Deedo IDDP-PUN-HEDTMahaRERA shows it completed; no MahaRERA orders on record; 67% of its units are booked.
Pimpale Saudagar, Pune 411027 · Property rates in Pimpale Saudagar · by Wjv Landmarks LLP
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 13 Jul 2023, completion promised 30 Sep 2026.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Rental · 22 mo · Oct 2026
- Rental · Oct 2026
- Mortgage · Oct 2026No amount
- Rental · Oct 2026
- Rental · Oct 2026
- Rental · 22 mo · Sep 2026
- Rental · Sep 2026
- Rental · 22 mo · Sep 2026
- Primary sale · Sep 2026
- Rental · Sep 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Oct 2026 | B Wing · 303 | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | A Wing · 403 | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | Main building · 202 | Mortgage | — | View Mortgage, Oct 2026 | |
| Oct 2026 | F Wing · 304 | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | G Wing · 303 | Rental | — | View Rental, Oct 2026 | |
| Sep 2026 | A Wing · 203 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | E Wing · 303 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | C Wing · 203 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | H Wing · 202 | Primary sale | 939 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | A Wing · 204 | Rental | — | View Rental, Sep 2026 |
12 buildings
Open a building to see every flat, floor by floor.
- A Wing8 floors · 28 units82% booked
- B Wing7 floors · 26 units92% booked
- C Wing7 floors · 26 units81% booked
- D Wing7 floors · 26 units35% booked
- E Wing7 floors · 26 units65% booked
- F Wing7 floors · 26 units92% booked
- G Wing7 floors · 26 units46% booked
- H Wing7 floors · 20 units35% booked
- Wing ASize not on record
- Wing BSize not on record
- Wing CSize not on record
- Wing HSize not on record
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100051930
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100051930 | 13 Jul 2023 | 30 Sep 2026 | 30 Sep 2026 | Wjv Landmarks LLP | Project page |
Documents247
2 documents held by Deedo, 245 filings listed on MahaRERA's project page
Finance
- PAN CardPAN Card - Firm.pdf · uploaded 14 Jun 2023Source
Legal
- Other – LegalSale Deed 2786-2010-1-27.pdf · uploaded 14 Jun 2023Source
- Other – LegalSale Deed 2786-2010-28-54.pdf · uploaded 14 Jun 2023Source
- Declaration Form BForm B - Promoter.pdf · uploaded 14 Jun 2023Source
- Legal Title reportLegal Title Report - Revised.pdf · uploaded 23 Jun 2023Source
- Other – LegalDEVIATION REPORT AFS DT 03-07-2023.pdf · uploaded 3 Jul 2023Source
Show all 247 documentsShow fewer documents
Migrated
- 1 PAN CardPAN Card - Firm.pdf · uploaded 14 Jun 2023Source
- 1 a Details of encumbrances concerned to FinanceEncumbrances certificate - Finance.pdf · uploaded 14 Jun 2023Source
- 2 a Details of encumbrances concerned to FinanceEncumbrances certificate - Legal.pdf · uploaded 14 Jun 2023Source
- 1 b Details of encumbrances concerned to LegalEncumbrances certificate - Finance.pdf · uploaded 14 Jun 2023Source
- 2 b Details of encumbrances concerned to LegalEncumbrances certificate - Legal.pdf · uploaded 14 Jun 2023Source
- 1 Copy of Layout Approval (in case of layout)Plan No 1.pdf · uploaded 14 Jun 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan No 2.pdf · uploaded 14 Jun 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentPlan No 3.pdf · uploaded 14 Jun 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentPlan No 4.pdf · uploaded 14 Jun 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate Dated- 27-04-2023.pdf · uploaded 14 Jun 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentNA Order.pdf · uploaded 14 Jun 2023Source
- 1 Declaration about Commencement CertificateDeclaration of commencement certificate - Format D.pdf · uploaded 14 Jun 2023Source
- 1 Declaration in FORM BForm B - Promoter.pdf · uploaded 14 Jun 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's Certificate Form-1.pdf · uploaded 14 Jun 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE Form 2.pdf · uploaded 14 Jun 2023Source
- 1 CERSAI detailsCERSAI Search Report- Sai Aura.pdf · uploaded 14 Jun 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 - Sai Aura.pdf · uploaded 14 Jun 2023Source
- 1 Proforma of Allotment letterAllotment Letter - Sai Aura.pdf · uploaded 14 Jun 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration about separate bank account.pdf · uploaded 14 Jun 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation report - Allotment Letter.pdf · uploaded 14 Jun 2023Source
- 1 Other – LegalSale Deed 2786-2010-1-27.pdf · uploaded 14 Jun 2023Source
- 2 Other – LegalSale Deed 2786-2010-28-54.pdf · uploaded 14 Jun 2023Source
- 2 CERSAI detailsWJV- UNDERTAKING FOR NO CERSAI REPORT.pdf · uploaded 16 Jun 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Real Estate Organizations.pdf · uploaded 17 Jun 2023Source
- 1 Copy of the legal title reportLegal Title Report - Revised.pdf · uploaded 23 Jun 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report of AFS.pdf · uploaded 24 Jun 2023Source
- 1 Other – TechnicalPlan No 1 Highlighted.pdf · uploaded 27 Jun 2023Source
- 1 Proforma of Agreement for saleAgreement For Sale - Final.pdf · uploaded 3 Jul 2023Source
- 3 Other – LegalDEVIATION REPORT AFS DT 03-07-2023.pdf · uploaded 3 Jul 2023Source
- 2 Proforma of Agreement for saleAgreement For Sale - Sai Aura.pdf · uploaded 18 Jul 2023Source
- 3 Proforma of Agreement for sale2 Revised Agreement for Sale - SAI AURA.pdf · uploaded 12 Oct 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)SAI AURA ARCH CERT FY 23-24 Q2 .pdf · uploaded 8 Nov 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)WJV LANDMARKS ENGGINEERING CERT.pdf · uploaded 8 Nov 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 -Q2 CA Certificate -Final.pdf · uploaded 8 Nov 2023Source
- 1 Disclosure of sold/ booked inventorySAI AURA - PROMOTERS DISCLOSURE.pdf · uploaded 9 Nov 2023Source
- 4 Proforma of Agreement for saleRevised Draft for Agreement to Sale - SAI AURA 18-01-2024.pdf · uploaded 18 Jan 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)SAI AURA ARCH CERT FORM 1 FY23-24 Q3.pdf · uploaded 21 Feb 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)SAI AURA ENGG CERT FORM 2 FY23-24 Q3.pdf · uploaded 21 Feb 2024Source
- 2 Disclosure of sold/ booked inventorySAI AURA PROMOTERS DISCLOSURE FY 23-24 Q3.pdf · uploaded 23 Feb 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - CA Certificate ( Sai Aura) Q3.pdf · uploaded 26 Feb 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)04 SAI AURA ARCH CERT FORM 1 FY23-24 Q4.pdf · uploaded 7 May 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)SAI AURA ENGG CERT FORM 2 FY 23-24 Q4.pdf · uploaded 7 May 2024Source
- 3 Disclosure of sold/ booked inventoryPROMOTERS DISCLOSURE FY 23-24 Q4.pdf · uploaded 18 May 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SAI AURA FY 23-24 Q4.pdf · uploaded 18 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A SAI AURA FY 23-24.pdf · uploaded 17 Jun 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE WJV LANDMARKS LLP.pdf · uploaded 8 Aug 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE WJV LANDMARKS LLP.pdf · uploaded 8 Aug 2024Source
- 4 Disclosure of sold/ booked inventoryPROMOTERS DISCLOSURE SAI AURA.pdf · uploaded 8 Aug 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 FY 2024-25 Q1 Sai Aura.pdf · uploaded 8 Aug 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan- 2.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan- 3.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan-4.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan-5.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan-6.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan-7.pdf · uploaded 7 Oct 2024Source
- 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 7 Oct 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_compressed.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan -1.pdf · uploaded 7 Oct 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 1.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 2.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 3.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 4.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 5.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 6.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 7.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan- 2.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan- 3.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan-4.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan-5.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan-6.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan-7.pdf · uploaded 7 Oct 2024Source
- 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 7 Oct 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_compressed.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan -1.pdf · uploaded 7 Oct 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 1.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 2.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 3.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 4.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 5.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 6.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 7.pdf · uploaded 7 Oct 2024Source
- 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 7 Oct 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_compressed.pdf · uploaded 7 Oct 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 7 Oct 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentBuilding Plan-5.pdf · uploaded 7 Oct 2024Source
- 14 Building Plan Approval / NA Order for plotted developmentPlan 7.pdf · uploaded 7 Oct 2024Source
- 13 Building Plan Approval / NA Order for plotted developmentPlan 6.pdf · uploaded 7 Oct 2024Source
- 12 Building Plan Approval / NA Order for plotted developmentPlan 5.pdf · uploaded 7 Oct 2024Source
- 11 Building Plan Approval / NA Order for plotted developmentPlan 4.pdf · uploaded 7 Oct 2024Source
- 10 Building Plan Approval / NA Order for plotted developmentPlan 3.pdf · uploaded 7 Oct 2024Source
- 9 Building Plan Approval / NA Order for plotted developmentPlan 2.pdf · uploaded 7 Oct 2024Source
- 8 Building Plan Approval / NA Order for plotted developmentPlan 1.pdf · uploaded 7 Oct 2024Source
- 7 Building Plan Approval / NA Order for plotted developmentBuilding Plan-7.pdf · uploaded 7 Oct 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentBuilding Plan-6.pdf · uploaded 7 Oct 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentBuilding Plan-4.pdf · uploaded 7 Oct 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentBuilding Plan- 3.pdf · uploaded 7 Oct 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentBuilding Plan- 2.pdf · uploaded 7 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan -1.pdf · uploaded 7 Oct 2024Source
- 1 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMENT CERTIFICATE WJV .pdf · uploaded 26 Oct 2024Source
- 1 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMENT CERTIFICATE WJV .pdf · uploaded 26 Oct 2024Source
- 1 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMENT CERTIFICATE WJV .pdf · uploaded 26 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1 FY 25-25 Q-2 Sai Aura.pdf · uploaded 28 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 FY 24-25 Q-2 Sai Aura.pdf · uploaded 28 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryPROMOTERS DISCLOSURE - SAI AURA Q2.pdf · uploaded 28 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1 FY 25-25 Q-2 Sai Aura.pdf · uploaded 28 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 FY 24-25 Q-2 Sai Aura.pdf · uploaded 28 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryPROMOTERS DISCLOSURE - SAI AURA Q2.pdf · uploaded 28 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1 FY 25-25 Q-2 Sai Aura.pdf · uploaded 28 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 FY 24-25 Q-2 Sai Aura.pdf · uploaded 28 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryPROMOTERS DISCLOSURE - SAI AURA Q2.pdf · uploaded 28 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 FY 2024-25 Q-2 Sai Aura.pdf · uploaded 9 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 FY 2024-25 Q-2 Sai Aura.pdf · uploaded 9 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 FY 2024-25 Q-2 Sai Aura.pdf · uploaded 9 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)CA Certificate Form 5 - Sai Aura.pdf · uploaded 9 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)CA Certificate Form 5 - Sai Aura.pdf · uploaded 9 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)CA Certificate Form 5 - Sai Aura.pdf · uploaded 9 Dec 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Sai Aura Q3.pdf · uploaded 1 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Sai Aura Q3 (1).pdf · uploaded 1 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryPromoter Disclosure Sai Aura Q3.pdf · uploaded 1 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Sai Aura Q3 (1).pdf · uploaded 1 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Sai Aura Q3.pdf · uploaded 1 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Sai Aura Q3 (1).pdf · uploaded 1 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryPromoter Disclosure Sai Aura Q3.pdf · uploaded 1 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Sai Aura Q3 (1).pdf · uploaded 1 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Sai Aura Q3 (1).pdf · uploaded 1 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Sai Aura Q3 (1).pdf · uploaded 1 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Sai Aura Q3.pdf · uploaded 1 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryPromoter Disclosure Sai Aura Q3.pdf · uploaded 1 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1-24-25Q4.pdf · uploaded 7 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 WJV 2024-25 Q4.pdf · uploaded 7 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2ENGINEERCERTIFICATESAIAURAQ4.pdf · uploaded 7 May 2025Source
- 1 Disclosure of sold/ booked inventoryPROMOTERS DISCLOSURE Q4.pdf · uploaded 7 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)ENGINEER CERTIFICATE 2A- SAI AURA Q4.pdf · uploaded 7 May 2025Source
- Form 5 (FY 2024-2025)Form 5 for FY 2024-25 Sai Aura final.pdf · uploaded 9 Dec 2025Source
- Withdrawal Update Form 1Form 1 for FY 2025-26 Q3- Sai Aura.pdf · uploaded 24 Feb 2026Source
- Withdrawal Update Form 1Form 1 for FY 2025-26 Q3- Sai Aura.pdf · uploaded 24 Feb 2026Source
- Withdrawal Update Form 2Form 2 for FY 2025-26 Q3- Sai Aura.pdf · uploaded 24 Feb 2026Source
- Withdrawal Update Form 2Form 2 for FY 2025-26 Q3- Sai Aura.pdf · uploaded 24 Feb 2026Source
- Withdrawal Update Form 3Form 3 for FY 2025-26 Q3- Sai Aura.pdf · uploaded 24 Feb 2026Source
- Withdrawal Update Form 3Form 3 for FY 2025-26 Q3- Sai Aura.pdf · uploaded 24 Feb 2026Source
- Withdrawal Update Form 1ARCHITECT CERTIFICATE WJV LANDMARKS LLP FY 2025-26 Q1 _compressed.pdf · uploaded 13 Mar 2026Source
- Withdrawal Update Form 2ENGINEER CERTIFICATE - Q1 FY 2025-26.pdf · uploaded 13 Mar 2026Source
- Withdrawal Update Form 3Form 3 For FY 2025-26 Q1 Sai Aura.pdf · uploaded 13 Mar 2026Source
- Withdrawal Update Form 1Form1 FY 2025-26 Q2 Sai Aura.pdf · uploaded 14 Mar 2026Source
- Withdrawal Update Form 22 ENGINEER CERTIFICATE - SAI AURA Q2 FY 2025-26.pdf · uploaded 14 Mar 2026Source
- Withdrawal Update Form 3Form 3 CA Certificate Sai Aura FY 2025-26 Q2.pdf · uploaded 14 Mar 2026Source
- Form 2A (FY 2024-2025)Form 2A for FY 2024-25 sai aura final.pdf · uploaded 23 Mar 2026Source
- Withdrawal Update Form 1Form 1 for FY 2025-26 Q4- Sai Aura final.pdf · uploaded 13 Apr 2026Source
- Withdrawal Update Form 2Form 2 for FY 2025-26 Q4 Sai Aura Final.pdf · uploaded 13 Apr 2026Source
- Withdrawal Update Form 3Form 3 for FY 205-26 Q4- Sai Aura.pdf · uploaded 13 Apr 2026Source
- Form 2A (FY 2025-2026)Form 2A for FY 2025-26- Sai Aura final.pdf · uploaded 13 Apr 2026Source
- Occupational CertificateOccupancy Certificate.pdf · uploaded 25 Jun 2026Source
- Withdrawal Update Form 1Form 1 For FY 2026-27 Q1 Final.pdf · uploaded 25 Jul 2026Source
- Withdrawal Update Form 2Form 2 For FY 2026-27 Q1.pdf · uploaded 25 Jul 2026Source
- Withdrawal Update Form 3Form 3 for FY 2026-27 Q1.pdf · uploaded 25 Jul 2026Source
Technical
- DocumentPlan No 1.pdf · uploaded 14 Jun 2023Source
- DocumentPlan No 2.pdf · uploaded 14 Jun 2023Source
- DocumentPlan No 3.pdf · uploaded 14 Jun 2023Source
- DocumentPlan No 4.pdf · uploaded 14 Jun 2023Source
- Other – TechnicalPlan No 1 Highlighted.pdf · uploaded 27 Jun 2023Source
- DocumentLayout.pdf · uploaded 7 Oct 2024Source
- DocumentLayout.pdf · uploaded 7 Oct 2024Source
- DocumentLayout.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan- 2.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan- 3.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan-4.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan-5.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan-6.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan-7.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan -1.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 1.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 2.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 3.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 4.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 5.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 6.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 7.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan- 2.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan- 3.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan-4.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan-5.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan-6.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan-7.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan -1.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 1.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 2.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 3.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 4.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 5.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 6.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 7.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan -1.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan- 2.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan- 3.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan-4.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan-5.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan-6.pdf · uploaded 7 Oct 2024Source
- DocumentBuilding Plan-7.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 1.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 2.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 3.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 4.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 5.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 6.pdf · uploaded 7 Oct 2024Source
- DocumentPlan 7.pdf · uploaded 7 Oct 2024Source
- Document01 Plan Layout.pdf · uploaded 5 May 2026Source
- Document02 Plan.pdf · uploaded 5 May 2026Source
- Document03 Plan.pdf · uploaded 5 May 2026Source
- Document04 Plan.pdf · uploaded 5 May 2026Source
- Document05 Plan.pdf · uploaded 5 May 2026Source
- Document06 Plan.pdf · uploaded 5 May 2026Source
- Document07 Plan.pdf · uploaded 5 May 2026Source
- Document08 Plan.pdf · uploaded 5 May 2026Source
- Document09 Plan.pdf · uploaded 5 May 2026Source
- Document10 Plan.pdf · uploaded 5 May 2026Source
- Document11 Plan.pdf · uploaded 5 May 2026Source
- Document12 Plan.pdf · uploaded 5 May 2026Source
- Document13 Plan.pdf · uploaded 5 May 2026Source
- Document14 Plan.pdf · uploaded 5 May 2026Source
- Document15 Plan.pdf · uploaded 5 May 2026Source
- OthersDeclaration about Commencement Certificate.pdf · uploaded 5 May 2026Source
Technical (Architect)
- DocumentForm -1 FY 25-25 Q-2 Sai Aura.pdf · uploaded 28 Oct 2024Source
- DocumentForm -1 FY 25-25 Q-2 Sai Aura.pdf · uploaded 28 Oct 2024Source
- DocumentForm -1 FY 25-25 Q-2 Sai Aura.pdf · uploaded 28 Oct 2024Source
- DocumentArchitect Certificate Sai Aura Q3 (1).pdf · uploaded 1 Feb 2025Source
- DocumentArchitect Certificate Sai Aura Q3 (1).pdf · uploaded 1 Feb 2025Source
- DocumentArchitect Certificate Sai Aura Q3 (1).pdf · uploaded 1 Feb 2025Source
- DocumentForm1-24-25Q4.pdf · uploaded 7 May 2025Source
- DocumentForm 1 For FY 2026-27 Q1 Final.pdf · uploaded 25 Jul 2026Source
Technical (Engineer)
- DocumentForm-2 FY 24-25 Q-2 Sai Aura.pdf · uploaded 28 Oct 2024Source
- DocumentForm-2 FY 24-25 Q-2 Sai Aura.pdf · uploaded 28 Oct 2024Source
- DocumentForm-2 FY 24-25 Q-2 Sai Aura.pdf · uploaded 28 Oct 2024Source
- DocumentEngineer Certificate - Sai Aura Q3.pdf · uploaded 1 Feb 2025Source
- DocumentEngineer Certificate - Sai Aura Q3.pdf · uploaded 1 Feb 2025Source
- DocumentEngineer Certificate - Sai Aura Q3.pdf · uploaded 1 Feb 2025Source
- DocumentForm 2ENGINEERCERTIFICATESAIAURAQ4.pdf · uploaded 7 May 2025Source
- DocumentForm 2 For FY 2026-27 Q1.pdf · uploaded 25 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 103/2B (P), CTS No. 1111(P)
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 3BHK, Shop, 3.5BHK, 3.5 BHK204 units in all
- Address
- 103/2B (P), Near Kunal Icon Road, Pimple SaudagarPIN 411027
- Village
- Pimpale Saudagar, Haveli taluka
- Location
- 18.59011, 73.79657
- Land area for this project
- 7,200 sq m (77,500 sq ft)
- Permissible built-up area
- 20,816 sq m (2,24,061 sq ft)
- Sanctioned built-up area
- 20,816 sq m (2,24,061 sq ft)
- Recreational open space
- 677 sq m (7,287 sq ft)
- Designated bank account
- 85
- Developed in phases
- Yes
- Also registered as
- Sai Ora, साई ओरा
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
103/2B (P), CTS No. 1111(P)
Boundaries
- North
- Survey No 135
- South
- Boundry Of Militray
- East
- Survey No 102
- West
- Survey No 103-1B
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking204 units
137 of 204 units booked (67%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | 2BHK | 65.78 sq m · 708 sq ft | 18 | 14 |
| A Wing | 2BHK | 69.15 sq m · 744 sq ft | 6 | 6 |
| A Wing | 3BHK | 90.57 sq m · 975 sq ft | 1 | 1 |
| A Wing | 3BHK | 92.41 sq m · 995 sq ft | 1 | 1 |
| A Wing | Shop | 64.96 sq m · 699 sq ft | 1 | 1 |
| A Wing | Shop | 71.18 sq m · 766 sq ft | 1 | 0 |
| B Wing | 2BHK | 65.78 sq m · 708 sq ft | 18 | 18 |
| B Wing | 2BHK | 69.15 sq m · 744 sq ft | 6 | 6 |
Show all 32 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| B Wing | 3BHK | 90.57 sq m · 975 sq ft | 1 | 0 |
| B Wing | 3BHK | 92.41 sq m · 995 sq ft | 1 | 0 |
| C Wing | 2BHK | 65.78 sq m · 708 sq ft | 18 | 16 |
| C Wing | 2BHK | 69.15 sq m · 744 sq ft | 6 | 5 |
| C Wing | 3BHK | 90.57 sq m · 975 sq ft | 1 | 0 |
| C Wing | 3BHK | 92.41 sq m · 995 sq ft | 1 | 0 |
| D Wing | 2BHK | 65.78 sq m · 708 sq ft | 18 | 5 |
| D Wing | 2BHK | 69.15 sq m · 744 sq ft | 6 | 4 |
| D Wing | 3BHK | 85.37 sq m · 919 sq ft | 1 | 0 |
| D Wing | 3BHK | 87 sq m · 936 sq ft | 1 | 0 |
| E Wing | 2BHK | 65.78 sq m · 708 sq ft | 18 | 13 |
| E Wing | 2BHK | 69.15 sq m · 744 sq ft | 6 | 4 |
| E Wing | 3BHK | 85.37 sq m · 919 sq ft | 1 | 0 |
| E Wing | 3BHK | 87 sq m · 936 sq ft | 1 | 0 |
| F Wing | 3.5BHK | 104.91 sq m · 1,129 sq ft | 1 | 1 |
| F Wing | 3.5BHK | 106.41 sq m · 1,145 sq ft | 1 | 1 |
| F Wing | 3BHK | 87.28 sq m · 939 sq ft | 24 | 22 |
| G Wing | 3.5 BHK | 104.91 sq m · 1,129 sq ft | 1 | 0 |
| G Wing | 3.5 BHK | 106.41 sq m · 1,145 sq ft | 1 | 0 |
| G Wing | 3BHK | 87.28 sq m · 939 sq ft | 24 | 12 |
| H Wing | 2BHK | 64.78 sq m · 697 sq ft | 1 | 0 |
| H Wing | 3.5 BHK | 104.91 sq m · 1,129 sq ft | 1 | 1 |
| H Wing | 3BHK | 87.28 sq m · 939 sq ft | 12 | 2 |
| H Wing | 3BHK | 95.84 sq m · 1,032 sq ft | 6 | 4 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals6
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | The Zine Studio | — |
| Chartered accountant | V. L. Jain & Co | — |
| Chartered accountant | V S A P & Company | — |
| Engineer | Pravin Nigade | — |
| Other | Ajay Bhilare & Associates | — |
| Other | Invental Construction Company | — |
Source: MahaRERA project page. Contact details are not shown.
Sai Aura in numbers
Registered deals, summarised
Deedo has 294 registered documents at Sai Aura, from Jan 2024 to Oct 2026: 184 sales, 31 leave and licence agreements, 58 mortgages. The median registered sale since Jan 2024 works out to about ₹12,200 per sq ft, at a median of ₹1.01 Cr a deal; 2% of sales were resales.
- What is the price per sq ft at Sai Aura?
- The median registered sale since Jan 2024 works out to about ₹12,200 per sq ft, at a median of ₹1.01 Cr a deal; 2% of sales were resales.
- How many properties have been sold at Sai Aura?
- 184 sales are registered at Sai Aura, 3 of them resales.
- Are properties at Sai Aura rented out?
- Yes: 31 leave and licence agreements are registered at Sai Aura, at a median rent since Jan 2024 of about ₹31,000 a month with a deposit of about ₹60,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Sai Aura by Deedo, last updated with deals registered in Oct 2026.
Latest deal · Rental · Oct 2026