Yoo Pristine
Deedo IDDP-PUN-H0B4It is due for completion in Apr 2031, with no extension on record; no MahaRERA orders on record.
Pimpri Chinchawad (M Corp.), Pune 411035 · by Megapillar Realty Llp
Buying a flat here?
See every deed registered on it.
It is due for completion in Apr 2031, with no extension on record
- This projectRegistered 27 Dec 2024, completion promised 30 Apr 2031.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Oct 2026
- Primary sale · Oct 2026
- Primary sale · Oct 2026
- Primary sale · Oct 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Oct 2026 | C Building · 2608 | Primary sale | 1,025 sq ft | View Primary sale, Oct 2026 | |
| Oct 2026 | C Building · 2904 | Primary sale | 1,003 sq ft | View Primary sale, Oct 2026 | |
| Oct 2026 | C Building · 1904 | Primary sale | 1,003 sq ft | View Primary sale, Oct 2026 | |
| Oct 2026 | C Building · 901 | Primary sale | 1,042 sq ft | View Primary sale, Oct 2026 | |
| Sep 2026 | C Building · 3004 | Primary sale | 1,003 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | C Building · 105 | Primary sale | 481 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | C Building · 106 | Primary sale | 477 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Not on record | Primary sale | 3,961 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | C Building · 504 | Primary sale | 1,003 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | A Building · 1404 | Primary sale | 1,423 sq ft | View Primary sale, Sep 2026 |
6 buildings
Open a building to see every flat, floor by floor.
- A Building30 floors · 68 units0% booked
- B Building36 floors · 129 units0% booked
- C Building35 floors · 22 units0% booked
- Commercial Building2 floors · 31 units0% booked
- D Building4 floors · 22 units0% booked
- E Bldg MHADA18 floors · 51 units0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100078555
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100078555 | 27 Dec 2024 | 30 Apr 2031 | 30 Apr 2031 | M/S Megapillar Realty LLP | Project page |
Documents207
2 documents held by Deedo, 205 filings listed on MahaRERA's project page
Registration certificate (2)
Finance
- PAN CardPan Card Megapillar-cropped.pdf · uploaded 27 Nov 2024Source
Legal
- Declaration Form BForm B Affidivate Cum Decl (1) compressed.pdf · uploaded 27 Nov 2024Source
- Other – LegalLLP Deed 100 4th April 2024 rotated compressed.pdf · uploaded 30 Nov 2024Source
- Other – LegalConveyance Deed final.pdf · uploaded 18 Dec 2024Source
- Other – Legal7-12 Extract.pdf · uploaded 18 Dec 2024Source
- Legal Title reportRERA Report_compressed.pdf · uploaded 18 Dec 2024Source
Show all 207 documentsShow fewer documents
Migrated
- 1 PAN CardPan Card Megapillar-cropped.pdf · uploaded 27 Nov 2024Source
- 1 Declaration in FORM BForm B Affidivate Cum Decl (1) compressed.pdf · uploaded 27 Nov 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engg Certificate 1.pdf · uploaded 27 Nov 2024Source
- 1 Declaration about Commencement CertificateCC Declaration (1).pdf · uploaded 27 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Megapillar compressed.pdf · uploaded 28 Nov 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentAKURDI CC_compressed.pdf · uploaded 28 Nov 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)Bank Account Declaration 1.pdf · uploaded 28 Nov 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnex A PIG.pdf · uploaded 28 Nov 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B Bank Letter Ed.pdf · uploaded 28 Nov 2024Source
- 1 Proforma of Allotment letterModel Form Allotment Letter compressed.pdf · uploaded 29 Nov 2024Source
- 1 Deviation Report with respect to Allotment letterDeviation Allotment Letter 1.pdf · uploaded 29 Nov 2024Source
- 1 Deviation Report with respect to model copy of AgreementDeviation ATS 1 compressed.pdf · uploaded 29 Nov 2024Source
- 1 Proforma of Agreement for saleATS compressed.pdf · uploaded 29 Nov 2024Source
- 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 30 Nov 2024Source
- 2 Copy of Layout Approval (in case of layout)Layout - Highlighted.pdf · uploaded 30 Nov 2024Source
- 1 Other – LegalLLP Deed 100 4th April 2024 rotated compressed.pdf · uploaded 30 Nov 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentC Building Commercial 3 compressed rotated.pdf · uploaded 2 Dec 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentD Building Commecrial rotated 1 compressed.pdf · uploaded 2 Dec 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentD Building Commerical FF SN 5 Rotated.pdf · uploaded 2 Dec 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Pristine Akurdi Final compressed.pdf · uploaded 3 Dec 2024Source
- 7 Building Plan Approval / NA Order for plotted developmentCommerical B SN 9 rotated.pdf · uploaded 3 Dec 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentD Building Commerical First Floar plancompressed rotated.pdf · uploaded 3 Dec 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentE Building Mhada SN 7 rotated.pdf · uploaded 3 Dec 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentE Building Mhada SN 8 TERRACE rotated.pdf · uploaded 3 Dec 2024Source
- 8 Building Plan Approval / NA Order for plotted developmentCommerical BLDG ff s n 10 rotated.pdf · uploaded 3 Dec 2024Source
- 9 Building Plan Approval / NA Order for plotted developmentS N 11 COMMERCIAL BLDG rotated.pdf · uploaded 3 Dec 2024Source
- 1 Copy of the legal title reportRERA Report_compressed.pdf · uploaded 18 Dec 2024Source
- 1 a Details of encumbrances concerned to FinanceEncumberance Certificate.pdf · uploaded 18 Dec 2024Source
- 2 a Details of encumbrances concerned to Finance1 a Details of encumbrances concerned to Finance (2).pdf · uploaded 18 Dec 2024Source
- 3 a Details of encumbrances concerned to FinanceMortagage deed index 2 YOO Pristine.pdf · uploaded 18 Dec 2024Source
- 2 Other – Legal7-12 Extract.pdf · uploaded 18 Dec 2024Source
- 3 Other – LegalConveyance Deed final.pdf · uploaded 18 Dec 2024Source
- 1 b Details of encumbrances concerned to LegalEncumberance Certificate.pdf · uploaded 18 Dec 2024Source
- 2 b Details of encumbrances concerned to Legal1 a Details of encumbrances concerned to Finance (2).pdf · uploaded 18 Dec 2024Source
- 3 b Details of encumbrances concerned to LegalMortagage deed index 2 YOO Pristine.pdf · uploaded 18 Dec 2024Source
- 1 Other – TechnicalAnnex A Decla Cum Undertaking (1).pdf · uploaded 18 Dec 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsAnnex A IKG.pdf · uploaded 18 Dec 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentSS CC Verification Yoo Pristine.pdf · uploaded 21 Dec 2024Source
- 1 CERSAI detailsCERSAI After Search YOO Pristine.pdf · uploaded 21 Dec 2024Source
- 2 CERSAI detailsPincode Declaration YOO Pristine rotated FINAL.pdf · uploaded 21 Dec 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectSecured Unsecure fully final with ca yoo pristine.pdf · uploaded 21 Dec 2024Source
- 1 Copy of Layout Approval (in case of layout)AKURDI 01 FINAL.pdf · uploaded 10 Feb 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentAKURDI CC.pdf · uploaded 10 Feb 2025Source
- 7 Building Plan Approval / NA Order for plotted developmentAKURDI 07.pdf · uploaded 10 Feb 2025Source
- 14 Building Plan Approval / NA Order for plotted developmentAKURDI 14.pdf · uploaded 10 Feb 2025Source
- 13 Building Plan Approval / NA Order for plotted developmentAKURDI 13.pdf · uploaded 10 Feb 2025Source
- 12 Building Plan Approval / NA Order for plotted developmentAKURDI 12.pdf · uploaded 10 Feb 2025Source
- 11 Building Plan Approval / NA Order for plotted developmentAKURDI 11.pdf · uploaded 10 Feb 2025Source
- 10 Building Plan Approval / NA Order for plotted developmentAKURDI 10.pdf · uploaded 10 Feb 2025Source
- 9 Building Plan Approval / NA Order for plotted developmentAKURDI 09.pdf · uploaded 10 Feb 2025Source
- 8 Building Plan Approval / NA Order for plotted developmentAKURDI 08.pdf · uploaded 10 Feb 2025Source
- 6 Building Plan Approval / NA Order for plotted developmentAKURDI 06.pdf · uploaded 10 Feb 2025Source
- 5 Building Plan Approval / NA Order for plotted developmentAKURDI 05.pdf · uploaded 10 Feb 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentAKURDI 04.pdf · uploaded 10 Feb 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentAKURDI 03.pdf · uploaded 10 Feb 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentAKURDI 01 FINAL.pdf · uploaded 10 Feb 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentAKURDI 02.pdf · uploaded 10 Feb 2025Source
- 1 Declaration about Commencement CertificateCC DECLARATION A B 17TH FLOOR.pdf · uploaded 10 Feb 2025Source
- 1 Commencement Certificates / NA Order for plotted development20250509091846_rotated.pdf · uploaded 9 May 2025Source
- 1 Copy of Layout Approval (in case of layout)Scan 2025-5-9 rotated - fINAL HIGHLITGHTED_compressed.pdf · uploaded 10 May 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 Rotated_compressed.pdf · uploaded 10 May 2025Source
- 26 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 (2,27,21) COMM BLDG_rotated_compressed.pdf · uploaded 10 May 2025Source
- 25 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 COMM BLg _rotated_compressed.pdf · uploaded 10 May 2025Source
- 24 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 COMM BLDG_rotated_compressed.pdf · uploaded 10 May 2025Source
- 23 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 (2,22,57) E MHADA - 2.pdf · uploaded 10 May 2025Source
- 22 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 E MHADA - 1_compressed.pdf · uploaded 10 May 2025Source
- 21 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 D - 7_compressed.pdf · uploaded 10 May 2025Source
- 20 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 D- 6_compressed.pdf · uploaded 10 May 2025Source
- 19 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 D - 5_compressed.pdf · uploaded 10 May 2025Source
- 18 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 D - 4_compressed.pdf · uploaded 10 May 2025Source
- 17 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 D- 3_compressed.pdf · uploaded 10 May 2025Source
- 16 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 D- 2_compressed.pdf · uploaded 10 May 2025Source
- 15 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 D - 1_rotated_compressed.pdf · uploaded 10 May 2025Source
- 14 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 C- 4_rotated_compressed.pdf · uploaded 10 May 2025Source
- 13 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 C - 3_compressed.pdf · uploaded 10 May 2025Source
- 12 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 C - 2_compressed.pdf · uploaded 10 May 2025Source
- 11 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 C - 1_rotated_compressed.pdf · uploaded 10 May 2025Source
- 10 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 B - 4_compressed.pdf · uploaded 10 May 2025Source
- 9 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 B - 3 _rotated_compressed.pdf · uploaded 10 May 2025Source
- 8 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 B - 2rotated_compressed.pdf · uploaded 10 May 2025Source
- 7 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 B - 1_compressed.pdf · uploaded 10 May 2025Source
- 6 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 (2,8,47) A- 4.pdf · uploaded 10 May 2025Source
- 5 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 (2,8,9) A - 3.pdf · uploaded 10 May 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 A - 2_rotated_compressed.pdf · uploaded 10 May 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 A- 1_compressed.pdf · uploaded 10 May 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentScan 2025-5-9 rotated_compressed- 2.pdf · uploaded 10 May 2025Source
- 1 Declaration about Commencement CertificateCC Declaration 1st updated sanction.pdf · uploaded 10 May 2025Source
- Form 1Form -1 31-03-2025.pdf · uploaded 24 May 2025Source
- Form 2Form 2 Yoo Pristine 31-03-2025.pdf · uploaded 24 May 2025Source
- Form 3Form 3 Yoo Pristine 31-03-2025_11zon.pdf · uploaded 24 May 2025Source
- Disclosure of Sold and Booked InventorySold & Unsold Yoo Pristine 31-03-2025.pdf · uploaded 24 May 2025Source
- Withdrawal Update Form 130-6-25 Form-1.pdf · uploaded 30 Oct 2025Source
- Withdrawal Update Form 230-6-25 Form-2.pdf · uploaded 30 Oct 2025Source
- Withdrawal Update Form 3Form 3 Yoo Pristine F 30-06-2025 F signed.pdf · uploaded 30 Oct 2025Source
- Form 5 (FY 2024-2025)Form 5 Yoo Pristine.pdf · uploaded 30 Oct 2025Source
- Withdrawal Update Form 130-9-25 Form -1.pdf · uploaded 17 Nov 2025Source
- Withdrawal Update Form 230-9-25 Form-2.pdf · uploaded 17 Nov 2025Source
- Withdrawal Update Form 3Form 3 Yoo Pristine F 30-09-2025 Final sign.pdf · uploaded 17 Nov 2025Source
- Withdrawal Update Form 1Form-1.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 2Form-2.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 3Form 3 Yoo Pristine F 31-12-2025 (2).pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 1Form 1 Megapillar 3.pdf · uploaded 30 Jun 2026Source
- Withdrawal Update Form 2FORM 2 FINAL.pdf · uploaded 30 Jun 2026Source
- Withdrawal Update Form 3FORM 3 FINAL.pdf · uploaded 30 Jun 2026Source
- Withdrawal Update Form 1Form-1 Yoo Pristine.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 2Form-2 Yoo Pristine.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 3Form 3 Yoo Pristine F 30-06-2026.pdf · uploaded 23 Jul 2026Source
- Form 2A (FY 2024-2025)FOrm 2A.pdf · uploaded 5 Aug 2026Source
- Form 2A (FY 2025-2026)FORM2A.pdf · uploaded 5 Aug 2026Source
- Withdrawal Update Form 1Form-1 Yoo Pristine.pdf · uploaded 24 Aug 2026Source
- Withdrawal Update Form 2Form-2 Yoo Pristine.pdf · uploaded 24 Aug 2026Source
- Withdrawal Update Form 3Form 3 - Yoo Pristine_.pdf · uploaded 24 Aug 2026Source
Technical
- DocumentLayout - Highlighted.pdf · uploaded 30 Nov 2024Source
- DocumentLayout.pdf · uploaded 30 Nov 2024Source
- DocumentD Building Commerical FF SN 5 Rotated.pdf · uploaded 2 Dec 2024Source
- DocumentD Building Commecrial rotated 1 compressed.pdf · uploaded 2 Dec 2024Source
- DocumentC Building Commercial 3 compressed rotated.pdf · uploaded 2 Dec 2024Source
- DocumentS N 11 COMMERCIAL BLDG rotated.pdf · uploaded 3 Dec 2024Source
- DocumentCommerical BLDG ff s n 10 rotated.pdf · uploaded 3 Dec 2024Source
- DocumentCommerical B SN 9 rotated.pdf · uploaded 3 Dec 2024Source
- DocumentE Building Mhada SN 8 TERRACE rotated.pdf · uploaded 3 Dec 2024Source
- DocumentE Building Mhada SN 7 rotated.pdf · uploaded 3 Dec 2024Source
- DocumentD Building Commerical First Floar plancompressed rotated.pdf · uploaded 3 Dec 2024Source
- Other – TechnicalAnnex A Decla Cum Undertaking (1).pdf · uploaded 18 Dec 2024Source
- DocumentAKURDI 01 FINAL.pdf · uploaded 10 Feb 2025Source
- DocumentAKURDI 02.pdf · uploaded 10 Feb 2025Source
- DocumentAKURDI 01 FINAL.pdf · uploaded 10 Feb 2025Source
- DocumentAKURDI 03.pdf · uploaded 10 Feb 2025Source
- DocumentAKURDI 04.pdf · uploaded 10 Feb 2025Source
- DocumentAKURDI 05.pdf · uploaded 10 Feb 2025Source
- DocumentAKURDI 06.pdf · uploaded 10 Feb 2025Source
- DocumentAKURDI 07.pdf · uploaded 10 Feb 2025Source
- DocumentAKURDI 08.pdf · uploaded 10 Feb 2025Source
- DocumentAKURDI 09.pdf · uploaded 10 Feb 2025Source
- DocumentAKURDI 10.pdf · uploaded 10 Feb 2025Source
- DocumentAKURDI 11.pdf · uploaded 10 Feb 2025Source
- DocumentAKURDI 12.pdf · uploaded 10 Feb 2025Source
- DocumentAKURDI 13.pdf · uploaded 10 Feb 2025Source
- DocumentAKURDI 14.pdf · uploaded 10 Feb 2025Source
- DocumentScan 2025-5-9 rotated - fINAL HIGHLITGHTED_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 Rotated_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 rotated_compressed- 2.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 A- 1_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 A - 2_rotated_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 (2,8,9) A - 3.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 (2,8,47) A- 4.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 B - 1_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 B - 2rotated_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 B - 3 _rotated_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 B - 4_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 C - 1_rotated_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 C - 2_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 C - 3_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 C- 4_rotated_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 D - 1_rotated_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 D- 2_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 D- 3_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 D - 4_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 D - 5_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 D- 6_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 D - 7_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 E MHADA - 1_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 (2,22,57) E MHADA - 2.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 COMM BLDG_rotated_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 COMM BLg _rotated_compressed.pdf · uploaded 10 May 2025Source
- DocumentScan 2025-5-9 (2,27,21) COMM BLDG_rotated_compressed.pdf · uploaded 10 May 2025Source
- Document01-29 _ Layout.pdf · uploaded 26 Aug 2026Source
- Document02-29 _ Parking Layout.pdf · uploaded 26 Aug 2026Source
- Document03-29 _ Parking Layout.pdf · uploaded 26 Aug 2026Source
- Document04-29 _ Building A.pdf · uploaded 26 Aug 2026Source
- Document05-29 _ Building A.pdf · uploaded 26 Aug 2026Source
- Document06-29 _ Building A.pdf · uploaded 26 Aug 2026Source
- Document07-29 _ Building A.pdf · uploaded 26 Aug 2026Source
- Document08-29 _ Building B.pdf · uploaded 26 Aug 2026Source
- Document09-29 _ Building B.pdf · uploaded 26 Aug 2026Source
- Document10-29 _ Building B.pdf · uploaded 26 Aug 2026Source
- Document11-29 _ Building B.pdf · uploaded 26 Aug 2026Source
- Document12-29 _ Building C.pdf · uploaded 26 Aug 2026Source
- Document13-29 _ Building C.pdf · uploaded 26 Aug 2026Source
- Document14-29 _ Building C.pdf · uploaded 26 Aug 2026Source
- Document15-29 _ Building C.pdf · uploaded 26 Aug 2026Source
- Document16-29 _ Building C.pdf · uploaded 26 Aug 2026Source
- Document17-29 _ Building C.pdf · uploaded 26 Aug 2026Source
- Document18-29 _ Building D.pdf · uploaded 26 Aug 2026Source
- Document19-29 _ Building D.pdf · uploaded 26 Aug 2026Source
- Document20-29 _ Building D.pdf · uploaded 26 Aug 2026Source
- Document21-29 _ Building D.pdf · uploaded 26 Aug 2026Source
- Document22-29 _ Building D.pdf · uploaded 26 Aug 2026Source
- Document23-29 _ Building D.pdf · uploaded 26 Aug 2026Source
- Document24-29 _ Building D.pdf · uploaded 26 Aug 2026Source
- Document25-29 _ Building E.pdf · uploaded 26 Aug 2026Source
- Document26-29 _ Building E.pdf · uploaded 26 Aug 2026Source
- Document27-29 _ Commercial Building.pdf · uploaded 26 Aug 2026Source
- Document28-29 _ Commercial Building.pdf · uploaded 26 Aug 2026Source
- Document29-29 _ Commercial Building.pdf · uploaded 26 Aug 2026Source
- Others2 - Highlighted Parking Layout.pdf · uploaded 31 Aug 2026Source
- Others3 - Highlighted Parking Layout.pdf · uploaded 31 Aug 2026Source
Technical (Architect)
- DocumentForm-1 Yoo Pristine.pdf · uploaded 23 Jul 2026Source
Technical (Engineer)
- DocumentForm-2 Yoo Pristine.pdf · uploaded 23 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel CTS No. 4667 (P), Survey No. 162 (P)
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 3BHK, 4BHK, 2BHK, 3.5 BHK, Shop, 1BHK323 units in all
- Address
- Survey No. 162 (P), CTS No. 4667 (P), Village AkurdiPIN 411035
- Village
- Pimpri Chinchawad (M Corp.), Haveli taluka
- Location
- 18.64408, 73.78958
- Land area for this project
- 23,619 sq m (2,54,233 sq ft)
- Permissible built-up area
- 91,087 sq m (9,80,456 sq ft)
- Sanctioned built-up area
- 90,855 sq m (9,77,953 sq ft)
- Recreational open space
- 2,003 sq m (21,563 sq ft)
- Designated bank account
- 85
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Survey No. 162 (P), CTS No. 4667 (P), Village Akurdi
Boundaries
- North
- By Partly Nala and Partly 61 Mtr Wide Pune Mumbai
- South
- By 61 Mtr Wide Pune Mumbai Road
- East
- By 18 mtr wide Road
- West
- By Nala passing through Adj CTS No 4667 P
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking323 units
0 of 323 units booked (0%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Building | 3BHK | 118.47 sq m · 1,275 sq ft | 4 | 0 |
| A Building | 3BHK | 118.64 sq m · 1,277 sq ft | 4 | 0 |
| A Building | 4BHK | 131.16 sq m · 1,412 sq ft | 17 | 0 |
| A Building | 4BHK | 132.15 sq m · 1,422 sq ft | 17 | 0 |
| A Building | 4BHK | 135.76 sq m · 1,461 sq ft | 13 | 0 |
| A Building | 4BHK | 135.94 sq m · 1,463 sq ft | 13 | 0 |
| B Building | 2BHK | 70.93 sq m · 763 sq ft | 65 | 0 |
| B Building | 3.5 BHK | 114.03 sq m · 1,227 sq ft | 1 | 0 |
Show all 34 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| B Building | 3.5 BHK | 115.12 sq m · 1,239 sq ft | 4 | 0 |
| B Building | 3BHK | 94.86 sq m · 1,021 sq ft | 59 | 0 |
| C Building | Shop | 24.79 sq m · 267 sq ft | 2 | 0 |
| C Building | Shop | 35.51 sq m · 382 sq ft | 12 | 0 |
| C Building | Shop | 38.69 sq m · 416 sq ft | 6 | 0 |
| C Building | Shop | 47.83 sq m · 515 sq ft | 2 | 0 |
| Commercial Building | Shop | 61.35 sq m · 660 sq ft | 2 | 0 |
| Commercial Building | Shop | 64.2 sq m · 691 sq ft | 6 | 0 |
| Commercial Building | Shop | 75.78 sq m · 816 sq ft | 2 | 0 |
| Commercial Building | Shop | 77.58 sq m · 835 sq ft | 6 | 0 |
| Commercial Building | Shop | 82.88 sq m · 892 sq ft | 2 | 0 |
| Commercial Building | Shop | 83.51 sq m · 899 sq ft | 2 | 0 |
| Commercial Building | Shop | 134.38 sq m · 1,446 sq ft | 7 | 0 |
| Commercial Building | Shop | 166.61 sq m · 1,793 sq ft | 1 | 0 |
| Commercial Building | Shop | 367.99 sq m · 3,961 sq ft | 1 | 0 |
| Commercial Building | Shop | 777.98 sq m · 8,374 sq ft | 1 | 0 |
| Commercial Building | Shop | 1,319.8 sq m · 14,206 sq ft | 1 | 0 |
| D Building | Shop | 35.51 sq m · 382 sq ft | 6 | 0 |
| D Building | Shop | 36.23 sq m · 390 sq ft | 2 | 0 |
| D Building | Shop | 37.52 sq m · 404 sq ft | 8 | 0 |
| D Building | Shop | 38.69 sq m · 416 sq ft | 4 | 0 |
| D Building | Shop | 306.96 sq m · 3,304 sq ft | 1 | 0 |
| D Building | Shop | 485.26 sq m · 5,223 sq ft | 1 | 0 |
| E Bldg MHADA | 1BHK | 35.9 sq m · 386 sq ft | 15 | 0 |
| E Bldg MHADA | 1BHK | 38.61 sq m · 416 sq ft | 18 | 0 |
| E Bldg MHADA | 1BHK | 41.82 sq m · 450 sq ft | 18 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Manoj Tatooskar | — |
| Chartered accountant | Ca Amit Satish Shingvi | — |
| Engineer | Anandkumar Revadkar | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Pimpri Chinchawad (M Corp.)
- Rahul ResidencyRERA PR1260002602540
- SkyoneRERA PR1260002601495
- Kundan Praangan B BuildingRERA PM1261012600240
- Avis AvanteRERA PM1260002502977
- Ellora EnclaveRERA PR1260002502650
- Leela HeritageRERA PR1260002502610
- Samruddhi Indraprasth ResidencyRERA PR1260002501910
- Apex Business BayRERA PC1260002501719
All 543 projects in Pimpri Chinchawad (M Corp.) · Compare Yoo Pristine with another project
Yoo Pristine in numbers
Registered deals, summarised
Deedo has 377 registered documents at Yoo Pristine, from Feb 2025 to Oct 2026: 374 sales, 3 mortgages. The median registered sale since Feb 2025 works out to about ₹12,500 per sq ft, at a median of ₹1.12 Cr a deal; 0% of sales were resales.
- What is the price per sq ft at Yoo Pristine?
- The median registered sale since Feb 2025 works out to about ₹12,500 per sq ft, at a median of ₹1.12 Cr a deal; 0% of sales were resales.
- How many properties have been sold at Yoo Pristine?
- 374 sales are registered at Yoo Pristine.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Yoo Pristine by Deedo, last updated with deals registered in Oct 2026.
Latest deal · Primary sale · Oct 2026
₹1–1.5 Cr