Infinity World
Deedo IDDP-PUN-JQXWMahaRERA shows it completed; no MahaRERA orders on record; 76% of its units are booked.
Punawale, Pune 411033 · Property rates in Punawale · by Tulip Developers
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 10 Jun 2019, completion promised 30 Dec 2026.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
12 buildings
Open a building to see every flat, floor by floor.
- 2bSize not on record100% booked
- 3bSize not on record100% booked
- 4bSize not on record100% booked
- 5bSize not on record100% booked
- 6bSize not on record100% booked
- 7bSize not on record100% booked
- A, B, C&DwingSize not on record100% booked
- A Wing22 floors · 92 units66% booked
- B9Size not on record100% booked
- B Wing22 floors · 76 units84% booked
- C Wing22 floors · 80 units84% booked
- D Wing23 floors · 79 units73% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100021151
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100021151 | 10 Jun 2019 | 30 Dec 2026 | 30 Dec 2026 | Tulip Developers | Project page |
Documents230
2 documents held by Deedo, 228 filings listed on MahaRERA's project page
Show all 230 documentsShow fewer documents
Migrated
- 3 Building Plan Approval (IOD)scan 04.pdf · uploaded 25 May 2019Source
- 4 Building Plan Approval (IOD)scan 05.pdf · uploaded 25 May 2019Source
- 5 Building Plan Approval (IOD)scan 06.pdf · uploaded 25 May 2019Source
- 6 Building Plan Approval (IOD)scan 07.pdf · uploaded 25 May 2019Source
- 7 Building Plan Approval (IOD)scan 08.pdf · uploaded 25 May 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 25 May 2019Source
- 1 Declaration in FORM BINFINITY WORLD DECLARATION.pdf · uploaded 25 May 2019Source
- 1 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 25 May 2019Source
- 1 Details of encumbrancesENCUMBRANCES CERTIFICATE.pdf · uploaded 28 May 2019Source
- 1 Copy of the legal title reportSearch Report - Infinity World.pdf · uploaded 30 May 2019Source
- 1 Proforma of Allotment letterAGREEMENT AS PER RERA - BY LEGAL REALTY - SINGLE BUILDING.pdf · uploaded 30 May 2019Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 31 Jan 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate.pdf · uploaded 31 Jan 2020Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Engineers Certificate For Quality Assurance.pdf · uploaded 31 Jan 2020Source
- 2 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 31 Jan 2020Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 6 Feb 2020Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Q3.pdf · uploaded 6 Feb 2020Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Engineers Certificate for Quality Assurance.pdf · uploaded 6 Feb 2020Source
- 3 Certificates of CA (Form 3)CA Certificate Q3.pdf · uploaded 6 Feb 2020Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate-World -Q4.pdf · uploaded 9 Jul 2020Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Cost Incurred Q4.pdf · uploaded 9 Jul 2020Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Engineers Certificate for Quality Assurance Q4.pdf · uploaded 9 Jul 2020Source
- 4 Certificates of CA (Form 3)CA Certificate Q4 TD.pdf · uploaded 10 Jul 2020Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 18 Aug 2020Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate World Q1.pdf · uploaded 18 Aug 2020Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Engineer certificate World Q1 Quality.pdf · uploaded 18 Aug 2020Source
- 5 Certificates of CA (Form 3)CA Certificate TD Q1.pdf · uploaded 18 Aug 2020Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate TD.pdf · uploaded 22 Oct 2020Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ENGG CERTIFICATE TD.pdf · uploaded 22 Oct 2020Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 24 ENGG CERTIFICATE-QUALITY Q2 SEPT 20.pdf · uploaded 22 Oct 2020Source
- 6 Certificates of CA (Form 3)CA Certificate Q2 TD.pdf · uploaded 22 Oct 2020Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certficate TD.pdf · uploaded 27 Jan 2021Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate-Q3 TD.pdf · uploaded 27 Jan 2021Source
- 6 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Engineers Certificate for Quality -World -Q3.pdf · uploaded 27 Jan 2021Source
- 7 Certificates of CA (Form 3)CA Certificate Q3 TD.pdf · uploaded 27 Jan 2021Source
- 2 Copy of Layout Approval (in case of layout)scan 001 LAYOUT.pdf · uploaded 20 Apr 2021Source
- 8 Building Plan Approval (IOD)scan 002 PARKING.pdf · uploaded 20 Apr 2021Source
- 9 Building Plan Approval (IOD)scan 003 Upper parking.pdf · uploaded 20 Apr 2021Source
- 10 Building Plan Approval (IOD)scan 004 podium parking.pdf · uploaded 20 Apr 2021Source
- 11 Building Plan Approval (IOD)scan 005 AB FLOOR.pdf · uploaded 20 Apr 2021Source
- 12 Building Plan Approval (IOD)scan 006 C floor.pdf · uploaded 20 Apr 2021Source
- 13 Building Plan Approval (IOD)scan 007 C Elevation.pdf · uploaded 20 Apr 2021Source
- 14 Building Plan Approval (IOD)scan 008 D floor.pdf · uploaded 20 Apr 2021Source
- 15 Building Plan Approval (IOD)scan 009 D Elevation.pdf · uploaded 20 Apr 2021Source
- 2 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 20 Apr 2021Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Infinity World - Q4.pdf · uploaded 26 Apr 2021Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate-cost Q4.pdf · uploaded 26 Apr 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Engineers Certificate-Quality Assurance.pdf · uploaded 26 Apr 2021Source
- 8 Certificates of CA (Form 3)CA Certificate Q4 - TD.pdf · uploaded 2 Jun 2021Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 31 Jul 2021Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate - WORLD Q1.pdf · uploaded 31 Jul 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Engineers Certificate For Quality Assurance.pdf · uploaded 31 Jul 2021Source
- 1 Disclosure of sold/ booked inventoryDisclosure Of Sold-Booked Inventory.pdf · uploaded 31 Jul 2021Source
- 9 Certificates of CA (Form 3)CA Certificate - Q1 TD.pdf · uploaded 31 Jul 2021Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate World Q2.pdf · uploaded 22 Oct 2021Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate-Q2 World.pdf · uploaded 22 Oct 2021Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Engineers Certificate For Quality Assurance-Q2 World.pdf · uploaded 22 Oct 2021Source
- 2 Disclosure of sold/ booked inventoryPromoters Disclosure-World.pdf · uploaded 22 Oct 2021Source
- 10 Certificates of CA (Form 3)CA Certificate Q2.pdf · uploaded 22 Oct 2021Source
- 16 Building Plan Approval (IOD)scan 001.pdf · uploaded 2 Nov 2021Source
- 17 Building Plan Approval (IOD)scan 002.pdf · uploaded 2 Nov 2021Source
- 18 Building Plan Approval (IOD)scan 003.pdf · uploaded 2 Nov 2021Source
- 19 Building Plan Approval (IOD)scan 004.pdf · uploaded 2 Nov 2021Source
- 20 Building Plan Approval (IOD)scan 005.pdf · uploaded 2 Nov 2021Source
- 21 Building Plan Approval (IOD)scan 006.pdf · uploaded 2 Nov 2021Source
- 22 Building Plan Approval (IOD)scan 007.pdf · uploaded 2 Nov 2021Source
- 23 Building Plan Approval (IOD)scan 008.pdf · uploaded 2 Nov 2021Source
- 24 Building Plan Approval (IOD)scan 009.pdf · uploaded 2 Nov 2021Source
- 25 Building Plan Approval (IOD)scan 010.pdf · uploaded 2 Nov 2021Source
- 26 Building Plan Approval (IOD)scan 011.pdf · uploaded 2 Nov 2021Source
- 27 Building Plan Approval (IOD)scan 012.pdf · uploaded 2 Nov 2021Source
- 3 Commencement Certificates / NA Order for plotted developmentCommencment Certificate.pdf · uploaded 2 Nov 2021Source
- 1 Declaration about Commencement CertificateFORMAT D Declaration Commencement Certificate.pdf · uploaded 13 Nov 2021Source
- 2 Details of encumbrancesENCUMBRANCE LETTER.pdf · uploaded 11 Dec 2021Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 TD.pdf · uploaded 29 Jan 2022Source
- 11 Certificates of CA (Form 3)CA Certificate first part.pdf · uploaded 29 Jan 2022Source
- 12 Certificates of CA (Form 3)CA Certificate second part.pdf · uploaded 29 Jan 2022Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate-World.pdf · uploaded 31 Jan 2022Source
- 3 Disclosure of sold/ booked inventoryPromoters Disclosure -World.pdf · uploaded 31 Jan 2022Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Rera Architect Certificate-World.pdf · uploaded 27 Apr 2022Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate cost Q4 World.pdf · uploaded 27 Apr 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Engineers Certificate Quality World.pdf · uploaded 27 Apr 2022Source
- 4 Disclosure of sold/ booked inventoryPromoters Disclosure-World.pdf · uploaded 27 Apr 2022Source
- 13 Certificates of CA (Form 3)CA Certificate Q4.pdf · uploaded 29 Apr 2022Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA Architect Certificate-World Q1.pdf · uploaded 27 Jul 2022Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate-Q1-World.pdf · uploaded 27 Jul 2022Source
- 5 Disclosure of sold/ booked inventoryPromoters Disclosure-Q1-World.pdf · uploaded 27 Jul 2022Source
- 14 Certificates of CA (Form 3)CA Certificate - World.pdf · uploaded 27 Jul 2022Source
- 28 Building Plan Approval (IOD)Plan 1.pdf · uploaded 6 Sep 2022Source
- 29 Building Plan Approval (IOD)Plan 2.pdf · uploaded 6 Sep 2022Source
- 30 Building Plan Approval (IOD)Plan 3.pdf · uploaded 6 Sep 2022Source
- 31 Building Plan Approval (IOD)Plan 4.pdf · uploaded 6 Sep 2022Source
- 32 Building Plan Approval (IOD)Plan 5.pdf · uploaded 6 Sep 2022Source
- 33 Building Plan Approval (IOD)Plan 6.pdf · uploaded 6 Sep 2022Source
- 34 Building Plan Approval (IOD)Plan 7.pdf · uploaded 6 Sep 2022Source
- 35 Building Plan Approval (IOD)Plan 8.pdf · uploaded 6 Sep 2022Source
- 36 Building Plan Approval (IOD)Plan 9.pdf · uploaded 6 Sep 2022Source
- 37 Building Plan Approval (IOD)Plan 10.pdf · uploaded 6 Sep 2022Source
- 38 Building Plan Approval (IOD)Plan 11.pdf · uploaded 6 Sep 2022Source
- 39 Building Plan Approval (IOD)Plan 12.pdf · uploaded 6 Sep 2022Source
- 4 Commencement Certificates / NA Order for plotted developmentCommencement Cerificate 20-07-2022 World.pdf · uploaded 6 Sep 2022Source
- 15 Certificates of CA (Form 3)CA Certificate Q2 IW (1).pdf · uploaded 29 Nov 2022Source
- 16 Certificates of CA (Form 3)CA Certificate Q2 IW - Final.pdf · uploaded 3 Dec 2022Source
- 2 Declaration about Commencement CertificateDeclaration about Commencement Certificate-World.pdf · uploaded 10 Dec 2022Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate (Infinity World) Q3.pdf · uploaded 5 Mar 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate-World Q3.pdf · uploaded 5 Mar 2023Source
- 6 Disclosure of sold/ booked inventoryPromoters Disclosure-World-Q3.pdf · uploaded 5 Mar 2023Source
- 17 Certificates of CA (Form 3)CA Certificate Q3 IW.pdf · uploaded 5 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Infinity World FY 19-20.pdf · uploaded 31 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Infinity World FY 20-21.pdf · uploaded 31 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Infinity World FY 21-22.pdf · uploaded 31 Mar 2023Source
- 1 PAN CardPAN Card - TD.pdf · uploaded 1 Apr 2023Source
- 3 a Details of encumbrances concerned to FinanceEncumm.pdf · uploaded 1 Apr 2023Source
- 1 b Details of encumbrances concerned to LegalEncumm.pdf · uploaded 1 Apr 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Engineers Certificate Quality World ABCD Q4.pdf · uploaded 1 Apr 2023Source
- 1 Proforma of Agreement for saleAFS.pdf · uploaded 1 Apr 2023Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Rera Architect Certificate 12-04-2023 World_compressed.pdf · uploaded 3 May 2023Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate World Q4 Cost_compressed.pdf · uploaded 3 May 2023Source
- 7 Disclosure of sold/ booked inventoryPromoters Disclosure World Q4_compressed.pdf · uploaded 3 May 2023Source
- 18 Certificates of CA (Form 3)Form 3_compressed.pdf · uploaded 3 May 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Engineers Certificate World Q4 Quality.pdf · uploaded 27 May 2023Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate IW Q2.pdf · uploaded 19 Jul 2023Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate- IW Q2.pdf · uploaded 19 Jul 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Engineers Certificate on Quality Assurance 22-23.pdf · uploaded 19 Jul 2023Source
- 8 Disclosure of sold/ booked inventoryPromoters Disclosure - IW Q2.pdf · uploaded 19 Jul 2023Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech Cirtificate IW Q1.pdf · uploaded 6 Sep 2023Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate- IW Q1.pdf · uploaded 6 Sep 2023Source
- 9 Disclosure of sold/ booked inventoryPromoter Disclosure - IW Q1.pdf · uploaded 6 Sep 2023Source
- 19 Certificates of CA (Form 3)CA Certificate Form 3 IW (Q1).pdf · uploaded 6 Sep 2023Source
- 40 Building Plan Approval (IOD)Plan 1.pdf · uploaded 22 Oct 2023Source
- 41 Building Plan Approval (IOD)Plan 2.pdf · uploaded 22 Oct 2023Source
- 42 Building Plan Approval (IOD)Plan 3.pdf · uploaded 22 Oct 2023Source
- 43 Building Plan Approval (IOD)Plan 3.pdf · uploaded 22 Oct 2023Source
- 44 Building Plan Approval (IOD)Plan 5.pdf · uploaded 22 Oct 2023Source
- 45 Building Plan Approval (IOD)Plan 6.pdf · uploaded 22 Oct 2023Source
- 46 Building Plan Approval (IOD)Plan 7.pdf · uploaded 22 Oct 2023Source
- 47 Building Plan Approval (IOD)Plan 8.pdf · uploaded 22 Oct 2023Source
- 48 Building Plan Approval (IOD)Plan 9.pdf · uploaded 22 Oct 2023Source
- 49 Building Plan Approval (IOD)Plan 10.pdf · uploaded 22 Oct 2023Source
- 50 Building Plan Approval (IOD)Plan 11.pdf · uploaded 22 Oct 2023Source
- 51 Building Plan Approval (IOD)Plan 12.pdf · uploaded 22 Oct 2023Source
- 52 Building Plan Approval (IOD)Plan 13.pdf · uploaded 22 Oct 2023Source
- 5 Commencement Certificates / NA Order for plotted developmentCommncement Certificate_21-06-2023.pdf · uploaded 22 Oct 2023Source
- 3 Declaration about Commencement CertificateDeclaration about commencement Certification.pdf · uploaded 25 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Annual Report - IW FY 2022-23.pdf · uploaded 10 Jan 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Infinity World RERA Q2.pdf · uploaded 23 Jan 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Q2 IW.pdf · uploaded 23 Jan 2024Source
- 10 Disclosure of sold/ booked inventoryPromoter Disclosure Infinity world Q2.pdf · uploaded 23 Jan 2024Source
- 20 Certificates of CA (Form 3)Form 3 - Infinity World FY 23-24 Q2.pdf · uploaded 23 Jan 2024Source
- 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Cirtificate World Q3.pdf · uploaded 17 May 2024Source
- 19 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Infinity World Q4.pdf · uploaded 17 May 2024Source
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate World Q3.pdf · uploaded 17 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A FY 23-24 Quality World.pdf · uploaded 5 Jun 2024Source
- 11 Disclosure of sold/ booked inventoryPromoter Disclosure Q3 World.pdf · uploaded 1 Jul 2024Source
- 12 Disclosure of sold/ booked inventoryPromoter Disclosure FY23-24 Infinity World Q4.pdf · uploaded 1 Jul 2024Source
- 19 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Infinity World Q4.pdf · uploaded 4 Jul 2024Source
- 21 Certificates of CA (Form 3)Form 3 FY 2023-24 Q3.pdf · uploaded 4 Jul 2024Source
- 22 Certificates of CA (Form 3)Form 3 FY 2023-24 Q4.pdf · uploaded 4 Jul 2024Source
- 20 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate World Q1.pdf · uploaded 26 Jul 2024Source
- 20 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 FY 2024-25 Q1 Infinity World.pdf · uploaded 26 Jul 2024Source
- 13 Disclosure of sold/ booked inventoryDisclosure of sold world Q1.pdf · uploaded 26 Jul 2024View
- 23 Certificates of CA (Form 3)Form 3 FY 2024-25 Q1 Infinity World.pdf · uploaded 26 Jul 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate Infinity World.pdf · uploaded 27 Jul 2024Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)Society Registration Certificate Infinity World.pdf · uploaded 27 Jul 2024Source
- 1 Architect’s Certificate on Completion of Project (Form 4)Form 4 World.pdf · uploaded 9 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Annual Report - TD World 04-04-2025.pdf · uploaded 12 Apr 2025Source
Technical
- DocumentLAYOUT.pdf · uploaded 25 May 2019Source
- Documentscan 02.pdf · uploaded 25 May 2019Source
- Documentscan 03.pdf · uploaded 25 May 2019Source
- Documentscan 04.pdf · uploaded 25 May 2019Source
- Documentscan 05.pdf · uploaded 25 May 2019Source
- Documentscan 06.pdf · uploaded 25 May 2019Source
- Documentscan 07.pdf · uploaded 25 May 2019Source
- Documentscan 08.pdf · uploaded 25 May 2019Source
- Documentscan 001 LAYOUT.pdf · uploaded 20 Apr 2021Source
- Documentscan 002 PARKING.pdf · uploaded 20 Apr 2021Source
- Documentscan 003 Upper parking.pdf · uploaded 20 Apr 2021Source
- Documentscan 004 podium parking.pdf · uploaded 20 Apr 2021Source
- Documentscan 005 AB FLOOR.pdf · uploaded 20 Apr 2021Source
- Documentscan 006 C floor.pdf · uploaded 20 Apr 2021Source
- Documentscan 007 C Elevation.pdf · uploaded 20 Apr 2021Source
- Documentscan 008 D floor.pdf · uploaded 20 Apr 2021Source
- Documentscan 009 D Elevation.pdf · uploaded 20 Apr 2021Source
- Documentscan 001.pdf · uploaded 2 Nov 2021Source
- Documentscan 002.pdf · uploaded 2 Nov 2021Source
- Documentscan 003.pdf · uploaded 2 Nov 2021Source
- Documentscan 004.pdf · uploaded 2 Nov 2021Source
- Documentscan 005.pdf · uploaded 2 Nov 2021Source
- Documentscan 006.pdf · uploaded 2 Nov 2021Source
- Documentscan 007.pdf · uploaded 2 Nov 2021Source
- Documentscan 008.pdf · uploaded 2 Nov 2021Source
- Documentscan 009.pdf · uploaded 2 Nov 2021Source
- Documentscan 010.pdf · uploaded 2 Nov 2021Source
- Documentscan 011.pdf · uploaded 2 Nov 2021Source
- Documentscan 012.pdf · uploaded 2 Nov 2021Source
- DocumentPlan 7.pdf · uploaded 6 Sep 2022Source
- DocumentPlan 5.pdf · uploaded 6 Sep 2022Source
- DocumentPlan 8.pdf · uploaded 6 Sep 2022Source
- DocumentPlan 9.pdf · uploaded 6 Sep 2022Source
- DocumentPlan 10.pdf · uploaded 6 Sep 2022Source
- DocumentPlan 11.pdf · uploaded 6 Sep 2022Source
- DocumentPlan 12.pdf · uploaded 6 Sep 2022Source
- DocumentPlan 1.pdf · uploaded 6 Sep 2022Source
- DocumentPlan 2.pdf · uploaded 6 Sep 2022Source
- DocumentPlan 3.pdf · uploaded 6 Sep 2022Source
- DocumentPlan 4.pdf · uploaded 6 Sep 2022Source
- DocumentPlan 6.pdf · uploaded 6 Sep 2022Source
- DocumentPlan 1.pdf · uploaded 22 Oct 2023Source
- DocumentPlan 2.pdf · uploaded 22 Oct 2023Source
- DocumentPlan 3.pdf · uploaded 22 Oct 2023Source
- DocumentPlan 3.pdf · uploaded 22 Oct 2023Source
- DocumentPlan 5.pdf · uploaded 22 Oct 2023Source
- DocumentPlan 6.pdf · uploaded 22 Oct 2023Source
- DocumentPlan 7.pdf · uploaded 22 Oct 2023Source
- DocumentPlan 8.pdf · uploaded 22 Oct 2023Source
- DocumentPlan 9.pdf · uploaded 22 Oct 2023Source
- DocumentPlan 10.pdf · uploaded 22 Oct 2023Source
- DocumentPlan 11.pdf · uploaded 22 Oct 2023Source
- DocumentPlan 12.pdf · uploaded 22 Oct 2023Source
- DocumentPlan 13.pdf · uploaded 22 Oct 2023Source
Technical (Architect)
- DocumentArchitect Certificate World Q1.pdf · uploaded 26 Jul 2024Source
Technical (Engineer)
- DocumentForm 2 FY 2024-25 Q1 Infinity World.pdf · uploaded 26 Jul 2024Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 1/11 TO 1/14, SURVEY NUMBER 1/5/2
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, 3BHK, Shop, 4BHK327 units in all
- Address
- Survey Number 1/5/2, 1/11 To 1/14, Punawale, PunawalePIN 411033
- Village
- Punawale, Mulshi taluka
- Land area for this project
- 9,000 sq m (96,875 sq ft)
- Permissible built-up area
- 36,001 sq m (3,87,509 sq ft)
- Sanctioned built-up area
- 7,891 sq m (84,936 sq ft)
- Recreational open space
- 871 sq m (9,375 sq ft)
- Designated bank account
- 76
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
SURVEY NUMBER 1/5/2, 1/11 TO 1/14
Boundaries
- North
- Land Of Nilesh Darshale And Others
- South
- Land Of Namdeo Darshale And Others
- East
- Land Of Nivrutti Darshale And Others
- West
- 18 Mtrs Proposed Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking327 units
250 of 327 units booked (76%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | 1BHK | 42.8 sq m · 461 sq ft | 1 | 0 |
| A Wing | 2BHK | 54.92 sq m · 591 sq ft | 8 | 8 |
| A Wing | 2BHK | 55.27 sq m · 595 sq ft | 2 | 2 |
| A Wing | 2BHK | 71.85 sq m · 773 sq ft | 12 | 0 |
| A Wing | 2BHK | 75.07 sq m · 808 sq ft | 1 | 0 |
| A Wing | 3BHK | 68.79 sq m · 740 sq ft | 11 | 11 |
| A Wing | 3BHK | 70.38 sq m · 758 sq ft | 1 | 1 |
| A Wing | 3BHK | 85.34 sq m · 919 sq ft | 19 | 19 |
Show all 59 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | 3BHK | 86.89 sq m · 935 sq ft | 20 | 20 |
| A Wing | 3BHK | 91.76 sq m · 988 sq ft | 5 | 0 |
| A Wing | 3BHK | 107.18 sq m · 1,154 sq ft | 5 | 0 |
| A Wing | Shop | 71.31 sq m · 768 sq ft | 1 | 0 |
| A Wing | Shop | 87.75 sq m · 945 sq ft | 2 | 0 |
| A Wing | Shop | 94.95 sq m · 1,022 sq ft | 2 | 0 |
| A Wing | Shop | 109.87 sq m · 1,183 sq ft | 1 | 0 |
| A Wing | Shop | 110.72 sq m · 1,192 sq ft | 1 | 0 |
| B Wing | 2BHK | 54.92 sq m · 591 sq ft | 11 | 11 |
| B Wing | 2BHK | 57.99 sq m · 624 sq ft | 1 | 1 |
| B Wing | 2BHK | 71.85 sq m · 773 sq ft | 8 | 0 |
| B Wing | 2BHK | 72.83 sq m · 784 sq ft | 15 | 15 |
| B Wing | 2BHK | 75.07 sq m · 808 sq ft | 1 | 0 |
| B Wing | 2BHK | 92.43 sq m · 995 sq ft | 37 | 37 |
| B Wing | 3BHK | 93.13 sq m · 1,002 sq ft | 1 | 0 |
| B Wing | 3BHK | 107.18 sq m · 1,154 sq ft | 1 | 0 |
| B Wing | 4BHK | 132.14 sq m · 1,422 sq ft | 1 | 0 |
| C Wing | 2BHK | 59.89 sq m · 645 sq ft | 9 | 9 |
| C Wing | 2BHK | 60.14 sq m · 647 sq ft | 8 | 8 |
| C Wing | 2BHK | 67.1 sq m · 722 sq ft | 2 | 2 |
| C Wing | 2BHK | 72.43 sq m · 780 sq ft | 1 | 0 |
| C Wing | 2BHK | 72.67 sq m · 782 sq ft | 2 | 0 |
| C Wing | 3BHK | 66.92 sq m · 720 sq ft | 1 | 1 |
| C Wing | 3BHK | 77.71 sq m · 836 sq ft | 7 | 7 |
| C Wing | 3BHK | 77.83 sq m · 838 sq ft | 7 | 7 |
| C Wing | 3BHK | 80.16 sq m · 863 sq ft | 9 | 9 |
| C Wing | 3BHK | 80.33 sq m · 865 sq ft | 8 | 8 |
| C Wing | 3BHK | 91.49 sq m · 985 sq ft | 1 | 0 |
| C Wing | 3BHK | 91.62 sq m · 986 sq ft | 2 | 0 |
| C Wing | 3BHK | 91.86 sq m · 989 sq ft | 9 | 9 |
| C Wing | 3BHK | 91.88 sq m · 989 sq ft | 7 | 7 |
| C Wing | 3BHK | 93.48 sq m · 1,006 sq ft | 1 | 0 |
| C Wing | 3BHK | 93.65 sq m · 1,008 sq ft | 2 | 0 |
| C Wing | 3BHK | 105.6 sq m · 1,137 sq ft | 1 | 0 |
| C Wing | 3BHK | 105.62 sq m · 1,137 sq ft | 3 | 0 |
| D Wing | 2BHK | 59.85 sq m · 644 sq ft | 8 | 0 |
| D Wing | 2BHK | 59.9 sq m · 645 sq ft | 9 | 9 |
| D Wing | 2BHK | 64.37 sq m · 693 sq ft | 1 | 0 |
| D Wing | 2BHK | 64.55 sq m · 695 sq ft | 2 | 2 |
| D Wing | 2BHK | 72.39 sq m · 779 sq ft | 2 | 0 |
| D Wing | 2BHK | 72.44 sq m · 780 sq ft | 1 | 0 |
| D Wing | 3BHK | 77.88 sq m · 838 sq ft | 6 | 6 |
| D Wing | 3BHK | 78.01 sq m · 840 sq ft | 7 | 7 |
| D Wing | 3BHK | 91.56 sq m · 986 sq ft | 2 | 0 |
| D Wing | 3BHK | 91.68 sq m · 987 sq ft | 2 | 0 |
| D Wing | 3BHK | 91.84 sq m · 989 sq ft | 14 | 14 |
| D Wing | 3BHK | 91.87 sq m · 989 sq ft | 10 | 10 |
| D Wing | 3BHK | 105.47 sq m · 1,135 sq ft | 5 | 0 |
| D Wing | 3BHK | 105.5 sq m · 1,136 sq ft | 8 | 8 |
| D Wing | 3BHK | 164.47 sq m · 1,770 sq ft | 1 | 1 |
| D Wing | 3BHK | 164.6 sq m · 1,772 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Landmark Design Group | — |
| Chartered accountant | S U N S V G & Associates | — |
| Chartered accountant | Vaibhav Mayur | — |
| Engineer | M/S Jw Consultants LLP (Mr. Umesh Joshi) | — |
| Registered real estate agent | Manisha Keshav Gaikwad | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Punawale
- Celestia HeightsRERA PM1260002602252
- Legacy HighpointRERA PM1260002601788
- V Top VELESTARERA PR1260002601596
- Anika Piccadilly Phase 4RERA PR1261012601568
- Venkateshwara HeightRERA PR1260002601444
- One PearlRERA PR1260002601216
- F Signature MHADARERA PR1262022601150
- Que 154 G WingRERA PR1261012601056
All 190 projects in Punawale · Compare Infinity World with another project