96 units · as the promoter reported to MahaRERAPrice₹7,070 /sq ft2.4% above Undri · 34 registered sales

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed, after its date was pushed back 4 years and 6 months

  • This projectRegistered 22 Aug 2017, completion promised 31 Mar 2020, revised to 25 Sep 2024.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

All 126 deeds →
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Oct 2026Unit 1004Rental—View Rental, Oct 2026
Jul 2026Not on recordRental—View Rental, Jul 2026
Jul 2026Unit 1102Mortgage701 sq ftView Mortgage, Jul 2026
Jun 2026Building B · 704Rental—View Rental, Jun 2026
May 2026Building A · 1004Rental—View Rental, May 2026
May 2026Building A · 302Rental—View Rental, May 2026
Apr 2026Building A · 203Rental—View Rental, Apr 2026
Apr 2026Building A · 202Rental—View Rental, Apr 2026
Mar 2026Building B · 804Rental—View Rental, Mar 2026
Mar 2026Not on recordMortgage—View Mortgage, Mar 2026

4 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100009650
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210000965022 Aug 201731 Mar 202025 Sep 2024Marimagnum ConstructionsProject page
Documents133

3 documents held by Deedo, 130 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Other

  • OtherDate not statedView

Legal

  • Legal Title reportSEARCH TITLE.pdf · uploaded 26 Jul 2017Source
  • Declaration Form BForm B_1.pdf · uploaded 29 Jul 2017Source
  • Declaration Form BForm B.pdf · uploaded 29 Jul 2017Source
  • Declaration Form BP52100009650_FileName_0.pdf · uploaded 8 Nov 2023Source

Migrated

  • 1 Copy of the legal title reportSEARCH TITLE.pdf · uploaded 26 Jul 2017Source
Show all 133 documentsShow fewer documents

Migrated

  • 1 Details of encumbrancesEncumbrance Certificate.pdf · uploaded 28 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)Basement.pdf · uploaded 28 Jul 2017Source
  • 2 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 29 Jul 2017Source
  • 1 Building Plan Approval (IOD)4-13.pdf · uploaded 29 Jul 2017Source
  • 2 Building Plan Approval (IOD)5-13.pdf · uploaded 29 Jul 2017Source
  • 3 Building Plan Approval (IOD)6-13.pdf · uploaded 29 Jul 2017Source
  • 4 Building Plan Approval (IOD)7-13.pdf · uploaded 29 Jul 2017Source
  • 5 Building Plan Approval (IOD)8-13.pdf · uploaded 29 Jul 2017Source
  • 6 Building Plan Approval (IOD)9-13.pdf · uploaded 29 Jul 2017Source
  • 7 Building Plan Approval (IOD)10-13.pdf · uploaded 29 Jul 2017Source
  • 8 Building Plan Approval (IOD)11-13.pdf · uploaded 29 Jul 2017Source
  • 1 Declaration in FORM BForm B_1.pdf · uploaded 29 Jul 2017Source
  • 2 Declaration in FORM BForm B.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 A.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Vasim Ibrahim Shaikh.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of CA (Form 3)Doshi Jethae Associates.pdf · uploaded 29 Jul 2017Source
  • 1 Proforma of Allotment letterP6943-LETTER-ALLOTMENT-MICASA-FINAL-27TH-JULY-2017.pdf · uploaded 29 Jul 2017Source
  • 2 Proforma of Allotment letterP6943-UNIT-AGR-MI-CASA-FINAL-27TH-JULY-2017.pdf · uploaded 29 Jul 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentAthavani Commissment Certificate_.pdf · uploaded 28 Mar 2018Source
  • 1 Certificates of CA (Form 5)RERA FORM 5(CA CERTIFICATE).pdf · uploaded 27 Nov 2018Source
  • 9 Building Plan Approval (IOD)1_16.pdf · uploaded 16 Jan 2019Source
  • 10 Building Plan Approval (IOD)2_16.pdf · uploaded 16 Jan 2019Source
  • 11 Building Plan Approval (IOD)1_16.pdf · uploaded 16 Jan 2019Source
  • 12 Building Plan Approval (IOD)4_16.pdf · uploaded 16 Jan 2019Source
  • 13 Building Plan Approval (IOD)5_16.pdf · uploaded 16 Jan 2019Source
  • 14 Building Plan Approval (IOD)6_16.pdf · uploaded 16 Jan 2019Source
  • 15 Building Plan Approval (IOD)7_16.pdf · uploaded 16 Jan 2019Source
  • 16 Building Plan Approval (IOD)8_16.pdf · uploaded 16 Jan 2019Source
  • 17 Building Plan Approval (IOD)9_16.pdf · uploaded 16 Jan 2019Source
  • 18 Building Plan Approval (IOD)10_16.pdf · uploaded 16 Jan 2019Source
  • 19 Building Plan Approval (IOD)11_16.pdf · uploaded 16 Jan 2019Source
  • 20 Building Plan Approval (IOD)12_16.pdf · uploaded 16 Jan 2019Source
  • 21 Building Plan Approval (IOD)13_16.pdf · uploaded 16 Jan 2019Source
  • 22 Building Plan Approval (IOD)16_16.pdf · uploaded 16 Jan 2019Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Form - 1.pdf · uploaded 21 Jan 2019Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE.pdf · uploaded 21 Jan 2019Source
  • 2 Certificates of CA (Form 3)CA CERTIFICATE.pdf · uploaded 21 Jan 2019Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect_compressed.pdf · uploaded 28 Aug 2021Source
  • 1 Disclosure of sold/ booked inventoryinventory.pdf · uploaded 28 Aug 2021Source
  • 2 Certificates of CA (Form 5)CA CERTIFICATE RERA.pdf · uploaded 28 Aug 2021Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form-1(Architect's).pdf · uploaded 6 Mar 2023Source
  • 3 Certificates of CA (Form 3)Form-3 Mi-casa _compressed (1).pdf · uploaded 6 Mar 2023Source
  • 3 Certificates of CA (Form 5)Form-5.pdf · uploaded 6 Mar 2023Source
  • 2 a Details of encumbrances concerned to FinanceENCUMBERANCE LEGAL.pdf · uploaded 11 Mar 2023Source
  • 1 b Details of encumbrances concerned to LegalENCUMBERANCE LEGAL.pdf · uploaded 11 Mar 2023Source
  • 1 Declaration about Commencement CertificateDeclaration about commencement certificate .pdf · uploaded 11 Mar 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)2020.pdf · uploaded 11 Mar 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2021.pdf · uploaded 11 Mar 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2022.pdf · uploaded 11 Mar 2023Source
  • 2 Disclosure of sold/ booked inventoryDisclosure of Sold_book inventory .pdf · uploaded 11 Mar 2023View
  • 1 CERSAI detailsFINANCE Encumbrance Certificate.pdf · uploaded 11 Mar 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in other Real estate organizations (1).pdf · uploaded 11 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Marimagnum Audit Report F Y 2019 20 p1.pdf · uploaded 11 Mar 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Marimagnum Audit Report F Y 2019 20 p2.pdf · uploaded 11 Mar 2023Source
  • 3 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Marimagnum Audited Report F Y 2018 19 P1_compressed.pdf · uploaded 11 Mar 2023Source
  • 4 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Marimagnum Audited Report F Y 2018 19 P2_compressed.pdf · uploaded 11 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Marimagnum Audit Report F Y 2019 20 p1.pdf · uploaded 11 Mar 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Marimagnum Audit Report F Y 2019 20 p2.pdf · uploaded 11 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Marimagnum Audit Report F Y 2020 21 P1_compressed.pdf · uploaded 11 Mar 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Marimagnum Audit Report F Y 2020 21 P2_compressed.pdf · uploaded 11 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Marimagnum Audited Report F Y 2021 22 P1_compressed.pdf · uploaded 11 Mar 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Marimagnum Audited Report F Y 2021 22 P2_compressed.pdf · uploaded 11 Mar 2023Source
  • 1 Proforma of Agreement for saleAGREEMENT.pdf · uploaded 11 Mar 2023Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentMi-casa -Completion Certificate _compressed.pdf · uploaded 11 Mar 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration about Seperate Bank account for Real Estate Projects.pdf · uploaded 11 Mar 2023Source
  • 1 Deviation Report with respect to Allotment letterApplication for Deviation Report.pdf · uploaded 11 Mar 2023Source
  • 1 Deviation Report with respect to model copy of AgreementApplication for Deviation Report.pdf · uploaded 11 Mar 2023Source
  • 3 Declaration in FORM BP52100009650_FileName_0.pdf · uploaded 8 Nov 2023Source
  • 1 Other – TechnicalArchitects - Form 4.pdf · uploaded 22 Jan 2024Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)mi casa architech cert mar 23 form 1.pdf · uploaded 16 Apr 2024Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)mi casa architech cert june'22 form 1.pdf · uploaded 16 Apr 2024Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)mi casa architech cert sept 22 form 1.pdf · uploaded 16 Apr 2024Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)mi casa architech cert dec 22 form 1.pdf · uploaded 16 Apr 2024Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Mi-casa-Engineer certificate Mar-22 form-2.pdf · uploaded 16 Apr 2024Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Mi-casa-Engineer certificate June-22 form-2.pdf · uploaded 16 Apr 2024Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Mi-casa-Engineer certificate Sept-22 form-2.pdf · uploaded 16 Apr 2024Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Mi-casa-Engineer certificate Dec-22 form-2.pdf · uploaded 16 Apr 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2a may.pdf · uploaded 16 Apr 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Mi-casa-Engineer Certificate-June-22 Form-2A.pdf · uploaded 16 Apr 2024Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2A sep.pdf · uploaded 16 Apr 2024Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2A dec.pdf · uploaded 16 Apr 2024Source
  • 4 Certificates of CA (Form 3)form 3 1.pdf · uploaded 16 Apr 2024Source
  • 5 Certificates of CA (Form 3)form 3 2.pdf · uploaded 16 Apr 2024Source
  • 6 Certificates of CA (Form 3)fprm 3 3.pdf · uploaded 16 Apr 2024Source
  • 7 Certificates of CA (Form 3)form 3 4.pdf · uploaded 16 Apr 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)form 5 20203.pdf · uploaded 16 Apr 2024Source
  • 1 Status of ConveyanceA - 203 Index II-merged_11zon.pdf · uploaded 16 Apr 2024Source
  • 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion B wing Part.pdf · uploaded 21 May 2024Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)Declaration Deed 1 (dragged).pdf · uploaded 21 May 2024Source
  • 2 Status of ConveyanceB -1203 Index II .pdf · uploaded 21 May 2024Source
  • 3 Status of ConveyanceB - 1103 Index II.pdf · uploaded 15 Jun 2024Source
  • 4 Status of ConveyanceB - 1002 Index II.pdf · uploaded 15 Jun 2024Source
  • 5 Status of ConveyanceA - 704 Index II .pdf · uploaded 25 Jun 2024Source
  • 1 Status of ConveyanceA - 104 Index II.pdf · uploaded 15 Nov 2024Source
  • 2 Status of ConveyanceA - 202 Index II.pdf · uploaded 15 Nov 2024Source
  • 3 Status of ConveyanceA - 602 Index II.pdf · uploaded 15 Nov 2024Source
  • 4 Status of ConveyanceA - 904 Index II.pdf · uploaded 15 Nov 2024Source
  • 5 Status of ConveyanceA - 1104 Index II.pdf · uploaded 15 Nov 2024Source

Technical

  • DocumentBasement.pdf · uploaded 28 Jul 2017Source
  • Document7-13.pdf · uploaded 29 Jul 2017Source
  • Document8-13.pdf · uploaded 29 Jul 2017Source
  • Document9-13.pdf · uploaded 29 Jul 2017Source
  • Document10-13.pdf · uploaded 29 Jul 2017Source
  • Document11-13.pdf · uploaded 29 Jul 2017Source
  • DocumentLayout.pdf · uploaded 29 Jul 2017Source
  • Document5-13.pdf · uploaded 29 Jul 2017Source
  • Document6-13.pdf · uploaded 29 Jul 2017Source
  • Document4-13.pdf · uploaded 29 Jul 2017Source
  • Document1_16.pdf · uploaded 16 Jan 2019Source
  • Document2_16.pdf · uploaded 16 Jan 2019Source
  • Document1_16.pdf · uploaded 16 Jan 2019Source
  • Document4_16.pdf · uploaded 16 Jan 2019Source
  • Document5_16.pdf · uploaded 16 Jan 2019Source
  • Document6_16.pdf · uploaded 16 Jan 2019Source
  • Document7_16.pdf · uploaded 16 Jan 2019Source
  • Document8_16.pdf · uploaded 16 Jan 2019Source
  • Document9_16.pdf · uploaded 16 Jan 2019Source
  • Document10_16.pdf · uploaded 16 Jan 2019Source
  • Document11_16.pdf · uploaded 16 Jan 2019Source
  • Document12_16.pdf · uploaded 16 Jan 2019Source
  • Document13_16.pdf · uploaded 16 Jan 2019Source
  • Document16_16.pdf · uploaded 16 Jan 2019Source
  • Other – TechnicalArchitects - Form 4.pdf · uploaded 22 Jan 2024Source

Technical (Architect)

  • Documentmi casa architech cert dec 22 form 1.pdf · uploaded 16 Apr 2024Source

Technical (Engineer)

  • DocumentMi-casa-Engineer certificate Dec-22 form-2.pdf · uploaded 16 Apr 2024Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 60/2/2

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
2rhk, 3rhk96 units in all
Address
60/2/2, Undri Road, UndriPIN 411060
Village
Undri, Haveli taluka
Land area for this project
5,077 sq m (54,643 sq ft)
Permissible built-up area
8,198 sq m (88,239 sq ft)
Sanctioned built-up area
8,198 sq m (88,239 sq ft)
Recreational open space
597 sq m (6,429 sq ft)
Designated bank account
220
Developed in phases
Yes
Also registered as
M I Casa

Survey, CTS, gat or plot numbers

60/2/2

Land as published on MahaRERA's project page

60/2/2

Boundaries

North
Hissa No 2-2p
South
Hissa No 2-2p
East
Rp Road
West
Hissa No 3

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking96 units

80 of 96 units booked (83%), as the promoter reported to MahaRERA

2rhk · 48 units3rhk · 48 units
BuildingTypeCarpet areaUnitsBooked
Building A2rhk63.39 sq m · 682 sq ft11
Building A2rhk65.1 sq m · 701 sq ft44
Building A2rhk65.12 sq m · 701 sq ft55
Building A2rhk65.81 sq m · 708 sq ft55
Building A2rhk66.01 sq m · 711 sq ft11
Building A2rhk66.02 sq m · 711 sq ft11
Building A2rhk66.53 sq m · 716 sq ft55
Building A2rhk67.26 sq m · 724 sq ft11
Show all 38 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Building A2rhk67.27 sq m · 724 sq ft11
Building A3rhk73.61 sq m · 792 sq ft11
Building A3rhk86.82 sq m · 935 sq ft44
Building A3rhk87.01 sq m · 937 sq ft55
Building A3rhk87.35 sq m · 940 sq ft11
Building A3rhk87.53 sq m · 942 sq ft11
Building A3rhk100.89 sq m · 1,086 sq ft55
Building A3rhk101.07 sq m · 1,088 sq ft55
Building A3rhk101.59 sq m · 1,094 sq ft11
Building A3rhk101.74 sq m · 1,095 sq ft11
Building B2rhk62.84 sq m · 676 sq ft53
Building B2rhk63.68 sq m · 685 sq ft10
Building B2rhk64.15 sq m · 691 sq ft55
Building B2rhk65.11 sq m · 701 sq ft11
Building B2rhk65.25 sq m · 702 sq ft31
Building B2rhk65.35 sq m · 703 sq ft32
Building B2rhk65.91 sq m · 709 sq ft21
Building B2rhk66.54 sq m · 716 sq ft32
Building B2rhk66.67 sq m · 718 sq ft10
Building B3rhk70.24 sq m · 756 sq ft10
Building B3rhk83.08 sq m · 894 sq ft42
Building B3rhk83.71 sq m · 901 sq ft11
Building B3rhk86.98 sq m · 936 sq ft32
Building B3rhk87.05 sq m · 937 sq ft21
Building B3rhk87.6 sq m · 943 sq ft10
Building B3rhk98.05 sq m · 1,055 sq ft33
Building B3rhk98.12 sq m · 1,056 sq ft22
Building B3rhk98.61 sq m · 1,061 sq ft11
Building B3rhk101.09 sq m · 1,088 sq ft54
Building B3rhk101.9 sq m · 1,097 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals2

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectShirish Dasnurkar And Associates—
EngineerRajesh Mankani—

Source: MahaRERA project page. Contact details are not shown.

Mi Casa in numbers

Registered deals, summarised

Deedo has 126 registered documents at Mi Casa, from Feb 2017 to Oct 2026: 34 sales, 56 leave and licence agreements, 27 mortgages. The median registered sale since Feb 2017 works out to about ₹7,100 per sq ft, at a median of ₹56 L a deal; 12% of sales were resales.

What is the price per sq ft at Mi Casa?
The median registered sale since Feb 2017 works out to about ₹7,100 per sq ft, at a median of ₹56 L a deal; 12% of sales were resales.
How many properties have been sold at Mi Casa?
34 sales are registered at Mi Casa, 4 of them resales.
Are properties at Mi Casa rented out?
Yes: 56 leave and licence agreements are registered at Mi Casa, at a median rent since Feb 2017 of about ₹19,000 a month with a deposit of about ₹50,000.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Mi Casa by Deedo, last updated with deals registered in Oct 2026.

Latest deal · Rental · Oct 2026

₹20–50k / month

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology