Infinity Evana
Certificate SignedPunawale, Pune 411033 |Promoter: Tulip Infra
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 6
- Unit types
- 3BHK, 4BHK, 2BHK, 2BHK Landowner Allot, 3BHK Landowner Allot, 1BHK131 units in all
- Address
- Survey No 43/10/2, 43/12/1/A (P), 43/14/1, 43/16/1, 43/16/2, 43/9/2 (P), Malwadi, PunawalePIN 411033
- Designated bank account
- 76
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 12 Dec 2024
- Promised
- 30 Jun 2029
- Revised
- 30 Oct 2029
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100078470 | 12 Dec 2024 | 30 Jun 2029 | 30 Oct 2029 | Tulip Infra | Project page |
6 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| A Wing | 47 | 28 |
| Bunglow | 3 | — |
| B Wing | 47 | — |
| C Wing | 34 | 72 |
| D Wing | 33 | 31 |
| E Wing MHADA | 22 | — |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
0 of 131 units booked (0%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | 3BHK | 94.46 sq m · 1,017 sq ft | 7 | 0 |
| A Wing | 3BHK | 99.37 sq m · 1,070 sq ft | 7 | 0 |
| A Wing | 3BHK | 105.1 sq m · 1,131 sq ft | 7 | 0 |
| A Wing | 4BHK | 124.16 sq m · 1,336 sq ft | 7 | 0 |
| C Wing | 2BHK | 65.82 sq m · 708 sq ft | 14 | 0 |
| C Wing | 2BHK | 68.96 sq m · 742 sq ft | 15 | 0 |
| C Wing | 2BHK | 88.1 sq m · 948 sq ft | 3 | 0 |
| C Wing | 2BHK Landowner Allot | 73.77 sq m · 794 sq ft | 4 | 0 |
Show all 17 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| C Wing | 2BHK Landowner Allot | 77.79 sq m · 837 sq ft | 3 | 0 |
| C Wing | 2BHK Landowner Allot | 78.37 sq m · 844 sq ft | 1 | 0 |
| C Wing | 3BHK | 69.43 sq m · 747 sq ft | 3 | 0 |
| C Wing | 3BHK | 88.1 sq m · 948 sq ft | 9 | 0 |
| C Wing | 3BHK | 94.38 sq m · 1,016 sq ft | 15 | 0 |
| C Wing | 3BHK Landowner Allot | 97.04 sq m · 1,045 sq ft | 2 | 0 |
| C Wing | 3BHK Landowner Allot | 103.78 sq m · 1,117 sq ft | 3 | 0 |
| D Wing | 1BHK | 39.49 sq m · 425 sq ft | 16 | 0 |
| D Wing | 1BHK | 40.05 sq m · 431 sq ft | 15 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 253 filings listed on MahaRERA's project page
Finance
- Other – Financesupplementary Agreement.pdf · uploaded 25 Nov 2024Source
- Other – FinanceDeclaration of Landowners Not Opening Rera bank ac.pdf · uploaded 25 Nov 2024Source
- PAN CardTulip Infra Pan Card.pdf · uploaded 25 Nov 2024Source
- OthersDeclaration for estimattion - Infinity Evanna Correction.pdf · uploaded 16 Sep 2025Source
- OthersDeclaration about Estimation Change.pdf · uploaded 26 Jun 2026Source
Legal
- Declaration Form BForm B Declaration - Promoters on 500 stamp paper new.pdf · uploaded 25 Nov 2024Source
Show all 255 documentsShow fewer documents
Legal
- Other – LegalAdalabadal.pdf · uploaded 26 Nov 2024Source
- Legal Title reportLegal Title Report.pdf · uploaded 26 Nov 2024Source
- Other – LegalScreenshot on Name of Bank Account.pdf · uploaded 29 Nov 2024Source
- Declaration Form BLEGAL TITLE REPORT INFINITY EVANA.pdf · uploaded 15 Sep 2025Source
- Declaration Form BForm B Promoters Final.pdf · uploaded 15 Sep 2025Source
- Declaration Form BAdlabadal Patra Evana.pdf · uploaded 15 Sep 2025Source
- Declaration Form BBankar 2482 Sale Deed.pdf · uploaded 15 Sep 2025Source
- Declaration Form BMr Motwani 13 R Sale Deed.pdf · uploaded 15 Sep 2025Source
- Declaration Form BSudam kudale 2973 Sale Deed.pdf · uploaded 15 Sep 2025Source
- OthersDeclaration commencement certificate Format D.pdf · uploaded 21 Nov 2025Source
- OthersAgreement Draft.pdf · uploaded 27 Nov 2025Source
- OthersDRAFT AGREEMENT - Infinity Evana Final.pdf · uploaded 27 Nov 2025Source
- Declaration Form BLegal Titlle Report - Revised.pdf · uploaded 17 Apr 2026Source
- Declaration Form BInfinity Evana 7-12.pdf · uploaded 29 Apr 2026Source
- Declaration Form BTulip Infra Sale Deed 3109-2025-01-08.pdf · uploaded 30 Apr 2026Source
- Declaration Form BTulip Infra Sale Deed 3109-2025-09-16.pdf · uploaded 30 Apr 2026Source
- Declaration Form BTulip Infra Sale Deed 3109-2025-17-23.pdf · uploaded 30 Apr 2026Source
- OthersDeclaration about Commencement Certificate.pdf · uploaded 25 Jun 2026Source
Migrated
- 1 PAN CardTulip Infra Pan Card.pdf · uploaded 25 Nov 2024Source
- 1 a Details of encumbrances concerned to FinanceEncumberance Finance.pdf · uploaded 25 Nov 2024Source
- 1 Copy of Layout Approval (in case of layout)1 PLAN LAYOUT.pdf · uploaded 25 Nov 2024Source
- 1 Declaration in FORM BForm B Declaration - Promoters on 500 stamp paper new.pdf · uploaded 25 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 25 Nov 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Form 2.pdf · uploaded 25 Nov 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 25 Nov 2024Source
- 10 Building Plan Approval / NA Order for plotted development12-12.pdf · uploaded 25 Nov 2024Source
- 1 Building Plan Approval / NA Order for plotted development2-12.pdf · uploaded 25 Nov 2024Source
- 2 Building Plan Approval / NA Order for plotted development3-12.pdf · uploaded 25 Nov 2024Source
- 3 Building Plan Approval / NA Order for plotted development4-12.pdf · uploaded 25 Nov 2024Source
- 4 Building Plan Approval / NA Order for plotted development5-12.pdf · uploaded 25 Nov 2024Source
- 5 Building Plan Approval / NA Order for plotted development6-12.pdf · uploaded 25 Nov 2024Source
- 6 Building Plan Approval / NA Order for plotted development8-12.pdf · uploaded 25 Nov 2024Source
- 7 Building Plan Approval / NA Order for plotted development9-12.pdf · uploaded 25 Nov 2024Source
- 8 Building Plan Approval / NA Order for plotted development10-12.pdf · uploaded 25 Nov 2024Source
- 9 Building Plan Approval / NA Order for plotted development11-12.pdf · uploaded 25 Nov 2024Source
- 1 Declaration about Commencement CertificateDeclaration About Commencement Certificate Format D.pdf · uploaded 25 Nov 2024Source
- 1 CERSAI detailsDeclaration of No Cersai Report.pdf · uploaded 25 Nov 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A Declaration about Rera Designated Bank Account.pdf · uploaded 25 Nov 2024Source
- 1 b Details of encumbrances concerned to LegalEncumberance Finance.pdf · uploaded 25 Nov 2024Source
- 2 Other – Financesupplementary Agreement.pdf · uploaded 25 Nov 2024Source
- 1 Other – FinanceDeclaration of Landowners Not Opening Rera bank ac.pdf · uploaded 25 Nov 2024Source
- 1 Other – TechnicalAnnexure A Order -50.pdf · uploaded 25 Nov 2024Source
- 2 Other – TechnicalDeclaration of Landowners - Not to sale flats.pdf · uploaded 25 Nov 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Project 1 Annexure A Sanjay Varma.pdf · uploaded 25 Nov 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Project 1 Annexure A Amit Jhamtani.pdf · uploaded 25 Nov 2024Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Project 1 Annexure A Raj Varma.pdf · uploaded 25 Nov 2024Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Project 1 Annexure A Sejal Varma.pdf · uploaded 25 Nov 2024Source
- 5 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Project 1 Annexure A VirendraBehl.pdf · uploaded 25 Nov 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B Opening of RERA Designated Bank Account.pdf · uploaded 25 Nov 2024Source
- 1 Copy of the legal title reportLegal Title Report.pdf · uploaded 26 Nov 2024Source
- 2 a Details of encumbrances concerned to FinanceLegal Encubrance Letter Evana.pdf · uploaded 26 Nov 2024Source
- 1 Proforma of Allotment letterAllotement Letter Evana_compressed.pdf · uploaded 26 Nov 2024Source
- 1 Other – LegalAdalabadal.pdf · uploaded 26 Nov 2024Source
- 1 Deviation Report with respect to Allotment letterAllotment Deviation Letter.pdf · uploaded 26 Nov 2024Source
- 2 b Details of encumbrances concerned to LegalLegal Encubrance Letter Evana.pdf · uploaded 26 Nov 2024Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Agreement to sale Evana - converted.pdf · uploaded 26 Nov 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectDisclosure for Secured Unsecured Finance Availed For The Project.pdf · uploaded 26 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)revised form 3 29 11 2024.pdf · uploaded 29 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Table C.pdf · uploaded 29 Nov 2024Source
- 11 Building Plan Approval / NA Order for plotted developmentsheet 07 12.pdf · uploaded 29 Nov 2024Source
- 2 Other – LegalScreenshot on Name of Bank Account.pdf · uploaded 29 Nov 2024Source
- 1 Proforma of Agreement for saleAfs new.pdf · uploaded 29 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate Evana.pdf · uploaded 18 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 for Q3 FY 2024-25.pdf · uploaded 18 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Infra Registration Qtr 3.pdf · uploaded 18 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate Evana.pdf · uploaded 18 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 for Q3 FY 2024-25.pdf · uploaded 18 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Infra Registration Qtr 3.pdf · uploaded 18 Feb 2025Source
- Form 1Form 1 Architect Certificate Evana.pdf · uploaded 26 Jun 2025Source
- Form 1Form 1 Architect Certificate 21-04-2025 Avana.pdf · uploaded 26 Jun 2025Source
- Form 2Form 2 Engineer Certificate Infra Registration Qtr 3.pdf · uploaded 26 Jun 2025Source
- Form 2Form 2 Engineer Certificate Qtr 4 FY 2024-25 Evana.pdf · uploaded 26 Jun 2025Source
- Form 3Form 3 for Q3 FY 2024-25.pdf · uploaded 26 Jun 2025Source
- Form 3CA Certificate - Infinity Evana Q4.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventoryPromoters Disclosure Unit Wise Qtr 3.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventoryPromoters Disclosure Unit Wise Qtr 4.pdf · uploaded 26 Jun 2025Source
- Withdrawal Update Form 1FORM 1 Q1 FY 2025-26.pdf · uploaded 8 Aug 2025Source
- Withdrawal Update Form 2FORM 2 Q1 FY 2025-26.pdf · uploaded 8 Aug 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 8 Aug 2025Source
- Withdrawal Update Form 1FORM 1 Q1 FY 2025-26.pdf · uploaded 6 Sep 2025Source
- Withdrawal Update Form 2FORM 2 Q1 FY 2025-26.pdf · uploaded 6 Sep 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 6 Sep 2025Source
- Form 5 (FY 2024-2025)Form 5 FY 2024-25 Evana.pdf · uploaded 24 Sep 2025Source
- Withdrawal Update Form 1FORM 1 Q1 FY 2025-26.pdf · uploaded 9 Oct 2025Source
- Withdrawal Update Form 2FORM 2 Q1 FY 2025-26.pdf · uploaded 9 Oct 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 9 Oct 2025Source
- Withdrawal Update Form 1Form 1 Evana 08 Oct 25.pdf · uploaded 11 Oct 2025Source
- Withdrawal Update Form 2Form 2 Signed.pdf · uploaded 11 Oct 2025Source
- Withdrawal Update Form 3Form 3 FY 2025-2026 Q2.pdf · uploaded 11 Oct 2025Source
- Form 2A (FY 2024-2025)Form 2A Evana FY 2024-25.pdf · uploaded 15 Dec 2025Source
- Withdrawal Update Form 1Form 1 For FY 2025-26 Q3.pdf · uploaded 13 Mar 2026Source
- Withdrawal Update Form 2Form 2 For FY 2025-26 Q3 Evana.pdf · uploaded 13 Mar 2026Source
- Withdrawal Update Form 3Form 3 for FY 2025-26 Q3- Evana.pdf · uploaded 13 Mar 2026Source
- Form 2A (FY 2025-2026)Form 2A for FY 2025-26 final.pdf · uploaded 21 Apr 2026Source
- Withdrawal Update Form 1Form 1 for FY 2025-26 Q4 final.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 1Form 1 for FY 2025-26 Q4 final.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 2Form 2 for FY 2025-26 Q4 final.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 2Form 2 for FY 2025-26 Q4 final.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 3Form 3 for FY 2025-26 Q4 final.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 3Form 3 for FY 2025-26 Q4 revised.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 1Form 1 For FY 2026-27 Q1.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 2Form 2 For FY 2026-27 Q1.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 3Form 3 For FY 2026-27 Q1 final Resize.pdf · uploaded 21 Jul 2026Source
Technical
- Document1 PLAN LAYOUT.pdf · uploaded 25 Nov 2024Source
- Document12-12.pdf · uploaded 25 Nov 2024Source
- Document11-12.pdf · uploaded 25 Nov 2024Source
- Document10-12.pdf · uploaded 25 Nov 2024Source
- Document9-12.pdf · uploaded 25 Nov 2024Source
- Document8-12.pdf · uploaded 25 Nov 2024Source
- Document6-12.pdf · uploaded 25 Nov 2024Source
- Document5-12.pdf · uploaded 25 Nov 2024Source
- Document4-12.pdf · uploaded 25 Nov 2024Source
- Document3-12.pdf · uploaded 25 Nov 2024Source
- Document2-12.pdf · uploaded 25 Nov 2024Source
- Other – TechnicalDeclaration of Landowners - Not to sale flats.pdf · uploaded 25 Nov 2024Source
- Other – TechnicalAnnexure A Order -50.pdf · uploaded 25 Nov 2024Source
- Documentsheet 07 12.pdf · uploaded 29 Nov 2024Source
- Documentscan (1)_11zon.pdf · uploaded 15 Sep 2025Source
- Documentscan (2)_11zon.pdf · uploaded 15 Sep 2025Source
- Documentscan (3)_11zon.pdf · uploaded 15 Sep 2025Source
- Documentscan (4)_11zon.pdf · uploaded 15 Sep 2025Source
- Documentscan (5)_11zon.pdf · uploaded 15 Sep 2025Source
- Documentscan (6)_11zon.pdf · uploaded 15 Sep 2025Source
- Documentscan (7)_11zon.pdf · uploaded 15 Sep 2025Source
- Documentscan (8)_11zon.pdf · uploaded 15 Sep 2025Source
- Documentscan (9)_11zon.pdf · uploaded 15 Sep 2025Source
- Documentscan (10)_11zon.pdf · uploaded 15 Sep 2025Source
- Documentscan (11)_11zon.pdf · uploaded 15 Sep 2025Source
- Documentscan (12)_11zon.pdf · uploaded 15 Sep 2025Source
- Documentscan (13)_11zon.pdf · uploaded 15 Sep 2025Source
- Documentscan (14)_11zon.pdf · uploaded 15 Sep 2025Source
- Documentscan (15)_11zon.pdf · uploaded 15 Sep 2025Source
- Documentscan (16)_11zon.pdf · uploaded 15 Sep 2025Source
- Documentscan (17)_11zon.pdf · uploaded 15 Sep 2025Source
- Documentscan (18)_11zon.pdf · uploaded 15 Sep 2025Source
- Documentscan (19)_11zon.pdf · uploaded 15 Sep 2025Source
- Documentscan (20)_11zon.pdf · uploaded 15 Sep 2025Source
- Documentscan (21)_11zon.pdf · uploaded 15 Sep 2025Source
- OthersDeclaration about commencement Certificate final.pdf · uploaded 15 Sep 2025Source
- OthersPCMC- Mail CC Verification Screenshort.pdf · uploaded 16 Sep 2025Source
- OthersDeclaration of Landowners - Not to sale flats.pdf · uploaded 16 Sep 2025Source
- DocumentLayout Plan.pdf · uploaded 4 Nov 2025Source
- Documentscan (2).pdf · uploaded 4 Nov 2025Source
- Documentscan (3).pdf · uploaded 4 Nov 2025Source
- Documentscan (4).pdf · uploaded 4 Nov 2025Source
- Documentscan (5).pdf · uploaded 4 Nov 2025Source
- Documentscan (6).pdf · uploaded 4 Nov 2025Source
- Documentscan (7).pdf · uploaded 4 Nov 2025Source
- Documentscan (8).pdf · uploaded 4 Nov 2025Source
- Documentscan (9).pdf · uploaded 4 Nov 2025Source
- Documentscan (10).pdf · uploaded 4 Nov 2025Source
- Documentscan (11).pdf · uploaded 4 Nov 2025Source
- Documentscan (12).pdf · uploaded 4 Nov 2025Source
- Documentscan (13).pdf · uploaded 4 Nov 2025Source
- Documentscan (14).pdf · uploaded 4 Nov 2025Source
- Documentscan (15).pdf · uploaded 4 Nov 2025Source
- Documentscan (16).pdf · uploaded 4 Nov 2025Source
- Documentscan (17).pdf · uploaded 4 Nov 2025Source
- Documentscan (18).pdf · uploaded 4 Nov 2025Source
- Documentscan (19).pdf · uploaded 4 Nov 2025Source
- Documentscan (20).pdf · uploaded 4 Nov 2025Source
- Documentscan (21).pdf · uploaded 4 Nov 2025Source
- Documentscan (22).pdf · uploaded 4 Nov 2025Source
- Documentscan (23).pdf · uploaded 4 Nov 2025Source
- Documentscan (24).pdf · uploaded 4 Nov 2025Source
- Documentscan (25).pdf · uploaded 4 Nov 2025Source
- Documentscan (26).pdf · uploaded 4 Nov 2025Source
- Documentscan (27).pdf · uploaded 4 Nov 2025Source
- Documentscan (28).pdf · uploaded 4 Nov 2025Source
- Documentscan (29).pdf · uploaded 4 Nov 2025Source
- Documentscan (30).pdf · uploaded 4 Nov 2025Source
- Documentscan (31).pdf · uploaded 4 Nov 2025Source
- Documentscan (32).pdf · uploaded 4 Nov 2025Source
- Documentscan (33).pdf · uploaded 4 Nov 2025Source
- DocumentLayout Plan.pdf · uploaded 21 Nov 2025Source
- Documentscan (2).pdf · uploaded 21 Nov 2025Source
- Documentscan (3).pdf · uploaded 21 Nov 2025Source
- Documentground floor units-4.pdf · uploaded 21 Nov 2025Source
- Documentscan (5).pdf · uploaded 21 Nov 2025Source
- Documentscan (6).pdf · uploaded 21 Nov 2025Source
- Documentscan (7).pdf · uploaded 21 Nov 2025Source
- Documentscan (8).pdf · uploaded 21 Nov 2025Source
- Documentscan (9).pdf · uploaded 21 Nov 2025Source
- Documentscan (10).pdf · uploaded 21 Nov 2025Source
- Documentscan (11).pdf · uploaded 21 Nov 2025Source
- Documentscan (12).pdf · uploaded 21 Nov 2025Source
- Documentscan (13).pdf · uploaded 21 Nov 2025Source
- Documentscan (14).pdf · uploaded 21 Nov 2025Source
- DocumentA wing units-15.pdf · uploaded 21 Nov 2025Source
- Documentscan (16).pdf · uploaded 21 Nov 2025Source
- Documentscan (17).pdf · uploaded 21 Nov 2025Source
- Documentscan (18).pdf · uploaded 21 Nov 2025Source
- Documentscan (19).pdf · uploaded 21 Nov 2025Source
- DocumentB wing units-20.pdf · uploaded 21 Nov 2025Source
- Documentscan (21).pdf · uploaded 21 Nov 2025Source
- Documentscan (22).pdf · uploaded 21 Nov 2025Source
- Documentscan (23).pdf · uploaded 21 Nov 2025Source
- DocumentC wing units-24.pdf · uploaded 21 Nov 2025Source
- Documentscan (25).pdf · uploaded 21 Nov 2025Source
- Documentscan (26).pdf · uploaded 21 Nov 2025Source
- Documentscan (27).pdf · uploaded 21 Nov 2025Source
- DocumentD wing units-28.pdf · uploaded 21 Nov 2025Source
- Documentscan (29).pdf · uploaded 21 Nov 2025Source
- Documentscan (30).pdf · uploaded 21 Nov 2025Source
- DocumentMhada E wing units-31.pdf · uploaded 21 Nov 2025Source
- Documentscan (32).pdf · uploaded 21 Nov 2025Source
- Documentscan (33).pdf · uploaded 21 Nov 2025Source
- Documentscan (1).pdf · uploaded 25 Jun 2026Source
- Documentscan (2).pdf · uploaded 25 Jun 2026Source
- Documentscan (3).pdf · uploaded 25 Jun 2026Source
- Documentscan (4).pdf · uploaded 25 Jun 2026Source
- Documentscan (5).pdf · uploaded 25 Jun 2026Source
- Documentscan (6).pdf · uploaded 25 Jun 2026Source
- Documentscan (7).pdf · uploaded 25 Jun 2026Source
- Documentscan (8).pdf · uploaded 25 Jun 2026Source
- Documentscan (9).pdf · uploaded 25 Jun 2026Source
- Documentscan (10).pdf · uploaded 25 Jun 2026Source
- Documentscan (11).pdf · uploaded 25 Jun 2026Source
- Documentscan (12).pdf · uploaded 25 Jun 2026Source
- Documentscan (13).pdf · uploaded 25 Jun 2026Source
- Documentscan (14).pdf · uploaded 25 Jun 2026Source
- Documentscan (15).pdf · uploaded 25 Jun 2026Source
- Documentscan (16).pdf · uploaded 25 Jun 2026Source
- Documentscan (17).pdf · uploaded 25 Jun 2026Source
- Documentscan (18).pdf · uploaded 25 Jun 2026Source
- Documentscan (19).pdf · uploaded 25 Jun 2026Source
- Documentscan (20).pdf · uploaded 25 Jun 2026Source
- Documentscan (21).pdf · uploaded 25 Jun 2026Source
- Documentscan (22).pdf · uploaded 25 Jun 2026Source
- Documentscan (23).pdf · uploaded 25 Jun 2026Source
- Documentscan (24).pdf · uploaded 25 Jun 2026Source
- Documentscan (25).pdf · uploaded 25 Jun 2026Source
- Documentscan (26).pdf · uploaded 25 Jun 2026Source
- Documentscan (27).pdf · uploaded 25 Jun 2026Source
- Documentscan (28).pdf · uploaded 25 Jun 2026Source
- Documentscan (29).pdf · uploaded 25 Jun 2026Source
- Documentscan (30).pdf · uploaded 25 Jun 2026Source
- Documentscan (31).pdf · uploaded 25 Jun 2026Source
- Documentscan (32).pdf · uploaded 25 Jun 2026Source
- Documentscan (33).pdf · uploaded 25 Jun 2026Source
- OthersDeclaration about Commencement Certificate.pdf · uploaded 25 Jun 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Punawale, Mulshi taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Pavana River
- South
- Road
- East
- 12 Mtr Road & out of Survey No. 43
- West
- Survey No. 43/8, 43/1
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Engineer | Bhimrao Tengle | — |
| Engineer | Vidyanand Ashok Kyadar | — |
Source: MahaRERA project page. Contact details are not shown.