Others · 1 building · 71 unitsRERA P52100078994

Cullinan

Deedo IDDP-PUN-86JN

Completion was pushed back 4 months, to Apr 2030; no MahaRERA orders on record; 0% of its units are booked.

Pimple Nilakh, Pune 411027 · Property rates in Pimple Nilakh · by Garve Corporation

DeliveryExtended 4 moPromised Dec 2029 · now due Apr 2030RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales0% booked0 of 71 units · as the promoter reported to MahaRERAPrice₹6,830 /sq ft28.6% below Pimple Nilakh · 19 registered sales

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2030

  • This projectRegistered 28 Jan 2025, completion promised 31 Dec 2029, revised to 30 Apr 2030.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

All 21 deeds →
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Aug 2026Cullinan · 601Primary sale512 sq ftView Primary sale, Aug 2026
Jun 2026Cullinan · 9Primary sale—View Primary sale, Jun 2026
Jun 2026Cullinan · 9Primary sale—View Primary sale, Jun 2026
Mar 2026Cullinan · 10Primary sale304 sq ftView Primary sale, Mar 2026
Mar 2026Cullinan · 16Primary sale155 sq ftView Primary sale, Mar 2026
Apr 2025Cullinan · 804Resale1,499 sq ftView Resale, Apr 2025
Dec 2024Cullinan · 703Resale800 sq ftView Resale, Dec 2024
Nov 2024Cullinan · 703Primary sale800 sq ftView Primary sale, Nov 2024
Feb 2023Cullinan · 902Resale1,499 sq ftView Resale, Feb 2023
Mar 2021Cullinan · 1102Resale1,499 sq ftView Resale, Mar 2021

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100078994
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210007899428 Jan 202531 Dec 202930 Apr 2030M/s Garve CorporationProject page
Documents119

1 document held by Deedo, 118 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN Card Garve Corp.pdf · uploaded 1 Dec 2024Source
  • Other – FinanceDeclaration Cum Undertaking for No Sale.pdf · uploaded 3 Dec 2024Source
  • Other – FinanceDeclaration of Revenue Share.pdf · uploaded 4 Jan 2025Source

Legal

  • Legal Title reportLegal Search Title Report Cullinan.pdf · uploaded 1 Dec 2024Source
  • Declaration Form BForm B by Promoter.pdf · uploaded 1 Dec 2024Source
  • Other – LegalDeclaration of Revenue Share.pdf · uploaded 4 Jan 2025Source
  • Other – LegalDeclaration of Landowners and Legal Heirs.pdf · uploaded 4 Jan 2025Source
Show all 119 documentsShow fewer documents

Migrated

  • 1 PAN CardPAN Card Garve Corp.pdf · uploaded 1 Dec 2024Source
  • 1 Copy of the legal title reportLegal Search Title Report Cullinan.pdf · uploaded 1 Dec 2024Source
  • 1 a Details of encumbrances concerned to FinanceEncumbrances Declaration Finance.pdf · uploaded 1 Dec 2024Source
  • 2 a Details of encumbrances concerned to FinanceEncumbrances Declaration Legal.pdf · uploaded 1 Dec 2024Source
  • 1 Proforma of Allotment letterAllotment Letter Format RERA.PDF · uploaded 1 Dec 2024Source
  • 1 Declaration in FORM BForm B by Promoter.pdf · uploaded 1 Dec 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Cullinan.pdf · uploaded 1 Dec 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 1 Dec 2024Source
  • 1 Declaration about Commencement CertificateDeclaration Commencement Certificate.PDF · uploaded 1 Dec 2024Source
  • 1 CERSAI detailsCERSAI Declaration.pdf · uploaded 1 Dec 2024Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)Designated Bank Accout Declaration.PDF · uploaded 1 Dec 2024Source
  • 1 Deviation Report with respect to Allotment letterDeclaration Allotment Letter Deviation.pdf · uploaded 1 Dec 2024Source
  • 1 b Details of encumbrances concerned to LegalEncumbrances Declaration Finance.pdf · uploaded 1 Dec 2024Source
  • 2 b Details of encumbrances concerned to LegalEncumbrances Declaration Legal.pdf · uploaded 1 Dec 2024Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report CULLINAN.pdf · uploaded 1 Dec 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Other RERA Kishor Garve.PDF · uploaded 1 Dec 2024Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Other RERA Vinayak Garve.PDF · uploaded 1 Dec 2024Source
  • 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Bank Nomenclature Declaration.PDF · uploaded 1 Dec 2024Source
  • 1 Disclosure for secured/unsecured finance availed for the projectProject Finance Declaration.PDF · uploaded 1 Dec 2024Source
  • 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 3 Dec 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 3 Dec 2024Source
  • 9 Building Plan Approval / NA Order for plotted developmentFifth Floor Parking.pdf · uploaded 3 Dec 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentBasement 2 Parking.pdf · uploaded 3 Dec 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentBasement 1 Parking.pdf · uploaded 3 Dec 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentGround Floor Plan.pdf · uploaded 3 Dec 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentGround Mezzanine Plan.pdf · uploaded 3 Dec 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentFirst Floor Plan.pdf · uploaded 3 Dec 2024Source
  • 6 Building Plan Approval / NA Order for plotted developmentFirst Floor Mezzanine Plan.pdf · uploaded 3 Dec 2024Source
  • 7 Building Plan Approval / NA Order for plotted developmentSecond Floor Plan.pdf · uploaded 3 Dec 2024Source
  • 8 Building Plan Approval / NA Order for plotted developmentThird and Fourth Floor Parking.pdf · uploaded 3 Dec 2024Source
  • 10 Building Plan Approval / NA Order for plotted developmentElevation Plan.pdf · uploaded 3 Dec 2024Source
  • 11 Building Plan Approval / NA Order for plotted developmentSection Plan.pdf · uploaded 3 Dec 2024Source
  • 2 Other – FinanceDeclaration Cum Undertaking for No Sale.pdf · uploaded 3 Dec 2024Source
  • 1 Proforma of Agreement for saleAgreement to Sale Cullinan New.pdf · uploaded 3 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 Garve Corporation.pdf · uploaded 6 Dec 2024Source
  • 1 Other – TechnicalOne Project Declaration.pdf · uploaded 7 Dec 2024Source
  • 1 Other – LegalDeclaration of Landowners and Legal Heirs.pdf · uploaded 4 Jan 2025Source
  • 2 Other – LegalDeclaration of Revenue Share.pdf · uploaded 4 Jan 2025Source
  • 1 Other – FinanceDeclaration of Revenue Share.pdf · uploaded 4 Jan 2025Source
  • 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 3 May 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 3 May 2025Source
  • Form 1Cullinan Form 1 March 25.pdf · uploaded 15 May 2026Source
  • Form 2Cullinan Form 2 March 25.pdf · uploaded 15 May 2026Source
  • Form 3Cullinan Form 3 March 25.pdf · uploaded 15 May 2026Source
  • Disclosure of Sold and Booked InventoryCullinan Sold Inventory March 25.pdf · uploaded 15 May 2026Source
  • Form 1Cullinan Form 1 June 25.pdf · uploaded 22 Aug 2026Source
  • Form 1Cullinan Form 1 Sept 25.pdf · uploaded 22 Aug 2026Source
  • Form 1Cullinan Form 1 Dec 25.pdf · uploaded 22 Aug 2026Source
  • Form 1Cullinan Form 1 Mar 26.pdf · uploaded 22 Aug 2026Source
  • Form 1Cullinan Form 1 June 26.pdf · uploaded 22 Aug 2026Source
  • Form 2Form 2 Engineer Certificate June 25.pdf · uploaded 22 Aug 2026Source
  • Form 2Form 2 Engineer Certificate Sept 25.pdf · uploaded 22 Aug 2026Source
  • Form 2Form 2 Engineer Certificate Dec 25.pdf · uploaded 22 Aug 2026Source
  • Form 2Form 2 Engineer Certificate Mar 26.pdf · uploaded 22 Aug 2026Source
  • Form 2Form 2 Engineer Certificate June 26.pdf · uploaded 22 Aug 2026Source
  • Form 3Cullinan Form 3 June 25.pdf · uploaded 22 Aug 2026Source
  • Form 3Cullinan Form 3 Sept 25.pdf · uploaded 22 Aug 2026Source
  • Form 3Cullinan Form 3 Dec 25.pdf · uploaded 22 Aug 2026Source
  • Form 3Cullinan Form 3 Mar 26.pdf · uploaded 22 Aug 2026Source
  • Form 3Cullinan Form 3 June 26.pdf · uploaded 22 Aug 2026Source
  • Disclosure of Sold and Booked InventorySold Inventory June 25.pdf · uploaded 22 Aug 2026Source
  • Disclosure of Sold and Booked InventorySold Inventory Sept 25.pdf · uploaded 22 Aug 2026Source
  • Disclosure of Sold and Booked InventorySold Inventory Dec 25.pdf · uploaded 22 Aug 2026Source
  • Disclosure of Sold and Booked InventorySold Inventory Mar 26.pdf · uploaded 22 Aug 2026Source
  • Disclosure of Sold and Booked InventorySold Inventory June 26.pdf · uploaded 22 Aug 2026Source
  • Form 2A (FY 2024-2025)FORM-2A Garve Corporation 25.pdf · uploaded 1 Oct 2026Source
  • Form 2A (FY 2025-2026)FORM-2A Garve Corporation 26.pdf · uploaded 1 Oct 2026Source
  • Form 2A (FY 2026-2027)FORM-2A Garve Corporation 27.pdf · uploaded 1 Oct 2026Source
  • Form 5 (FY 2024-2025)FORM 5 Garve Corporation 2024 - 2025.pdf · uploaded 1 Oct 2026Source
  • Form 5 (FY 2025-2026)FORM 5 Garve Corporation 2025 - 2026.pdf · uploaded 1 Oct 2026Source
  • Withdrawal Update Form 1From 1 Cullinan.pdf · uploaded 3 Oct 2026Source
  • Withdrawal Update Form 2From 2 Cullinan.pdf · uploaded 3 Oct 2026Source
  • Withdrawal Update Form 3Form 3 Cullinan Sept 26.pdf · uploaded 3 Oct 2026Source

Technical

  • DocumentLayout.pdf · uploaded 3 Dec 2024Source
  • DocumentSection Plan.pdf · uploaded 3 Dec 2024Source
  • DocumentElevation Plan.pdf · uploaded 3 Dec 2024Source
  • DocumentFifth Floor Parking.pdf · uploaded 3 Dec 2024Source
  • DocumentThird and Fourth Floor Parking.pdf · uploaded 3 Dec 2024Source
  • DocumentSecond Floor Plan.pdf · uploaded 3 Dec 2024Source
  • DocumentFirst Floor Mezzanine Plan.pdf · uploaded 3 Dec 2024Source
  • DocumentFirst Floor Plan.pdf · uploaded 3 Dec 2024Source
  • DocumentGround Mezzanine Plan.pdf · uploaded 3 Dec 2024Source
  • DocumentGround Floor Plan.pdf · uploaded 3 Dec 2024Source
  • DocumentBasement 1 Parking.pdf · uploaded 3 Dec 2024Source
  • DocumentBasement 2 Parking.pdf · uploaded 3 Dec 2024Source
  • Other – TechnicalOne Project Declaration.pdf · uploaded 7 Dec 2024Source
  • DocumentLayout.pdf · uploaded 3 May 2025Source
  • DocumentLayout.pdf · uploaded 3 Oct 2026Source
  • DocumentBasement 1 Parking Plan.pdf · uploaded 3 Oct 2026Source
  • DocumentBasement 2 Parking Plan.pdf · uploaded 3 Oct 2026Source
  • DocumentGround Floor Plan.pdf · uploaded 3 Oct 2026Source
  • DocumentGround Floor Mezzanine.pdf · uploaded 3 Oct 2026Source
  • DocumentFirst Floor Plan.pdf · uploaded 3 Oct 2026Source
  • DocumentSecond Floor Plan.pdf · uploaded 3 Oct 2026Source
  • DocumentThird and Fourth Parking Plan.pdf · uploaded 3 Oct 2026Source
  • DocumentFifth Floor Parking Plan.pdf · uploaded 3 Oct 2026Source
  • DocumentSixth Floor Plan.pdf · uploaded 3 Oct 2026Source
  • DocumentBasement 2 Parking.pdf · uploaded 3 Oct 2026Source
  • DocumentBasement 1 Parking.pdf · uploaded 3 Oct 2026Source
  • DocumentGround Floor Plan.pdf · uploaded 3 Oct 2026Source
  • DocumentGround Mezzanine Floor.pdf · uploaded 3 Oct 2026Source
  • DocumentFirst Floor Plan.pdf · uploaded 3 Oct 2026Source
  • DocumentFirst Floor Mezzanine Floor.pdf · uploaded 3 Oct 2026Source
  • DocumentSecond Floor Plan.pdf · uploaded 3 Oct 2026Source
  • DocumentThird and Fourth Floor Parking.pdf · uploaded 3 Oct 2026Source
  • DocumentFifth Floor Parking.pdf · uploaded 3 Oct 2026Source
  • DocumentSixth Floor Plan.pdf · uploaded 3 Oct 2026Source
  • DocumentCommencement Certificate.pdf · uploaded 3 Oct 2026Source
  • DocumentCommencement Certificate.pdf · uploaded 3 Oct 2026Source

Technical (Architect)

  • DocumentFrom 1 Cullinan.pdf · uploaded 2 Oct 2026Source

Technical (Engineer)

  • DocumentFrom 2 Cullinan.pdf · uploaded 2 Oct 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 1405, 1409

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
Landowner Shop, Shop71 units in all
Address
Survey No 26/1/1/2/3, 26/1/1/2/6/1, 26/1/1/2/8 & 28/5 CTS No 1404, 1405, 1409, 1410 & 1411 (P), Wakad Bhosari BRTS Road, Pimple NilakhPIN 411027
Village
Pimple Nilakh, Haveli taluka
Land area for this project
4,322 sq m (46,522 sq ft)
Permissible built-up area
35,946 sq m (3,86,921 sq ft)
Sanctioned built-up area
7,726 sq m (83,165 sq ft)
Recreational open space
432 sq m (4,650 sq ft)
Designated bank account
86
Developed in phases
No

Survey, CTS, gat or plot numbers

1405140914101411 (P)26/1/1/2/6/126/1/1/2/828/5 CTS No 1404Survey No 26/1/1/2/3

Land as published on MahaRERA's project page

Survey No 26/1/1/2/3, 26/1/1/2/6/1, 26/1/1/2/8 & 28/5 CTS No 1404, 1405, 1409, 1410 & 1411 (P)

Boundaries

North
By property of CTS 1415 and 1416
South
By 24 Meters DP Road
East
By 12 Meters DP Road
West
By adjoining Survey No 27

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking71 units

0 of 71 units booked (0%), as the promoter reported to MahaRERA

Landowner Shop · 6 unitsShop · 65 units
TypeCarpet areaUnitsBooked
Landowner Shop44.37 sq m · 478 sq ft10
Landowner Shop55.77 sq m · 600 sq ft10
Landowner Shop93.64 sq m · 1,008 sq ft10
Landowner Shop95.74 sq m · 1,031 sq ft10
Landowner Shop118.71 sq m · 1,278 sq ft10
Landowner Shop164.06 sq m · 1,766 sq ft10
Shop15.21 sq m · 164 sq ft20
Shop19.88 sq m · 214 sq ft10
Show all 66 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Shop32.94 sq m · 355 sq ft10
Shop33.62 sq m · 362 sq ft10
Shop33.63 sq m · 362 sq ft20
Shop37.74 sq m · 406 sq ft10
Shop39.13 sq m · 421 sq ft10
Shop39.63 sq m · 427 sq ft10
Shop42.26 sq m · 455 sq ft10
Shop43.92 sq m · 473 sq ft10
Shop44.37 sq m · 478 sq ft20
Shop46.84 sq m · 504 sq ft10
Shop48.09 sq m · 518 sq ft10
Shop48.23 sq m · 519 sq ft10
Shop48.45 sq m · 522 sq ft10
Shop48.49 sq m · 522 sq ft10
Shop49.8 sq m · 536 sq ft10
Shop50.85 sq m · 547 sq ft10
Shop52.59 sq m · 566 sq ft10
Shop53.31 sq m · 574 sq ft10
Shop53.46 sq m · 575 sq ft10
Shop53.51 sq m · 576 sq ft10
Shop53.54 sq m · 576 sq ft10
Shop54.24 sq m · 584 sq ft10
Shop54.78 sq m · 590 sq ft10
Shop55.95 sq m · 602 sq ft20
Shop56.32 sq m · 606 sq ft20
Shop58.25 sq m · 627 sq ft10
Shop58.26 sq m · 627 sq ft10
Shop60.87 sq m · 655 sq ft10
Shop61.74 sq m · 665 sq ft10
Shop61.77 sq m · 665 sq ft10
Shop61.8 sq m · 665 sq ft10
Shop62.8 sq m · 676 sq ft10
Shop63.99 sq m · 689 sq ft10
Shop64.31 sq m · 692 sq ft10
Shop66.13 sq m · 712 sq ft10
Shop66.61 sq m · 717 sq ft10
Shop69.21 sq m · 745 sq ft10
Shop72.24 sq m · 778 sq ft10
Shop72.25 sq m · 778 sq ft10
Shop75.23 sq m · 810 sq ft10
Shop75.25 sq m · 810 sq ft10
Shop77.03 sq m · 829 sq ft10
Shop81.09 sq m · 873 sq ft10
Shop81.56 sq m · 878 sq ft10
Shop84.14 sq m · 906 sq ft10
Shop84.58 sq m · 910 sq ft10
Shop86.88 sq m · 935 sq ft10
Shop94.98 sq m · 1,022 sq ft10
Shop101.48 sq m · 1,092 sq ft10
Shop108.71 sq m · 1,170 sq ft10
Shop109.87 sq m · 1,183 sq ft10
Shop112.41 sq m · 1,210 sq ft10
Shop120.16 sq m · 1,293 sq ft10
Shop121.62 sq m · 1,309 sq ft10
Shop153.03 sq m · 1,647 sq ft10
Shop167.49 sq m · 1,803 sq ft10
Shop170.43 sq m · 1,834 sq ft10
Shop257.62 sq m · 2,773 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMilind Patil—
EngineerPrathamesh Deepak Sugate—
EngineerVenkangouda V Jadiyappagoudar—

Source: MahaRERA project page. Contact details are not shown.

Cullinan in numbers

Registered deals, summarised

Deedo has 21 registered documents at Cullinan, from Feb 2015 to Aug 2026: 19 sales, 1 leave and licence agreement. The median registered sale since Feb 2015 works out to about ₹6,800 per sq ft, at a median of ₹84 L a deal; 32% of sales were resales.

What is the price per sq ft at Cullinan?
The median registered sale since Feb 2015 works out to about ₹6,800 per sq ft, at a median of ₹84 L a deal; 32% of sales were resales.
How many properties have been sold at Cullinan?
19 sales are registered at Cullinan, 6 of them resales.
Are properties at Cullinan rented out?
Yes: 1 leave and licence agreement is registered at Cullinan.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Cullinan by Deedo, last updated with deals registered in Aug 2026.

Latest deal · Primary sale · Aug 2026

₹50–75 L

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology