Sonigara Concord
Deedo IDDP-PUN-CBPZCompletion was pushed back 4 months, to Apr 2030; no MahaRERA orders on record.
Ravet, Pune 412101 · Property rates in Ravet · by Madanlal Kesrimal Sonigra
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2030
- This projectRegistered 6 May 2025, completion promised 31 Dec 2029, revised to 30 Apr 2030.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Aug 2026
- Primary sale · Aug 2026
- Primary sale · Jul 2026
- Primary sale · Jun 2026
- Primary sale · Jun 2026
- Primary sale · Jun 2026
- Primary sale · Jun 2026
- Primary sale · May 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Sep 2026 | Not on record | Primary sale | 412 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | A Wing · 804 | Primary sale | 683 sq ft | View Primary sale, Sep 2026 | |
| Aug 2026 | C Wing · 904 | Primary sale | 377 sq ft | View Primary sale, Aug 2026 | |
| Aug 2026 | D Wing · 601 | Primary sale | 377 sq ft | View Primary sale, Aug 2026 | |
| Jul 2026 | C Wing · 603 | Primary sale | 377 sq ft | View Primary sale, Jul 2026 | |
| Jun 2026 | D Wing · 804 | Primary sale | 377 sq ft | View Primary sale, Jun 2026 | |
| Jun 2026 | B Wing · 404 | Primary sale | 579 sq ft | View Primary sale, Jun 2026 | |
| Jun 2026 | D Wing · 803 | Primary sale | 377 sq ft | View Primary sale, Jun 2026 | |
| Jun 2026 | D Wing · 604 | Primary sale | 377 sq ft | View Primary sale, Jun 2026 | |
| May 2026 | D Wing · 401 | Primary sale | 377 sq ft | View Primary sale, May 2026 |
5 buildings
Open a building to see every flat, floor by floor.
- A Wing10 floors · 85 units0% booked
- B Wing8 floors · 58 units0% booked
- C Wing11 floors · 35 units0% booked
- D Wing11 floors · 35 units0% booked
- E Wing11 floors · 35 units0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100080199
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100080199 | 6 May 2025 | 31 Dec 2029 | 30 Apr 2030 | Madanlal Kesrimal Sonigra | Project page |
Documents108
1 document held by Deedo, 107 filings listed on MahaRERA's project page
Finance
Legal
- Declaration Form BFORMB.pdf · uploaded 15 Mar 2025Source
- Other – LegalSAT BARA.pdf · uploaded 22 Apr 2025Source
- Other – LegalSociety Document changed.pdf · uploaded 22 Apr 2025Source
- Other – Legalsale deed.pdf · uploaded 28 Apr 2025Source
- Legal Title reportlegal title final (2 files merged) - converted.pdf · uploaded 2 May 2025Source
Show all 108 documentsShow fewer documents
Migrated
- 1 PAN CardPAN CARD.pdf · uploaded 15 Feb 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCCC.pdf · uploaded 15 Feb 2025Source
- 1 a Details of encumbrances concerned to FinanceLEGAL FINACE.pdf · uploaded 26 Feb 2025Source
- 1 Copy of Layout Approval (in case of layout)HPSC1377 Plan NO 1_compressed.pdf · uploaded 26 Feb 2025Source
- 14 Building Plan Approval / NA Order for plotted developmentHPSC1396 Plan NO 19_compressed.pdf · uploaded 26 Feb 2025Source
- 13 Building Plan Approval / NA Order for plotted developmentHPSC1395 Plan NO 18_compressed.pdf · uploaded 26 Feb 2025Source
- 12 Building Plan Approval / NA Order for plotted developmentHPSC1394 Plan NO 17_compressed.pdf · uploaded 26 Feb 2025Source
- 11 Building Plan Approval / NA Order for plotted developmentHPSC1392 Plan NO 15_compressed.pdf · uploaded 26 Feb 2025Source
- 9 Building Plan Approval / NA Order for plotted developmentHPSC1390 Plan NO 13_compressed.pdf · uploaded 26 Feb 2025Source
- 8 Building Plan Approval / NA Order for plotted developmentHPSC1389 Plan NO 12_compressed.pdf · uploaded 26 Feb 2025Source
- 7 Building Plan Approval / NA Order for plotted developmentHPSC1388 Plan NO 11_compressed.pdf · uploaded 26 Feb 2025Source
- 6 Building Plan Approval / NA Order for plotted developmentHPSC1387 Plan NO 10_compressed.pdf · uploaded 26 Feb 2025Source
- 5 Building Plan Approval / NA Order for plotted developmentHPSC1386 Plan NO 9_compressed.pdf · uploaded 26 Feb 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentHPSC1385 Plan NO 8_compressed.pdf · uploaded 26 Feb 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentHPSC1385 Plan NO 8_compressed.pdf · uploaded 26 Feb 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentHPSC1382 Plan NO 6_compressed.pdf · uploaded 26 Feb 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentHPSC1381 Plan NO 5_compressed.pdf · uploaded 26 Feb 2025Source
- 10 Building Plan Approval / NA Order for plotted developmentHPSC1391 Plan NO 14_compressed.pdf · uploaded 26 Feb 2025Source
- 1 Declaration about Commencement CertificateFORMAT D.pdf · uploaded 26 Feb 2025Source
- 1 Deviation Report with respect to Allotment letterDEVECTION ALLOTMENT LETTER.pdf · uploaded 26 Feb 2025Source
- 1 b Details of encumbrances concerned to LegalLEGAL FINACE.pdf · uploaded 26 Feb 2025Source
- 1 Deviation Report with respect to model copy of AgreementDEVICTION MODEL AGREEMENT.pdf · uploaded 26 Feb 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDIS INSRERT.pdf · uploaded 26 Feb 2025Source
- 1 Disclosure for secured/unsecured finance availed for the projectDISCLO.pdf · uploaded 26 Feb 2025Source
- 1 Proforma of Allotment letterallotment letter.pdf · uploaded 2 Mar 2025Source
- 2 a Details of encumbrances concerned to Financelegal and encu.pdf · uploaded 15 Mar 2025Source
- 1 Declaration in FORM BFORMB.pdf · uploaded 15 Mar 2025Source
- 15 Building Plan Approval / NA Order for plotted developmentHPSC1384 Plan NO 7_compressed.pdf · uploaded 15 Mar 2025Source
- 2 b Details of encumbrances concerned to Legallegal and encu.pdf · uploaded 15 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1.pdf · uploaded 22 Apr 2025Source
- 19 Building Plan Approval / NA Order for plotted developmentHPSC1380 Plan No 4_compressed.pdf · uploaded 22 Apr 2025Source
- 18 Building Plan Approval / NA Order for plotted developmentHPSC1379 Plan No 3 A BLDG_compressed.pdf · uploaded 22 Apr 2025Source
- 17 Building Plan Approval / NA Order for plotted developmentHPSC1378 Plan No 2_11zon.pdf · uploaded 22 Apr 2025Source
- 16 Building Plan Approval / NA Order for plotted developmentHPSC1393 Plan NO 16_compressed.pdf · uploaded 22 Apr 2025Source
- 1 Other – LegalSAT BARA.pdf · uploaded 22 Apr 2025Source
- 2 Other – LegalSociety Document changed.pdf · uploaded 22 Apr 2025Source
- 1 CERSAI details15 CERSAI_.pdf · uploaded 22 Apr 2025Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)25 format A.pdf · uploaded 22 Apr 2025Source
- 1 Other – Technical33 sonigara concord ANNEXURE - A declaration for one plot one project.pdf · uploaded 22 Apr 2025Source
- 2 Other – TechnicalCC revalidation letter.pdf · uploaded 22 Apr 2025Source
- 3 Other – TechnicalCC Authenticity mail.pdf · uploaded 22 Apr 2025Source
- 1 Proforma of Agreement for saleAFS Final.pdf · uploaded 22 Apr 2025Source
- 4 Other – TechnicalCC Revised.pdf · uploaded 27 Apr 2025Source
- 3 Other – Legalsale deed.pdf · uploaded 28 Apr 2025Source
- 1 Other – Financeself declaration.pdf · uploaded 28 Apr 2025Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)format B.pdf · uploaded 28 Apr 2025Source
- 1 Copy of the legal title reportlegal title final (2 files merged) - converted.pdf · uploaded 2 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - MK Const.pdf · uploaded 2 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 (Engineer Certificate) (1).pdf · uploaded 2 May 2025Source
- Withdrawal Update Form 1Architectu0027s Certificate -.pdf · uploaded 18 Jul 2025Source
- Withdrawal Update Form 1Architectu0027s Certificate -.pdf · uploaded 18 Jul 2025Source
- Withdrawal Update Form 1Architectu0027s Certificate -.pdf · uploaded 18 Jul 2025Source
- Withdrawal Update Form 2Engineer Certificate.pdf · uploaded 18 Jul 2025Source
- Withdrawal Update Form 2Engineer Certificate.pdf · uploaded 18 Jul 2025Source
- Withdrawal Update Form 2Engineer Certificate.pdf · uploaded 18 Jul 2025Source
- Withdrawal Update Form 3Form 3 SIGNED.pdf · uploaded 18 Jul 2025Source
- Withdrawal Update Form 3Form 3 SIGNED.pdf · uploaded 18 Jul 2025Source
- Withdrawal Update Form 3Form 3 SIGNED.pdf · uploaded 18 Jul 2025Source
- Withdrawal Update Form 1Form-1.pdf · uploaded 13 Oct 2025Source
- Withdrawal Update Form 2Form-2.pdf · uploaded 13 Oct 2025Source
- Withdrawal Update Form 3Form 3 - MK Const Sep_25 Sign.pdf · uploaded 13 Oct 2025Source
- Withdrawal Update Form 1Form 1 Architect Certificate January 2026.pdf · uploaded 7 Jan 2026Source
- Withdrawal Update Form 2Form 2 Edited.pdf · uploaded 7 Jan 2026Source
- Withdrawal Update Form 3Form 3 C A Cirtificate.pdf · uploaded 7 Jan 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 16 Apr 2026Source
- Withdrawal Update Form 2Form-2.pdf · uploaded 16 Apr 2026Source
- Withdrawal Update Form 3Form-3 Sign.pdf · uploaded 16 Apr 2026Source
- Withdrawal Update Form 1Form-1 Jun_26.pdf · uploaded 7 Jul 2026Source
- Withdrawal Update Form 2Form-2 Jun_26_ Signed.pdf · uploaded 7 Jul 2026Source
- Withdrawal Update Form 3Form 3 - MK Const Jun_26 Sign.pdf · uploaded 7 Jul 2026Source
- Form 5 (FY 2025-2026)Form 5 FY 25-26 Signed.pdf · uploaded 24 Sep 2026Source
- Withdrawal Update Form 1FORM 1 Sep_26 Sign.pdf · uploaded 10 Oct 2026Source
- Withdrawal Update Form 2FORM 2 Sep Sign.pdf · uploaded 10 Oct 2026Source
- Withdrawal Update Form 3Form-3 SEP_26 Signed.pdf · uploaded 10 Oct 2026Source
Technical
- DocumentHPSC1377 Plan NO 1_compressed.pdf · uploaded 26 Feb 2025Source
- DocumentHPSC1381 Plan NO 5_compressed.pdf · uploaded 26 Feb 2025Source
- DocumentHPSC1382 Plan NO 6_compressed.pdf · uploaded 26 Feb 2025Source
- DocumentHPSC1385 Plan NO 8_compressed.pdf · uploaded 26 Feb 2025Source
- DocumentHPSC1385 Plan NO 8_compressed.pdf · uploaded 26 Feb 2025Source
- DocumentHPSC1386 Plan NO 9_compressed.pdf · uploaded 26 Feb 2025Source
- DocumentHPSC1387 Plan NO 10_compressed.pdf · uploaded 26 Feb 2025Source
- DocumentHPSC1388 Plan NO 11_compressed.pdf · uploaded 26 Feb 2025Source
- DocumentHPSC1389 Plan NO 12_compressed.pdf · uploaded 26 Feb 2025Source
- DocumentHPSC1390 Plan NO 13_compressed.pdf · uploaded 26 Feb 2025Source
- DocumentHPSC1391 Plan NO 14_compressed.pdf · uploaded 26 Feb 2025Source
- DocumentHPSC1392 Plan NO 15_compressed.pdf · uploaded 26 Feb 2025Source
- DocumentHPSC1394 Plan NO 17_compressed.pdf · uploaded 26 Feb 2025Source
- DocumentHPSC1395 Plan NO 18_compressed.pdf · uploaded 26 Feb 2025Source
- DocumentHPSC1396 Plan NO 19_compressed.pdf · uploaded 26 Feb 2025Source
- DocumentHPSC1384 Plan NO 7_compressed.pdf · uploaded 15 Mar 2025Source
- DocumentHPSC1393 Plan NO 16_compressed.pdf · uploaded 22 Apr 2025Source
- DocumentHPSC1378 Plan No 2_11zon.pdf · uploaded 22 Apr 2025Source
- DocumentHPSC1379 Plan No 3 A BLDG_compressed.pdf · uploaded 22 Apr 2025Source
- DocumentHPSC1380 Plan No 4_compressed.pdf · uploaded 22 Apr 2025Source
- Other – Technical33 sonigara concord ANNEXURE - A declaration for one plot one project.pdf · uploaded 22 Apr 2025Source
- Other – TechnicalCC revalidation letter.pdf · uploaded 22 Apr 2025Source
- Other – TechnicalCC Authenticity mail.pdf · uploaded 22 Apr 2025Source
- Other – TechnicalCC Revised.pdf · uploaded 27 Apr 2025Source
Technical (Architect)
- DocumentFORM 1 Sep_26 Sign.pdf · uploaded 10 Oct 2026Source
Technical (Engineer)
- DocumentFORM 2 Sep Sign.pdf · uploaded 10 Oct 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 100, 101 (P)
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 3BHK, Office space, Shop, 1BHK248 units in all
- Address
- S NO 179 HISSA NO 2 CTS NO 95(P) to 98 (P), 99, 100, 101 (P), 103 (P), 104RAVET 412101, RAVET, RAVETPIN 412101
- Village
- Ravet, Haveli taluka
- Land area for this project
- 12,024 sq m (1,29,423 sq ft)
- Permissible built-up area
- 22,227 sq m (2,39,247 sq ft)
- Sanctioned built-up area
- 22,227 sq m (2,39,247 sq ft)
- Recreational open space
- 892 sq m (9,598 sq ft)
- Designated bank account
- 171
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S NO 179 HISSA NO 2 CTS NO 95(P) to 98 (P), 99, 100, 101 (P), 103 (P), 104RAVET 412101
Boundaries
- North
- Railway Line
- South
- Road
- East
- Remaining Part Of S No 179
- West
- 45 Mtr Wide Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking248 units
0 of 248 units booked (0%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | 2BHK | 55.87 sq m · 601 sq ft | 15 | 0 |
| A Wing | 3BHK | 57.22 sq m · 616 sq ft | 14 | 0 |
| A Wing | 3BHK | 86.37 sq m · 930 sq ft | 8 | 0 |
| A Wing | 3BHK | 86.37 sq m · 930 sq ft | 7 | 0 |
| A Wing | 3BHK | 91.7 sq m · 987 sq ft | 15 | 0 |
| A Wing | Office space | 26.36 sq m · 284 sq ft | 1 | 0 |
| A Wing | Office space | 28.22 sq m · 304 sq ft | 1 | 0 |
| A Wing | Office space | 29.62 sq m · 319 sq ft | 1 | 0 |
Show all 53 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | Office space | 29.62 sq m · 319 sq ft | 1 | 0 |
| A Wing | Office space | 31.82 sq m · 343 sq ft | 1 | 0 |
| A Wing | Office space | 31.82 sq m · 343 sq ft | 1 | 0 |
| A Wing | Office space | 32.85 sq m · 354 sq ft | 1 | 0 |
| A Wing | Office space | 34.71 sq m · 374 sq ft | 1 | 0 |
| A Wing | Office space | 35.22 sq m · 379 sq ft | 1 | 0 |
| A Wing | Office space | 37.51 sq m · 404 sq ft | 2 | 0 |
| A Wing | Office space | 47.34 sq m · 510 sq ft | 1 | 0 |
| A Wing | Office space | 57.48 sq m · 619 sq ft | 1 | 0 |
| A Wing | Shop | 39.57 sq m · 426 sq ft | 1 | 0 |
| A Wing | Shop | 42.36 sq m · 456 sq ft | 1 | 0 |
| A Wing | Shop | 44.46 sq m · 479 sq ft | 2 | 0 |
| A Wing | Shop | 47.75 sq m · 514 sq ft | 2 | 0 |
| A Wing | Shop | 49.31 sq m · 531 sq ft | 1 | 0 |
| A Wing | Shop | 52.18 sq m · 562 sq ft | 1 | 0 |
| A Wing | Shop | 52.86 sq m · 569 sq ft | 1 | 0 |
| A Wing | Shop | 56.03 sq m · 603 sq ft | 2 | 0 |
| A Wing | Shop | 71.04 sq m · 765 sq ft | 1 | 0 |
| A Wing | Shop | 86.27 sq m · 929 sq ft | 1 | 0 |
| B Wing | 2BHK | 55.87 sq m · 601 sq ft | 12 | 0 |
| B Wing | 2BHK | 57.22 sq m · 616 sq ft | 6 | 0 |
| B Wing | 3BHK | 91.7 sq m · 987 sq ft | 20 | 0 |
| B Wing | Office space | 24.65 sq m · 265 sq ft | 1 | 0 |
| B Wing | Office space | 25.61 sq m · 276 sq ft | 1 | 0 |
| B Wing | Office space | 28.71 sq m · 309 sq ft | 1 | 0 |
| B Wing | Office space | 29.05 sq m · 313 sq ft | 1 | 0 |
| B Wing | Office space | 29.07 sq m · 313 sq ft | 1 | 0 |
| B Wing | Office space | 31.03 sq m · 334 sq ft | 1 | 0 |
| B Wing | Office space | 31.82 sq m · 343 sq ft | 1 | 0 |
| B Wing | Office space | 37.51 sq m · 404 sq ft | 1 | 0 |
| B Wing | Office space | 39.16 sq m · 422 sq ft | 1 | 0 |
| B Wing | Office space | 51.48 sq m · 554 sq ft | 1 | 0 |
| B Wing | Shop | 37.01 sq m · 398 sq ft | 1 | 0 |
| B Wing | Shop | 38.43 sq m · 414 sq ft | 1 | 0 |
| B Wing | Shop | 43.01 sq m · 463 sq ft | 1 | 0 |
| B Wing | Shop | 43.61 sq m · 469 sq ft | 1 | 0 |
| B Wing | Shop | 44.58 sq m · 480 sq ft | 1 | 0 |
| B Wing | Shop | 46.98 sq m · 506 sq ft | 1 | 0 |
| B Wing | Shop | 47.75 sq m · 514 sq ft | 1 | 0 |
| B Wing | Shop | 56.03 sq m · 603 sq ft | 1 | 0 |
| B Wing | Shop | 59.01 sq m · 635 sq ft | 1 | 0 |
| B Wing | Shop | 77.25 sq m · 832 sq ft | 1 | 0 |
| C Wing | 1BHK | 37.7 sq m · 406 sq ft | 35 | 0 |
| D Wing | 1BHK | 37.7 sq m · 406 sq ft | 35 | 0 |
| E Wing | 1BHK | 36.28 sq m · 391 sq ft | 35 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Yojana Architects | — |
| Chartered accountant | CA Dolly Gandhi | — |
| Chartered accountant | Navdeep Jinda&Associates | — |
| Engineer | Vikas Krishna Kolhe | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Ravet
- Menlo Sky SuitesRERA PR1260002602755
- Anand AnantaRERA PM1260002602608
- Sonigara RichmontRERA PR1260002602530
- Shubharambh CorpRERA PC1260002602164
- Imperial Residency₹6,540 a sq ft
- Skyway Elite₹6,760 a sq ft
- SHANTAI CLASSIC D BuildingRERA PC1260002601637
- iLife 6RERA PR1260002601624
All 958 projects in Ravet · Compare Sonigara Concord with another project
Sonigara Concord in numbers
Registered deals, summarised
Deedo has 41 registered documents at Sonigara Concord, from Jun 2025 to Sep 2026: 40 sales. The median registered sale since Jun 2025 works out to about ₹11,700 per sq ft, at a median of ₹45 L a deal; 0% of sales were resales.
- What is the price per sq ft at Sonigara Concord?
- The median registered sale since Jun 2025 works out to about ₹11,700 per sq ft, at a median of ₹45 L a deal; 0% of sales were resales.
- How many properties have been sold at Sonigara Concord?
- 40 sales are registered at Sonigara Concord.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Sonigara Concord by Deedo, last updated with deals registered in Sep 2026.
Latest deal · Primary sale · Sep 2026
₹1–1.5 Cr