Saisha
Deedo IDDP-PUN-3E76Completion was pushed back 4 months, to May 2027; no MahaRERA orders on record; 86% of its units are booked.
Punawale, Pune 411033 · by Sai Samarttha Properties
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to May 2027
- This projectRegistered 26 Jun 2018, completion promised 31 Jan 2027, revised to 31 May 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
3 buildings
Open a building to see every flat, floor by floor.
- A Wing - Podium and 3 Floors3 floors · 15 units60% booked
- B Wing11 floors · 54 units93% booked
- C Wing11 floors · 64 units86% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100016985
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100016985 | 26 Jun 2018 | 31 Jan 2027 | 31 May 2027 | Sai Samarttha Properties | Project page |
Documents253
1 document held by Deedo, 252 filings listed on MahaRERA's project page
Finance
- PAN CardPAN.pdf · uploaded 19 Jun 2018Source
Legal
- Declaration Form BSSP PARTNER.pdf · uploaded 19 Jun 2018Source
- OtherNA Order 88R.pdf · uploaded 23 Jun 2018Source
- Othersaisha layout full.pdf · uploaded 23 Jun 2018Source
- Legal Title report88R Search titlal Report.pdf · uploaded 23 Jun 2018Source
- Legal Title reportSUPPLEMENTARY SEARCH HISSA 1.pdf · uploaded 23 Jun 2018Source
- Legal Title reportSUPPLEMENTARY SEARCH HISSA 2.pdf · uploaded 23 Jun 2018Source
Show all 253 documentsShow fewer documents
Legal
- Legal Title reportSUPPLEMENTARY SEARCH HISSA 3.pdf · uploaded 23 Jun 2018Source
- Legal Title reportSUPPLEMENTARY SEARCH HISSA 4.pdf · uploaded 23 Jun 2018Source
- Legal Title reportSUPPLEMENTARY SEARCH HISSA 5.pdf · uploaded 23 Jun 2018Source
- Declaration Form Bdeclaration.pdf · uploaded 4 Oct 2018Source
- Declaration Form BAffidavit cum Declaration (1)_compressed.pdf · uploaded 21 Jun 2024Source
- Declaration Form BFORM B - SAISHA PROJECT.pdf · uploaded 24 Oct 2024Source
Migrated
- 1 PAN CardPAN.pdf · uploaded 19 Jun 2018Source
- 1 Details of encumbrancesencumbrance1.pdf · uploaded 19 Jun 2018Source
- 1 Copy of Layout Approval (in case of layout)1.pdf · uploaded 19 Jun 2018Source
- 1 Building Plan Approval (IOD)1.pdf · uploaded 19 Jun 2018Source
- 2 Building Plan Approval (IOD)2.pdf · uploaded 19 Jun 2018Source
- 3 Building Plan Approval (IOD)3.pdf · uploaded 19 Jun 2018Source
- 4 Building Plan Approval (IOD)4.pdf · uploaded 19 Jun 2018Source
- 5 Building Plan Approval (IOD)5.pdf · uploaded 19 Jun 2018Source
- 6 Building Plan Approval (IOD)6.pdf · uploaded 19 Jun 2018Source
- 7 Building Plan Approval (IOD)7.pdf · uploaded 19 Jun 2018Source
- 8 Building Plan Approval (IOD)8.pdf · uploaded 19 Jun 2018Source
- 9 Building Plan Approval (IOD)9.pdf · uploaded 19 Jun 2018Source
- 10 Building Plan Approval (IOD)10.pdf · uploaded 19 Jun 2018Source
- 11 Building Plan Approval (IOD)11.pdf · uploaded 19 Jun 2018Source
- 12 Building Plan Approval (IOD)12.pdf · uploaded 19 Jun 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentSKM_C25818050819040.pdf · uploaded 19 Jun 2018Source
- 1 Declaration in FORM BSSP PARTNER.pdf · uploaded 19 Jun 2018Source
- 1 Copy of the legal title report88R Search titlal Report.pdf · uploaded 23 Jun 2018Source
- 2 Copy of the legal title reportSUPPLEMENTARY SEARCH HISSA 1.pdf · uploaded 23 Jun 2018Source
- 3 Copy of the legal title reportSUPPLEMENTARY SEARCH HISSA 2.pdf · uploaded 23 Jun 2018Source
- 4 Copy of the legal title reportSUPPLEMENTARY SEARCH HISSA 3.pdf · uploaded 23 Jun 2018Source
- 5 Copy of the legal title reportSUPPLEMENTARY SEARCH HISSA 4.pdf · uploaded 23 Jun 2018Source
- 6 Copy of the legal title reportSUPPLEMENTARY SEARCH HISSA 5.pdf · uploaded 23 Jun 2018Source
- 2 Copy of Layout Approval (in case of layout)saisha layout full.pdf · uploaded 23 Jun 2018Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch Certificate.pdf · uploaded 23 Jun 2018Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGR CERTIFICATE.pdf · uploaded 23 Jun 2018Source
- 1 Certificates of CA (Form 3)CA Certificates.pdf · uploaded 23 Jun 2018Source
- 1 Proforma of Allotment letterAgreement - Phase IV - Residential Unit - As per RERA for registration - 22-06-2018.pdf · uploaded 23 Jun 2018Source
- 2 Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 23 Jun 2018Source
- 1 OtherNA Order 88R.pdf · uploaded 23 Jun 2018Source
- 2 Othersaisha layout full.pdf · uploaded 23 Jun 2018Source
- 2 Details of encumbrancesecumbarance.pdf · uploaded 4 Oct 2018Source
- 2 Declaration in FORM Bdeclaration.pdf · uploaded 4 Oct 2018Source
- 3 Copy of Layout Approval (in case of layout)Scan 2019-3-26 (19,24,59).pdf · uploaded 27 Mar 2019Source
- 13 Building Plan Approval (IOD)Scan 2019-3-26 (19,31,43).pdf · uploaded 27 Mar 2019Source
- 14 Building Plan Approval (IOD)Scan 2019-3-26 (19,37,3).pdf · uploaded 27 Mar 2019Source
- 15 Building Plan Approval (IOD)Scan 2019-3-26 (19,37,45).pdf · uploaded 27 Mar 2019Source
- 16 Building Plan Approval (IOD)Scan 2019-3-26 (19,24,8).pdf · uploaded 27 Mar 2019Source
- 17 Building Plan Approval (IOD)Scan 2019-3-26 (19,23,33).pdf · uploaded 27 Mar 2019Source
- 18 Building Plan Approval (IOD)Scan 2019-3-26 (19,22,58).pdf · uploaded 27 Mar 2019Source
- 19 Building Plan Approval (IOD)Scan 2019-3-26 (19,22,23).pdf · uploaded 27 Mar 2019Source
- 20 Building Plan Approval (IOD)Scan 2019-3-26 (19,21,52).pdf · uploaded 27 Mar 2019Source
- 21 Building Plan Approval (IOD)Scan 2019-3-26 (19,36,11).pdf · uploaded 27 Mar 2019Source
- 22 Building Plan Approval (IOD)Scan 2019-3-26 (19,35,11).pdf · uploaded 27 Mar 2019Source
- 23 Building Plan Approval (IOD)Scan 2019-3-26 (19,20,45).pdf · uploaded 27 Mar 2019Source
- 2 Commencement Certificates / NA Order for plotted developmentorder.pdf · uploaded 27 Mar 2019Source
- 3 Proforma of Allotment letterAgreement Draft.pdf · uploaded 27 Mar 2019Source
- 1 Form 2ASAISHA QUALITY 01_compressed.pdf · uploaded 16 Apr 2019Source
- 2 Form 2ASAISHA QUALITY 02_compressed.pdf · uploaded 16 Apr 2019Source
- 3 Form 2ASAISHA QUALITY 03.pdf · uploaded 16 Apr 2019Source
- 4 Form 2ASaisha Quality Assu Cert April-June 19_compressed.pdf · uploaded 11 Oct 2019Source
- 5 Form 2ASaisha Quality Assu Cert July-Sept 19_compressed.pdf · uploaded 11 Oct 2019Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)saisha 26122018.pdf · uploaded 7 Nov 2019Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)saisha 26032019.pdf · uploaded 7 Nov 2019Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)SAISHA RERA Engg Certficate Dec 2018-3rd Quarter_compressed.pdf · uploaded 7 Nov 2019Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)SAISHA RERA Engg Certficate Mar 2019 - 4th Quarter_compressed.pdf · uploaded 7 Nov 2019Source
- 2 Certificates of CA (Form 3)saisha ca certificate.pdf · uploaded 7 Nov 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 (UT) Saisha 2018-19.pdf · uploaded 26 Nov 2019Source
- 6 Form 2AQuality Assurance Cert Saisha Dec 2019_compressed.pdf · uploaded 11 Feb 2020Source
- 7 Form 2AQAC.pdf · uploaded 25 Sep 2020Source
- 8 Form 2AQAC 1.pdf · uploaded 29 Sep 2020Source
- 4 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 21 Dec 2020Source
- 24 Building Plan Approval (IOD)A 1 and 2 floor.pdf · uploaded 21 Dec 2020Source
- 25 Building Plan Approval (IOD)A 3 to 10 floor.pdf · uploaded 21 Dec 2020Source
- 26 Building Plan Approval (IOD)A 11 floor.pdf · uploaded 21 Dec 2020Source
- 27 Building Plan Approval (IOD)A elevation section.pdf · uploaded 21 Dec 2020Source
- 28 Building Plan Approval (IOD)New MHADA 1 to 4 floor.pdf · uploaded 21 Dec 2020Source
- 29 Building Plan Approval (IOD)NEW MHADA elevation section.pdf · uploaded 21 Dec 2020Source
- 3 Commencement Certificates / NA Order for plotted developmentCommencement Certificate Revised.pdf · uploaded 21 Dec 2020Source
- 4 Proforma of Allotment letterAgreementl draft Saisha1.pdf · uploaded 21 Dec 2020Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)architects certificate 1-min.pdf · uploaded 18 Feb 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Sai Samartha FORM 5.pdf · uploaded 16 Apr 2021Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg cert March 2020-.pdf · uploaded 21 Apr 2021Source
- 9 Form 2Aengineers certificate saisha 31122020.pdf · uploaded 21 Apr 2021Source
- 10 Form 2Aengineers certificate saisha march 2021.pdf · uploaded 21 Apr 2021Source
- 11 Form 2ANew Doc 2021-04-21.pdf · uploaded 21 Apr 2021Source
- 1 Disclosure of sold/ booked inventorySAISHA 1-compressed.pdf · uploaded 28 May 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)engineers certificate saisha march 2021.pdf · uploaded 2 Aug 2021Source
- 12 Form 2Aquality assurance certificate-compressed.pdf · uploaded 3 Aug 2021Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)IMG_0001-merged-compressed-compressed.pdf · uploaded 5 Aug 2021Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)IMG_0001-converted-compressed.pdf · uploaded 5 Aug 2021Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Saisha ABC June 2021.pdf · uploaded 5 Aug 2021Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineers certificate saisha dec 2020.pdf · uploaded 5 Aug 2021Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg Cert march 2021.pdf · uploaded 5 Aug 2021Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer certificate saisha ph1_compressed.pdf · uploaded 11 Aug 2021Source
- 1 Declaration about Commencement CertificateNew Doc 2021-08-12_1.pdf · uploaded 12 Aug 2021Source
- 3 Certificates of CA (Form 3)FORM 3.pdf · uploaded 12 Aug 2021Source
- 4 Certificates of CA (Form 3)FORM 3 JUNE.pdf · uploaded 12 Aug 2021Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate F.pdf · uploaded 7 Oct 2021Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)saisha 30921.pdf · uploaded 7 Oct 2021Source
- 13 Form 2AQuality Assurance Certificate Saisha Sept 2021.pdf · uploaded 7 Oct 2021Source
- 2 Disclosure of sold/ booked inventoryRERA SAISHA PH1 5102111zon.pdf · uploaded 7 Oct 2021Source
- 5 Certificates of CA (Form 3)Form 3Saisha Phase 1Sept 2021F.pdf · uploaded 7 Oct 2021Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)NAME RESERVATION LETTER_0001.pdf · uploaded 3 Dec 2021Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)IMG_20211223_0002_compressed.pdf · uploaded 28 Dec 2021Source
- 14 Form 2AQA - SAISHA 1.pdf · uploaded 28 Dec 2021Source
- 3 Disclosure of sold/ booked inventoryRERA INVENTORY CERTIFICATE SAISHA PH-1.pdf · uploaded 6 Jan 2022Source
- 4 Disclosure of sold/ booked inventoryInventory Certificate Saisha - PH - 1.pdf · uploaded 7 Apr 2022Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Saisha Phase 1comp.pdf · uploaded 25 May 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Saisha Phase 1 Quailty Assurance Certificate (1).pdf · uploaded 25 May 2022Source
- 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Saisha Ar Ph1 C.pdf · uploaded 8 Jun 2022Source
- 5 Disclosure of sold/ booked inventoryRERA INVENTORY CERTIFICATE - SAISHA PH-1.pdf · uploaded 14 Jul 2022Source
- 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Ar Saisha phase 1.pdf · uploaded 9 Aug 2022Source
- 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg saisha phase 1.pdf · uploaded 9 Aug 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Quilty saisha phase 1.pdf · uploaded 9 Aug 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Quilty saisha phase 1.pdf · uploaded 9 Aug 2022Source
- 6 Certificates of CA (Form 3)Saisha ph1 mar22.pdf · uploaded 30 Aug 2022Source
- 7 Certificates of CA (Form 3)Saisha ph1 jun22.pdf · uploaded 30 Aug 2022Source
- 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Saishaph1 Ar.pdf · uploaded 21 Oct 2022Source
- 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)saishph1 Engg.pdf · uploaded 21 Oct 2022Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Quality saisha ph1.pdf · uploaded 21 Oct 2022Source
- 6 Disclosure of sold/ booked inventoryRERA INVENTORY ph1 - SEPT-22.pdf · uploaded 21 Oct 2022Source
- 8 Certificates of CA (Form 3)CA Certificate 1.pdf · uploaded 21 Oct 2022Source
- 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Ar Saisha Ph1.pdf · uploaded 5 Feb 2023Source
- 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg Saisha Ph1.pdf · uploaded 5 Feb 2023Source
- 7 Disclosure of sold/ booked inventoryBooking Saisha Ph1.pdf · uploaded 5 Feb 2023Source
- 9 Certificates of CA (Form 3)CA Saisha Ph1.pdf · uploaded 24 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5(UT) Saisha1 20-21 signed.pdf · uploaded 27 Mar 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5(UT) Saisha1 20-21 signed.pdf · uploaded 27 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5(UT) Saisha1 21-22 signed.pdf · uploaded 27 Mar 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5(UT) Saisha1 21-22 signed.pdf · uploaded 27 Mar 2023Source
- 8 Disclosure of sold/ booked inventorySAISHA INVENTORY CERTIFICATE - PH- 1.pdf · uploaded 5 May 2023Source
- 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Ar Cert Saisha1-4-2023.pdf · uploaded 8 May 2023Source
- 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Ar Cert Saisha Ph2 1-4-2023.pdf · uploaded 8 May 2023Source
- 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Enginer Saisha 1-4-23.pdf · uploaded 8 May 2023Source
- 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Enginer Saisha Ph2 1-4-23.pdf · uploaded 8 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality Saisha 1-4-2023.pdf · uploaded 8 May 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality Saisha Ph2 1-4-23.pdf · uploaded 8 May 2023Source
- 3 Details of encumbrancesRERA encumbrance - 2023.pdf · uploaded 15 May 2023Source
- 10 Certificates of CA (Form 3)CA Saisha Ph1 April 23.pdf · uploaded 5 Jul 2023Source
- 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect's Certificate Saisha - Ph - 1.pdf · uploaded 18 Jul 2023Source
- 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Saisha - Ph - 1.pdf · uploaded 18 Jul 2023Source
- 9 Disclosure of sold/ booked inventoryRERA - Inventory Certifiacte - June - 23 - PH - 1.pdf · uploaded 18 Jul 2023Source
- 11 Certificates of CA (Form 3)CA Saisha Ph1 july 23.pdf · uploaded 7 Aug 2023Source
- 10 Disclosure of sold/ booked inventoryInventory Certificate Saisha 1 Sept 23.pdf · uploaded 19 Oct 2023Source
- 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)saisha first architect certificate.pdf · uploaded 20 Nov 2023Source
- 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer certificate saisha phase 1.pdf · uploaded 20 Nov 2023Source
- 12 Certificates of CA (Form 3)Saisha Ph1 CA.pdf · uploaded 28 Nov 2023Source
- 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)saisha first architect certificate.pdf · uploaded 3 Apr 2024Source
- 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer certificate saisha phase 1.pdf · uploaded 3 Apr 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)CA saisha Ph1 FY 22-23.pdf · uploaded 3 Apr 2024Source
- 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Ph1.pdf · uploaded 13 Apr 2024Source
- 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Ph1.pdf · uploaded 13 Apr 2024Source
- 11 Disclosure of sold/ booked inventorySAISHA PROJECT - PH1 - Inventory certificate Dec-23.pdf · uploaded 22 Apr 2024Source
- 12 Disclosure of sold/ booked inventorySaisha Project - Ph-1 - Inventory certificate - March-24.pdf · uploaded 24 Apr 2024Source
- 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)AR Saisha PH1 April 24.pdf · uploaded 13 Jun 2024Source
- 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg Saisha ph1 April 24.pdf · uploaded 13 Jun 2024Source
- 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg Saisha ph1 April 24 C.pdf · uploaded 13 Jun 2024Source
- 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg saisha ph1 april 24 C.pdf · uploaded 13 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Quality saisha ph1 april 24.pdf · uploaded 13 Jun 2024Source
- 3 Declaration in FORM BAffidavit cum Declaration (1)_compressed.pdf · uploaded 21 Jun 2024Source
- 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)AR Saisha Ph1 April 24.pdf · uploaded 21 Jun 2024Source
- 22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Saisha ph1 engg april 24.pdf · uploaded 21 Jun 2024Source
- 13 Certificates of CA (Form 3)CA SAISHA PHASE I.pdf · uploaded 21 Jun 2024Source
- Disclosure of Sold and Booked InventorySaisha Project - Ph-1 - Inventory certificate - March-24.pdf · uploaded 3 Oct 2024Source
- 1 Declaration in FORM BFORM B - SAISHA PROJECT.pdf · uploaded 24 Oct 2024Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Ar saishph1 1july 24.pdf · uploaded 24 Oct 2024Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Ar saisha ph1 oct 24.pdf · uploaded 24 Oct 2024Source
- 1 Certificates of CA (Form 3)CA Saisha Phase1 Jun24.pdf · uploaded 24 Oct 2024Source
- 2 Certificates of CA (Form 3)CA Saisha Phase2 Jun24.pdf · uploaded 24 Oct 2024Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Ar saisha ph1 oct 24.pdf · uploaded 24 Oct 2024Source
- 1 Disclosure of sold/ booked inventorySaisha 1 Qty 2 booking.pdf · uploaded 24 Oct 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectSaisha 1 Qt-1 booking.pdf · uploaded 24 Oct 2024Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)REG CERTIFICATE.pdf · uploaded 3 Jun 2025Source
- Form 5 (FY 2024-2025)Annual Audit Form 5 for FY 2024-25 Shaisha Plase I.pdf · uploaded 5 Dec 2025Source
- Withdrawal Update Form 1Form 1 for FY 2025-026 Q1 Saisha I final.pdf · uploaded 9 Jun 2026Source
- Withdrawal Update Form 2Engineers Certificate form 2 for FY 2025-26 Q1 final.pdf · uploaded 9 Jun 2026Source
- Withdrawal Update Form 3CA Certificate Saisha I Q1_2025-26 Final.pdf · uploaded 9 Jun 2026Source
- Form 2A (FY 2024-2025)Form 2A Saisha Plase I FY 2024-25 final.pdf · uploaded 9 Jun 2026Source
- Form 2A (FY 2025-2026)Form 2A Saisha Plase I FY 2025-26 final.pdf · uploaded 9 Jun 2026Source
- Withdrawal Update Form 1Form 1 For 2025-26- Q2 final.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 2Form 2 for FY 2025-26 Q2 final.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 3Form 3 for FY 2025-26- Q2- Saisha I final.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 1Form 1 for FY 2025-26 Q3 saisha I final.pdf · uploaded 21 Aug 2026Source
- Withdrawal Update Form 2Form 2 for FY 2025-26 Q3 final.pdf · uploaded 21 Aug 2026Source
- Withdrawal Update Form 3Form 3 for FY 2025-26 Q3.pdf · uploaded 21 Aug 2026Source
- Form 5 (FY 2025-2026)Form 5 Shaisha I for FY 2025-26 final.pdf · uploaded 24 Aug 2026Source
- Withdrawal Update Form 1Form 1 for FY 2025-26 Q4 saisha I.pdf · uploaded 15 Sep 2026Source
- Withdrawal Update Form 1Form 1 for FY 2026-27 Q1 saisha I final.pdf · uploaded 15 Sep 2026Source
- Withdrawal Update Form 2Form 2 for FY 2025-26 Q4.pdf · uploaded 15 Sep 2026Source
- Withdrawal Update Form 2Form 2 for FY 2026-27 Q1 final.pdf · uploaded 15 Sep 2026Source
- Withdrawal Update Form 3Form 3 For FY 2025-26 Q4 Final.pdf · uploaded 15 Sep 2026Source
- Withdrawal Update Form 3Form 3 For FY 2026-27 Q1 Final.pdf · uploaded 15 Sep 2026Source
Technical
- Document1.pdf · uploaded 19 Jun 2018Source
- Document1.pdf · uploaded 19 Jun 2018Source
- Document2.pdf · uploaded 19 Jun 2018Source
- Document3.pdf · uploaded 19 Jun 2018Source
- Document4.pdf · uploaded 19 Jun 2018Source
- Document5.pdf · uploaded 19 Jun 2018Source
- Document6.pdf · uploaded 19 Jun 2018Source
- Document7.pdf · uploaded 19 Jun 2018Source
- Document8.pdf · uploaded 19 Jun 2018Source
- Document9.pdf · uploaded 19 Jun 2018Source
- Document10.pdf · uploaded 19 Jun 2018Source
- Document11.pdf · uploaded 19 Jun 2018Source
- Document12.pdf · uploaded 19 Jun 2018Source
- Documentsaisha layout full.pdf · uploaded 23 Jun 2018Source
- DocumentScan 2019-3-26 (19,24,59).pdf · uploaded 27 Mar 2019Source
- DocumentScan 2019-3-26 (19,31,43).pdf · uploaded 27 Mar 2019Source
- DocumentScan 2019-3-26 (19,37,3).pdf · uploaded 27 Mar 2019Source
- DocumentScan 2019-3-26 (19,37,45).pdf · uploaded 27 Mar 2019Source
- DocumentScan 2019-3-26 (19,24,8).pdf · uploaded 27 Mar 2019Source
- DocumentScan 2019-3-26 (19,23,33).pdf · uploaded 27 Mar 2019Source
- DocumentScan 2019-3-26 (19,22,58).pdf · uploaded 27 Mar 2019Source
- DocumentScan 2019-3-26 (19,22,23).pdf · uploaded 27 Mar 2019Source
- DocumentScan 2019-3-26 (19,21,52).pdf · uploaded 27 Mar 2019Source
- DocumentScan 2019-3-26 (19,36,11).pdf · uploaded 27 Mar 2019Source
- DocumentScan 2019-3-26 (19,35,11).pdf · uploaded 27 Mar 2019Source
- DocumentScan 2019-3-26 (19,20,45).pdf · uploaded 27 Mar 2019Source
- DocumentLayout.pdf · uploaded 21 Dec 2020Source
- DocumentA 1 and 2 floor.pdf · uploaded 21 Dec 2020Source
- DocumentA 3 to 10 floor.pdf · uploaded 21 Dec 2020Source
- DocumentA 11 floor.pdf · uploaded 21 Dec 2020Source
- DocumentA elevation section.pdf · uploaded 21 Dec 2020Source
- DocumentNew MHADA 1 to 4 floor.pdf · uploaded 21 Dec 2020Source
- DocumentNEW MHADA elevation section.pdf · uploaded 21 Dec 2020Source
- Document1 Layout.pdf · uploaded 29 Oct 2025Source
- Document1.pdf · uploaded 29 Oct 2025Source
- Document2.pdf · uploaded 29 Oct 2025Source
- Document3 A - wing - 8th floor.pdf · uploaded 29 Oct 2025Source
- Document4.pdf · uploaded 29 Oct 2025Source
- Document5.pdf · uploaded 29 Oct 2025Source
- Document6.pdf · uploaded 29 Oct 2025Source
- Document7.pdf · uploaded 29 Oct 2025Source
- Document8 B - wing - 8th floor.pdf · uploaded 29 Oct 2025Source
- Document9.pdf · uploaded 29 Oct 2025Source
- Document10.pdf · uploaded 29 Oct 2025Source
- Document11 C - wing - 8th flooR.pdf · uploaded 29 Oct 2025Source
- Document12.pdf · uploaded 29 Oct 2025Source
- Document13.pdf · uploaded 29 Oct 2025Source
- Document14.pdf · uploaded 29 Oct 2025Source
- Document15.pdf · uploaded 29 Oct 2025Source
- Document16.pdf · uploaded 29 Oct 2025Source
- OthersCommencement Certificate 05-02-2025.pdf · uploaded 29 Oct 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 43 12 1 A, 43 18 10
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 3BHK, 1BHK133 units in all
- Address
- 43 9 1, 43 9 2, 43 18 9, 43 18 10, 43 12 1 A, Pavana Nagar, Near To Shriyans Society, PunavalePIN 411033
- Village
- Punawale, Mulshi taluka
- Location
- 18.69055, 73.59010
- Land area for this project
- 8,800 sq m (94,722 sq ft)
- Permissible built-up area
- 9,046 sq m (97,371 sq ft)
- Sanctioned built-up area
- 9,046 sq m (97,371 sq ft)
- Recreational open space
- 887 sq m (9,544 sq ft)
- Designated bank account
- 76
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
43 9 1, 43 9 2, 43 18 9, 43 18 10, 43 12 1 A
Boundaries
- North
- Land Of Silveroak Reality And Bankar
- South
- Land Of Shivaji Kudale And Savata Mali Trust Land
- East
- Gk Builder And Land Of Manda Kudale
- West
- Land Of Bankar And Boundary Of S No 41
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking133 units
114 of 133 units booked (86%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing - Podium and 3 Floors | 2BHK | 52.1 sq m · 561 sq ft | 1 | 0 |
| A Wing - Podium and 3 Floors | 2BHK | 52.72 sq m · 567 sq ft | 1 | 0 |
| A Wing - Podium and 3 Floors | 2BHK | 55.88 sq m · 601 sq ft | 1 | 0 |
| A Wing - Podium and 3 Floors | 2BHK | 56.15 sq m · 604 sq ft | 1 | 1 |
| A Wing - Podium and 3 Floors | 2BHK | 57.48 sq m · 619 sq ft | 1 | 0 |
| A Wing - Podium and 3 Floors | 2BHK | 57.74 sq m · 622 sq ft | 1 | 0 |
| A Wing - Podium and 3 Floors | 3BHK | 52.24 sq m · 562 sq ft | 1 | 1 |
| A Wing - Podium and 3 Floors | 3BHK | 52.31 sq m · 563 sq ft | 1 | 1 |
Show all 56 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing - Podium and 3 Floors | 3BHK | 52.88 sq m · 569 sq ft | 1 | 0 |
| A Wing - Podium and 3 Floors | 3BHK | 54.02 sq m · 581 sq ft | 1 | 1 |
| A Wing - Podium and 3 Floors | 3BHK | 54.05 sq m · 582 sq ft | 1 | 1 |
| A Wing - Podium and 3 Floors | 3BHK | 54.24 sq m · 584 sq ft | 1 | 1 |
| A Wing - Podium and 3 Floors | 3BHK | 63.86 sq m · 687 sq ft | 1 | 1 |
| A Wing - Podium and 3 Floors | 3BHK | 63.9 sq m · 688 sq ft | 1 | 1 |
| A Wing - Podium and 3 Floors | 3BHK | 64.11 sq m · 690 sq ft | 1 | 1 |
| B Wing | 1BHK | 35.18 sq m · 379 sq ft | 1 | 0 |
| B Wing | 2BHK | 46.93 sq m · 505 sq ft | 3 | 3 |
| B Wing | 2BHK | 47.13 sq m · 507 sq ft | 1 | 1 |
| B Wing | 2BHK | 52.74 sq m · 568 sq ft | 1 | 1 |
| B Wing | 2BHK | 57.25 sq m · 616 sq ft | 1 | 1 |
| B Wing | 2BHK | 57.45 sq m · 618 sq ft | 1 | 1 |
| B Wing | 2BHK | 57.47 sq m · 619 sq ft | 8 | 8 |
| B Wing | 2BHK | 57.56 sq m · 620 sq ft | 3 | 3 |
| B Wing | 2BHK | 57.75 sq m · 622 sq ft | 7 | 6 |
| B Wing | 2BHK | 61.19 sq m · 659 sq ft | 1 | 0 |
| B Wing | 3BHK | 57.5 sq m · 619 sq ft | 1 | 1 |
| B Wing | 3BHK | 57.78 sq m · 622 sq ft | 9 | 8 |
| B Wing | 3BHK | 58.31 sq m · 628 sq ft | 1 | 1 |
| B Wing | 3BHK | 62.02 sq m · 668 sq ft | 3 | 3 |
| B Wing | 3BHK | 62.16 sq m · 669 sq ft | 3 | 3 |
| B Wing | 3BHK | 62.67 sq m · 675 sq ft | 5 | 5 |
| B Wing | 3BHK | 62.84 sq m · 676 sq ft | 4 | 4 |
| B Wing | 3BHK | 64.73 sq m · 697 sq ft | 1 | 1 |
| C Wing | 1BHK | 34.88 sq m · 375 sq ft | 2 | 2 |
| C Wing | 1BHK | 35.18 sq m · 379 sq ft | 2 | 2 |
| C Wing | 1BHK | 35.37 sq m · 381 sq ft | 2 | 2 |
| C Wing | 1BHK | 35.63 sq m · 384 sq ft | 2 | 1 |
| C Wing | 1BHK | 35.64 sq m · 384 sq ft | 1 | 1 |
| C Wing | 1BHK | 35.68 sq m · 384 sq ft | 1 | 0 |
| C Wing | 2BHK | 45.9 sq m · 494 sq ft | 10 | 10 |
| C Wing | 2BHK | 45.93 sq m · 494 sq ft | 8 | 5 |
| C Wing | 2BHK | 46.12 sq m · 496 sq ft | 2 | 2 |
| C Wing | 2BHK | 47.08 sq m · 507 sq ft | 1 | 1 |
| C Wing | 2BHK | 51.79 sq m · 557 sq ft | 1 | 0 |
| C Wing | 2BHK | 55.88 sq m · 601 sq ft | 5 | 4 |
| C Wing | 2BHK | 56 sq m · 603 sq ft | 1 | 1 |
| C Wing | 2BHK | 56.16 sq m · 605 sq ft | 4 | 4 |
| C Wing | 2BHK | 56.55 sq m · 609 sq ft | 1 | 1 |
| C Wing | 2BHK | 57.25 sq m · 616 sq ft | 2 | 2 |
| C Wing | 2BHK | 57.47 sq m · 619 sq ft | 2 | 2 |
| C Wing | 2BHK | 57.56 sq m · 620 sq ft | 1 | 1 |
| C Wing | 2BHK | 57.75 sq m · 622 sq ft | 5 | 5 |
| C Wing | 2BHK | 58.09 sq m · 625 sq ft | 1 | 1 |
| C Wing | 3BHK | 56.61 sq m · 609 sq ft | 1 | 1 |
| C Wing | 3BHK | 56.62 sq m · 609 sq ft | 1 | 1 |
| C Wing | 3BHK | 56.89 sq m · 612 sq ft | 8 | 6 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals9
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Unusual Spaces | — |
| Architect | Vinod Dhusia Architects | — |
| Engineer | G A Bhilare Consultants Pvt Ltd | — |
| Engineer | Satish Gagare | — |
| Other | G C Godbole & Co | — |
| Other | Kshitija Kolhatkar | — |
| Other | Namrata Dhruve & Co | — |
| Other | Siddhivinayak Mep Consultants | — |
| Other | Yash Constrotech | — |
Source: MahaRERA project page. Contact details are not shown.