Cullinan
Deedo IDDP-PUN-86JNCompletion was pushed back 4 months, to Apr 2030; no MahaRERA orders on record; 0% of its units are booked.
Pimple Nilakh, Pune 411027 · Property rates in Pimple Nilakh · by Garve Corporation
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2030
- This projectRegistered 28 Jan 2025, completion promised 31 Dec 2029, revised to 30 Apr 2030.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Aug 2026
- Primary sale · Jun 2026No amount
- Primary sale · Jun 2026No amount
- Primary sale · Mar 2026
- Primary sale · Mar 2026
- Resale · Apr 2025
- Resale · Dec 2024
- Primary sale · Nov 2024
- Resale · Feb 2023
- Resale · Mar 2021
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Aug 2026 | Cullinan · 601 | Primary sale | 512 sq ft | View Primary sale, Aug 2026 | |
| Jun 2026 | Cullinan · 9 | Primary sale | — | View Primary sale, Jun 2026 | |
| Jun 2026 | Cullinan · 9 | Primary sale | — | View Primary sale, Jun 2026 | |
| Mar 2026 | Cullinan · 10 | Primary sale | 304 sq ft | View Primary sale, Mar 2026 | |
| Mar 2026 | Cullinan · 16 | Primary sale | 155 sq ft | View Primary sale, Mar 2026 | |
| Apr 2025 | Cullinan · 804 | Resale | 1,499 sq ft | View Resale, Apr 2025 | |
| Dec 2024 | Cullinan · 703 | Resale | 800 sq ft | View Resale, Dec 2024 | |
| Nov 2024 | Cullinan · 703 | Primary sale | 800 sq ft | View Primary sale, Nov 2024 | |
| Feb 2023 | Cullinan · 902 | Resale | 1,499 sq ft | View Resale, Feb 2023 | |
| Mar 2021 | Cullinan · 1102 | Resale | 1,499 sq ft | View Resale, Mar 2021 |
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100078994
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100078994 | 28 Jan 2025 | 31 Dec 2029 | 30 Apr 2030 | M/s Garve Corporation | Project page |
Documents119
1 document held by Deedo, 118 filings listed on MahaRERA's project page
Finance
Legal
- Legal Title reportLegal Search Title Report Cullinan.pdf · uploaded 1 Dec 2024Source
- Declaration Form BForm B by Promoter.pdf · uploaded 1 Dec 2024Source
- Other – LegalDeclaration of Revenue Share.pdf · uploaded 4 Jan 2025Source
- Other – LegalDeclaration of Landowners and Legal Heirs.pdf · uploaded 4 Jan 2025Source
Show all 119 documentsShow fewer documents
Migrated
- 1 PAN CardPAN Card Garve Corp.pdf · uploaded 1 Dec 2024Source
- 1 Copy of the legal title reportLegal Search Title Report Cullinan.pdf · uploaded 1 Dec 2024Source
- 1 a Details of encumbrances concerned to FinanceEncumbrances Declaration Finance.pdf · uploaded 1 Dec 2024Source
- 2 a Details of encumbrances concerned to FinanceEncumbrances Declaration Legal.pdf · uploaded 1 Dec 2024Source
- 1 Proforma of Allotment letterAllotment Letter Format RERA.PDF · uploaded 1 Dec 2024Source
- 1 Declaration in FORM BForm B by Promoter.pdf · uploaded 1 Dec 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Cullinan.pdf · uploaded 1 Dec 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 1 Dec 2024Source
- 1 Declaration about Commencement CertificateDeclaration Commencement Certificate.PDF · uploaded 1 Dec 2024Source
- 1 CERSAI detailsCERSAI Declaration.pdf · uploaded 1 Dec 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)Designated Bank Accout Declaration.PDF · uploaded 1 Dec 2024Source
- 1 Deviation Report with respect to Allotment letterDeclaration Allotment Letter Deviation.pdf · uploaded 1 Dec 2024Source
- 1 b Details of encumbrances concerned to LegalEncumbrances Declaration Finance.pdf · uploaded 1 Dec 2024Source
- 2 b Details of encumbrances concerned to LegalEncumbrances Declaration Legal.pdf · uploaded 1 Dec 2024Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report CULLINAN.pdf · uploaded 1 Dec 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Other RERA Kishor Garve.PDF · uploaded 1 Dec 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Other RERA Vinayak Garve.PDF · uploaded 1 Dec 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Bank Nomenclature Declaration.PDF · uploaded 1 Dec 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectProject Finance Declaration.PDF · uploaded 1 Dec 2024Source
- 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 3 Dec 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 3 Dec 2024Source
- 9 Building Plan Approval / NA Order for plotted developmentFifth Floor Parking.pdf · uploaded 3 Dec 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentBasement 2 Parking.pdf · uploaded 3 Dec 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentBasement 1 Parking.pdf · uploaded 3 Dec 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentGround Floor Plan.pdf · uploaded 3 Dec 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentGround Mezzanine Plan.pdf · uploaded 3 Dec 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentFirst Floor Plan.pdf · uploaded 3 Dec 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentFirst Floor Mezzanine Plan.pdf · uploaded 3 Dec 2024Source
- 7 Building Plan Approval / NA Order for plotted developmentSecond Floor Plan.pdf · uploaded 3 Dec 2024Source
- 8 Building Plan Approval / NA Order for plotted developmentThird and Fourth Floor Parking.pdf · uploaded 3 Dec 2024Source
- 10 Building Plan Approval / NA Order for plotted developmentElevation Plan.pdf · uploaded 3 Dec 2024Source
- 11 Building Plan Approval / NA Order for plotted developmentSection Plan.pdf · uploaded 3 Dec 2024Source
- 2 Other – FinanceDeclaration Cum Undertaking for No Sale.pdf · uploaded 3 Dec 2024Source
- 1 Proforma of Agreement for saleAgreement to Sale Cullinan New.pdf · uploaded 3 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 Garve Corporation.pdf · uploaded 6 Dec 2024Source
- 1 Other – TechnicalOne Project Declaration.pdf · uploaded 7 Dec 2024Source
- 1 Other – LegalDeclaration of Landowners and Legal Heirs.pdf · uploaded 4 Jan 2025Source
- 2 Other – LegalDeclaration of Revenue Share.pdf · uploaded 4 Jan 2025Source
- 1 Other – FinanceDeclaration of Revenue Share.pdf · uploaded 4 Jan 2025Source
- 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 3 May 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 3 May 2025Source
- Form 1Cullinan Form 1 March 25.pdf · uploaded 15 May 2026Source
- Form 2Cullinan Form 2 March 25.pdf · uploaded 15 May 2026Source
- Form 3Cullinan Form 3 March 25.pdf · uploaded 15 May 2026Source
- Disclosure of Sold and Booked InventoryCullinan Sold Inventory March 25.pdf · uploaded 15 May 2026Source
- Form 1Cullinan Form 1 June 25.pdf · uploaded 22 Aug 2026Source
- Form 1Cullinan Form 1 Sept 25.pdf · uploaded 22 Aug 2026Source
- Form 1Cullinan Form 1 Dec 25.pdf · uploaded 22 Aug 2026Source
- Form 1Cullinan Form 1 Mar 26.pdf · uploaded 22 Aug 2026Source
- Form 1Cullinan Form 1 June 26.pdf · uploaded 22 Aug 2026Source
- Form 2Form 2 Engineer Certificate June 25.pdf · uploaded 22 Aug 2026Source
- Form 2Form 2 Engineer Certificate Sept 25.pdf · uploaded 22 Aug 2026Source
- Form 2Form 2 Engineer Certificate Dec 25.pdf · uploaded 22 Aug 2026Source
- Form 2Form 2 Engineer Certificate Mar 26.pdf · uploaded 22 Aug 2026Source
- Form 2Form 2 Engineer Certificate June 26.pdf · uploaded 22 Aug 2026Source
- Form 3Cullinan Form 3 June 25.pdf · uploaded 22 Aug 2026Source
- Form 3Cullinan Form 3 Sept 25.pdf · uploaded 22 Aug 2026Source
- Form 3Cullinan Form 3 Dec 25.pdf · uploaded 22 Aug 2026Source
- Form 3Cullinan Form 3 Mar 26.pdf · uploaded 22 Aug 2026Source
- Form 3Cullinan Form 3 June 26.pdf · uploaded 22 Aug 2026Source
- Disclosure of Sold and Booked InventorySold Inventory June 25.pdf · uploaded 22 Aug 2026Source
- Disclosure of Sold and Booked InventorySold Inventory Sept 25.pdf · uploaded 22 Aug 2026Source
- Disclosure of Sold and Booked InventorySold Inventory Dec 25.pdf · uploaded 22 Aug 2026Source
- Disclosure of Sold and Booked InventorySold Inventory Mar 26.pdf · uploaded 22 Aug 2026Source
- Disclosure of Sold and Booked InventorySold Inventory June 26.pdf · uploaded 22 Aug 2026Source
- Form 2A (FY 2024-2025)FORM-2A Garve Corporation 25.pdf · uploaded 1 Oct 2026Source
- Form 2A (FY 2025-2026)FORM-2A Garve Corporation 26.pdf · uploaded 1 Oct 2026Source
- Form 2A (FY 2026-2027)FORM-2A Garve Corporation 27.pdf · uploaded 1 Oct 2026Source
- Form 5 (FY 2024-2025)FORM 5 Garve Corporation 2024 - 2025.pdf · uploaded 1 Oct 2026Source
- Form 5 (FY 2025-2026)FORM 5 Garve Corporation 2025 - 2026.pdf · uploaded 1 Oct 2026Source
- Withdrawal Update Form 1From 1 Cullinan.pdf · uploaded 3 Oct 2026Source
- Withdrawal Update Form 2From 2 Cullinan.pdf · uploaded 3 Oct 2026Source
- Withdrawal Update Form 3Form 3 Cullinan Sept 26.pdf · uploaded 3 Oct 2026Source
Technical
- DocumentLayout.pdf · uploaded 3 Dec 2024Source
- DocumentSection Plan.pdf · uploaded 3 Dec 2024Source
- DocumentElevation Plan.pdf · uploaded 3 Dec 2024Source
- DocumentFifth Floor Parking.pdf · uploaded 3 Dec 2024Source
- DocumentThird and Fourth Floor Parking.pdf · uploaded 3 Dec 2024Source
- DocumentSecond Floor Plan.pdf · uploaded 3 Dec 2024Source
- DocumentFirst Floor Mezzanine Plan.pdf · uploaded 3 Dec 2024Source
- DocumentFirst Floor Plan.pdf · uploaded 3 Dec 2024Source
- DocumentGround Mezzanine Plan.pdf · uploaded 3 Dec 2024Source
- DocumentGround Floor Plan.pdf · uploaded 3 Dec 2024Source
- DocumentBasement 1 Parking.pdf · uploaded 3 Dec 2024Source
- DocumentBasement 2 Parking.pdf · uploaded 3 Dec 2024Source
- Other – TechnicalOne Project Declaration.pdf · uploaded 7 Dec 2024Source
- DocumentLayout.pdf · uploaded 3 May 2025Source
- DocumentLayout.pdf · uploaded 3 Oct 2026Source
- DocumentBasement 1 Parking Plan.pdf · uploaded 3 Oct 2026Source
- DocumentBasement 2 Parking Plan.pdf · uploaded 3 Oct 2026Source
- DocumentGround Floor Plan.pdf · uploaded 3 Oct 2026Source
- DocumentGround Floor Mezzanine.pdf · uploaded 3 Oct 2026Source
- DocumentFirst Floor Plan.pdf · uploaded 3 Oct 2026Source
- DocumentSecond Floor Plan.pdf · uploaded 3 Oct 2026Source
- DocumentThird and Fourth Parking Plan.pdf · uploaded 3 Oct 2026Source
- DocumentFifth Floor Parking Plan.pdf · uploaded 3 Oct 2026Source
- DocumentSixth Floor Plan.pdf · uploaded 3 Oct 2026Source
- DocumentBasement 2 Parking.pdf · uploaded 3 Oct 2026Source
- DocumentBasement 1 Parking.pdf · uploaded 3 Oct 2026Source
- DocumentGround Floor Plan.pdf · uploaded 3 Oct 2026Source
- DocumentGround Mezzanine Floor.pdf · uploaded 3 Oct 2026Source
- DocumentFirst Floor Plan.pdf · uploaded 3 Oct 2026Source
- DocumentFirst Floor Mezzanine Floor.pdf · uploaded 3 Oct 2026Source
- DocumentSecond Floor Plan.pdf · uploaded 3 Oct 2026Source
- DocumentThird and Fourth Floor Parking.pdf · uploaded 3 Oct 2026Source
- DocumentFifth Floor Parking.pdf · uploaded 3 Oct 2026Source
- DocumentSixth Floor Plan.pdf · uploaded 3 Oct 2026Source
- DocumentCommencement Certificate.pdf · uploaded 3 Oct 2026Source
- DocumentCommencement Certificate.pdf · uploaded 3 Oct 2026Source
Technical (Architect)
- DocumentFrom 1 Cullinan.pdf · uploaded 2 Oct 2026Source
Technical (Engineer)
- DocumentFrom 2 Cullinan.pdf · uploaded 2 Oct 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 1405, 1409
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- Landowner Shop, Shop71 units in all
- Address
- Survey No 26/1/1/2/3, 26/1/1/2/6/1, 26/1/1/2/8 & 28/5 CTS No 1404, 1405, 1409, 1410 & 1411 (P), Wakad Bhosari BRTS Road, Pimple NilakhPIN 411027
- Village
- Pimple Nilakh, Haveli taluka
- Location
- 18.58873, 73.78021
- Land area for this project
- 4,322 sq m (46,522 sq ft)
- Permissible built-up area
- 35,946 sq m (3,86,921 sq ft)
- Sanctioned built-up area
- 7,726 sq m (83,165 sq ft)
- Recreational open space
- 432 sq m (4,650 sq ft)
- Designated bank account
- 86
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Survey No 26/1/1/2/3, 26/1/1/2/6/1, 26/1/1/2/8 & 28/5 CTS No 1404, 1405, 1409, 1410 & 1411 (P)
Boundaries
- North
- By property of CTS 1415 and 1416
- South
- By 24 Meters DP Road
- East
- By 12 Meters DP Road
- West
- By adjoining Survey No 27
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking71 units
0 of 71 units booked (0%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Landowner Shop | 44.37 sq m · 478 sq ft | 1 | 0 |
| Landowner Shop | 55.77 sq m · 600 sq ft | 1 | 0 |
| Landowner Shop | 93.64 sq m · 1,008 sq ft | 1 | 0 |
| Landowner Shop | 95.74 sq m · 1,031 sq ft | 1 | 0 |
| Landowner Shop | 118.71 sq m · 1,278 sq ft | 1 | 0 |
| Landowner Shop | 164.06 sq m · 1,766 sq ft | 1 | 0 |
| Shop | 15.21 sq m · 164 sq ft | 2 | 0 |
| Shop | 19.88 sq m · 214 sq ft | 1 | 0 |
Show all 66 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Shop | 32.94 sq m · 355 sq ft | 1 | 0 |
| Shop | 33.62 sq m · 362 sq ft | 1 | 0 |
| Shop | 33.63 sq m · 362 sq ft | 2 | 0 |
| Shop | 37.74 sq m · 406 sq ft | 1 | 0 |
| Shop | 39.13 sq m · 421 sq ft | 1 | 0 |
| Shop | 39.63 sq m · 427 sq ft | 1 | 0 |
| Shop | 42.26 sq m · 455 sq ft | 1 | 0 |
| Shop | 43.92 sq m · 473 sq ft | 1 | 0 |
| Shop | 44.37 sq m · 478 sq ft | 2 | 0 |
| Shop | 46.84 sq m · 504 sq ft | 1 | 0 |
| Shop | 48.09 sq m · 518 sq ft | 1 | 0 |
| Shop | 48.23 sq m · 519 sq ft | 1 | 0 |
| Shop | 48.45 sq m · 522 sq ft | 1 | 0 |
| Shop | 48.49 sq m · 522 sq ft | 1 | 0 |
| Shop | 49.8 sq m · 536 sq ft | 1 | 0 |
| Shop | 50.85 sq m · 547 sq ft | 1 | 0 |
| Shop | 52.59 sq m · 566 sq ft | 1 | 0 |
| Shop | 53.31 sq m · 574 sq ft | 1 | 0 |
| Shop | 53.46 sq m · 575 sq ft | 1 | 0 |
| Shop | 53.51 sq m · 576 sq ft | 1 | 0 |
| Shop | 53.54 sq m · 576 sq ft | 1 | 0 |
| Shop | 54.24 sq m · 584 sq ft | 1 | 0 |
| Shop | 54.78 sq m · 590 sq ft | 1 | 0 |
| Shop | 55.95 sq m · 602 sq ft | 2 | 0 |
| Shop | 56.32 sq m · 606 sq ft | 2 | 0 |
| Shop | 58.25 sq m · 627 sq ft | 1 | 0 |
| Shop | 58.26 sq m · 627 sq ft | 1 | 0 |
| Shop | 60.87 sq m · 655 sq ft | 1 | 0 |
| Shop | 61.74 sq m · 665 sq ft | 1 | 0 |
| Shop | 61.77 sq m · 665 sq ft | 1 | 0 |
| Shop | 61.8 sq m · 665 sq ft | 1 | 0 |
| Shop | 62.8 sq m · 676 sq ft | 1 | 0 |
| Shop | 63.99 sq m · 689 sq ft | 1 | 0 |
| Shop | 64.31 sq m · 692 sq ft | 1 | 0 |
| Shop | 66.13 sq m · 712 sq ft | 1 | 0 |
| Shop | 66.61 sq m · 717 sq ft | 1 | 0 |
| Shop | 69.21 sq m · 745 sq ft | 1 | 0 |
| Shop | 72.24 sq m · 778 sq ft | 1 | 0 |
| Shop | 72.25 sq m · 778 sq ft | 1 | 0 |
| Shop | 75.23 sq m · 810 sq ft | 1 | 0 |
| Shop | 75.25 sq m · 810 sq ft | 1 | 0 |
| Shop | 77.03 sq m · 829 sq ft | 1 | 0 |
| Shop | 81.09 sq m · 873 sq ft | 1 | 0 |
| Shop | 81.56 sq m · 878 sq ft | 1 | 0 |
| Shop | 84.14 sq m · 906 sq ft | 1 | 0 |
| Shop | 84.58 sq m · 910 sq ft | 1 | 0 |
| Shop | 86.88 sq m · 935 sq ft | 1 | 0 |
| Shop | 94.98 sq m · 1,022 sq ft | 1 | 0 |
| Shop | 101.48 sq m · 1,092 sq ft | 1 | 0 |
| Shop | 108.71 sq m · 1,170 sq ft | 1 | 0 |
| Shop | 109.87 sq m · 1,183 sq ft | 1 | 0 |
| Shop | 112.41 sq m · 1,210 sq ft | 1 | 0 |
| Shop | 120.16 sq m · 1,293 sq ft | 1 | 0 |
| Shop | 121.62 sq m · 1,309 sq ft | 1 | 0 |
| Shop | 153.03 sq m · 1,647 sq ft | 1 | 0 |
| Shop | 167.49 sq m · 1,803 sq ft | 1 | 0 |
| Shop | 170.43 sq m · 1,834 sq ft | 1 | 0 |
| Shop | 257.62 sq m · 2,773 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Milind Patil | — |
| Engineer | Prathamesh Deepak Sugate | — |
| Engineer | Venkangouda V Jadiyappagoudar | — |
Source: MahaRERA project page. Contact details are not shown.
Cullinan in numbers
Registered deals, summarised
Deedo has 21 registered documents at Cullinan, from Feb 2015 to Aug 2026: 19 sales, 1 leave and licence agreement. The median registered sale since Feb 2015 works out to about ₹6,800 per sq ft, at a median of ₹84 L a deal; 32% of sales were resales.
- What is the price per sq ft at Cullinan?
- The median registered sale since Feb 2015 works out to about ₹6,800 per sq ft, at a median of ₹84 L a deal; 32% of sales were resales.
- How many properties have been sold at Cullinan?
- 19 sales are registered at Cullinan, 6 of them resales.
- Are properties at Cullinan rented out?
- Yes: 1 leave and licence agreement is registered at Cullinan.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Cullinan by Deedo, last updated with deals registered in Aug 2026.
Latest deal · Primary sale · Aug 2026
₹50–75 L