Deedo IDDP-PUN-TV0VCompletion was pushed back 4 months, to Jan 2030; no MahaRERA orders on record; 19% of its units are booked.
Shewalewadi, Pune 412307 · Property rates in Shewalewadi · by Palchin Real Estates Private Limited
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Jan 2030
- P52100052683Registered 20 Sep 2023, completion promised 30 Jun 2027, revised to 30 Oct 2027.
- P52100053177Registered 17 Oct 2023, completion promised 30 Jul 2027, revised to 30 Nov 2027.
- P52100053927Registered 11 Dec 2023, completion promised 30 Jun 2029, revised to 30 Oct 2029.
- P52100053966Registered 18 Dec 2023, completion promised 31 Mar 2029.
- P52100053978Registered 18 Dec 2023, completion promised 28 Feb 2029, revised to 28 Jun 2029.
- P52100054077Registered 27 Dec 2023, completion promised 30 Sep 2029, revised to 30 Jan 2030.
3 extension certificates on record.
6 registrations · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Oct 2026 (probable)
- Primary sale · Sep 2026 (probable)
- Primary sale · Sep 2026 (probable)
- Primary sale · Sep 2026
- Primary sale · Sep 2026 (probable)
- Primary sale · Aug 2026 (probable)
- Primary sale · Aug 2026 (probable)
- Primary sale · Aug 2026 (probable)
- Primary sale · Aug 2026 (probable)
- Primary sale · Jul 2026 (probable)
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Oct 2026 | 4 · 301 | Primary sale | 1,650 sq ft | View Primary sale, Oct 2026 | |
| Sep 2026 | 3 · 704 | Primary sale | 1,160 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | 3 · 501 | Primary sale | 1,163 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | 4 · 403 | Primary sale | 1,252 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | 1 · 502 | Primary sale | 1,650 sq ft | View Primary sale, Sep 2026 | |
| Aug 2026 | 4 · 102 | Primary sale | 1,650 sq ft | View Primary sale, Aug 2026 | |
| Aug 2026 | 3 · 1301 | Primary sale | 1,163 sq ft | View Primary sale, Aug 2026 | |
| Aug 2026 | 3 · 1302 | Primary sale | 1,167 sq ft | View Primary sale, Aug 2026 | |
| Aug 2026 | 3 · 504 | Primary sale | 1,160 sq ft | View Primary sale, Aug 2026 | |
| Jul 2026 | 3 · 804 | Primary sale | 1,160 sq ft | View Primary sale, Jul 2026 |
6 buildings
Open a building to see every flat, floor by floor.
- Row House R1 to R82 floors · 8 units0% booked
- Row House R9 to R132 floors · 5 units0% booked
- Tower 119 floors · 76 units51% booked
- Tower 219 floors · 76 units29% booked
- Tower 319 floors · 76 units0% booked
- Tower 419 floors · 76 units0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrations6
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100052683 | 20 Sep 2023 | 30 Jun 2027 | 30 Oct 2027 | Palchin Real Estates Private Limited | Project page |
| P52100053177 | 17 Oct 2023 | 30 Jul 2027 | 30 Nov 2027 | Palchin Real Estates Private Limited | Project page |
| P52100053927 | 11 Dec 2023 | 30 Jun 2029 | 30 Oct 2029 | Palchin Real Estates Private Limited | Project page |
| P52100053966 | 18 Dec 2023 | 31 Mar 2029 | 31 Mar 2029 | Palchin Real Estates Private Limited | Project page |
| P52100053978 | 18 Dec 2023 | 28 Feb 2029 | 28 Jun 2029 | Palchin Real Estates Private Limited | Project page |
| P52100054077 | 27 Dec 2023 | 30 Sep 2029 | 30 Jan 2030 | Palchin Real Estates Private Limited | Project page |
Documents733
9 documents held by Deedo, 724 filings listed on MahaRERA's project page
Extension certificate (3)
Registration certificate (6)
- Registration certificateP52100054077 · 20 Aug 2026ViewSource
- Registration certificateP52100053177 · 20 Aug 2026ViewSource
- Registration certificateP52100052683 · 20 Aug 2026ViewSource
- Registration certificateP52100053966 · 20 Aug 2026ViewSource
- Registration certificateP52100053978 · 24 Aug 2026ViewSource
Show all 733 documentsShow fewer documents
Finance
- PAN CardP52100054077 · Mrunmai PAN Card-LTD.pdf · uploaded 14 Jul 2023Source
- PAN CardP52100052683 · Mrunmai PAN Card-LTD.pdf · uploaded 11 Aug 2023Source
- PAN CardP52100053177 · Mrunmai PAN Card-LTD.pdf · uploaded 14 Aug 2023Source
- PAN CardP52100053966 · Mrunmai PAN Card-LTD.pdf · uploaded 14 Aug 2023Source
- PAN CardP52100053978 · PAN Card- Mrunmai.pdf · uploaded 31 Oct 2023Source
- PAN CardP52100053927 · PAN Card- Mrunmai.pdf · uploaded 31 Oct 2023Source
- Other – FinanceP52100053927 · V2- Declaration for Separate Bank Account 04122023.pdf · uploaded 4 Dec 2023Source
- PAN CardP52100053177 · Palchin PAN.pdf · uploaded 26 Jul 2024Source
- PAN CardP52100054077 · Palchin PAN.pdf · uploaded 26 Jul 2024Source
- PAN CardP52100052683 · Palchin PAN.pdf · uploaded 26 Jul 2024Source
- PAN CardP52100053978 · Palchin PAN.pdf · uploaded 26 Jul 2024Source
- PAN CardP52100053927 · Palchin PAN.pdf · uploaded 26 Jul 2024Source
- PAN CardP52100053966 · Palchin PAN.pdf · uploaded 26 Jul 2024Source
Legal
- Declaration Form BP52100054077 · MTV Tower 3- Form B.pdf · uploaded 14 Jul 2023Source
- Legal Title reportP52100052683 · Title Report- Part 1.pdf · uploaded 11 Aug 2023Source
- Legal Title reportP52100052683 · Title Report- Part 2.pdf · uploaded 11 Aug 2023Source
- Declaration Form BP52100052683 · MTV Tower 1- Affidavit (Form B).pdf · uploaded 11 Aug 2023Source
- Declaration Form BP52100053177 · MTV Tower 2- Form B.pdf · uploaded 14 Aug 2023Source
- Declaration Form BP52100053966 · MTV Tower 4- Form B.pdf · uploaded 14 Aug 2023Source
- Other – LegalP52100053177 · MTV T2- Declaration on Survey (legal)_signed.pdf · uploaded 9 Oct 2023Source
- Legal Title reportP52100053177 · Part 1.pdf · uploaded 10 Oct 2023Source
- Legal Title reportP52100053177 · Part 2.pdf · uploaded 10 Oct 2023Source
- Legal Title reportP52100054077 · Part 1.pdf · uploaded 18 Oct 2023Source
- Legal Title reportP52100054077 · Part 2.pdf · uploaded 18 Oct 2023Source
- Legal Title reportP52100053966 · Part 1.pdf · uploaded 18 Oct 2023Source
- Legal Title reportP52100053966 · Part 2.pdf · uploaded 18 Oct 2023Source
- Legal Title reportP52100053978 · Part 1.pdf · uploaded 31 Oct 2023Source
- Legal Title reportP52100053978 · Part 2.pdf · uploaded 31 Oct 2023Source
- Declaration Form BP52100053978 · Villa Phase 1- Form B.pdf · uploaded 31 Oct 2023Source
- Legal Title reportP52100053927 · Part 1.pdf · uploaded 31 Oct 2023Source
- Legal Title reportP52100053927 · Part 2.pdf · uploaded 31 Oct 2023Source
- Declaration Form BP52100053927 · Villa Phase 2- Form B.pdf · uploaded 4 Nov 2023Source
- Other – LegalP52100053966 · NCLT Certified Order- 17th Feb 2020.pdf · uploaded 9 Nov 2023Source
- Other – LegalP52100053966 · Mrunmai- Palchin Scheme.pdf · uploaded 9 Nov 2023Source
- Other – LegalP52100054077 · NCLT Certified Order- 17th Feb 2020.pdf · uploaded 13 Nov 2023Source
- Other – LegalP52100054077 · Mrunmai- Palchin Scheme.pdf · uploaded 13 Nov 2023Source
- Other – LegalP52100054077 · NCLT Order dtd 10th July 2023.pdf · uploaded 28 Nov 2023Source
- Other – LegalP52100054077 · T3- Declaration for 2012 Demerger.pdf · uploaded 28 Nov 2023Source
- Other – LegalP52100054077 · Part 1.pdf · uploaded 28 Nov 2023Source
- Other – LegalP52100054077 · Part 2.pdf · uploaded 28 Nov 2023Source
- Other – LegalP52100054077 · Part 3.pdf · uploaded 28 Nov 2023Source
- Other – LegalP52100053978 · (1) Mrunmai- Palchin Scheme.pdf · uploaded 4 Dec 2023Source
- Other – LegalP52100053978 · (2) NCLT Order- 17th Feb 2020.pdf · uploaded 4 Dec 2023Source
- Other – LegalP52100053978 · V1- Declaration on Survey (legal) 04122023.pdf · uploaded 4 Dec 2023Source
- Other – LegalP52100053978 · NCLT Order dtd 10th July 2023.pdf · uploaded 4 Dec 2023Source
- Other – LegalP52100053978 · Villa 1- Declaration for 2012 Demerger.pdf · uploaded 4 Dec 2023Source
- Other – LegalP52100053978 · Part 1.pdf · uploaded 4 Dec 2023Source
- Other – LegalP52100053978 · Part 2.pdf · uploaded 4 Dec 2023Source
- Other – LegalP52100053978 · Part 3.pdf · uploaded 4 Dec 2023Source
- Other – LegalP52100053927 · V2- Declaration on Survey (legal) 04122023.pdf · uploaded 4 Dec 2023Source
- Other – LegalP52100053927 · (2) NCLT Order- 17th Feb 2020.pdf · uploaded 4 Dec 2023Source
- Other – LegalP52100053927 · (1) Mrunmai- Palchin Scheme.pdf · uploaded 4 Dec 2023Source
- Other – LegalP52100053927 · (3) NCLT Order dtd 10th July 2023.pdf · uploaded 4 Dec 2023Source
- Other – LegalP52100053927 · Villa 2- Declaration for 2012 Demerger.pdf · uploaded 4 Dec 2023Source
- Other – LegalP52100053927 · Part 1.pdf · uploaded 4 Dec 2023Source
- Other – LegalP52100053927 · Part 2.pdf · uploaded 4 Dec 2023Source
- Other – LegalP52100053927 · Part 3.pdf · uploaded 4 Dec 2023Source
- Other – LegalP52100053966 · (3) NCLT Order dtd 10th July 2023.pdf · uploaded 8 Dec 2023Source
- Other – LegalP52100053966 · T4- Declaration for 2012 Demerger.pdf · uploaded 8 Dec 2023Source
- Other – LegalP52100053966 · Part 1.pdf · uploaded 8 Dec 2023Source
- Other – LegalP52100053966 · Part 2.pdf · uploaded 8 Dec 2023Source
- Other – LegalP52100053966 · Part 3.pdf · uploaded 8 Dec 2023Source
- Other – LegalP52100053966 · T4- Declaration on Survey (legal) 08122023.pdf · uploaded 8 Dec 2023Source
- Other – LegalP52100054077 · T3- Declaration on Survey (legal) 28112023.pdf · uploaded 11 Dec 2023Source
- Other – LegalP52100054077 · Mrunmai BR- Statutory.pdf · uploaded 19 Dec 2023Source
- Legal Title reportP52100053177 · Palchin- Title Report (MTV Project).pdf · uploaded 6 Aug 2024Source
- Legal Title reportP52100054077 · Palchin- Title Report (MTV Project).pdf · uploaded 6 Aug 2024Source
- Legal Title reportP52100052683 · Palchin- Title Report (MTV Project).pdf · uploaded 6 Aug 2024Source
- Legal Title reportP52100053978 · Palchin- Title Report (MTV Project).pdf · uploaded 6 Aug 2024Source
- Legal Title reportP52100053927 · Palchin- Title Report (MTV Project).pdf · uploaded 6 Aug 2024Source
- Legal Title reportP52100053966 · Palchin- Title Report (MTV Project).pdf · uploaded 6 Aug 2024Source
- Other – LegalP52100053177 · Palchin Regd Scheme Part 1.pdf · uploaded 20 Aug 2024Source
- Other – LegalP52100053177 · Palchin Regd Scheme Part 2.pdf · uploaded 20 Aug 2024Source
- Other – LegalP52100054077 · Palchin Regd Scheme Part 1.pdf · uploaded 20 Aug 2024Source
- Other – LegalP52100054077 · Palchin Regd Scheme Part 2.pdf · uploaded 20 Aug 2024Source
- Other – LegalP52100052683 · Palchin Regd Scheme Part 1.pdf · uploaded 20 Aug 2024Source
- Other – LegalP52100052683 · Palchin Regd Scheme Part 2.pdf · uploaded 20 Aug 2024Source
- Other – LegalP52100053978 · Palchin Regd Scheme Part 1.pdf · uploaded 20 Aug 2024Source
- Other – LegalP52100053978 · Palchin Regd Scheme Part 2.pdf · uploaded 20 Aug 2024Source
- Other – LegalP52100053927 · Palchin Regd Scheme Part 1.pdf · uploaded 20 Aug 2024Source
- Other – LegalP52100053927 · Palchin Regd Scheme Part 2.pdf · uploaded 20 Aug 2024Source
- Other – LegalP52100053966 · Palchin Regd Scheme Part 1.pdf · uploaded 20 Aug 2024Source
- Other – LegalP52100053966 · Palchin Regd Scheme Part 2.pdf · uploaded 20 Aug 2024Source
- Declaration Form BP52100053966 · MTV T4- Form B Affidavit- 31 Mar 2029.pdf · uploaded 28 Feb 2025Source
- OthersP52100054077 · Annex F- T3- Form B Affidavit.pdf · uploaded 5 Sep 2025Source
Migrated
- 1 PAN CardP52100054077 · Mrunmai PAN Card-LTD.pdf · uploaded 14 Jul 2023Source
- 1 Declaration in FORM BP52100054077 · MTV Tower 3- Form B.pdf · uploaded 14 Jul 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100054077 · Mrunmai- Director Declarations.pdf · uploaded 14 Jul 2023Source
- 1 Copy of Layout Approval (in case of layout)P52100054077 · Layout- BP (reduced).pdf · uploaded 11 Aug 2023Source
- 2 Copy of Layout Approval (in case of layout)P52100054077 · Layout- IOD (reduced).pdf · uploaded 11 Aug 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100054077 · T2 T3- FLoor Plan.pdf · uploaded 11 Aug 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100054077 · T3 Section Plan.pdf · uploaded 11 Aug 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100054077 · CC.pdf · uploaded 11 Aug 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054077 · MTV Tower 3- CA Certificate.pdf · uploaded 11 Aug 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100054077 · Tower 3- Declaration for Separate Bank Account.pdf · uploaded 11 Aug 2023Source
- 1 PAN CardP52100052683 · Mrunmai PAN Card-LTD.pdf · uploaded 11 Aug 2023Source
- 1 Copy of the legal title reportP52100052683 · Title Report- Part 1.pdf · uploaded 11 Aug 2023Source
- 2 Copy of the legal title reportP52100052683 · Title Report- Part 2.pdf · uploaded 11 Aug 2023Source
- 1 a Details of encumbrances concerned to FinanceP52100052683 · T1- Legal Encumbrance.pdf · uploaded 11 Aug 2023Source
- 1 b Details of encumbrances concerned to LegalP52100052683 · T1- Legal Encumbrance.pdf · uploaded 11 Aug 2023Source
- 1 Copy of Layout Approval (in case of layout)P52100052683 · Layout- BP (reduced).pdf · uploaded 11 Aug 2023Source
- 2 Copy of Layout Approval (in case of layout)P52100052683 · Layout- IOD (reduced).pdf · uploaded 11 Aug 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100052683 · T1- Floor Plan (reduced).pdf · uploaded 11 Aug 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100052683 · T1 Section Plan.pdf · uploaded 11 Aug 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100052683 · CC.pdf · uploaded 11 Aug 2023Source
- 1 Declaration about Commencement CertificateP52100052683 · MTV Tower 1- Declaration about CC.pdf · uploaded 11 Aug 2023Source
- 1 Declaration in FORM BP52100052683 · MTV Tower 1- Affidavit (Form B).pdf · uploaded 11 Aug 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100052683 · Mrunmai- Director Declarations.pdf · uploaded 11 Aug 2023Source
- 1 Proforma of Allotment letterP52100052683 · T1- Draft Allotment Letter.pdf · uploaded 11 Aug 2023Source
- 1 Deviation Report with respect to Allotment letterP52100052683 · T1- Deviation Report Letter of Allotment.pdf · uploaded 11 Aug 2023Source
- 1 PAN CardP52100053177 · Mrunmai PAN Card-LTD.pdf · uploaded 14 Aug 2023Source
- 1 a Details of encumbrances concerned to FinanceP52100053177 · T2- Financial Encumbrance.pdf · uploaded 14 Aug 2023Source
- 1 b Details of encumbrances concerned to LegalP52100053177 · T2- Financial Encumbrance.pdf · uploaded 14 Aug 2023Source
- 1 Copy of Layout Approval (in case of layout)P52100053177 · Layout- BP (reduced).pdf · uploaded 14 Aug 2023Source
- 2 Copy of Layout Approval (in case of layout)P52100053177 · Layout- IOD (reduced).pdf · uploaded 14 Aug 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100053177 · T2 Floor Plan (reduced).pdf · uploaded 14 Aug 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100053177 · T2 Section Plan.pdf · uploaded 14 Aug 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100053177 · MTV- Commencement Certificate.pdf · uploaded 14 Aug 2023Source
- 1 Declaration about Commencement CertificateP52100053177 · MTV Tower 2- Declaration about CC.pdf · uploaded 14 Aug 2023Source
- 1 Declaration in FORM BP52100053177 · MTV Tower 2- Form B.pdf · uploaded 14 Aug 2023Source
- 1 CERSAI detailsP52100053177 · CERSAI_Search_Report_Aug 23.pdf · uploaded 14 Aug 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053177 · MTV Tower 2- CA Certificate_signed.pdf · uploaded 14 Aug 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100053177 · Mrunmai- Director Declarations.pdf · uploaded 14 Aug 2023Source
- 1 Proforma of Agreement for saleP52100053177 · Tower 2- Draft AFS.pdf · uploaded 14 Aug 2023Source
- 1 Proforma of Allotment letterP52100053177 · Tower 2- Draft Allotment Letter.pdf · uploaded 14 Aug 2023Source
- 1 Deviation Report with respect to Allotment letterP52100053177 · Tower 2- Deviation Report to Allotment Letter.pdf · uploaded 14 Aug 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100053177 · Tower 2- Deviation Report to AFS.pdf · uploaded 14 Aug 2023Source
- 1 PAN CardP52100053966 · Mrunmai PAN Card-LTD.pdf · uploaded 14 Aug 2023Source
- 1 Copy of Layout Approval (in case of layout)P52100053966 · Layout- BP (reduced).pdf · uploaded 14 Aug 2023Source
- 2 Copy of Layout Approval (in case of layout)P52100053966 · Layout- IOD (reduced).pdf · uploaded 14 Aug 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100053966 · T4 Floor Plan (reduced).pdf · uploaded 14 Aug 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100053966 · T4 Section Plan.pdf · uploaded 14 Aug 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100053966 · MTV- Commencement Certificate.pdf · uploaded 14 Aug 2023Source
- 1 Declaration in FORM BP52100053966 · MTV Tower 4- Form B.pdf · uploaded 14 Aug 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053966 · MTV Tower 4- CA Certificate.pdf · uploaded 14 Aug 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100053966 · Mrunmai- Director Declarations.pdf · uploaded 14 Aug 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100053966 · Tower 4- Declaration for Separate Bank Account.pdf · uploaded 14 Aug 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100053177 · Tower 2- Separate Bank Account Declaration (latest).pdf · uploaded 24 Aug 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052683 · MTV Tower 1- CA Certificate- July 23.pdf · uploaded 24 Aug 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100052683 · Tower 1- Separate Bank Account Declaration (latest).pdf · uploaded 24 Aug 2023Source
- 1 Proforma of Agreement for saleP52100052683 · T1- Draft AFS.pdf · uploaded 29 Aug 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100052683 · T1- Deviation Report for AFS.pdf · uploaded 29 Aug 2023Source
- 1 Other – TechnicalP52100052683 · PMRDA Mail and CC MTV.pdf · uploaded 29 Aug 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentP52100052683 · MTV Tower 1- Declaration about CC (revised).pdf · uploaded 12 Sep 2023Source
- 2 Other – TechnicalP52100052683 · MTV T1- Declaration on Survey.pdf · uploaded 12 Sep 2023Source
- 3 Other – TechnicalP52100052683 · Annexure 1.pdf · uploaded 12 Sep 2023Source
- 4 Other – TechnicalP52100052683 · Annexure 2.pdf · uploaded 12 Sep 2023Source
- 5 Other – TechnicalP52100052683 · Annexure 3 (updated).pdf · uploaded 13 Sep 2023Source
- 2 a Details of encumbrances concerned to FinanceP52100052683 · T1- Financial Encumbrance.pdf · uploaded 14 Sep 2023Source
- 2 b Details of encumbrances concerned to LegalP52100052683 · T1- Financial Encumbrance.pdf · uploaded 14 Sep 2023Source
- 1 CERSAI detailsP52100052683 · T1- Declaration and CERSAI Report.pdf · uploaded 14 Sep 2023Source
- 2 a Details of encumbrances concerned to FinanceP52100053177 · T2- Legal Encumbrance (revised)_signed.pdf · uploaded 9 Oct 2023Source
- 2 b Details of encumbrances concerned to LegalP52100053177 · T2- Legal Encumbrance (revised)_signed.pdf · uploaded 9 Oct 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentP52100053177 · MTV Tower 2- CC Declaration (revised)_signed.pdf · uploaded 9 Oct 2023Source
- 1 Other – LegalP52100053177 · MTV T2- Declaration on Survey (legal)_signed.pdf · uploaded 9 Oct 2023Source
- 1 Other – TechnicalP52100053177 · MTV T2- Declaration on Survey_signed.pdf · uploaded 9 Oct 2023Source
- 2 Other – TechnicalP52100053177 · Annexure 1.pdf · uploaded 9 Oct 2023Source
- 3 Other – TechnicalP52100053177 · Annexure 2.pdf · uploaded 9 Oct 2023Source
- 4 Other – TechnicalP52100053177 · Annexure 3.pdf · uploaded 9 Oct 2023Source
- 1 Copy of the legal title reportP52100053177 · Part 1.pdf · uploaded 10 Oct 2023Source
- 2 Copy of the legal title reportP52100053177 · Part 2.pdf · uploaded 10 Oct 2023Source
- 3 a Details of encumbrances concerned to FinanceP52100053177 · T2- Financial Encumbrance.pdf · uploaded 11 Oct 2023Source
- 3 b Details of encumbrances concerned to LegalP52100053177 · T2- Financial Encumbrance.pdf · uploaded 11 Oct 2023Source
- 2 CERSAI detailsP52100053177 · T2- CERSAI Declaration and Report.pdf · uploaded 11 Oct 2023Source
- 1 Copy of the legal title reportP52100054077 · Part 1.pdf · uploaded 18 Oct 2023Source
- 2 Copy of the legal title reportP52100054077 · Part 2.pdf · uploaded 18 Oct 2023Source
- 1 Declaration about Commencement CertificateP52100054077 · MTV Tower 3- CC Declaration (revised)_signed.pdf · uploaded 18 Oct 2023Source
- 1 Other – TechnicalP52100054077 · T3- Declaration on Survey (technical)_signed.pdf · uploaded 18 Oct 2023Source
- 2 Other – TechnicalP52100054077 · Annexure 1.pdf · uploaded 18 Oct 2023Source
- 3 Other – TechnicalP52100054077 · Annexure 2.pdf · uploaded 18 Oct 2023Source
- 4 Other – TechnicalP52100054077 · Annexure 3.pdf · uploaded 18 Oct 2023Source
- 1 Copy of the legal title reportP52100053966 · Part 1.pdf · uploaded 18 Oct 2023Source
- 2 Copy of the legal title reportP52100053966 · Part 2.pdf · uploaded 18 Oct 2023Source
- 1 Declaration about Commencement CertificateP52100053966 · MTV Tower 4- CC Declaration (revised)_signed.pdf · uploaded 18 Oct 2023Source
- 1 Other – TechnicalP52100053966 · T4- Declaration on Survey (technical)_signed.pdf · uploaded 18 Oct 2023Source
- 2 Other – TechnicalP52100053966 · Annexure 1.pdf · uploaded 18 Oct 2023Source
- 3 Other – TechnicalP52100053966 · Annexure 2.pdf · uploaded 18 Oct 2023Source
- 4 Other – TechnicalP52100053966 · Annexure 3.pdf · uploaded 18 Oct 2023Source
- 1 PAN CardP52100053978 · PAN Card- Mrunmai.pdf · uploaded 31 Oct 2023Source
- 1 Copy of the legal title reportP52100053978 · Part 1.pdf · uploaded 31 Oct 2023Source
- 2 Copy of the legal title reportP52100053978 · Part 2.pdf · uploaded 31 Oct 2023Source
- 1 Copy of Layout Approval (in case of layout)P52100053978 · Layout- BP (reduced).pdf · uploaded 31 Oct 2023Source
- 2 Copy of Layout Approval (in case of layout)P52100053978 · Layout- IOD (reduced).pdf · uploaded 31 Oct 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100053978 · MTV- Commencement Certificate.pdf · uploaded 31 Oct 2023Source
- 1 Declaration in FORM BP52100053978 · Villa Phase 1- Form B.pdf · uploaded 31 Oct 2023Source
- 1 CERSAI detailsP52100053978 · CERSAI Report - 26th Oct.pdf · uploaded 31 Oct 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100053978 · Mrunmai- Director Declarations.pdf · uploaded 31 Oct 2023Source
- 1 PAN CardP52100053927 · PAN Card- Mrunmai.pdf · uploaded 31 Oct 2023Source
- 1 Copy of the legal title reportP52100053927 · Part 1.pdf · uploaded 31 Oct 2023Source
- 2 Copy of the legal title reportP52100053927 · Part 2.pdf · uploaded 31 Oct 2023Source
- 1 Copy of Layout Approval (in case of layout)P52100053927 · Layout- BP (reduced).pdf · uploaded 31 Oct 2023Source
- 2 Copy of Layout Approval (in case of layout)P52100053927 · Layout- IOD (reduced).pdf · uploaded 31 Oct 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100053927 · Row House Plan.pdf · uploaded 31 Oct 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100053927 · MTV- Commencement Certificate.pdf · uploaded 31 Oct 2023Source
- 1 CERSAI detailsP52100053927 · CERSAI Report - 26th Oct.pdf · uploaded 31 Oct 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100053927 · Mrunmai- Director Declarations.pdf · uploaded 31 Oct 2023Source
- 1 a Details of encumbrances concerned to FinanceP52100053978 · V1- Mrunmai- Financial Encumbrance.pdf · uploaded 2 Nov 2023Source
- 1 b Details of encumbrances concerned to LegalP52100053978 · V1- Mrunmai- Financial Encumbrance.pdf · uploaded 2 Nov 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100053978 · Row House Plan.pdf · uploaded 2 Nov 2023Source
- 1 Declaration about Commencement CertificateP52100053978 · V1- CC Declaration.pdf · uploaded 2 Nov 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053978 · Villa Phase 1- Form 3- June 23.pdf · uploaded 2 Nov 2023Source
- 1 Deviation Report with respect to Allotment letterP52100053978 · V1- Deviation Report for Allotment Letter.pdf · uploaded 2 Nov 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100053978 · V1- Deviation Report for AFS.pdf · uploaded 2 Nov 2023Source
- 1 Other – TechnicalP52100053978 · V1- Declaration on Survey (technical).pdf · uploaded 2 Nov 2023Source
- 2 Other – TechnicalP52100053978 · Annexure 1.pdf · uploaded 2 Nov 2023Source
- 3 Other – TechnicalP52100053978 · Annexure 2.pdf · uploaded 2 Nov 2023Source
- 4 Other – TechnicalP52100053978 · Villa 1- Annexure 3.pdf · uploaded 2 Nov 2023Source
- 1 a Details of encumbrances concerned to FinanceP52100053927 · V2- Mrunmai- Financial Encumbrance.pdf · uploaded 2 Nov 2023Source
- 1 b Details of encumbrances concerned to LegalP52100053927 · V2- Mrunmai- Financial Encumbrance.pdf · uploaded 2 Nov 2023Source
- 1 Declaration about Commencement CertificateP52100053927 · V2- CC Declaration.pdf · uploaded 2 Nov 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100053927 · V2- Declaration for Separate Bank Account.pdf · uploaded 2 Nov 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100053927 · V2- Deviation Report for AFS.pdf · uploaded 2 Nov 2023Source
- 1 Other – TechnicalP52100053927 · V2- Declaration on Survey (technical).pdf · uploaded 2 Nov 2023Source
- 2 Other – TechnicalP52100053927 · Annexure 1.pdf · uploaded 2 Nov 2023Source
- 3 Other – TechnicalP52100053927 · Annexure 2.pdf · uploaded 2 Nov 2023Source
- 4 Other – TechnicalP52100053927 · Villa 2- Annexure 3.pdf · uploaded 2 Nov 2023Source
- 1 Proforma of Agreement for saleP52100053978 · Draft AFS- Villa Phase 1.pdf · uploaded 3 Nov 2023Source
- 1 Proforma of Allotment letterP52100053978 · Draft Allotment Letter- Villa Phase 1.pdf · uploaded 3 Nov 2023Source
- 1 Proforma of Agreement for saleP52100053927 · Draft AFS- Villa Phase 2.pdf · uploaded 3 Nov 2023Source
- 1 Declaration in FORM BP52100053927 · Villa Phase 2- Form B.pdf · uploaded 4 Nov 2023Source
- 1 a Details of encumbrances concerned to FinanceP52100053966 · T4- Financial Encumbrance (revised).pdf · uploaded 9 Nov 2023Source
- 1 b Details of encumbrances concerned to LegalP52100053966 · T4- Financial Encumbrance (revised).pdf · uploaded 9 Nov 2023Source
- 1 Other – LegalP52100053966 · NCLT Certified Order- 17th Feb 2020.pdf · uploaded 9 Nov 2023Source
- 2 Other – LegalP52100053966 · Mrunmai- Palchin Scheme.pdf · uploaded 9 Nov 2023Source
- 1 a Details of encumbrances concerned to FinanceP52100054077 · T3- Financial Encumbrance (revised)_signed.pdf · uploaded 13 Nov 2023Source
- 1 b Details of encumbrances concerned to LegalP52100054077 · T3- Financial Encumbrance (revised)_signed.pdf · uploaded 13 Nov 2023Source
- 1 Other – LegalP52100054077 · NCLT Certified Order- 17th Feb 2020.pdf · uploaded 13 Nov 2023Source
- 2 Other – LegalP52100054077 · Mrunmai- Palchin Scheme.pdf · uploaded 13 Nov 2023Source
- 1 CERSAI detailsP52100053966 · CERSAI Report - 26th Oct.pdf · uploaded 17 Nov 2023Source
- 1 CERSAI detailsP52100054077 · CERSAI Report - 26th Oct.pdf · uploaded 20 Nov 2023Source
- 2 a Details of encumbrances concerned to FinanceP52100054077 · T3- Mrunmai- Legal Encumbrance 28112023.pdf · uploaded 28 Nov 2023Source
- 2 b Details of encumbrances concerned to LegalP52100054077 · T3- Mrunmai- Legal Encumbrance 28112023.pdf · uploaded 28 Nov 2023Source
- 2 CERSAI detailsP52100054077 · T3- CERSAI Declaration 28112023.pdf · uploaded 28 Nov 2023Source
- 1 Proforma of Agreement for saleP52100054077 · T3- AFS 21112023.pdf · uploaded 28 Nov 2023Source
- 1 Proforma of Allotment letterP52100054077 · T3- Allotment Letter 21112023.pdf · uploaded 28 Nov 2023Source
- 1 Deviation Report with respect to Allotment letterP52100054077 · T3- Deviation Report for Allotment Letter 21112023.pdf · uploaded 28 Nov 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100054077 · T3- Deviation Report for AFS 21112023.pdf · uploaded 28 Nov 2023Source
- 3 Other – LegalP52100054077 · NCLT Order dtd 10th July 2023.pdf · uploaded 28 Nov 2023Source
- 4 Other – LegalP52100054077 · Part 1.pdf · uploaded 28 Nov 2023Source
- 5 Other – LegalP52100054077 · Part 2.pdf · uploaded 28 Nov 2023Source
- 6 Other – LegalP52100054077 · Part 3.pdf · uploaded 28 Nov 2023Source
- 7 Other – LegalP52100054077 · T3- Declaration for 2012 Demerger.pdf · uploaded 28 Nov 2023Source
- 2 a Details of encumbrances concerned to FinanceP52100053978 · V1- Mrunmai- Legal Encumbrance 04122023.pdf · uploaded 4 Dec 2023Source
- 2 b Details of encumbrances concerned to LegalP52100053978 · V1- Mrunmai- Legal Encumbrance 04122023.pdf · uploaded 4 Dec 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100053978 · V1- Declaration for Separate Bank Account 04122023.pdf · uploaded 4 Dec 2023Source
- 1 Other – LegalP52100053978 · V1- Declaration on Survey (legal) 04122023.pdf · uploaded 4 Dec 2023Source
- 2 Other – LegalP52100053978 · NCLT Order dtd 10th July 2023.pdf · uploaded 4 Dec 2023Source
- 3 Other – LegalP52100053978 · Villa 1- Declaration for 2012 Demerger.pdf · uploaded 4 Dec 2023Source
- 4 Other – LegalP52100053978 · Part 1.pdf · uploaded 4 Dec 2023Source
- 5 Other – LegalP52100053978 · Part 2.pdf · uploaded 4 Dec 2023Source
- 6 Other – LegalP52100053978 · Part 3.pdf · uploaded 4 Dec 2023Source
- 7 Other – LegalP52100053978 · (1) Mrunmai- Palchin Scheme.pdf · uploaded 4 Dec 2023Source
- 8 Other – LegalP52100053978 · (2) NCLT Order- 17th Feb 2020.pdf · uploaded 4 Dec 2023Source
- 2 a Details of encumbrances concerned to FinanceP52100053927 · V2- Mrunmai- Legal Encumbrance 04122023.pdf · uploaded 4 Dec 2023Source
- 2 b Details of encumbrances concerned to LegalP52100053927 · V2- Mrunmai- Legal Encumbrance 04122023.pdf · uploaded 4 Dec 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053927 · Villa Phase 2- Form 3- Oct 23.pdf · uploaded 4 Dec 2023Source
- 1 Proforma of Allotment letterP52100053927 · Draft Allotment letter Villa Phase 2 (21112023).pdf · uploaded 4 Dec 2023Source
- 1 Deviation Report with respect to Allotment letterP52100053927 · Deviation Report- Allotment Letter- Villas Phase 2 (21112023).pdf · uploaded 4 Dec 2023Source
- 1 Other – LegalP52100053927 · V2- Declaration on Survey (legal) 04122023.pdf · uploaded 4 Dec 2023Source
- 2 Other – LegalP52100053927 · (2) NCLT Order- 17th Feb 2020.pdf · uploaded 4 Dec 2023Source
- 3 Other – LegalP52100053927 · (1) Mrunmai- Palchin Scheme.pdf · uploaded 4 Dec 2023Source
- 4 Other – LegalP52100053927 · (3) NCLT Order dtd 10th July 2023.pdf · uploaded 4 Dec 2023Source
- 5 Other – LegalP52100053927 · Villa 2- Declaration for 2012 Demerger.pdf · uploaded 4 Dec 2023Source
- 6 Other – LegalP52100053927 · Part 1.pdf · uploaded 4 Dec 2023Source
- 7 Other – LegalP52100053927 · Part 2.pdf · uploaded 4 Dec 2023Source
- 8 Other – LegalP52100053927 · Part 3.pdf · uploaded 4 Dec 2023Source
- 1 Other – FinanceP52100053927 · V2- Declaration for Separate Bank Account 04122023.pdf · uploaded 4 Dec 2023Source
- 5 Other – TechnicalP52100053927 · Mrunmai BR- Statutory.pdf · uploaded 8 Dec 2023Source
- 2 a Details of encumbrances concerned to FinanceP52100053966 · T4- Mrunmai- Legal Encumbrance 08122023.pdf · uploaded 8 Dec 2023Source
- 2 b Details of encumbrances concerned to LegalP52100053966 · T4- Mrunmai- Legal Encumbrance 08122023.pdf · uploaded 8 Dec 2023Source
- 2 CERSAI detailsP52100053966 · T4- CERSAI Declaration 08122023.pdf · uploaded 8 Dec 2023Source
- 1 Proforma of Agreement for saleP52100053966 · T4- Draft AFS 28-11-2023.pdf · uploaded 8 Dec 2023Source
- 1 Proforma of Allotment letterP52100053966 · T4- Draft Allotment letter 28-11-2023.pdf · uploaded 8 Dec 2023Source
- 1 Deviation Report with respect to Allotment letterP52100053966 · T4- Deviation Report Letter of Allotment 30-11-2023.pdf · uploaded 8 Dec 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100053966 · T4- Deviation Report AFS 30-11-2023.pdf · uploaded 8 Dec 2023Source
- 3 Other – LegalP52100053966 · (3) NCLT Order dtd 10th July 2023.pdf · uploaded 8 Dec 2023Source
- 4 Other – LegalP52100053966 · T4- Declaration for 2012 Demerger.pdf · uploaded 8 Dec 2023Source
- 5 Other – LegalP52100053966 · Part 1.pdf · uploaded 8 Dec 2023Source
- 6 Other – LegalP52100053966 · Part 2.pdf · uploaded 8 Dec 2023Source
- 7 Other – LegalP52100053966 · Part 3.pdf · uploaded 8 Dec 2023Source
- 8 Other – LegalP52100053966 · T4- Declaration on Survey (legal) 08122023.pdf · uploaded 8 Dec 2023Source
- 5 Other – TechnicalP52100053966 · Mrunmai BR- Statutory.pdf · uploaded 8 Dec 2023Source
- 8 Other – LegalP52100054077 · T3- Declaration on Survey (legal) 28112023.pdf · uploaded 11 Dec 2023Source
- 5 Other – TechnicalP52100053978 · Mrunmai BR- Statutory.pdf · uploaded 11 Dec 2023Source
- 9 Other – LegalP52100054077 · Mrunmai BR- Statutory.pdf · uploaded 19 Dec 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052683 · T1- No Progress Declaration- Sept'23_signed.pdf · uploaded 6 Feb 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052683 · T1- Form 1- Dec 2023_signed.pdf · uploaded 6 Feb 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052683 · T1- No Progress Declaration- Dec'23_Signed.pdf · uploaded 6 Feb 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052683 · T1- No Progress Declaration- Sept'23_signed.pdf · uploaded 6 Feb 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052683 · T1- Form 2- Dec 2023_signed.pdf · uploaded 6 Feb 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052683 · T1- No Withdrawals- Sept 2023_signed.pdf · uploaded 6 Feb 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052683 · T1- No Withdrawals- Dec 2023_signed.pdf · uploaded 6 Feb 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053177 · T2- Form 1- Dec 2023_signed.pdf · uploaded 12 Mar 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053177 · T2- Physical Progress Declaration- Dec'23.pdf · uploaded 12 Mar 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053177 · T2- Form 2- Dec 2023.pdf · uploaded 12 Mar 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053177 · T2- No Withdrawals- Dec 2023_signed.pdf · uploaded 12 Mar 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054077 · T3- No Progress Declaration- Dec'23_signed.pdf · uploaded 12 Mar 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054077 · T3- No Progress Declaration- Dec'23_signed.pdf · uploaded 12 Mar 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054077 · T3- No Withdrawals- Dec 2023_signed.pdf · uploaded 12 Mar 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053978 · Villa 1- No Progress Declaration- Dec'23_signed.pdf · uploaded 12 Mar 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053978 · Villa 1- No Progress Declaration- Dec'23_signed.pdf · uploaded 12 Mar 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053978 · Villa 1- No Withdrawals- Dec 2023_signed.pdf · uploaded 12 Mar 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053927 · Villa 2- No Progress Declaration- Dec'23_signed.pdf · uploaded 12 Mar 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053927 · Villa 2- No Progress Declaration- Dec'23_signed.pdf · uploaded 12 Mar 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053927 · Villa 2- No Withdrawals- Dec 2023_signed.pdf · uploaded 12 Mar 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053966 · T4- No Progress Declaration- Dec'23_signed.pdf · uploaded 12 Mar 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053966 · T4- No Progress Declaration- Dec'23_signed.pdf · uploaded 12 Mar 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053966 · T4- No Withdrawals- Dec 2023_signed.pdf · uploaded 12 Mar 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053177 · T2- Form 1- Mar 2024.pdf · uploaded 25 Jun 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053177 · T2- Physical Progress Declaration- Mar'24.pdf · uploaded 25 Jun 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053177 · T2- Form 2- Mar 2024.pdf · uploaded 25 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100053177 · T2- Form 2A Declaration- Mar'24.pdf · uploaded 25 Jun 2024Source
- 1 Disclosure of sold/ booked inventoryP52100053177 · Tower 2- Inventory Report- 25 Apr 2024.pdf · uploaded 25 Jun 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054077 · T3- Physical Progress Declaration- Mar'24.pdf · uploaded 25 Jun 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054077 · T3- Physical Progress Declaration- Mar'24.pdf · uploaded 25 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100054077 · T3- Form 2A Declaration- Mar'24.pdf · uploaded 25 Jun 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054077 · T3- No Withdrawals- Mar 2024.pdf · uploaded 25 Jun 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052683 · T1- Form 1- Mar 2024.pdf · uploaded 25 Jun 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052683 · T1- Physical Progress Declaration- Mar'24.pdf · uploaded 25 Jun 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052683 · T1- Form 2- Mar 2024.pdf · uploaded 25 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100052683 · T1- Form 2A Declaration- Mar'24.pdf · uploaded 25 Jun 2024Source
- 1 Disclosure of sold/ booked inventoryP52100052683 · Tower 1- Inventory Report- 25 Apr 2024.pdf · uploaded 25 Jun 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053978 · Villa 1- Physical Progress Declaration- Mar'24.pdf · uploaded 25 Jun 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053978 · Villa 1- Physical Progress Declaration- Mar'24.pdf · uploaded 25 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100053978 · Villa 1- Form 2A Declaration- Mar'24.pdf · uploaded 25 Jun 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053978 · Villa 1- No Withdrawals- Mar 2024.pdf · uploaded 25 Jun 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053927 · Villa 2- Physical Progress Declaration- Mar'24.pdf · uploaded 25 Jun 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053927 · Villa 2- Physical Progress Declaration- Mar'24.pdf · uploaded 25 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100053927 · Villa 2- Form 2A Declaration- Mar'24.pdf · uploaded 25 Jun 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053927 · Villa 2- No Withdrawals- Mar 2024.pdf · uploaded 25 Jun 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053966 · T4- Physical Progress Declaration- Mar'24.pdf · uploaded 25 Jun 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053966 · T4- Physical Progress Declaration- Mar'24.pdf · uploaded 25 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100053966 · T4- Form 2A Declaration- Mar'24.pdf · uploaded 25 Jun 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053966 · T4- No Withdrawals- Mar 2024.pdf · uploaded 25 Jun 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053177 · T2- Form 3- March 2024.pdf · uploaded 27 Jun 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052683 · T1- Form 3- March 2024.pdf · uploaded 27 Jun 2024Source
- 2 PAN CardP52100053177 · Palchin PAN.pdf · uploaded 26 Jul 2024Source
- 2 PAN CardP52100054077 · Palchin PAN.pdf · uploaded 26 Jul 2024Source
- 2 PAN CardP52100052683 · Palchin PAN.pdf · uploaded 26 Jul 2024Source
- 2 PAN CardP52100053978 · Palchin PAN.pdf · uploaded 26 Jul 2024Source
- 2 PAN CardP52100053927 · Palchin PAN.pdf · uploaded 26 Jul 2024Source
- 2 PAN CardP52100053966 · Palchin PAN.pdf · uploaded 26 Jul 2024Source
- 3 Copy of the legal title reportP52100053177 · Palchin- Title Report (MTV Project).pdf · uploaded 6 Aug 2024Source
- 3 Copy of the legal title reportP52100054077 · Palchin- Title Report (MTV Project).pdf · uploaded 6 Aug 2024Source
- 3 Copy of the legal title reportP52100052683 · Palchin- Title Report (MTV Project).pdf · uploaded 6 Aug 2024Source
- 3 Copy of the legal title reportP52100053978 · Palchin- Title Report (MTV Project).pdf · uploaded 6 Aug 2024Source
- 3 Copy of the legal title reportP52100053927 · Palchin- Title Report (MTV Project).pdf · uploaded 6 Aug 2024Source
- 3 Copy of the legal title reportP52100053966 · Palchin- Title Report (MTV Project).pdf · uploaded 6 Aug 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053927 · MTV Villa 2- Form 1- June 2024.pdf · uploaded 13 Aug 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053927 · MTV Villa 2- Physical Progress- June 2024.pdf · uploaded 13 Aug 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053927 · MTV Villa 2- Form 2- June 2024.pdf · uploaded 13 Aug 2024Source
- 1 Disclosure of sold/ booked inventoryP52100053927 · MTV Villa 2- Inventory Report- June 2024.pdf · uploaded 13 Aug 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053927 · MTV Villa 2- Form 3- June 2024 (reduced).pdf · uploaded 13 Aug 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053927 · MTV Villa 2- No Withdrawals- June 2024.pdf · uploaded 13 Aug 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053966 · MTV T4- Form 1- June 2024.pdf · uploaded 13 Aug 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053966 · MTV T4- Physical Progress- June 2024.pdf · uploaded 13 Aug 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053966 · MTV T4- Form 2- June 2024.pdf · uploaded 13 Aug 2024Source
- 1 Disclosure of sold/ booked inventoryP52100053966 · MTV T4- Inventory Report- June 2024.pdf · uploaded 13 Aug 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053966 · MTV T4- Form 3- June 2024 (reduced).pdf · uploaded 13 Aug 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053966 · MTV T4- No Withdrawals- June 2024.pdf · uploaded 13 Aug 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053177 · MTV T2- Form 1- June 2024.pdf · uploaded 14 Aug 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053177 · MTV T2- Physical Progress- June 2024.pdf · uploaded 14 Aug 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053177 · MTV T2- Form 2- June 2024.pdf · uploaded 14 Aug 2024Source
- 2 Disclosure of sold/ booked inventoryP52100053177 · MTV T2- Inventory Report- June 2024.pdf · uploaded 14 Aug 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053177 · MTV T2- Form 3- June 2024 (reduced).pdf · uploaded 14 Aug 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054077 · MTV T3- Form 1- June 2024.pdf · uploaded 14 Aug 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054077 · MTV T3- Physical Progress- June 2024.pdf · uploaded 14 Aug 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054077 · MTV T3- Form 2- June 2024.pdf · uploaded 14 Aug 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054077 · MTV T3- Form 3- June 2024 (reduced).pdf · uploaded 14 Aug 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054077 · MTV T3- No Withdrawals- June 2024.pdf · uploaded 14 Aug 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052683 · MTV T1- Form 1- June 2024.pdf · uploaded 14 Aug 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052683 · MTV T1- Physical Progress- June 2024.pdf · uploaded 14 Aug 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052683 · MTV T1- Form 2- June 2024.pdf · uploaded 14 Aug 2024Source
- 2 Disclosure of sold/ booked inventoryP52100052683 · MTV T1- Inventory Report- June 2024.pdf · uploaded 14 Aug 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052683 · MTV T1- Form 3- June 2024 (reduced).pdf · uploaded 14 Aug 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053978 · MTV Villa 1- Form 1- June 2024.pdf · uploaded 14 Aug 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053978 · MTV Villa 1- Form 1- June 2024.pdf · uploaded 14 Aug 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053978 · MTV Villa 1- Physical Progress- June 2024.pdf · uploaded 14 Aug 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053978 · MTV Villa 1- Form 2- June 2024.pdf · uploaded 14 Aug 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053978 · MTV Villa 1- Form 2- June 2024.pdf · uploaded 14 Aug 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053978 · MTV Villa 1- Form 3- June 2024 (reduced).pdf · uploaded 14 Aug 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053978 · MTV Villa 1- No Withdrawals- June 2024.pdf · uploaded 14 Aug 2024Source
- 2 Proforma of Agreement for saleP52100053177 · AFS Mrunmai Palchin T2 (for RERA) 04-07-2023 (20-08-2024).pdf · uploaded 20 Aug 2024Source
- 2 Proforma of Allotment letterP52100053177 · Allotment letter T2 Palchin (for RERA) 04-07-2023 (20-08-2024).pdf · uploaded 20 Aug 2024Source
- 2 Other – LegalP52100053177 · Palchin Regd Scheme Part 1.pdf · uploaded 20 Aug 2024Source
- 3 Other – LegalP52100053177 · Palchin Regd Scheme Part 2.pdf · uploaded 20 Aug 2024Source
- 2 Proforma of Allotment letterP52100054077 · Allotment letter T3 Palchin (for RERA) 21-11-2023 (20-08-2024).pdf · uploaded 20 Aug 2024Source
- 2 Proforma of Agreement for saleP52100054077 · AFS Mrunmai T3 Palchin (for RERA) 21-11-2023 (20-08-2024).pdf · uploaded 20 Aug 2024Source
- 10 Other – LegalP52100054077 · Palchin Regd Scheme Part 1.pdf · uploaded 20 Aug 2024Source
- 11 Other – LegalP52100054077 · Palchin Regd Scheme Part 2.pdf · uploaded 20 Aug 2024Source
- 2 Proforma of Agreement for saleP52100052683 · AFS Mrunmai Palchin T1 (for RERA) 20-09-2023 dt 20-08-2024.pdf · uploaded 20 Aug 2024Source
- 2 Proforma of Allotment letterP52100052683 · Allotment letter T1 Palchin (for RERA) 24-06-2023 dt 20-08-2024.pdf · uploaded 20 Aug 2024Source
- 1 Other – LegalP52100052683 · Palchin Regd Scheme Part 1.pdf · uploaded 20 Aug 2024Source
- 2 Other – LegalP52100052683 · Palchin Regd Scheme Part 2.pdf · uploaded 20 Aug 2024Source
- 2 Proforma of Agreement for saleP52100053978 · AFS Mrunmai Villa Phase 1 (for RERA) 19-12-2023 (20-08-2024).pdf · uploaded 20 Aug 2024Source
- 2 Proforma of Allotment letterP52100053978 · Allotment letter Villa Phase 1(for RERA) 21-11-2023 (20-08-2024).pdf · uploaded 20 Aug 2024Source
- 9 Other – LegalP52100053978 · Palchin Regd Scheme Part 1.pdf · uploaded 20 Aug 2024Source
- 10 Other – LegalP52100053978 · Palchin Regd Scheme Part 2.pdf · uploaded 20 Aug 2024Source
- 2 Proforma of Agreement for saleP52100053927 · AFS Mrunmai Villa 2 (for RERA) 19-12-2023 (20-08-2024).pdf · uploaded 20 Aug 2024Source
- 2 Proforma of Allotment letterP52100053927 · Allotment letter Villa 2 (for RERA) 21-11-2023 (20-08-2024).pdf · uploaded 20 Aug 2024Source
- 9 Other – LegalP52100053927 · Palchin Regd Scheme Part 1.pdf · uploaded 20 Aug 2024Source
- 10 Other – LegalP52100053927 · Palchin Regd Scheme Part 2.pdf · uploaded 20 Aug 2024Source
- 2 Proforma of Agreement for saleP52100053966 · AFS Mrunmai T4 (for RERA) 28-11-2023 (20-08-2024).pdf · uploaded 20 Aug 2024Source
- 2 Proforma of Allotment letterP52100053966 · Allotment letter T4 (for RERA) 28-11-2023 (20-08-2024).pdf · uploaded 20 Aug 2024Source
- 9 Other – LegalP52100053966 · Palchin Regd Scheme Part 1.pdf · uploaded 20 Aug 2024Source
- 10 Other – LegalP52100053966 · Palchin Regd Scheme Part 2.pdf · uploaded 20 Aug 2024Source
- 1 Disclosure of sold/ booked inventoryP52100053177 · MTV T2- Inventory Report.pdf · uploaded 20 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100053177 · T2- Form 5- FY 23-24.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054077 · T3- No Withdrawal- Sept 2024.pdf · uploaded 20 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054077 · T3- No Withdrawal- Dec 2024.pdf · uploaded 20 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100054077 · T3- Form 5- FY 23-24.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100052683 · MTV T1- Inventory Report.pdf · uploaded 20 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100052683 · T1- Form 5- FY 23-24.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053978 · Villa 1- No Withdrawal- Sept 2024.pdf · uploaded 20 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053978 · Villa 1- No Withdrawal- Dec 2024.pdf · uploaded 20 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100053978 · Villa 1- Form 5- FY 23-24.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053927 · Villa 2- No Withdrawal- Sept 2024.pdf · uploaded 20 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053927 · Villa 2- No Withdrawal- Dec 2024.pdf · uploaded 20 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100053927 · Villa 2- Form 5- FY 23-24.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053966 · T4- No Withdrawal- Sept 2024.pdf · uploaded 20 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053966 · T4- No Withdrawal- Dec 2024.pdf · uploaded 20 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100053966 · T4- Form 5- FY 23-24.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053966 · T4- PPR- Sept 2024.pdf · uploaded 6 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053966 · T4- Form 1- Sept 2024.pdf · uploaded 6 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053966 · T4- PPR- Dec 2024.pdf · uploaded 6 Feb 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053966 · T4- Form 1- Dec 2024.pdf · uploaded 6 Feb 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053966 · T4- Form 3- Sept 2024.pdf · uploaded 6 Feb 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053966 · T4- Form 3- Dec 2024.pdf · uploaded 6 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053966 · T4- Form 2- Sept 2024.pdf · uploaded 6 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053966 · T4- Form 2- Dec 2024.pdf · uploaded 6 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053177 · T2- PPR- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053177 · T2- Form 1- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053177 · T2- PPR- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053177 · T2- Form 1- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053177 · T2- Form 3- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053177 · T2- Form 3- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053177 · T2- Form 2- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053177 · T2- Form 2- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054077 · T3- PPR- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054077 · T3- Form 1- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054077 · T3- PPR- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054077 · T3- Form 1- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054077 · T3- No Withdrawal- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054077 · T3- Form 3- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054077 · T3- No Withdrawal- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054077 · T3- Form 3- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054077 · T3- Form 2- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054077 · T3- Form 2- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052683 · T1- PPR- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052683 · T1- Form 1- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052683 · T1- PPR- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052683 · T1- Form 1- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052683 · T1- Form 3- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052683 · T1- Form 3- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052683 · T1- Form 2- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052683 · T1- Form 2- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053978 · Villa 1- PPR- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053978 · Villa 1- Form 1- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053978 · Villa 1- PPR- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053978 · Villa 1- Form 1- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053978 · Villa 1- No Withdrawal- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053978 · Villa 1- Form 3- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053978 · Villa 1- No Withdrawal- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053978 · Villa 1- Form 3- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053978 · Villa 1- Form 2- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053978 · Villa 1- Form 2- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053927 · Villa 2- PPR- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053927 · Villa 2- Form 1- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053927 · Villa 2- PPR- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053927 · Villa 2- Form 1- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053927 · Villa 2- No Withdrawal- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053927 · Villa 2- Form 3- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053927 · Villa 2- No Withdrawal- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053927 · Villa 2- Form 3- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053927 · Villa 2- Form 2- Sept 2024.pdf · uploaded 19 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053927 · Villa 2- Form 2- Dec 2024.pdf · uploaded 19 Feb 2025Source
- 1 Declaration in FORM BP52100053966 · MTV T4- Form B Affidavit- 31 Mar 2029.pdf · uploaded 28 Feb 2025Source
- Form 1P52100054077 · T3- Form 1- March 2025.pdf · uploaded 4 Sep 2025Source
- Form 2P52100054077 · T3- Form 2- March 2025.pdf · uploaded 4 Sep 2025Source
- Form 3P52100054077 · T3- Form 3- March 2025.pdf · uploaded 4 Sep 2025Source
- Disclosure of Sold and Booked InventoryP52100054077 · MTV T3- Inventory Report.pdf · uploaded 4 Sep 2025Source
- Withdrawal Update Form 1P52100054077 · T3- Form 1- June 2025.pdf · uploaded 4 Sep 2025Source
- Withdrawal Update Form 1P52100054077 · T3- Form 1- June 2025.pdf · uploaded 4 Sep 2025Source
- Withdrawal Update Form 2P52100054077 · T3- Form 2- June 2025.pdf · uploaded 4 Sep 2025Source
- Withdrawal Update Form 2P52100054077 · T3- Form 2- June 2025.pdf · uploaded 4 Sep 2025Source
- Withdrawal Update Form 3P52100054077 · T3- Form 3- June 2025 (reduced).pdf · uploaded 4 Sep 2025Source
- Withdrawal Update Form 3P52100054077 · T3- Form 3- June 2025 (reduced).pdf · uploaded 4 Sep 2025Source
- Form 2A (FY 2024-2025)P52100054077 · T3- Form 2A- March 2025.pdf · uploaded 5 Sep 2025Source
- Form 5 (FY 2024-2025)P52100054077 · Tower 3- Form 5- FY 24-25 (signed).pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 1P52100053978 · Villa 1- Form 1- June 2025.pdf · uploaded 15 Feb 2026Source
- Withdrawal Update Form 2P52100053978 · Villa 1- Form 2- June 2025.pdf · uploaded 15 Feb 2026Source
- Withdrawal Update Form 3P52100053978 · Villa 1- Form 3- June 2025.pdf · uploaded 15 Feb 2026Source
- Form 2A (FY 2024-2025)P52100053978 · Villa 1- Form 2A- March 2025.pdf · uploaded 15 Feb 2026Source
- Withdrawal Update Form 1P52100053978 · Villa 1- Form 1- Sept 2025.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 1P52100053978 · Villa 1- Form 1- Dec 2025.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 2P52100053978 · Villa 1- Form 2- Sept 2025.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 2P52100053978 · Villa 1- Form 2- Dec 2025.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 3P52100053978 · FORM3_VILLA Phase1_Sept-25.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 3P52100053978 · Villa 1- Form 3- Dec 2025.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 1P52100053927 · Villa 2- Form 1- Dec 2025.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 1P52100053927 · Villa 2- Form 1- June 2025.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 1P52100053927 · Villa 2- Form 1- Sept 2025.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 2P52100053927 · Villa 2- Form 2- Dec 2025.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 2P52100053927 · Villa 2- Form 2- June 2025.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 2P52100053927 · Villa 2- Form 2- Sept 2025.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 3P52100053927 · Villa 2- Form 3- Dec 2025.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 3P52100053927 · Villa 2- Form 3- June 2025.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 3P52100053927 · FORM3_VILLA Phase2_Sept-25.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 1P52100052683 · T1- Form 1- June 2025.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 1P52100052683 · T1- Form 1- Sept 2025.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 1P52100052683 · T1- Form 1- Dec 2025.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 2P52100052683 · T1- Form 2- June 2025.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 2P52100052683 · T1- Form 2- Sept 2025.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 2P52100052683 · T1- Form 2- Dec 2025.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 3P52100052683 · T1- Form 3- June 2025.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 3P52100052683 · FORM3_T1_Sept-25.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 3P52100052683 · T1- Form 3- Dec 2025.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 1P52100053966 · T4- Form 1- June 2025.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 1P52100053966 · T4- Form 1- Sept 2025.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 1P52100053966 · T4- Form 1- Dec 2025.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 2P52100053966 · T4- Form 2- June 2025.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 2P52100053966 · T4- Form 2- Sept 2025.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 2P52100053966 · T4- Form 2- Dec 2025.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 3P52100053966 · T4- Form 3- June 2025.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 3P52100053966 · FORM3_T4_Sept-25.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 3P52100053966 · T4- Form 3- Dec 2025.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 1P52100053177 · T2- Form 1- June 2025.pdf · uploaded 21 Feb 2026Source
- Withdrawal Update Form 1P52100053177 · T2- Form 1- Sept 2025.pdf · uploaded 21 Feb 2026Source
- Withdrawal Update Form 1P52100053177 · T2- Form 1- Dec 2025.pdf · uploaded 21 Feb 2026Source
- Withdrawal Update Form 2P52100053177 · T2- Form 2- June 2025.pdf · uploaded 21 Feb 2026Source
- Withdrawal Update Form 2P52100053177 · T2- Form 2- Sept 2025.pdf · uploaded 21 Feb 2026Source
- Withdrawal Update Form 2P52100053177 · T2- Form 2- Sept 2025.pdf · uploaded 21 Feb 2026Source
- Withdrawal Update Form 3P52100053177 · T2- Form 3- June 2025.pdf · uploaded 21 Feb 2026Source
- Withdrawal Update Form 3P52100053177 · FORM3_T2_Sept-25.pdf · uploaded 21 Feb 2026Source
- Withdrawal Update Form 3P52100053177 · T2- Form 3- Dec 2025.pdf · uploaded 21 Feb 2026Source
- Withdrawal Update Form 1P52100054077 · T3- Form 1- Sept 2025.pdf · uploaded 22 Feb 2026Source
- Withdrawal Update Form 1P52100054077 · T3- Form 1- Dec 2025.pdf · uploaded 22 Feb 2026Source
- Withdrawal Update Form 2P52100054077 · T3- Form 2- Sept 2025.pdf · uploaded 22 Feb 2026Source
- Withdrawal Update Form 2P52100054077 · T3- Form 2- Sept 2025.pdf · uploaded 22 Feb 2026Source
- Withdrawal Update Form 3P52100054077 · FORM3_T3_Sept-25.pdf · uploaded 22 Feb 2026Source
- Withdrawal Update Form 3P52100054077 · T3- Form 3- Dec 2025.pdf · uploaded 22 Feb 2026Source
- Withdrawal Update Form 1P52100052683 · Tower 1- Form 1- March 2026.pdf · uploaded 28 May 2026Source
- Withdrawal Update Form 2P52100052683 · Tower 1- Form 2- March 2026.pdf · uploaded 28 May 2026Source
- Withdrawal Update Form 3P52100052683 · 202603 RERA Certificate MTV Tower 1 - RERA.pdf · uploaded 28 May 2026Source
- Withdrawal Update Form 1P52100053978 · Villa Phase 1- Form 1- March 2026.pdf · uploaded 28 May 2026Source
- Withdrawal Update Form 2P52100053978 · Villa 1- Form 2- March 2026.pdf · uploaded 28 May 2026Source
- Withdrawal Update Form 3P52100053978 · 202603 RERA Certificate MTV Villa Phase 1 - RERA.pdf · uploaded 28 May 2026Source
- Withdrawal Update Form 1P52100053927 · Villa Phase 2- Form 1- March 2026.pdf · uploaded 28 May 2026Source
- Withdrawal Update Form 2P52100053927 · Villa 2- Form 2- March 2026.pdf · uploaded 28 May 2026Source
- Withdrawal Update Form 3P52100053927 · 202603 RERA Certificate MTV Villa Phase 2 - RERA.pdf · uploaded 28 May 2026Source
- Withdrawal Update Form 1P52100053966 · Tower 4- Form 1- March 2026.pdf · uploaded 28 May 2026Source
- Withdrawal Update Form 2P52100053966 · Tower 4- Form 2- March 2026.pdf · uploaded 28 May 2026Source
- Withdrawal Update Form 3P52100053966 · 202603 RERA Certificate MTV Tower 4 - RERA.pdf · uploaded 28 May 2026Source
- Withdrawal Update Form 1P52100054077 · Tower 3- Form 1- March 2026.pdf · uploaded 29 May 2026Source
- Withdrawal Update Form 2P52100054077 · Tower 3- Form 2- March 2026.pdf · uploaded 29 May 2026Source
- Withdrawal Update Form 3P52100054077 · Form 3- MTV Tower 3- RERA.pdf · uploaded 29 May 2026Source
- Withdrawal Update Form 1P52100053177 · Tower 2- Form 1- March 2026.pdf · uploaded 3 Jun 2026Source
- Withdrawal Update Form 2P52100053177 · Tower 2- Form 2- March 2026.pdf · uploaded 3 Jun 2026Source
- Withdrawal Update Form 3P52100053177 · 202603 RERA Certificate MTV Tower 2 - RERA.pdf · uploaded 3 Jun 2026Source
- Form 2A (FY 2024-2025)P52100053177 · T2- Form 2A- March 2025.pdf · uploaded 29 Jun 2026Source
- Form 2A (FY 2025-2026)P52100053177 · Tower 2- Form 2A (FY 25-26).pdf · uploaded 29 Jun 2026Source
- Form 2A (FY 2025-2026)P52100054077 · Tower 3- Form 2A (FY 25-26).pdf · uploaded 29 Jun 2026Source
- Form 2A (FY 2024-2025)P52100052683 · T1- Form 2A- March 2025.pdf · uploaded 29 Jun 2026Source
- Form 2A (FY 2025-2026)P52100052683 · Tower 1- Form 2A (FY 25-26).pdf · uploaded 29 Jun 2026Source
- Form 2A (FY 2025-2026)P52100053978 · Villa 1- Form 2A (FY 25-26).pdf · uploaded 29 Jun 2026Source
- Form 2A (FY 2024-2025)P52100053927 · Villa 2- Form 2A- March 2025.pdf · uploaded 29 Jun 2026Source
- Form 2A (FY 2025-2026)P52100053927 · Villa 2- Form 2A (FY 25-26).pdf · uploaded 29 Jun 2026Source
- Form 2A (FY 2024-2025)P52100053966 · T4- Form 2A- March 2025.pdf · uploaded 29 Jun 2026Source
- Form 2A (FY 2025-2026)P52100053966 · Tower 4- Form 2A (FY 25-26).pdf · uploaded 29 Jun 2026Source
- Form 5 (FY 2024-2025)P52100053177 · T2- Form 5- FY 24-25.pdf · uploaded 30 Jun 2026Source
- Form 5 (FY 2024-2025)P52100052683 · T1- Form 5- FY 24-25.pdf · uploaded 30 Jun 2026Source
- Form 5 (FY 2024-2025)P52100053978 · Villa 1- Form 5- FY 24-25.pdf · uploaded 30 Jun 2026Source
- Form 5 (FY 2024-2025)P52100053927 · Villa 2- Form 5- FY 24-25.pdf · uploaded 30 Jun 2026Source
- Form 5 (FY 2024-2025)P52100053966 · T4- Form 5- FY 24-25.pdf · uploaded 30 Jun 2026Source
- Disclosure of Sold and Booked InventoryP52100053177 · T2- Inventory Report- March 2025.pdf · uploaded 3 Jul 2026Source
- Form 1P52100053177 · T2- Form 1- March 2025.pdf · uploaded 3 Jul 2026Source
- Form 2P52100053177 · T2- Form 2- March 2025.pdf · uploaded 3 Jul 2026Source
- Form 3P52100053177 · T2- Form 3- March 2025.pdf · uploaded 3 Jul 2026Source
- Form 1P52100052683 · T1- Form 1- March 2025.pdf · uploaded 3 Jul 2026Source
- Form 2P52100052683 · T1- Form 2- March 2025.pdf · uploaded 3 Jul 2026Source
- Form 3P52100052683 · T1- Form 3- March 2025.pdf · uploaded 3 Jul 2026Source
- Disclosure of Sold and Booked InventoryP52100052683 · T1- Inventory Report- March 2025.pdf · uploaded 3 Jul 2026Source
- Form 1P52100053978 · Villa 1- Form 1- March 2025.pdf · uploaded 3 Jul 2026Source
- Form 2P52100053978 · Villa 1- Form 2- March 2025.pdf · uploaded 3 Jul 2026Source
- Form 3P52100053978 · Villa 1- Form 3- March 2025.pdf · uploaded 3 Jul 2026Source
- Disclosure of Sold and Booked InventoryP52100053978 · Villa 1- Inventory Report- March 2025.pdf · uploaded 3 Jul 2026Source
- Form 1P52100053927 · Villa 2- Form 1- March 2025.pdf · uploaded 3 Jul 2026Source
- Form 2P52100053927 · Villa 2- Form 2- March 2025.pdf · uploaded 3 Jul 2026Source
- Form 3P52100053927 · Villa 2- Form 3- March 2025.pdf · uploaded 3 Jul 2026Source
- Disclosure of Sold and Booked InventoryP52100053927 · Villa 2- Inventory Report- March 2025.pdf · uploaded 3 Jul 2026Source
- Form 1P52100053966 · T4- Form 1- March 2025.pdf · uploaded 3 Jul 2026Source
- Form 2P52100053966 · T4- Form 2- March 2025.pdf · uploaded 3 Jul 2026Source
- Form 3P52100053966 · T4- Form 3- March 2025.pdf · uploaded 3 Jul 2026Source
- Disclosure of Sold and Booked InventoryP52100053966 · T4- Inventory Report- March 2025.pdf · uploaded 3 Jul 2026Source
- Withdrawal Update Form 1P52100053978 · Villa 1- Form 1- June 2026.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 2P52100053978 · Villa 1- Form 2- June 2026.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 3P52100053978 · Villa 1- Form 3- June 2026.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 1P52100053927 · Villa 2- Form 1- June 2026.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 2P52100053927 · Villa 2- Form 2- June 2026.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 3P52100053927 · Villa 2- Form 3- June 2026.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 1P52100053177 · Tower 2- Form 1- June 2026.pdf · uploaded 15 Sep 2026Source
- Withdrawal Update Form 2P52100053177 · Tower 2- Form 2- June 2026.pdf · uploaded 15 Sep 2026Source
- Withdrawal Update Form 3P52100053177 · Tower 2- Form 3- June 2026.pdf · uploaded 15 Sep 2026Source
- Withdrawal Update Form 1P52100054077 · Tower 3- Form 1- June 2026.pdf · uploaded 15 Sep 2026Source
- Withdrawal Update Form 2P52100054077 · Tower 3- Form 2- June 2026.pdf · uploaded 15 Sep 2026Source
- Withdrawal Update Form 3P52100054077 · Tower 3- Form 3- June 2026.pdf · uploaded 15 Sep 2026Source
- Withdrawal Update Form 1P52100052683 · Tower 1- Form 1- June 2026.pdf · uploaded 15 Sep 2026Source
- Withdrawal Update Form 2P52100052683 · Tower 1- Form 2- June 2026.pdf · uploaded 15 Sep 2026Source
- Withdrawal Update Form 3P52100052683 · Tower 1- Form 3- June 2026.pdf · uploaded 15 Sep 2026Source
- Withdrawal Update Form 1P52100053966 · Tower 4- Form 1- June 2026.pdf · uploaded 15 Sep 2026Source
- Withdrawal Update Form 2P52100053966 · Tower 4- Form 2- June 2026.pdf · uploaded 15 Sep 2026Source
- Withdrawal Update Form 3P52100053966 · Tower 4- Form 3- June 2026.pdf · uploaded 15 Sep 2026Source
- Form 5 (FY 2025-2026)P52100053177 · MTV T2- Form 5- FY 25-26.pdf · uploaded 30 Sep 2026Source
- Form 5 (FY 2025-2026)P52100054077 · MTV T3- Form 5- FY 25-26.pdf · uploaded 30 Sep 2026Source
- Form 5 (FY 2025-2026)P52100052683 · MTV T1- Form 5- FY 25-26.pdf · uploaded 30 Sep 2026Source
- Form 5 (FY 2025-2026)P52100053978 · MTV Villa 1- Form 5- FY 25-26.pdf · uploaded 30 Sep 2026Source
- Form 5 (FY 2025-2026)P52100053927 · MTV Villa 2- Form 5- FY 25-26.pdf · uploaded 30 Sep 2026Source
- Form 5 (FY 2025-2026)P52100053966 · MTV T4- Form 5- FY 25-26.pdf · uploaded 30 Sep 2026Source
Technical
- DocumentP52100054077 · Layout- BP (reduced).pdf · uploaded 11 Aug 2023Source
- DocumentP52100054077 · Layout- IOD (reduced).pdf · uploaded 11 Aug 2023Source
- DocumentP52100054077 · T3 Section Plan.pdf · uploaded 11 Aug 2023Source
- DocumentP52100054077 · T2 T3- FLoor Plan.pdf · uploaded 11 Aug 2023Source
- DocumentP52100052683 · Layout- BP (reduced).pdf · uploaded 11 Aug 2023Source
- DocumentP52100052683 · Layout- IOD (reduced).pdf · uploaded 11 Aug 2023Source
- DocumentP52100052683 · T1- Floor Plan (reduced).pdf · uploaded 11 Aug 2023Source
- DocumentP52100052683 · T1 Section Plan.pdf · uploaded 11 Aug 2023Source
- DocumentP52100053177 · Layout- BP (reduced).pdf · uploaded 14 Aug 2023Source
- DocumentP52100053177 · Layout- IOD (reduced).pdf · uploaded 14 Aug 2023Source
- DocumentP52100053177 · T2 Floor Plan (reduced).pdf · uploaded 14 Aug 2023Source
- DocumentP52100053177 · T2 Section Plan.pdf · uploaded 14 Aug 2023Source
- DocumentP52100053966 · Layout- BP (reduced).pdf · uploaded 14 Aug 2023Source
- DocumentP52100053966 · Layout- IOD (reduced).pdf · uploaded 14 Aug 2023Source
- DocumentP52100053966 · T4 Floor Plan (reduced).pdf · uploaded 14 Aug 2023Source
- DocumentP52100053966 · T4 Section Plan.pdf · uploaded 14 Aug 2023Source
- Other – TechnicalP52100052683 · PMRDA Mail and CC MTV.pdf · uploaded 29 Aug 2023Source
- Other – TechnicalP52100052683 · MTV T1- Declaration on Survey.pdf · uploaded 12 Sep 2023Source
- Other – TechnicalP52100052683 · Annexure 1.pdf · uploaded 12 Sep 2023Source
- Other – TechnicalP52100052683 · Annexure 2.pdf · uploaded 12 Sep 2023Source
- Other – TechnicalP52100052683 · Annexure 3 (updated).pdf · uploaded 13 Sep 2023Source
- Other – TechnicalP52100053177 · MTV T2- Declaration on Survey_signed.pdf · uploaded 9 Oct 2023Source
- Other – TechnicalP52100053177 · Annexure 1.pdf · uploaded 9 Oct 2023Source
- Other – TechnicalP52100053177 · Annexure 2.pdf · uploaded 9 Oct 2023Source
- Other – TechnicalP52100053177 · Annexure 3.pdf · uploaded 9 Oct 2023Source
- Other – TechnicalP52100054077 · T3- Declaration on Survey (technical)_signed.pdf · uploaded 18 Oct 2023Source
- Other – TechnicalP52100054077 · Annexure 1.pdf · uploaded 18 Oct 2023Source
- Other – TechnicalP52100054077 · Annexure 2.pdf · uploaded 18 Oct 2023Source
- Other – TechnicalP52100054077 · Annexure 3.pdf · uploaded 18 Oct 2023Source
- Other – TechnicalP52100053966 · T4- Declaration on Survey (technical)_signed.pdf · uploaded 18 Oct 2023Source
- Other – TechnicalP52100053966 · Annexure 1.pdf · uploaded 18 Oct 2023Source
- Other – TechnicalP52100053966 · Annexure 2.pdf · uploaded 18 Oct 2023Source
- Other – TechnicalP52100053966 · Annexure 3.pdf · uploaded 18 Oct 2023Source
- DocumentP52100053978 · Layout- BP (reduced).pdf · uploaded 31 Oct 2023Source
- DocumentP52100053978 · Layout- IOD (reduced).pdf · uploaded 31 Oct 2023Source
- DocumentP52100053927 · Layout- BP (reduced).pdf · uploaded 31 Oct 2023Source
- DocumentP52100053927 · Layout- IOD (reduced).pdf · uploaded 31 Oct 2023Source
- DocumentP52100053927 · Row House Plan.pdf · uploaded 31 Oct 2023Source
- DocumentP52100053978 · Row House Plan.pdf · uploaded 2 Nov 2023Source
- Other – TechnicalP52100053978 · V1- Declaration on Survey (technical).pdf · uploaded 2 Nov 2023Source
- Other – TechnicalP52100053978 · Annexure 1.pdf · uploaded 2 Nov 2023Source
- Other – TechnicalP52100053978 · Annexure 2.pdf · uploaded 2 Nov 2023Source
- Other – TechnicalP52100053978 · Villa 1- Annexure 3.pdf · uploaded 2 Nov 2023Source
- Other – TechnicalP52100053927 · Annexure 1.pdf · uploaded 2 Nov 2023Source
- Other – TechnicalP52100053927 · Annexure 2.pdf · uploaded 2 Nov 2023Source
- Other – TechnicalP52100053927 · Villa 2- Annexure 3.pdf · uploaded 2 Nov 2023Source
- Other – TechnicalP52100053927 · V2- Declaration on Survey (technical).pdf · uploaded 2 Nov 2023Source
- Other – TechnicalP52100053927 · Mrunmai BR- Statutory.pdf · uploaded 8 Dec 2023Source
- Other – TechnicalP52100053966 · Mrunmai BR- Statutory.pdf · uploaded 8 Dec 2023Source
- Other – TechnicalP52100053978 · Mrunmai BR- Statutory.pdf · uploaded 11 Dec 2023Source
- DocumentP52100054077 · T3- Layout Highlighted.pdf · uploaded 29 May 2026Source
- DocumentP52100054077 · T3- Elevation Plan.pdf · uploaded 29 May 2026Source
- DocumentP52100054077 · T3- Floor Plan.pdf · uploaded 29 May 2026Source
- DocumentP52100054077 · T3- Section.pdf · uploaded 29 May 2026Source
- DocumentP52100053927 · Villa Phase 2 Plans_ S4.pdf · uploaded 29 May 2026Source
- DocumentP52100053927 · Villa Phase 2_ S12.pdf · uploaded 29 May 2026Source
- DocumentP52100053927 · Commencement Certificate.pdf · uploaded 29 May 2026Source
- DocumentP52100053978 · Layout Plan (Highlighted).pdf · uploaded 29 Jul 2026Source
- DocumentP52100053978 · Villa- Highlighted Plan.pdf · uploaded 29 Jul 2026Source
Technical (Architect)
- DocumentP52100053966 · T4- PPR- Sept 2024.pdf · uploaded 6 Feb 2025Source
- DocumentP52100053966 · T4- Form 1- Sept 2024.pdf · uploaded 6 Feb 2025Source
- DocumentP52100053966 · T4- PPR- Dec 2024.pdf · uploaded 6 Feb 2025Source
- DocumentP52100053966 · T4- Form 1- Dec 2024.pdf · uploaded 6 Feb 2025Source
- DocumentP52100053177 · T2- PPR- Sept 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100053177 · T2- Form 1- Sept 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100053177 · T2- PPR- Dec 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100053177 · T2- Form 1- Dec 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100054077 · T3- Form 1- Sept 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100054077 · T3- PPR- Dec 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100054077 · T3- Form 1- Dec 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100052683 · T1- PPR- Sept 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100052683 · T1- Form 1- Sept 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100052683 · T1- PPR- Dec 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100052683 · T1- Form 1- Dec 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100053978 · Villa 1- PPR- Sept 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100053978 · Villa 1- Form 1- Sept 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100053978 · Villa 1- PPR- Dec 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100053978 · Villa 1- Form 1- Dec 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100053927 · Villa 2- PPR- Sept 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100053927 · Villa 2- Form 1- Sept 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100053927 · Villa 2- PPR- Dec 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100053927 · Villa 2- Form 1- Dec 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100053978 · Villa 1- Form 1- June 2026.pdf · uploaded 21 Jul 2026Source
- DocumentP52100053927 · Villa 2- Form 1- June 2026.pdf · uploaded 21 Jul 2026Source
- DocumentP52100053177 · Tower 2- Form 1- June 2026.pdf · uploaded 15 Sep 2026Source
- DocumentP52100054077 · Tower 3- Form 1- June 2026.pdf · uploaded 15 Sep 2026Source
- DocumentP52100052683 · Tower 1- Form 1- June 2026.pdf · uploaded 15 Sep 2026Source
- DocumentP52100053966 · Tower 4- Form 1- June 2026.pdf · uploaded 15 Sep 2026Source
Technical (Engineer)
- DocumentP52100053966 · T4- Form 2- Sept 2024.pdf · uploaded 6 Feb 2025Source
- DocumentP52100053966 · T4- Form 2- Dec 2024.pdf · uploaded 6 Feb 2025Source
- DocumentP52100053177 · T2- Form 2- Sept 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100053177 · T2- Form 2- Dec 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100054077 · T3- Form 2- Sept 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100054077 · T3- Form 2- Dec 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100052683 · T1- Form 2- Sept 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100052683 · T1- Form 2- Dec 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100053978 · Villa 1- Form 2- Sept 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100053978 · Villa 1- Form 2- Dec 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100053927 · Villa 2- Form 2- Sept 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100053927 · Villa 2- Form 2- Dec 2024.pdf · uploaded 19 Feb 2025Source
- DocumentP52100053978 · Villa 1- Form 2- June 2026.pdf · uploaded 21 Jul 2026Source
- DocumentP52100053927 · Villa 2- Form 2- June 2026.pdf · uploaded 21 Jul 2026Source
- DocumentP52100053177 · Tower 2- Form 2- June 2026.pdf · uploaded 15 Sep 2026Source
- DocumentP52100054077 · Tower 3- Form 2- June 2026.pdf · uploaded 15 Sep 2026Source
- DocumentP52100052683 · Tower 1- Form 2- June 2026.pdf · uploaded 15 Sep 2026Source
- DocumentP52100053966 · Tower 4- Form 2- June 2026.pdf · uploaded 15 Sep 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 11/1, 11/2A
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Phases
- 6
- Unit types
- 4 BHK Villa, 3BHK, 3BHK Podium Garden, 4BHK, 4BHK Podium Garden, 3 BHK Podium Garden, 4 BHK Podium Garden317 units in all
- Address
- Survey Nos. 11/1, 11/2A, 11/2B, 11/2C, 11/2D/1, 11/2D/2, 12/4(P), 12/5, 13/1, 13/2A, 14, 15, 16 at Village Shewalwadi and Survey Nos. 70A, 71/A/2, 71/B, 71C/2, 71/1/1B, 71/A/1/1F & 71/A/1/1E at Village Manjri Budruk, Pune Solapur Road, ShewalewadiPIN 412307
- Village
- Shewalewadi, Haveli taluka
- Location
- 18.49439, 73.96726
- Land area for this project
- 2,866 sq m (30,853 sq ft)
- Permissible built-up area
- 26,556 sq m (2,85,843 sq ft)
- Sanctioned built-up area
- 13,278 sq m (1,42,921 sq ft)
- Recreational open space
- 5,763 sq m (62,029 sq ft)
- Designated bank account
- 85
- Developed in phases
- No
- Also registered as
- Mango Tree Villa Tower 3, Mango Tree Villa Tower 2, Mango Tree Villa Tower 1, Mango Tree Villa Tower 4, Mango Tree Villa Phase 1, Mango Tree Villa Phase 2
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Survey Nos. 11/1, 11/2A, 11/2B, 11/2C, 11/2D/1, 11/2D/2, 12/4(P), 12/5, 13/1, 13/2A, 14, 15, 16 at Village Shewalwadi and Survey Nos. 70A, 71/A/2, 71/B, 71C/2, 71/1/1B, 71/A/1/1F & 71/A/1/1E at Village Manjri Budruk
Boundaries
- North
- Premium Tower 2
- South
- Canal
- East
- Ramp
- West
- 9 m Driveway
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking317 units
61 of 317 units booked (19%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100053978 | Row House R1 to R8 | 4 BHK Villa | 242.67 sq m · 2,612 sq ft | 8 | 0 |
| P52100053927 | Row House R9 to R13 | 4 BHK Villa | 242.67 sq m · 2,612 sq ft | 5 | 0 |
| P52100052683 | Tower 1 | 3BHK | 116.27 sq m · 1,252 sq ft | 36 | 20 |
| P52100052683 | Tower 1 | 3BHK Podium Garden | 116.27 sq m · 1,252 sq ft | 2 | 0 |
| P52100052683 | Tower 1 | 4BHK | 153.33 sq m · 1,650 sq ft | 36 | 17 |
| P52100052683 | Tower 1 | 4BHK Podium Garden | 153.33 sq m · 1,650 sq ft | 2 | 2 |
| P52100053177 | Tower 2 | 3BHK | 107.8 sq m · 1,160 sq ft | 18 | 6 |
| P52100053177 | Tower 2 | 3BHK | 108.05 sq m · 1,163 sq ft | 18 | 9 |
Show all 22 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100053177 | Tower 2 | 3BHK | 108.46 sq m · 1,167 sq ft | 36 | 5 |
| P52100053177 | Tower 2 | 3 BHK Podium Garden | 107.8 sq m · 1,160 sq ft | 1 | 0 |
| P52100053177 | Tower 2 | 3 BHK Podium Garden | 108.05 sq m · 1,163 sq ft | 1 | 0 |
| P52100053177 | Tower 2 | 3 BHK Podium Garden | 108.46 sq m · 1,167 sq ft | 2 | 2 |
| P52100054077 | Tower 3 | 3BHK | 107.8 sq m · 1,160 sq ft | 18 | 0 |
| P52100054077 | Tower 3 | 3BHK | 108.05 sq m · 1,163 sq ft | 18 | 0 |
| P52100054077 | Tower 3 | 3BHK | 108.46 sq m · 1,167 sq ft | 36 | 0 |
| P52100054077 | Tower 3 | 3BHK Podium Garden | 107.8 sq m · 1,160 sq ft | 1 | 0 |
| P52100054077 | Tower 3 | 3BHK Podium Garden | 108.05 sq m · 1,163 sq ft | 1 | 0 |
| P52100054077 | Tower 3 | 3BHK Podium Garden | 108.46 sq m · 1,167 sq ft | 2 | 0 |
| P52100053966 | Tower 4 | 3BHK | 116.27 sq m · 1,252 sq ft | 36 | 0 |
| P52100053966 | Tower 4 | 3 BHK Podium Garden | 116.27 sq m · 1,252 sq ft | 2 | 0 |
| P52100053966 | Tower 4 | 4BHK | 153.33 sq m · 1,650 sq ft | 36 | 0 |
| P52100053966 | Tower 4 | 4 BHK Podium Garden | 153.33 sq m · 1,650 sq ft | 2 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals26
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Fourth Dimension Architects Private Limited | — | P52100053177 |
| Architect | Fourth Dimension Architects Private Limited | — | P52100053927 |
| Architect | Fourth Dimension Architects Private Limited | — | P52100054077 |
| Architect | Fourth Dimension Architects Private Limited | — | P52100053978 |
| Architect | Fourth Dimension Architects Private Limited | — | P52100053966 |
| Architect | Fourth Dimension Architects Private Limited | — | P52100052683 |
| Chartered accountant | B R Nagda & Co | — | P52100053927 |
| Chartered accountant | B R Nagda & Co | — | P52100054077 |
Show all 26 professionalsShow fewer professionals
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Chartered accountant | B R Nagda & Co | — | P52100053978 |
| Chartered accountant | BR Nagda & Company | — | P52100052683 |
| Chartered accountant | BR Nagda & Company | — | P52100053177 |
| Chartered accountant | BR Nagda & Company | — | P52100053966 |
| Engineer | ER. Ambadas T Kharatmol | — | P52100052683 |
| Engineer | ER. Ambadas T Kharatmol | — | P52100053927 |
| Engineer | ER. Ambadas T Kharatmol | — | P52100054077 |
| Engineer | ER. Ambadas T Kharatmol | — | P52100053177 |
| Engineer | ER. Ambadas T Kharatmol | — | P52100053978 |
| Engineer | ER. Ambadas T Kharatmol Kharatmol | — | P52100053966 |
| Engineer | Rahul Krishna Singh Revulagadda | — | P52100053177 |
| Engineer | Rahul Krishna Singh Revulagadda | — | P52100052683 |
| Engineer | Rahul Krishna Singh Revulagadda | — | P52100054077 |
| Engineer | Rahul Krishna Singh Revulagadda | — | P52100053966 |
| Engineer | Rahul Krishna Singh Revulagadda | — | P52100053927 |
| Engineer | Rahul Krishna Singh Revulagadda | — | P52100053978 |
| Other | Rahul Krishna Singh Revulagadda | — | P52100054077 |
| Other | Siddhant | — | P52100053978 |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Shewalewadi
- Blossom Meadows Wing C and Wing D₹7,170 a sq ft
- Joyville Hadapsar Annexe RetailRERA P52100080679
- EWS Building - Wing ARERA P52100078565
- EWS Building - Wing BRERA P52100078550
- EWS Building - Wing DRERA PR1260002400008
- Mango Tree Villa Villament Block 1RERA P52100053977
- Joyville Celestia₹10,570 a sq ft
- Joyville Hadapsar Sky-Luxe₹10,860 a sq ft
All 216 projects in Shewalewadi · Compare Mango Tree Villa with another project
Mango Tree Villa in numbers
Registered deals, summarised
Deedo has 25 registered documents at Mango Tree Villa, from Feb 2024 to Sep 2026: 25 sales. The median registered sale since Feb 2024 works out to about ₹13,600 per sq ft, at a median of ₹1.77 Cr a deal; 0% of sales were resales.
- What is the price per sq ft at Mango Tree Villa?
- The median registered sale since Feb 2024 works out to about ₹13,600 per sq ft, at a median of ₹1.77 Cr a deal; 0% of sales were resales.
- How many properties have been sold at Mango Tree Villa?
- 25 sales are registered at Mango Tree Villa.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Mango Tree Villa by Deedo, last updated with deals registered in Sep 2026.
Latest deal · Primary sale · Oct 2026