Shankeshwar Pearl
Deedo IDDP-PUN-8878MahaRERA shows it completed; no MahaRERA orders on record.
Ravet, Pune 412101 · Property rates in Ravet · by S P Developers
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 4 May 2022, completion promised 31 Dec 2025.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Resale · Apr 2026
- Primary sale · Feb 2026
- Resale · Feb 2026
- Primary sale · Jan 2026
- Primary sale · Dec 2025
- Primary sale · Dec 2025
- Primary sale · Nov 2025
- Primary sale · Sep 2025
- Primary sale · Sep 2025
- Primary sale · Sep 2025
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Apr 2026 | Shankeshwar Pearl · 106 | Resale | 744 sq ft | View Resale, Apr 2026 | |
| Feb 2026 | Shankeshwar Pearl · 6 | Primary sale | 459 sq ft | View Primary sale, Feb 2026 | |
| Feb 2026 | Shankeshwar Pearl · 901 | Resale | 1,015 sq ft | View Resale, Feb 2026 | |
| Jan 2026 | Shankeshwar Pearl · 104 | Primary sale | 744 sq ft | View Primary sale, Jan 2026 | |
| Dec 2025 | Shankeshwar Pearl · 103 | Primary sale | 744 sq ft | View Primary sale, Dec 2025 | |
| Dec 2025 | Shankeshwar Pearl · 901 | Primary sale | 1,015 sq ft | View Primary sale, Dec 2025 | |
| Nov 2025 | Shankeshwar Pearl · 10 | Primary sale | 432 sq ft | View Primary sale, Nov 2025 | |
| Sep 2025 | Shankeshwar Pearl · 301 | Primary sale | 1,015 sq ft | View Primary sale, Sep 2025 | |
| Sep 2025 | Shankeshwar Pearl · 5 | Primary sale | 323 sq ft | View Primary sale, Sep 2025 | |
| Sep 2025 | Shankeshwar Pearl · 9 | Primary sale | 360 sq ft | View Primary sale, Sep 2025 |
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100035074
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100035074 | 4 May 2022 | 31 Dec 2025 | 31 Dec 2025 | S P Developers | Project page |
Documents106
1 document held by Deedo, 105 filings listed on MahaRERA's project page
Finance
- PAN CardS P DEVELOPERS PAN CARD_compressed.pdf · uploaded 21 Feb 2022Source
Legal
- Declaration Form BS P Developers - Affidavit_Form B_compressed.pdf · uploaded 21 Feb 2022Source
- Legal Title reportLegal Title Report.pdf · uploaded 29 Apr 2022Source
- Legal Title reportSupplementary Search Report compressed.pdf · uploaded 29 Apr 2022Source
- Legal Title reportFormat A - Flow Of Title Of the Said Land.pdf · uploaded 29 Apr 2022Source
Show all 106 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)APPROVED LAYOUT.pdf · uploaded 21 Feb 2022Source
- 2 Copy of Layout Approval (in case of layout)default 0002_compressed.pdf · uploaded 21 Feb 2022Source
- 3 Copy of Layout Approval (in case of layout)default 0003_compressed.pdf · uploaded 21 Feb 2022Source
- 4 Copy of Layout Approval (in case of layout)default 0004_compressed.pdf · uploaded 21 Feb 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentAPPROVED LAYOUT.pdf · uploaded 21 Feb 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate - compressed.pdf · uploaded 21 Feb 2022Source
- 1 Declaration about Commencement CertificateDeclaration About Commencement Certificate.pdf · uploaded 21 Feb 2022Source
- 1 Declaration in FORM BS P Developers - Affidavit_Form B_compressed.pdf · uploaded 21 Feb 2022Source
- 1 CERSAI detailsCERSAI_Search_Report.pdf · uploaded 21 Feb 2022Source
- 2 Declaration about Commencement CertificateDRAFT LETTER OF ALLOTMENT.pdf · uploaded 22 Feb 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate S P Developers_compressed.pdf · uploaded 25 Feb 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Cerytificate_compressed.pdf · uploaded 1 Mar 2022Source
- 1 Proforma of Allotment letterProvisional Allotment Letter_compressed.pdf · uploaded 10 Mar 2022Source
- 2 Proforma of Allotment letterDraft Agreement of sales- RERA Shankeshwar Pearl SP Developers.pdf · uploaded 6 Apr 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE- S P DEVELOPERS.PDF · uploaded 20 Apr 2022Source
- 1 Copy of the legal title reportLegal Title Report.pdf · uploaded 29 Apr 2022Source
- 2 Copy of the legal title reportSupplementary Search Report compressed.pdf · uploaded 29 Apr 2022Source
- 3 Copy of the legal title reportFormat A - Flow Of Title Of the Said Land.pdf · uploaded 29 Apr 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate compressed.pdf · uploaded 16 Aug 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate SP Developers.pdf · uploaded 28 Nov 2022Source
- 2 a Details of encumbrances concerned to FinanceDetails Of Encumbrances Concerned to Legal.pdf · uploaded 7 Feb 2023Source
- 3 a Details of encumbrances concerned to FinanceDetails Of Encumbrances Concerned to Finance.pdf · uploaded 7 Feb 2023Source
- 1 b Details of encumbrances concerned to LegalDetails Of Encumbrances Concerned to Legal.pdf · uploaded 7 Feb 2023Source
- 2 b Details of encumbrances concerned to LegalDetails Of Encumbrances Concerned to Finance.pdf · uploaded 7 Feb 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE Form 2.pdf · uploaded 7 Feb 2023Source
- 1 Proforma of Agreement for saleAgreement.pdf · uploaded 7 Feb 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclartion about Separate Bank Account for real estate projects.pdf · uploaded 7 Feb 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report with Respect to Model Copy of Agreement.pdf · uploaded 7 Feb 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)SP Developers Pearl Arch letter for updation.pdf · uploaded 15 May 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 pearl compressed.pdf · uploaded 26 May 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 pearl compressed.pdf · uploaded 26 May 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 - CA Certificate - SP Developers.pdf · uploaded 17 Oct 2023Source
- 4 a Details of encumbrances concerned to FinanceBAJAJ FINANCE.pdf · uploaded 21 Dec 2023Source
- 3 b Details of encumbrances concerned to LegalBAJAJ FINANCE.pdf · uploaded 21 Dec 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 18 Jan 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 18 Jan 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate.pdf · uploaded 18 Jan 2024Source
- 5 Copy of Layout Approval (in case of layout)Sheet No 1_11zon.pdf · uploaded 3 Apr 2024Source
- 6 Copy of Layout Approval (in case of layout)Sheet No 2_11zon.pdf · uploaded 3 Apr 2024Source
- 7 Copy of Layout Approval (in case of layout)Sheet No 3.pdf · uploaded 3 Apr 2024Source
- 8 Copy of Layout Approval (in case of layout)Sheet No 4_11zon.pdf · uploaded 3 Apr 2024Source
- 9 Copy of Layout Approval (in case of layout)Sheet No 5_11zon.pdf · uploaded 3 Apr 2024Source
- 10 Copy of Layout Approval (in case of layout)Sheet No 6.pdf · uploaded 3 Apr 2024Source
- 11 Copy of Layout Approval (in case of layout)Sheet No 7.pdf · uploaded 3 Apr 2024Source
- 3 Declaration about Commencement CertificateCommencement Certificate S P Developers_11zon (1).pdf · uploaded 3 Apr 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate.pdf · uploaded 21 May 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certifcate 180524.pdf · uploaded 21 May 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 7 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.pdf · uploaded 7 Jun 2024Source
- 1 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 7 Jun 2024Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration for 70 Bank Account P1.pdf · uploaded 15 Jul 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Shankeshwar Pearl.pdf · uploaded 15 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate Q1.pdf · uploaded 30 Nov 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate DT Q2.pdf · uploaded 30 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 300624 Pearl.pdf · uploaded 30 Dec 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 300924 Pearl.pdf · uploaded 30 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)CA Certificate - Form 5 Dt 24 08 2024 Pearl.pdf · uploaded 19 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate Dt 31 12 24.pdf · uploaded 4 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Pearl Form 3 dt 31 12 24.pdf · uploaded 4 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Pearl 31 12 24.pdf · uploaded 5 Mar 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate DT 27 09 2024 Shankeshwar Pearl.pdf · uploaded 5 Mar 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate DT 02 07 2024 Shankeshwar Pearl.pdf · uploaded 5 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's Certificate Dt 09-04-2025 - Shankeshwar Pearl.pdf · uploaded 25 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 Dt 31-03-2025 - Pearl_compressed.pdf · uploaded 25 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate Form 2 Dt 09-04-2025 Pearl.pdf · uploaded 25 Apr 2025Source
- Withdrawal Update Form 1Architects Certificate Shankeshwar Pearl q1.pdf · uploaded 23 Aug 2025Source
- Withdrawal Update Form 2Form 2 Engineer Certificate -Shankeshwar Pearl Q1.pdf · uploaded 23 Aug 2025Source
- Withdrawal Update Form 3CA Certifcate 180524.pdf · uploaded 23 Aug 2025Source
- Form 5 (FY 2024-2025)form 5 with sign.pdf · uploaded 30 Sep 2025Source
- Form 5 (FY 2022-2023)Form 5 - CA Certificate - SP Developers.pdf · uploaded 3 Oct 2025Source
- Form 5 (FY 2023-2024)form 5 with sign.pdf · uploaded 3 Oct 2025Source
- Withdrawal Update Form 1Architects certificate 16-10-25.pdf · uploaded 13 Dec 2025Source
- Withdrawal Update Form 2Form 2 Q2.pdf · uploaded 13 Dec 2025Source
- Withdrawal Update Form 3FORM 3 S P DEVELOPERS.pdf · uploaded 13 Dec 2025Source
- Occupational CertificateCompletion Certificate - Shankeshwar Pearl.pdf · uploaded 13 Dec 2025Source
- Occupational CertificateMail Screen Shot.pdf · uploaded 13 Dec 2025Source
Technical
- DocumentAPPROVED LAYOUT.pdf · uploaded 21 Feb 2022Source
- Documentdefault 0002_compressed.pdf · uploaded 21 Feb 2022Source
- Documentdefault 0003_compressed.pdf · uploaded 21 Feb 2022Source
- Documentdefault 0004_compressed.pdf · uploaded 21 Feb 2022Source
- DocumentAPPROVED LAYOUT.pdf · uploaded 21 Feb 2022Source
- DocumentSheet No 1_11zon.pdf · uploaded 3 Apr 2024Source
- DocumentSheet No 2_11zon.pdf · uploaded 3 Apr 2024Source
- DocumentSheet No 3.pdf · uploaded 3 Apr 2024Source
- DocumentSheet No 4_11zon.pdf · uploaded 3 Apr 2024Source
- DocumentSheet No 5_11zon.pdf · uploaded 3 Apr 2024Source
- DocumentSheet No 6.pdf · uploaded 3 Apr 2024Source
- DocumentSheet No 7.pdf · uploaded 3 Apr 2024Source
Technical (Architect)
- DocumentArchitects Certificate Q1.pdf · uploaded 30 Nov 2024Source
- DocumentArchitects Certificate DT Q2.pdf · uploaded 30 Nov 2024Source
- DocumentArchitects Certificate Dt 31 12 24.pdf · uploaded 4 Mar 2025Source
- DocumentArchitect's Certificate Dt 09-04-2025 - Shankeshwar Pearl.pdf · uploaded 25 Apr 2025Source
- DocumentArchitects certificate 16-10-25.pdf · uploaded 13 Dec 2025Source
Technical (Engineer)
- DocumentForm 2 Pearl 31 12 24.pdf · uploaded 5 Mar 2025Source
- DocumentEngineer's Certificate DT 27 09 2024 Shankeshwar Pearl.pdf · uploaded 5 Mar 2025Source
- DocumentEngineer's Certificate DT 02 07 2024 Shankeshwar Pearl.pdf · uploaded 5 Mar 2025Source
- DocumentEngineer's Certificate Form 2 Dt 09-04-2025 Pearl.pdf · uploaded 25 Apr 2025Source
- DocumentForm 2 Q2.pdf · uploaded 13 Dec 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 97/1A/1A/1
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- —85 units in all
- Address
- 97/1a/1a/1, Ravet, RavetPIN 412101
- Village
- Ravet, Haveli taluka
- Location
- 18.66231, 73.74523
- Land area for this project
- 2,046 sq m (22,023 sq ft)
- Permissible built-up area
- 9,288 sq m (99,978 sq ft)
- Sanctioned built-up area
- 9,098 sq m (97,933 sq ft)
- Designated bank account
- 76
- Developed in phases
- No
- Also registered as
- Shankeshvar Parl, शंकेश्वर पर्ल
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
97/1A/1A/1
Boundaries
- North
- Property Of Sufdam Tarasmahaske Wastiand
- South
- 20 Feet Internal Road
- East
- Property Belongs To Ms Celesta Developers
- West
- 20 Mtr D P Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking85 units
85 units registered
| Type | Carpet area | Units |
|---|---|---|
| — | — | 85 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Usha Rangarajan | — |
| Chartered accountant | Ganesh Mandlecha | — |
| Engineer | Raghuveer Jambhale | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Ravet
- Menlo Sky SuitesRERA PR1260002602755
- Anand AnantaRERA PM1260002602608
- Sonigara RichmontRERA PR1260002602530
- Shubharambh CorpRERA PC1260002602164
- Imperial Residency₹6,540 a sq ft
- Skyway Elite₹6,760 a sq ft
- SHANTAI CLASSIC D BuildingRERA PC1260002601637
- iLife 6RERA PR1260002601624
All 958 projects in Ravet · Compare Shankeshwar Pearl with another project
Shankeshwar Pearl in numbers
Registered deals, summarised
Deedo has 77 registered documents at Shankeshwar Pearl, from Dec 2022 to Apr 2026: 73 sales, 1 mortgage. The median registered sale since Dec 2022 works out to about ₹8,400 per sq ft, at a median of ₹64 L a deal; 3% of sales were resales.
- What is the price per sq ft at Shankeshwar Pearl?
- The median registered sale since Dec 2022 works out to about ₹8,400 per sq ft, at a median of ₹64 L a deal; 3% of sales were resales.
- How many properties have been sold at Shankeshwar Pearl?
- 73 sales are registered at Shankeshwar Pearl, 2 of them resales.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Shankeshwar Pearl by Deedo, last updated with deals registered in Apr 2026.
Latest deal · Resale · Apr 2026
₹50–75 L