Jai Bliss
Deedo IDDP-PUN-ADENCompletion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record.
Ravet, Pune 412101 · Property rates in Ravet · by Jai Constructions
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2027
- This projectRegistered 10 Nov 2020, completion promised 31 Dec 2026, revised to 30 Apr 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Sep 2026
- Primary sale · Jul 2026
- Primary sale · Jul 2026
- Primary sale · Jun 2026
- Primary sale · Jun 2026
- Primary sale · May 2026
- Primary sale · Nov 2025
- Primary sale · Nov 2025
- Primary sale · Sep 2025
- Primary sale · Apr 2025
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Sep 2026 | Wing A · 701 | Primary sale | 591 sq ft | View Primary sale, Sep 2026 | |
| Jul 2026 | Building A · 102 | Primary sale | 580 sq ft | View Primary sale, Jul 2026 | |
| Jul 2026 | Building A · 103 | Primary sale | 580 sq ft | View Primary sale, Jul 2026 | |
| Jun 2026 | Building A · 402 | Primary sale | 591 sq ft | View Primary sale, Jun 2026 | |
| Jun 2026 | Building A · 403 | Primary sale | 591 sq ft | View Primary sale, Jun 2026 | |
| May 2026 | Building A · 701 | Primary sale | 591 sq ft | View Primary sale, May 2026 | |
| Nov 2025 | Building A · 402 | Primary sale | 590 sq ft | View Primary sale, Nov 2025 | |
| Nov 2025 | Building A · 403 | Primary sale | 590 sq ft | View Primary sale, Nov 2025 | |
| Sep 2025 | Building A · 401 | Primary sale | 590 sq ft | View Primary sale, Sep 2025 | |
| Apr 2025 | Building A · 701 | Primary sale | 590 sq ft | View Primary sale, Apr 2025 |
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100027040
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100027040 | 10 Nov 2020 | 31 Dec 2026 | 30 Apr 2027 | Jai Constructions | Project page |
Documents97
1 document held by Deedo, 96 filings listed on MahaRERA's project page
Finance
- PAN Cardjai constructions pan.pdf · uploaded 7 Nov 2020Source
Legal
- Legal Title reportSearch and Title Report 1-8.pdf · uploaded 7 Nov 2020Source
- Legal Title reportSearch and Title Report 9-17.pdf · uploaded 7 Nov 2020Source
- Legal Title reportTitle declaration.pdf · uploaded 7 Nov 2020Source
- Declaration Form BPromoter Declaration.pdf · uploaded 8 Nov 2020Source
- Declaration Form BForm B_compressed.pdf · uploaded 26 Jun 2024Source
Migrated
- 1 PAN Cardjai constructions pan.pdf · uploaded 7 Nov 2020Source
Show all 97 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportSearch and Title Report 1-8.pdf · uploaded 7 Nov 2020Source
- 2 Copy of the legal title reportSearch and Title Report 9-17.pdf · uploaded 7 Nov 2020Source
- 3 Copy of the legal title reportTitle declaration.pdf · uploaded 7 Nov 2020Source
- 1 Details of encumbrancesNo encumbrance certificate.pdf · uploaded 7 Nov 2020Source
- 1 Copy of Layout Approval (in case of layout)A building plan_compressed.pdf · uploaded 7 Nov 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentB building.pdf · uploaded 7 Nov 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 7 Nov 2020Source
- 1 Proforma of Allotment letterDraft Agreement.pdf · uploaded 7 Nov 2020Source
- 2 Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 7 Nov 2020Source
- 1 Declaration in FORM BPromoter Declaration.pdf · uploaded 8 Nov 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 9 Nov 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)JAI BLISS - CA Certificate_compressed.pdf · uploaded 9 Nov 2020Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)AR CERTIFICATE.pdf · uploaded 11 Jan 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Final_compressed.pdf · uploaded 7 Feb 2024Source
- 2 Copy of Layout Approval (in case of layout)Main Layout.pdf · uploaded 24 Jun 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentBuilding A Layout.pdf · uploaded 24 Jun 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentBuilding B Layout.pdf · uploaded 24 Jun 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentBuilding Layout.pdf · uploaded 24 Jun 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentCommencement Certificate V1.pdf · uploaded 24 Jun 2024Source
- 1 Declaration about Commencement CertificateFormat D - Commencement-done.pdf · uploaded 24 Jun 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Q4.pdf · uploaded 24 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Engineer Certificate for Quality Assurance 21.pdf · uploaded 24 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Engineer Certificate for Quality Assurance 22.pdf · uploaded 24 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Engineer Certificate for Quality Assurance.pdf · uploaded 24 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Engineer Certificate for Quality Assurance 23.pdf · uploaded 24 Jun 2024Source
- 1 Disclosure of sold/ booked inventoryFormat Statement Sold_Unsold Inventory.pdf · uploaded 24 Jun 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate Final_compressed.pdf · uploaded 24 Jun 2024Source
- 1 Proforma of Agreement for saleAgreement.pdf · uploaded 24 Jun 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration for Bank Account-Done.pdf · uploaded 24 Jun 2024Source
- 1 Deviation Report with respect to Allotment letterDeviation Report with Allotment letter-done.pdf · uploaded 24 Jun 2024Source
- 2 Declaration in FORM BForm B_compressed.pdf · uploaded 26 Jun 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE with sign.pdf · uploaded 26 Jun 2024Source
- 1 CERSAI detailsCERSAI_Search_Report_200311520428_For_Asset_Based_Search_26_06_2024_15_26_28_327.pdf · uploaded 26 Jun 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 Jai Constructions 1-4-20 To 31-4-21 sign.pdf · uploaded 26 Jun 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Jai Constructions 1-4-21 To 31-3-22 sign.pdf · uploaded 26 Jun 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Jai Constructions 1-4-22 To 31-3-23 sign.pdf · uploaded 26 Jun 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Jai Constructions 1-4-23 To 31-3-24 sign.pdf · uploaded 26 Jun 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30 06 2024_compressed.pdf · uploaded 4 Apr 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30 09 2024_compressed.pdf · uploaded 4 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Q1 30062024.pdf · uploaded 4 Apr 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Q2 30092024.pdf · uploaded 4 Apr 2025Source
- Form 1Form 1.pdf · uploaded 21 Jul 2025Source
- Form 2Form 2 Engineer Certificate Q2 30092024.pdf · uploaded 21 Jul 2025Source
- Form 3Form 3 30 09 2024.pdf · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventoryDoscloser of statement of sold and unsoled..pdf · uploaded 21 Jul 2025Source
- Form 1form 1 30-6-2024.pdf · uploaded 30 Jul 2025Source
- Form 2Form 2 Engineer Certificate Q1 30062024.pdf · uploaded 30 Jul 2025Source
- Form 3Form 3 30 06 2024.pdf · uploaded 30 Jul 2025Source
- Disclosure of Sold and Booked InventoryDoscloser of statement of sold and unsold as on 30-6-2024.pdf · uploaded 30 Jul 2025Source
- Form 1ARCHITECT LETTER _ 31-12-2024.pdf · uploaded 5 Aug 2025Source
- Form 2Form 2 Engineer Certificate Q3.pdf · uploaded 5 Aug 2025Source
- Form 3FORM 3 Q3 2024-25 with sign_11zon.pdf · uploaded 5 Aug 2025Source
- Disclosure of Sold and Booked InventoryDoscloser of statement of sold and unsold as on 30-06-2025.pdf · uploaded 5 Aug 2025Source
- Form 1ARCHITECT LETTER _ 31-03-2025.pdf · uploaded 5 Aug 2025Source
- Form 2Form 2 Engineer Certificate Q4.pdf · uploaded 5 Aug 2025Source
- Form 3FORM 3 Q4 2024-25 with sign_11zon.pdf · uploaded 5 Aug 2025Source
- Disclosure of Sold and Booked InventoryDoscloser of statement of sold and unsold as on 30-06-2025.pdf · uploaded 5 Aug 2025Source
- Form 2A (FY 2020-2021)Form 2A (2020-21).pdf · uploaded 16 Aug 2025Source
- Form 2A (FY 2021-2022)Form 2A (2021-22).pdf · uploaded 16 Aug 2025Source
- Form 2A (FY 2022-2023)Form 2A (2022-23).pdf · uploaded 16 Aug 2025Source
- Form 2A (FY 2023-2024)Form 2A (2023-24).pdf · uploaded 16 Aug 2025Source
- Form 2A (FY 2024-2025)Form 2A (2024-25).pdf · uploaded 16 Aug 2025Source
- Form 5 (FY 2020-2021)Form 5 Jai Constructions 1-4-20 To 31-4-21 sign.pdf · uploaded 16 Aug 2025Source
- Form 5 (FY 2021-2022)Form 5 Jai Constructions 1-4-21 To 31-3-22 sign.pdf · uploaded 16 Aug 2025Source
- Form 5 (FY 2022-2023)Form 5 Jai Constructions 1-4-22 To 31-3-23 sign.pdf · uploaded 16 Aug 2025Source
- Form 5 (FY 2023-2024)Form 5 Jai Constructions 1-4-23 To 31-3-24 sign.pdf · uploaded 16 Aug 2025Source
- Form 5 (FY 2024-2025)form 5 with sign.pdf · uploaded 29 Sep 2025Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 15 Jul 2026Source
- Withdrawal Update Form 2Form 2 Engineer Certificate Q2.pdf · uploaded 15 Jul 2026Source
- Withdrawal Update Form 3FORM 3 WITH SIGN Q2..pdf · uploaded 15 Jul 2026Source
- Withdrawal Update Form 1FORM 1 Q3.pdf · uploaded 16 Jul 2026Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 16 Jul 2026Source
- Withdrawal Update Form 2Form 2 Engineer Certificate Q3.pdf · uploaded 16 Jul 2026Source
- Withdrawal Update Form 2Form 2 Engineer Certificate Q4.pdf · uploaded 16 Jul 2026Source
- Withdrawal Update Form 3FORM 3 WITH SIGN Q3_removed.pdf · uploaded 16 Jul 2026Source
- Withdrawal Update Form 3FORM 3 WITH SIGN Q4_removed.pdf · uploaded 16 Jul 2026Source
- Withdrawal Update Form 1FORM 1 Q1 (2).pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 2Form 2 Engineer Certificate Q1.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 3FORM 3 WITH SIGN Q1_removed (1).pdf · uploaded 18 Jul 2026Source
Technical
- DocumentA building plan_compressed.pdf · uploaded 7 Nov 2020Source
- DocumentB building.pdf · uploaded 7 Nov 2020Source
- DocumentMain Layout.pdf · uploaded 24 Jun 2024Source
- DocumentBuilding A Layout.pdf · uploaded 24 Jun 2024Source
- DocumentBuilding B Layout.pdf · uploaded 24 Jun 2024Source
- DocumentBuilding Layout.pdf · uploaded 24 Jun 2024Source
Technical (Architect)
- DocumentFORM 1 Q1 (2).pdf · uploaded 16 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 1A/1A/1A/2, 1A/1A/25
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 101 row house, 102 row house, 103 row house, 104 row house, 105 row house, 106 row house, 107 row house, 108 row house36 units in all
- Address
- Survey No. 97, Hissa No. 1a/1a/24, 1a/1a/25, 1a/1a/27, 1a/1a/42 And 1a/1a/1a/2, RavetPIN 412101
- Village
- Pimpri Chinchawad (M Corp.), Haveli taluka
- Location
- 18.66091, 73.74597
- Land area for this project
- 1,899 sq m (20,441 sq ft)
- Permissible built-up area
- 3,033 sq m (32,648 sq ft)
- Sanctioned built-up area
- 1,533 sq m (16,502 sq ft)
- Designated bank account
- 220
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
SURVEY NO. 97, HISSA NO. 1A/1A/24, 1A/1A/25, 1A/1A/27, 1A/1A/42 AND 1A/1A/1A/2
Boundaries
- North
- Road
- South
- Survey No 103 Part
- East
- Survy No 97 Part
- West
- Survey No 97 Part
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking36 units
7 of 36 units booked (19%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building A | 2BHK | 53.9 sq m · 580 sq ft | 4 | 3 |
| Building A | 2BHK | 54.85 sq m · 590 sq ft | 24 | 3 |
| Building B | 101 row house | 102.9 sq m · 1,108 sq ft | 1 | 1 |
| Building B | 102 row house | 102.9 sq m · 1,108 sq ft | 1 | 0 |
| Building B | 103 row house | 102.9 sq m · 1,108 sq ft | 1 | 0 |
| Building B | 104 row house | 102.9 sq m · 1,108 sq ft | 1 | 0 |
| Building B | 105 row house | 102.9 sq m · 1,108 sq ft | 1 | 0 |
| Building B | 106 row house | 102.9 sq m · 1,108 sq ft | 1 | 0 |
| Building B | 107 row house | 102.9 sq m · 1,108 sq ft | 1 | 0 |
| Building B | 108 row house | 102.9 sq m · 1,108 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals8
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Vision Associates | — |
| Chartered accountant | Anand Jethani And Co | — |
| Chartered accountant | Ganesh sunil Mandlecha | — |
| Engineer | Deltacom Structures Consultanat | — |
| Engineer | Nikhil Khandge | — |
| Engineer | Vicky Pawar | — |
| Engineer | Vijay Khandge | — |
| Other | Infratech | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Ravet
- Menlo Sky SuitesRERA PR1260002602755
- Anand AnantaRERA PM1260002602608
- Sonigara RichmontRERA PR1260002602530
- Shubharambh CorpRERA PC1260002602164
- Imperial Residency₹6,540 a sq ft
- Skyway Elite₹6,760 a sq ft
- SHANTAI CLASSIC D BuildingRERA PC1260002601637
- iLife 6RERA PR1260002601624
All 958 projects in Ravet · Compare Jai Bliss with another project
Jai Bliss in numbers
Registered deals, summarised
Deedo has 48 registered documents at Jai Bliss, from Dec 2020 to Oct 2026: 30 sales, 3 mortgages. The median registered sale since Dec 2020 works out to about ₹8,000 per sq ft, at a median of ₹47 L a deal; 0% of sales were resales.
- What is the price per sq ft at Jai Bliss?
- The median registered sale since Dec 2020 works out to about ₹8,000 per sq ft, at a median of ₹47 L a deal; 0% of sales were resales.
- How many properties have been sold at Jai Bliss?
- 30 sales are registered at Jai Bliss.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Jai Bliss by Deedo, last updated with deals registered in Oct 2026.
Latest deal · Primary sale · Sep 2026
₹50–75 L
