Certificate Signed

Punawale, Pune 411033 |Promoter: Infinity Associates

Residential / Group HousingRERAP52100077968
14 Nov 2024Registered with MahaRERA
31 Dec 2029Promised completion
30 Apr 2030Revised completionPushed back 4 months
7Buildings
315Units registered209 booked (66%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
7
Unit types
2BHK, 3BHK, Mhada, 1BHK315 units in all
Address
Survey No. 23/1(P), 23/2/1, 23/2/2, 23/5, 23/6/2, 23/6/3, 23/6/4, Village Punawale, Kate Wasti, PunawalePIN 411033
Designated bank account
220
Developed in phases
Yes

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
14 Nov 2024
Promised
31 Dec 2029
Revised
30 Apr 2030

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210007796814 Nov 202431 Dec 202930 Apr 2030Infinity AssociatesProject page

7 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A23—
B23—
C23—
D23—
E23—
F23—
G21—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

209 of 315 units booked (66%), as the promoter reported to MahaRERA

2BHK · 178 units3BHK · 70 unitsMhada · 63 units1BHK · 4 units
BuildingTypeCarpet areaUnitsBooked
Building A2BHK60.6 sq m · 652 sq ft66
Building A3BHK74.4 sq m · 801 sq ft1912
Building A3BHK74.88 sq m · 806 sq ft5127
Building B2BHK49.79 sq m · 536 sq ft2019
Building B2BHK53.09 sq m · 571 sq ft2019
Building B2BHK56.41 sq m · 607 sq ft2020
Building B2BHK56.81 sq m · 611 sq ft3634
Building BMhada47.68 sq m · 513 sq ft30
Show all 19 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Building BMhada51.08 sq m · 550 sq ft30
Building BMhada54.66 sq m · 588 sq ft30
Building BMhada55.04 sq m · 592 sq ft60
Building C1BHK35.98 sq m · 387 sq ft43
Building C2BHK48.76 sq m · 525 sq ft2422
Building C2BHK53.42 sq m · 575 sq ft5247
Building CMhada47.22 sq m · 508 sq ft60
Building CMhada51.7 sq m · 556 sq ft120
Building DMhada52.22 sq m · 562 sq ft120
Building EMhada47.22 sq m · 508 sq ft60
Building EMhada51.7 sq m · 556 sq ft120

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 196 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPan.pdf · uploaded 10 Oct 2024Source
  • Other – FinanceMortgage IndexII.pdf · uploaded 11 Oct 2024Source
  • Other – FinanceBank LOD.pdf · uploaded 11 Oct 2024Source
  • Other – FinanceFormat A - Declaration about Separate Bank Account for Real Estate Projects.pdf · uploaded 14 Oct 2024Source
  • OthersLOD-Milestone for latest mortgage.pdf · uploaded 29 Oct 2025Source
  • OthersMortgage Deed Aditya Birla Capital 26918-2025_removed_compressed (1).pdf · uploaded 29 Oct 2025Source
  • Others1-10.pdf · uploaded 31 Mar 2026Source
Show all 197 documentsShow fewer documents

Finance

  • Others11-20.pdf · uploaded 31 Mar 2026Source
  • Others21-30.pdf · uploaded 31 Mar 2026Source
  • Others31-40.pdf · uploaded 31 Mar 2026Source
  • Others41-50.pdf · uploaded 31 Mar 2026Source
  • Others51-60_compressed.pdf · uploaded 31 Mar 2026Source
  • Others61-70_compressed.pdf · uploaded 31 Mar 2026Source
  • Others71-80_compressed.pdf · uploaded 31 Mar 2026Source
  • Others81-90_compressed.pdf · uploaded 31 Mar 2026Source
  • Others91-100.pdf · uploaded 31 Mar 2026Source
  • Others101-111_compressed.pdf · uploaded 31 Mar 2026Source

Legal

  • Legal Title reportSearch Report.pdf · uploaded 10 Oct 2024Source
  • Other – LegalAll 7-12 Extracts.pdf · uploaded 11 Oct 2024Source
  • Other – LegalAll Sale Deeds and Exchanged Deed copy in favour of Infinity Associates_compressed.pdf · uploaded 11 Oct 2024Source
  • Declaration Form BFrom B.pdf · uploaded 14 Oct 2024Source
  • Declaration Form BTitle Search Report Final.pdf · uploaded 28 Mar 2026Source

Migrated

  • 1 PAN CardPan.pdf · uploaded 10 Oct 2024Source
  • 1 Copy of the legal title reportSearch Report.pdf · uploaded 10 Oct 2024Source
  • 1 Copy of Layout Approval (in case of layout)Building Marked Plan for Rera Registration.pdf · uploaded 11 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate - Form 1.pdf · uploaded 11 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form - 3.pdf · uploaded 11 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form - 2.pdf · uploaded 11 Oct 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentC C 10-10-2024_compressed.pdf · uploaded 11 Oct 2024Source
  • 7 Building Plan Approval / NA Order for plotted development07-09.pdf · uploaded 11 Oct 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentAmalgamation_compressed.pdf · uploaded 11 Oct 2024Source
  • 2 Building Plan Approval / NA Order for plotted development02-09.pdf · uploaded 11 Oct 2024Source
  • 3 Building Plan Approval / NA Order for plotted development03-09.pdf · uploaded 11 Oct 2024Source
  • 4 Building Plan Approval / NA Order for plotted development04-09.pdf · uploaded 11 Oct 2024Source
  • 5 Building Plan Approval / NA Order for plotted development05-09.pdf · uploaded 11 Oct 2024Source
  • 6 Building Plan Approval / NA Order for plotted development06-09.pdf · uploaded 11 Oct 2024Source
  • 8 Building Plan Approval / NA Order for plotted development08-09.pdf · uploaded 11 Oct 2024Source
  • 9 Building Plan Approval / NA Order for plotted development09-09.pdf · uploaded 11 Oct 2024Source
  • 10 Building Plan Approval / NA Order for plotted developmentNA Order 51- 18-06-2024.pdf · uploaded 11 Oct 2024Source
  • 1 Other – LegalAll Sale Deeds and Exchanged Deed copy in favour of Infinity Associates_compressed.pdf · uploaded 11 Oct 2024Source
  • 2 Other – LegalAll 7-12 Extracts.pdf · uploaded 11 Oct 2024Source
  • 1 Deviation Report with respect to Allotment letterNo Deviation with respect to Allotment Letter.pdf · uploaded 11 Oct 2024Source
  • 1 Other – FinanceBank LOD.pdf · uploaded 11 Oct 2024Source
  • 2 Other – FinanceMortgage IndexII.pdf · uploaded 11 Oct 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of lnterest in Other Real Estate Organizations 1.pdf · uploaded 11 Oct 2024Source
  • 1 Home Buyer /Allottee Grievance Redressal CellDetails of Redressal Officer.pdf · uploaded 11 Oct 2024Source
  • 1 Proforma of Allotment letterModel Form of Allotement Letter_compressed.pdf · uploaded 14 Oct 2024Source
  • 1 Declaration in FORM BFrom B.pdf · uploaded 14 Oct 2024Source
  • 1 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf · uploaded 14 Oct 2024Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)FORMAT - A - As per Order No 56-2024.pdf · uploaded 14 Oct 2024Source
  • 3 Other – FinanceFormat A - Declaration about Separate Bank Account for Real Estate Projects.pdf · uploaded 14 Oct 2024Source
  • 1 Other – TechnicalDeclaration-Cum-Undertaking.pdf · uploaded 14 Oct 2024Source
  • 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B - As per order no 56-2024.pdf · uploaded 14 Oct 2024Source
  • 1 Deviation Report with respect to model copy of Agreement- Deviation Report with respect to model copy of Agreement to Sale.pdf · uploaded 15 Oct 2024Source
  • 1 Proforma of Agreement for saleAgreement to Sale.pdf · uploaded 15 Oct 2024Source
  • 2 Copy of Layout Approval (in case of layout)Declaration about project - plot area.pdf · uploaded 16 Oct 2024Source
  • 3 Copy of Layout Approval (in case of layout)PCMC Building Permission RERA Confirmation Email.pdf · uploaded 16 Oct 2024Source
  • 1 a Details of encumbrances concerned to FinanceFinancial Encumbrances and Legal Encumbrances -.pdf · uploaded 22 Oct 2024Source
  • 1 b Details of encumbrances concerned to LegalFinancial Encumbrances and Legal Encumbrances -.pdf · uploaded 22 Oct 2024Source
  • 4 Copy of Layout Approval (in case of layout)1 - Layout and Building Marked.pdf · uploaded 23 Oct 2024Source
  • 5 Copy of Layout Approval (in case of layout)1 - Layout and Building Marked_organized.pdf · uploaded 29 Oct 2024Source
  • 1 CERSAI detailsCersai report with assest based and ID based and declration (3).pdf · uploaded 11 Nov 2024Source
  • 1 Disclosure for secured/unsecured finance availed for the projectDisclosure for secured_unsecured finance availed for the project with CA letter (2).pdf · uploaded 11 Nov 2024Source
  • 1 Proforma of Agreement for saleAgreement to Sale - Legacy Milestone.pdf · uploaded 28 Dec 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate 18-01-2025 (3).pdf · uploaded 3 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Milestone Engineer certificate 15-1-25.pdf · uploaded 3 Feb 2025Source
  • 1 Disclosure of sold/ booked inventoryLegacy Milestone Dec 2024 Sold-Unsold.pdf · uploaded 11 Feb 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC-21-03-2025.pdf · uploaded 24 Mar 2025Source
  • 1 Declaration about Commencement CertificateDecleration of Commencment Legacy Milestone.pdf · uploaded 11 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate 05-01-2025.pdf · uploaded 21 Apr 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)LegacyMilestone Architects Certificate 09-04-2025_compressed.pdf · uploaded 21 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Legacy Milestone Form-3.pdf · uploaded 21 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryLegacy Milestone A-Building Sold-Unsold 31-03-2025_compressed.pdf · uploaded 21 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Legacy Milestone.pdf · uploaded 26 Apr 2025Source
  • 1 Commencement Certificates / NA Order for plotted development2-12 A0_compressed.pdf · uploaded 26 Apr 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentMilestone Layout_compressed.pdf · uploaded 26 Apr 2025Source
  • 2 Building Plan Approval / NA Order for plotted development2-12 A0_compressed.pdf · uploaded 26 Apr 2025Source
  • 3 Building Plan Approval / NA Order for plotted development3-12 A0_compressed.pdf · uploaded 26 Apr 2025Source
  • 4 Building Plan Approval / NA Order for plotted development4-12_compressed.pdf · uploaded 26 Apr 2025Source
  • 5 Building Plan Approval / NA Order for plotted development5-12_compressed.pdf · uploaded 26 Apr 2025Source
  • 6 Building Plan Approval / NA Order for plotted development6-12_compressed.pdf · uploaded 26 Apr 2025Source
  • 7 Building Plan Approval / NA Order for plotted development7-12_compressed.pdf · uploaded 26 Apr 2025Source
  • 8 Building Plan Approval / NA Order for plotted development8-12_compressed.pdf · uploaded 26 Apr 2025Source
  • 9 Building Plan Approval / NA Order for plotted development9-12_compressed.pdf · uploaded 26 Apr 2025Source
  • 10 Building Plan Approval / NA Order for plotted development10-12_compressed.pdf · uploaded 26 Apr 2025Source
  • 11 Building Plan Approval / NA Order for plotted development11-12_compressed.pdf · uploaded 26 Apr 2025Source
  • 12 Building Plan Approval / NA Order for plotted development12-12_compressed.pdf · uploaded 26 Apr 2025Source
  • Form 1Architects Certificate 05-01-2025.pdf · uploaded 15 Jul 2025Source
  • Form 1LegacyMilestone Architects Certificate 09-04-2025.pdf · uploaded 15 Jul 2025Source
  • Form 2Milestone Engineer certificate 15-1-25.pdf · uploaded 15 Jul 2025Source
  • Form 2Form-2 Legacy Milestone Q4.pdf · uploaded 15 Jul 2025Source
  • Form 3Form-3 Q3.pdf · uploaded 15 Jul 2025Source
  • Form 3Form-3 Q4-24-25 Final.pdf · uploaded 15 Jul 2025Source
  • Disclosure of Sold and Booked InventoryLegacy Milestone Dec 2024 Sold-Unsold.pdf · uploaded 15 Jul 2025Source
  • Disclosure of Sold and Booked InventoryLegacy Milestone A-Building Sold-Unsold 31-03-2025_compressed (1).pdf · uploaded 15 Jul 2025Source
  • Self-declaration of Quarterly ProgressLegacy Milestone QPR Self Decl-Q3-24-25.pdf · uploaded 15 Jul 2025Source
  • Self-declaration of Quarterly ProgressSelf Decl-Q4- QPR.pdf · uploaded 15 Jul 2025Source
  • Form 1Legacy Milestone Architects Certificate 14-07-2025.pdf · uploaded 19 Jul 2025Source
  • Form 2Form-2 - Q1-25-26.pdf · uploaded 19 Jul 2025Source
  • Form 3Form-3 Q1-25--26.pdf · uploaded 19 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold-Unsold Legacy Milestone A Building.pdf · uploaded 19 Jul 2025Source
  • Self-declaration of Quarterly ProgressSelf Declaration-Q1-2025-26.pdf · uploaded 19 Jul 2025Source
  • Form 5 (FY 2024-2025)Form 5 Infinity Associates -FY-24-25.pdf · uploaded 30 Sep 2025Source
  • Form 2A (FY 2024-2025)Form2-A 2025 Legacy Milestone.pdf · uploaded 16 Oct 2025Source
  • Withdrawal Update Form 1Q2 - Form 1 - Milestone - 2025-2026.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 1Q2 - Form 1 - Milestone - 2025-2026.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 2Q2 - Form 2 - Milestone - 2025-2026.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 2Q2 - Form 2 - Milestone - 2025-2026.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 3Form - 3.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 3Q2 - Form 3 - Milestone - 2025-2026_compressed.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 1Q2 - Form 1 - Milestone - 2025-2026.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 2Form-2 Engineers Certificate 07-01-2026.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 3Q3 CA Certificate Legacy Milestone 07-01-2026.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 1Q3- Architects Certificate 06-01-2026.pdf · uploaded 27 Jan 2026Source
  • Withdrawal Update Form 2Form-2 Engineers Certificate 07-01-2026.pdf · uploaded 27 Jan 2026Source
  • Withdrawal Update Form 3CA Certificate 07-01-2026.pdf · uploaded 27 Jan 2026Source
  • Withdrawal Update Form 1Architects Certificate 21-03-2026.pdf · uploaded 18 Apr 2026Source
  • Withdrawal Update Form 2Q4 Milestone .pdf · uploaded 18 Apr 2026Source
  • Withdrawal Update Form 3Q4 Fprm 3 Milestone _compressed.pdf · uploaded 18 Apr 2026Source
  • Withdrawal Update Form 1Form 1 - Legacy Milestone -02-07-2026.pdf · uploaded 21 Jul 2026Source
  • Withdrawal Update Form 1Form 1 - Legacy Milestone -02-07-2026.pdf · uploaded 21 Jul 2026Source
  • Withdrawal Update Form 2Form-2 Legacy Milestone 07-07-2026.pdf · uploaded 21 Jul 2026Source
  • Withdrawal Update Form 2Form-2 Legacy Milestone 07-07-2026.pdf · uploaded 21 Jul 2026Source
  • Withdrawal Update Form 3Form-3 Legacy Milestone 13-07-2026_compressed.pdf · uploaded 21 Jul 2026Source
  • Withdrawal Update Form 3Form-3 Legacy Milestone 13-07-2026_compressed.pdf · uploaded 21 Jul 2026Source

Technical

  • DocumentBuilding Marked Plan for Rera Registration.pdf · uploaded 11 Oct 2024Source
  • DocumentNA Order 51- 18-06-2024.pdf · uploaded 11 Oct 2024Source
  • Document09-09.pdf · uploaded 11 Oct 2024Source
  • Document08-09.pdf · uploaded 11 Oct 2024Source
  • Document07-09.pdf · uploaded 11 Oct 2024Source
  • Document06-09.pdf · uploaded 11 Oct 2024Source
  • Document05-09.pdf · uploaded 11 Oct 2024Source
  • Document04-09.pdf · uploaded 11 Oct 2024Source
  • Document03-09.pdf · uploaded 11 Oct 2024Source
  • Document02-09.pdf · uploaded 11 Oct 2024Source
  • DocumentAmalgamation_compressed.pdf · uploaded 11 Oct 2024Source
  • Other – TechnicalDeclaration-Cum-Undertaking.pdf · uploaded 14 Oct 2024Source
  • DocumentPCMC Building Permission RERA Confirmation Email.pdf · uploaded 16 Oct 2024Source
  • DocumentDeclaration about project - plot area.pdf · uploaded 16 Oct 2024Source
  • Document1 - Layout and Building Marked.pdf · uploaded 23 Oct 2024Source
  • Document1 - Layout and Building Marked_organized.pdf · uploaded 29 Oct 2024Source
  • DocumentMilestone Layout_compressed.pdf · uploaded 26 Apr 2025Source
  • Document2-12 A0_compressed.pdf · uploaded 26 Apr 2025Source
  • Document3-12 A0_compressed.pdf · uploaded 26 Apr 2025Source
  • Document4-12_compressed.pdf · uploaded 26 Apr 2025Source
  • Document5-12_compressed.pdf · uploaded 26 Apr 2025Source
  • Document6-12_compressed.pdf · uploaded 26 Apr 2025Source
  • Document7-12_compressed.pdf · uploaded 26 Apr 2025Source
  • Document8-12_compressed.pdf · uploaded 26 Apr 2025Source
  • Document9-12_compressed.pdf · uploaded 26 Apr 2025Source
  • Document10-12_compressed.pdf · uploaded 26 Apr 2025Source
  • Document11-12_compressed.pdf · uploaded 26 Apr 2025Source
  • Document12-12_compressed.pdf · uploaded 26 Apr 2025Source
  • Document01-17 Layout.pdf · uploaded 20 Aug 2025Source
  • Document02-17.pdf · uploaded 20 Aug 2025Source
  • Document03-17.pdf · uploaded 20 Aug 2025Source
  • Document05-17.pdf · uploaded 20 Aug 2025Source
  • Document06-17.pdf · uploaded 20 Aug 2025Source
  • Document07-17.pdf · uploaded 20 Aug 2025Source
  • Document08-17.pdf · uploaded 20 Aug 2025Source
  • Document09-17.pdf · uploaded 20 Aug 2025Source
  • Document10-17.pdf · uploaded 20 Aug 2025Source
  • Document11-17.pdf · uploaded 20 Aug 2025Source
  • Document12-17.pdf · uploaded 20 Aug 2025Source
  • Document13-17.pdf · uploaded 20 Aug 2025Source
  • Document14-17.pdf · uploaded 20 Aug 2025Source
  • Document15-17.pdf · uploaded 20 Aug 2025Source
  • Document16-17.pdf · uploaded 20 Aug 2025Source
  • Document17-17.pdf · uploaded 20 Aug 2025Source
  • OthersDecalration About Commencement Certificate.pdf · uploaded 20 Aug 2025Source
  • Document04-17.pdf · uploaded 20 Sep 2025Source
  • Document01-18 Layout_compressed.pdf · uploaded 31 Mar 2026Source
  • Document02-18 Parking Floor Plan_compressed.pdf · uploaded 31 Mar 2026Source
  • Document03-18 Parking Floor and Club house.pdf · uploaded 31 Mar 2026Source
  • Document04-18 A Building Floor Plan_compressed.pdf · uploaded 31 Mar 2026Source
  • Document05-18 A Building Section and Elevation_compressed.pdf · uploaded 31 Mar 2026Source
  • Document06-18 B Building_compressed.pdf · uploaded 31 Mar 2026Source
  • Document07-18 B Building Section and Elevation_compressed.pdf · uploaded 31 Mar 2026Source
  • Document08-18 C Building Floor Plan_compressed.pdf · uploaded 31 Mar 2026Source
  • Document09-18 C Building Section and Elevation_compressed.pdf · uploaded 31 Mar 2026Source
  • Document10-18 D Building_compressed.pdf · uploaded 31 Mar 2026Source
  • Document11-18 D Building Section and Elevation_compressed.pdf · uploaded 31 Mar 2026Source
  • Document12-18 E Building Floor Plan_compressed.pdf · uploaded 31 Mar 2026Source
  • Document13-18 E Building Section and Elevation_compressed.pdf · uploaded 31 Mar 2026Source
  • Document14-18 F Building Floor Plan.pdf · uploaded 31 Mar 2026Source
  • Document15-18 F Building Section and Elevation.pdf · uploaded 31 Mar 2026Source
  • Document16-18 G Building.pdf · uploaded 31 Mar 2026Source
  • Document17-18 G Building Section and Elevation.pdf · uploaded 31 Mar 2026Source
  • Document18-18 G Building Section.pdf · uploaded 31 Mar 2026Source
  • OthersDeclartion CC.pdf · uploaded 31 Mar 2026Source

Technical (Architect)

  • DocumentArchitects Certificate 05-01-2025.pdf · uploaded 21 Apr 2025Source
  • DocumentLegacyMilestone Architects Certificate 09-04-2025_compressed.pdf · uploaded 21 Apr 2025Source
  • DocumentQ 2 Form 1- Architects Certificate 01-10-2026.pdf · uploaded 6 Oct 2026Source

Technical (Engineer)

  • DocumentMilestone Engineer certificate 15-1-25.pdf · uploaded 3 Feb 2025Source
  • DocumentForm-2 Legacy Milestone.pdf · uploaded 26 Apr 2025Source
  • DocumentForm-2 Legacy Milestone 07-07-2026.pdf · uploaded 20 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Punawale, Mulshi taluka

Survey, CTS, gat or plot numbers

23/2/123/2/223/523/6/223/6/323/6/4Survey No. 23/1(P)

Boundaries

North
By Survey No 20
South
By remaining land out of survey no 23
East
By Survey No 23 Hissa 2
West
By road and remaining land of Survey No 23 p

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMehul Shah—
Chartered accountantPravin Pise and associates—
EngineerRupesh Mahamuni—

Source: MahaRERA project page. Contact details are not shown.