Skip to content
Others · 6 buildings · 131 unitsRERA P52100078470

Infinity Evana

Deedo IDDP-PUN-YBFR

Completion was pushed back 4 months, to Oct 2029; no MahaRERA orders on record.

Punawale, Pune 411033 · Property rates in Punawale · by Tulip Infra

DeliveryExtended 4 moPromised Jun 2029 · now due Oct 2029RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readPrice₹10,690 /sq ft4.8% above Punawale · 3 registered sales

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Oct 2029

  • This projectRegistered 12 Dec 2024, completion promised 30 Jun 2029, revised to 30 Oct 2029.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Apr 2026D Wing · D-1201Primary sale991 sq ftView Primary sale, Apr 2026
Mar 2026A Wing · A-2703Primary sale971 sq ftView Primary sale, Mar 2026
Jan 2026D Wing · D-2303Primary sale676 sq ftView Primary sale, Jan 2026
Mar 2026D Wing · D-2303Correction—View Correction, Mar 2026

6 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100078470
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210007847012 Dec 202430 Jun 202930 Oct 2029Tulip InfraProject page
Documents261

8 documents held by Deedo, 253 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Index ii (6)

Show all 261 documentsShow fewer documents

Finance

  • Other – Financesupplementary Agreement.pdf · uploaded 25 Nov 2024Source
  • Other – FinanceDeclaration of Landowners Not Opening Rera bank ac.pdf · uploaded 25 Nov 2024Source
  • PAN CardTulip Infra Pan Card.pdf · uploaded 25 Nov 2024Source
  • OthersDeclaration for estimattion - Infinity Evanna Correction.pdf · uploaded 16 Sep 2025Source
  • OthersDeclaration about Estimation Change.pdf · uploaded 26 Jun 2026Source

Legal

  • Declaration Form BForm B Declaration - Promoters on 500 stamp paper new.pdf · uploaded 25 Nov 2024Source
  • Other – LegalAdalabadal.pdf · uploaded 26 Nov 2024Source
  • Legal Title reportLegal Title Report.pdf · uploaded 26 Nov 2024Source
  • Other – LegalScreenshot on Name of Bank Account.pdf · uploaded 29 Nov 2024Source
  • Declaration Form BLEGAL TITLE REPORT INFINITY EVANA.pdf · uploaded 15 Sep 2025Source
  • Declaration Form BForm B Promoters Final.pdf · uploaded 15 Sep 2025Source
  • Declaration Form BAdlabadal Patra Evana.pdf · uploaded 15 Sep 2025Source
  • Declaration Form BBankar 2482 Sale Deed.pdf · uploaded 15 Sep 2025Source
  • Declaration Form BMr Motwani 13 R Sale Deed.pdf · uploaded 15 Sep 2025Source
  • Declaration Form BSudam kudale 2973 Sale Deed.pdf · uploaded 15 Sep 2025Source
  • OthersDeclaration commencement certificate Format D.pdf · uploaded 21 Nov 2025Source
  • OthersAgreement Draft.pdf · uploaded 27 Nov 2025Source
  • OthersDRAFT AGREEMENT - Infinity Evana Final.pdf · uploaded 27 Nov 2025Source
  • Declaration Form BLegal Titlle Report - Revised.pdf · uploaded 17 Apr 2026Source
  • Declaration Form BInfinity Evana 7-12.pdf · uploaded 29 Apr 2026Source
  • Declaration Form BTulip Infra Sale Deed 3109-2025-01-08.pdf · uploaded 30 Apr 2026Source
  • Declaration Form BTulip Infra Sale Deed 3109-2025-09-16.pdf · uploaded 30 Apr 2026Source
  • Declaration Form BTulip Infra Sale Deed 3109-2025-17-23.pdf · uploaded 30 Apr 2026Source
  • OthersDeclaration about Commencement Certificate.pdf · uploaded 25 Jun 2026Source

Migrated

  • 1 PAN CardTulip Infra Pan Card.pdf · uploaded 25 Nov 2024Source
  • 1 a Details of encumbrances concerned to FinanceEncumberance Finance.pdf · uploaded 25 Nov 2024Source
  • 1 Copy of Layout Approval (in case of layout)1 PLAN LAYOUT.pdf · uploaded 25 Nov 2024Source
  • 1 Declaration in FORM BForm B Declaration - Promoters on 500 stamp paper new.pdf · uploaded 25 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 25 Nov 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Form 2.pdf · uploaded 25 Nov 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 25 Nov 2024Source
  • 10 Building Plan Approval / NA Order for plotted development12-12.pdf · uploaded 25 Nov 2024Source
  • 1 Building Plan Approval / NA Order for plotted development2-12.pdf · uploaded 25 Nov 2024Source
  • 2 Building Plan Approval / NA Order for plotted development3-12.pdf · uploaded 25 Nov 2024Source
  • 3 Building Plan Approval / NA Order for plotted development4-12.pdf · uploaded 25 Nov 2024Source
  • 4 Building Plan Approval / NA Order for plotted development5-12.pdf · uploaded 25 Nov 2024Source
  • 5 Building Plan Approval / NA Order for plotted development6-12.pdf · uploaded 25 Nov 2024Source
  • 6 Building Plan Approval / NA Order for plotted development8-12.pdf · uploaded 25 Nov 2024Source
  • 7 Building Plan Approval / NA Order for plotted development9-12.pdf · uploaded 25 Nov 2024Source
  • 8 Building Plan Approval / NA Order for plotted development10-12.pdf · uploaded 25 Nov 2024Source
  • 9 Building Plan Approval / NA Order for plotted development11-12.pdf · uploaded 25 Nov 2024Source
  • 1 Declaration about Commencement CertificateDeclaration About Commencement Certificate Format D.pdf · uploaded 25 Nov 2024Source
  • 1 CERSAI detailsDeclaration of No Cersai Report.pdf · uploaded 25 Nov 2024Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A Declaration about Rera Designated Bank Account.pdf · uploaded 25 Nov 2024Source
  • 1 b Details of encumbrances concerned to LegalEncumberance Finance.pdf · uploaded 25 Nov 2024Source
  • 2 Other – Financesupplementary Agreement.pdf · uploaded 25 Nov 2024Source
  • 1 Other – FinanceDeclaration of Landowners Not Opening Rera bank ac.pdf · uploaded 25 Nov 2024Source
  • 1 Other – TechnicalAnnexure A Order -50.pdf · uploaded 25 Nov 2024Source
  • 2 Other – TechnicalDeclaration of Landowners - Not to sale flats.pdf · uploaded 25 Nov 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Project 1 Annexure A Sanjay Varma.pdf · uploaded 25 Nov 2024Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Project 1 Annexure A Amit Jhamtani.pdf · uploaded 25 Nov 2024Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Project 1 Annexure A Raj Varma.pdf · uploaded 25 Nov 2024Source
  • 4 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Project 1 Annexure A Sejal Varma.pdf · uploaded 25 Nov 2024Source
  • 5 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Project 1 Annexure A VirendraBehl.pdf · uploaded 25 Nov 2024Source
  • 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B Opening of RERA Designated Bank Account.pdf · uploaded 25 Nov 2024Source
  • 1 Copy of the legal title reportLegal Title Report.pdf · uploaded 26 Nov 2024Source
  • 2 a Details of encumbrances concerned to FinanceLegal Encubrance Letter Evana.pdf · uploaded 26 Nov 2024Source
  • 1 Proforma of Allotment letterAllotement Letter Evana_compressed.pdf · uploaded 26 Nov 2024Source
  • 1 Other – LegalAdalabadal.pdf · uploaded 26 Nov 2024Source
  • 1 Deviation Report with respect to Allotment letterAllotment Deviation Letter.pdf · uploaded 26 Nov 2024Source
  • 2 b Details of encumbrances concerned to LegalLegal Encubrance Letter Evana.pdf · uploaded 26 Nov 2024Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Agreement to sale Evana - converted.pdf · uploaded 26 Nov 2024Source
  • 1 Disclosure for secured/unsecured finance availed for the projectDisclosure for Secured Unsecured Finance Availed For The Project.pdf · uploaded 26 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)revised form 3 29 11 2024.pdf · uploaded 29 Nov 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Table C.pdf · uploaded 29 Nov 2024Source
  • 11 Building Plan Approval / NA Order for plotted developmentsheet 07 12.pdf · uploaded 29 Nov 2024Source
  • 2 Other – LegalScreenshot on Name of Bank Account.pdf · uploaded 29 Nov 2024Source
  • 1 Proforma of Agreement for saleAfs new.pdf · uploaded 29 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate Evana.pdf · uploaded 18 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 for Q3 FY 2024-25.pdf · uploaded 18 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Infra Registration Qtr 3.pdf · uploaded 18 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate Evana.pdf · uploaded 18 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 for Q3 FY 2024-25.pdf · uploaded 18 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Infra Registration Qtr 3.pdf · uploaded 18 Feb 2025Source
  • Form 1Form 1 Architect Certificate Evana.pdf · uploaded 26 Jun 2025Source
  • Form 1Form 1 Architect Certificate 21-04-2025 Avana.pdf · uploaded 26 Jun 2025Source
  • Form 2Form 2 Engineer Certificate Infra Registration Qtr 3.pdf · uploaded 26 Jun 2025Source
  • Form 2Form 2 Engineer Certificate Qtr 4 FY 2024-25 Evana.pdf · uploaded 26 Jun 2025Source
  • Form 3Form 3 for Q3 FY 2024-25.pdf · uploaded 26 Jun 2025Source
  • Form 3CA Certificate - Infinity Evana Q4.pdf · uploaded 26 Jun 2025Source
  • Disclosure of Sold and Booked InventoryPromoters Disclosure Unit Wise Qtr 3.pdf · uploaded 26 Jun 2025Source
  • Disclosure of Sold and Booked InventoryPromoters Disclosure Unit Wise Qtr 4.pdf · uploaded 26 Jun 2025Source
  • Withdrawal Update Form 1FORM 1 Q1 FY 2025-26.pdf · uploaded 8 Aug 2025Source
  • Withdrawal Update Form 2FORM 2 Q1 FY 2025-26.pdf · uploaded 8 Aug 2025Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 8 Aug 2025Source
  • Withdrawal Update Form 1FORM 1 Q1 FY 2025-26.pdf · uploaded 6 Sep 2025Source
  • Withdrawal Update Form 2FORM 2 Q1 FY 2025-26.pdf · uploaded 6 Sep 2025Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 6 Sep 2025Source
  • Form 5 (FY 2024-2025)Form 5 FY 2024-25 Evana.pdf · uploaded 24 Sep 2025Source
  • Withdrawal Update Form 1FORM 1 Q1 FY 2025-26.pdf · uploaded 9 Oct 2025Source
  • Withdrawal Update Form 2FORM 2 Q1 FY 2025-26.pdf · uploaded 9 Oct 2025Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 9 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Evana 08 Oct 25.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 2Form 2 Signed.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 3Form 3 FY 2025-2026 Q2.pdf · uploaded 11 Oct 2025Source
  • Form 2A (FY 2024-2025)Form 2A Evana FY 2024-25.pdf · uploaded 15 Dec 2025Source
  • Withdrawal Update Form 1Form 1 For FY 2025-26 Q3.pdf · uploaded 13 Mar 2026Source
  • Withdrawal Update Form 2Form 2 For FY 2025-26 Q3 Evana.pdf · uploaded 13 Mar 2026Source
  • Withdrawal Update Form 3Form 3 for FY 2025-26 Q3- Evana.pdf · uploaded 13 Mar 2026Source
  • Form 2A (FY 2025-2026)Form 2A for FY 2025-26 final.pdf · uploaded 21 Apr 2026Source
  • Withdrawal Update Form 1Form 1 for FY 2025-26 Q4 final.pdf · uploaded 29 Apr 2026Source
  • Withdrawal Update Form 1Form 1 for FY 2025-26 Q4 final.pdf · uploaded 29 Apr 2026Source
  • Withdrawal Update Form 2Form 2 for FY 2025-26 Q4 final.pdf · uploaded 29 Apr 2026Source
  • Withdrawal Update Form 2Form 2 for FY 2025-26 Q4 final.pdf · uploaded 29 Apr 2026Source
  • Withdrawal Update Form 3Form 3 for FY 2025-26 Q4 final.pdf · uploaded 29 Apr 2026Source
  • Withdrawal Update Form 3Form 3 for FY 2025-26 Q4 revised.pdf · uploaded 29 Apr 2026Source
  • Withdrawal Update Form 1Form 1 For FY 2026-27 Q1.pdf · uploaded 21 Jul 2026Source
  • Withdrawal Update Form 2Form 2 For FY 2026-27 Q1.pdf · uploaded 21 Jul 2026Source
  • Withdrawal Update Form 3Form 3 For FY 2026-27 Q1 final Resize.pdf · uploaded 21 Jul 2026Source

Technical

  • Document1 PLAN LAYOUT.pdf · uploaded 25 Nov 2024Source
  • Document12-12.pdf · uploaded 25 Nov 2024Source
  • Document11-12.pdf · uploaded 25 Nov 2024Source
  • Document10-12.pdf · uploaded 25 Nov 2024Source
  • Document9-12.pdf · uploaded 25 Nov 2024Source
  • Document8-12.pdf · uploaded 25 Nov 2024Source
  • Document6-12.pdf · uploaded 25 Nov 2024Source
  • Document5-12.pdf · uploaded 25 Nov 2024Source
  • Document4-12.pdf · uploaded 25 Nov 2024Source
  • Document3-12.pdf · uploaded 25 Nov 2024Source
  • Document2-12.pdf · uploaded 25 Nov 2024Source
  • Other – TechnicalDeclaration of Landowners - Not to sale flats.pdf · uploaded 25 Nov 2024Source
  • Other – TechnicalAnnexure A Order -50.pdf · uploaded 25 Nov 2024Source
  • Documentsheet 07 12.pdf · uploaded 29 Nov 2024Source
  • Documentscan (1)_11zon.pdf · uploaded 15 Sep 2025Source
  • Documentscan (2)_11zon.pdf · uploaded 15 Sep 2025Source
  • Documentscan (3)_11zon.pdf · uploaded 15 Sep 2025Source
  • Documentscan (4)_11zon.pdf · uploaded 15 Sep 2025Source
  • Documentscan (5)_11zon.pdf · uploaded 15 Sep 2025Source
  • Documentscan (6)_11zon.pdf · uploaded 15 Sep 2025Source
  • Documentscan (7)_11zon.pdf · uploaded 15 Sep 2025Source
  • Documentscan (8)_11zon.pdf · uploaded 15 Sep 2025Source
  • Documentscan (9)_11zon.pdf · uploaded 15 Sep 2025Source
  • Documentscan (10)_11zon.pdf · uploaded 15 Sep 2025Source
  • Documentscan (11)_11zon.pdf · uploaded 15 Sep 2025Source
  • Documentscan (12)_11zon.pdf · uploaded 15 Sep 2025Source
  • Documentscan (13)_11zon.pdf · uploaded 15 Sep 2025Source
  • Documentscan (14)_11zon.pdf · uploaded 15 Sep 2025Source
  • Documentscan (15)_11zon.pdf · uploaded 15 Sep 2025Source
  • Documentscan (16)_11zon.pdf · uploaded 15 Sep 2025Source
  • Documentscan (17)_11zon.pdf · uploaded 15 Sep 2025Source
  • Documentscan (18)_11zon.pdf · uploaded 15 Sep 2025Source
  • Documentscan (19)_11zon.pdf · uploaded 15 Sep 2025Source
  • Documentscan (20)_11zon.pdf · uploaded 15 Sep 2025Source
  • Documentscan (21)_11zon.pdf · uploaded 15 Sep 2025Source
  • OthersDeclaration about commencement Certificate final.pdf · uploaded 15 Sep 2025Source
  • OthersPCMC- Mail CC Verification Screenshort.pdf · uploaded 16 Sep 2025Source
  • OthersDeclaration of Landowners - Not to sale flats.pdf · uploaded 16 Sep 2025Source
  • DocumentLayout Plan.pdf · uploaded 4 Nov 2025Source
  • Documentscan (2).pdf · uploaded 4 Nov 2025Source
  • Documentscan (3).pdf · uploaded 4 Nov 2025Source
  • Documentscan (4).pdf · uploaded 4 Nov 2025Source
  • Documentscan (5).pdf · uploaded 4 Nov 2025Source
  • Documentscan (6).pdf · uploaded 4 Nov 2025Source
  • Documentscan (7).pdf · uploaded 4 Nov 2025Source
  • Documentscan (8).pdf · uploaded 4 Nov 2025Source
  • Documentscan (9).pdf · uploaded 4 Nov 2025Source
  • Documentscan (10).pdf · uploaded 4 Nov 2025Source
  • Documentscan (11).pdf · uploaded 4 Nov 2025Source
  • Documentscan (12).pdf · uploaded 4 Nov 2025Source
  • Documentscan (13).pdf · uploaded 4 Nov 2025Source
  • Documentscan (14).pdf · uploaded 4 Nov 2025Source
  • Documentscan (15).pdf · uploaded 4 Nov 2025Source
  • Documentscan (16).pdf · uploaded 4 Nov 2025Source
  • Documentscan (17).pdf · uploaded 4 Nov 2025Source
  • Documentscan (18).pdf · uploaded 4 Nov 2025Source
  • Documentscan (19).pdf · uploaded 4 Nov 2025Source
  • Documentscan (20).pdf · uploaded 4 Nov 2025Source
  • Documentscan (21).pdf · uploaded 4 Nov 2025Source
  • Documentscan (22).pdf · uploaded 4 Nov 2025Source
  • Documentscan (23).pdf · uploaded 4 Nov 2025Source
  • Documentscan (24).pdf · uploaded 4 Nov 2025Source
  • Documentscan (25).pdf · uploaded 4 Nov 2025Source
  • Documentscan (26).pdf · uploaded 4 Nov 2025Source
  • Documentscan (27).pdf · uploaded 4 Nov 2025Source
  • Documentscan (28).pdf · uploaded 4 Nov 2025Source
  • Documentscan (29).pdf · uploaded 4 Nov 2025Source
  • Documentscan (30).pdf · uploaded 4 Nov 2025Source
  • Documentscan (31).pdf · uploaded 4 Nov 2025Source
  • Documentscan (32).pdf · uploaded 4 Nov 2025Source
  • Documentscan (33).pdf · uploaded 4 Nov 2025Source
  • DocumentLayout Plan.pdf · uploaded 21 Nov 2025Source
  • Documentscan (2).pdf · uploaded 21 Nov 2025Source
  • Documentscan (3).pdf · uploaded 21 Nov 2025Source
  • Documentground floor units-4.pdf · uploaded 21 Nov 2025Source
  • Documentscan (5).pdf · uploaded 21 Nov 2025Source
  • Documentscan (6).pdf · uploaded 21 Nov 2025Source
  • Documentscan (7).pdf · uploaded 21 Nov 2025Source
  • Documentscan (8).pdf · uploaded 21 Nov 2025Source
  • Documentscan (9).pdf · uploaded 21 Nov 2025Source
  • Documentscan (10).pdf · uploaded 21 Nov 2025Source
  • Documentscan (11).pdf · uploaded 21 Nov 2025Source
  • Documentscan (12).pdf · uploaded 21 Nov 2025Source
  • Documentscan (13).pdf · uploaded 21 Nov 2025Source
  • Documentscan (14).pdf · uploaded 21 Nov 2025Source
  • DocumentA wing units-15.pdf · uploaded 21 Nov 2025Source
  • Documentscan (16).pdf · uploaded 21 Nov 2025Source
  • Documentscan (17).pdf · uploaded 21 Nov 2025Source
  • Documentscan (18).pdf · uploaded 21 Nov 2025Source
  • Documentscan (19).pdf · uploaded 21 Nov 2025Source
  • DocumentB wing units-20.pdf · uploaded 21 Nov 2025Source
  • Documentscan (21).pdf · uploaded 21 Nov 2025Source
  • Documentscan (22).pdf · uploaded 21 Nov 2025Source
  • Documentscan (23).pdf · uploaded 21 Nov 2025Source
  • DocumentC wing units-24.pdf · uploaded 21 Nov 2025Source
  • Documentscan (25).pdf · uploaded 21 Nov 2025Source
  • Documentscan (26).pdf · uploaded 21 Nov 2025Source
  • Documentscan (27).pdf · uploaded 21 Nov 2025Source
  • DocumentD wing units-28.pdf · uploaded 21 Nov 2025Source
  • Documentscan (29).pdf · uploaded 21 Nov 2025Source
  • Documentscan (30).pdf · uploaded 21 Nov 2025Source
  • DocumentMhada E wing units-31.pdf · uploaded 21 Nov 2025Source
  • Documentscan (32).pdf · uploaded 21 Nov 2025Source
  • Documentscan (33).pdf · uploaded 21 Nov 2025Source
  • Documentscan (1).pdf · uploaded 25 Jun 2026Source
  • Documentscan (2).pdf · uploaded 25 Jun 2026Source
  • Documentscan (3).pdf · uploaded 25 Jun 2026Source
  • Documentscan (4).pdf · uploaded 25 Jun 2026Source
  • Documentscan (5).pdf · uploaded 25 Jun 2026Source
  • Documentscan (6).pdf · uploaded 25 Jun 2026Source
  • Documentscan (7).pdf · uploaded 25 Jun 2026Source
  • Documentscan (8).pdf · uploaded 25 Jun 2026Source
  • Documentscan (9).pdf · uploaded 25 Jun 2026Source
  • Documentscan (10).pdf · uploaded 25 Jun 2026Source
  • Documentscan (11).pdf · uploaded 25 Jun 2026Source
  • Documentscan (12).pdf · uploaded 25 Jun 2026Source
  • Documentscan (13).pdf · uploaded 25 Jun 2026Source
  • Documentscan (14).pdf · uploaded 25 Jun 2026Source
  • Documentscan (15).pdf · uploaded 25 Jun 2026Source
  • Documentscan (16).pdf · uploaded 25 Jun 2026Source
  • Documentscan (17).pdf · uploaded 25 Jun 2026Source
  • Documentscan (18).pdf · uploaded 25 Jun 2026Source
  • Documentscan (19).pdf · uploaded 25 Jun 2026Source
  • Documentscan (20).pdf · uploaded 25 Jun 2026Source
  • Documentscan (21).pdf · uploaded 25 Jun 2026Source
  • Documentscan (22).pdf · uploaded 25 Jun 2026Source
  • Documentscan (23).pdf · uploaded 25 Jun 2026Source
  • Documentscan (24).pdf · uploaded 25 Jun 2026Source
  • Documentscan (25).pdf · uploaded 25 Jun 2026Source
  • Documentscan (26).pdf · uploaded 25 Jun 2026Source
  • Documentscan (27).pdf · uploaded 25 Jun 2026Source
  • Documentscan (28).pdf · uploaded 25 Jun 2026Source
  • Documentscan (29).pdf · uploaded 25 Jun 2026Source
  • Documentscan (30).pdf · uploaded 25 Jun 2026Source
  • Documentscan (31).pdf · uploaded 25 Jun 2026Source
  • Documentscan (32).pdf · uploaded 25 Jun 2026Source
  • Documentscan (33).pdf · uploaded 25 Jun 2026Source
  • OthersDeclaration about Commencement Certificate.pdf · uploaded 25 Jun 2026Source

Technical (Architect)

  • DocumentForm 1 Architect Certificate Evana.pdf · uploaded 18 Feb 2025Source
  • DocumentForm 1 Architect Certificate Evana.pdf · uploaded 18 Feb 2025Source
  • DocumentForm 1 For FY 2026-27 Q1.pdf · uploaded 21 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 Engineer Certificate Infra Registration Qtr 3.pdf · uploaded 18 Feb 2025Source
  • DocumentForm 2 Engineer Certificate Infra Registration Qtr 3.pdf · uploaded 18 Feb 2025Source
  • DocumentForm 2 For FY 2026-27 Q1.pdf · uploaded 21 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 43/10/1, 43/12/1/A(P)

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
3BHK, 4BHK, 2BHK, 2BHK Landowner Allot, 3BHK Landowner Allot, 1BHK131 units in all
Address
Survey No 43/10/2, 43/12/1/A (P), 43/14/1, 43/16/1, 43/16/2, 43/9/2 (P), Malwadi, PunawalePIN 411033
Village
Punawale, Mulshi taluka
Land area for this project
26,883 sq m (2,89,366 sq ft)
Permissible built-up area
79,326 sq m (8,53,855 sq ft)
Sanctioned built-up area
79,326 sq m (8,53,855 sq ft)
Recreational open space
2,089 sq m (22,485 sq ft)
Designated bank account
76
Developed in phases
Yes

Survey, CTS, gat or plot numbers

43/10/143/12/1/A(P)43/14/143/14/243/16/143/16/243/243/4/143/4/243/5/143/5/243/643/9/1(P)43/9/2(P)Survey No 43/10/2

Land as published on MahaRERA's project page

Survey No 43/10/2, 43/12/1/A(P), 43/14/1, 43/16/1, 43/16/2, 43/9/2(P), 43/4/1, 43/6, 43/5/1, 43/5/2, 43/4/2, 43/9/1(P), 43/14/2, 43/10/1, 43/2

Boundaries

North
Pavana River
South
Road
East
12 Mtr Road & out of Survey No. 43
West
Survey No. 43/8, 43/1

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking131 units

0 of 131 units booked (0%), as the promoter reported to MahaRERA

3BHK · 48 units4BHK · 7 units2BHK · 32 units2BHK Landowner Allot · 8 units3BHK Landowner Allot · 5 units1BHK · 31 units
BuildingTypeCarpet areaUnitsBooked
A Wing3BHK94.46 sq m · 1,017 sq ft70
A Wing3BHK99.37 sq m · 1,070 sq ft70
A Wing3BHK105.1 sq m · 1,131 sq ft70
A Wing4BHK124.16 sq m · 1,336 sq ft70
C Wing2BHK65.82 sq m · 708 sq ft140
C Wing2BHK68.96 sq m · 742 sq ft150
C Wing2BHK88.1 sq m · 948 sq ft30
C Wing2BHK Landowner Allot73.77 sq m · 794 sq ft40
Show all 17 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
C Wing2BHK Landowner Allot77.79 sq m · 837 sq ft30
C Wing2BHK Landowner Allot78.37 sq m · 844 sq ft10
C Wing3BHK69.43 sq m · 747 sq ft30
C Wing3BHK88.1 sq m · 948 sq ft90
C Wing3BHK94.38 sq m · 1,016 sq ft150
C Wing3BHK Landowner Allot97.04 sq m · 1,045 sq ft20
C Wing3BHK Landowner Allot103.78 sq m · 1,117 sq ft30
D Wing1BHK39.49 sq m · 425 sq ft160
D Wing1BHK40.05 sq m · 431 sq ft150

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals2

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
EngineerBhimrao Tengle—
EngineerVidyanand Ashok Kyadar—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Punawale

All 190 projects in Punawale · Compare Infinity Evana with another project

Infinity Evana in numbers

Registered deals, summarised

Deedo has 4 registered documents at Infinity Evana, from Jan 2026 to Apr 2026: 3 sales. The median registered sale since Jan 2026 works out to about ₹10,700 per sq ft, at a median of ₹1.04 Cr a deal; 0% of sales were resales.

What is the price per sq ft at Infinity Evana?
The median registered sale since Jan 2026 works out to about ₹10,700 per sq ft, at a median of ₹1.04 Cr a deal; 0% of sales were resales.
How many properties have been sold at Infinity Evana?
3 sales are registered at Infinity Evana.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Infinity Evana by Deedo, last updated with deals registered in Apr 2026.

Latest deal · Primary sale · Apr 2026

₹1–1.5 Cr

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology