B-Capital
Deedo IDDP-PUN-X967Completion was pushed back 4 months, to Jul 2028; no MahaRERA orders on record.
Pimpale Gurav, Pune 411061 · Property rates in Pimpale Gurav · by Rahul Vasant Bhegade
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Jul 2028
- This projectRegistered 9 May 2023, completion promised 31 Mar 2028, revised to 31 Jul 2028.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Aug 2026
- Primary sale · Jul 2026
- Primary sale · Mar 2026
- Primary sale · Nov 2025
- Primary sale · Oct 2025
- Primary sale · Feb 2025
- Primary sale · Jan 2024
- Primary sale · Dec 2023
- Primary sale · Dec 2023
- Primary sale · Oct 2023
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Aug 2026 | Main building · 401 | Primary sale | — | View Primary sale, Aug 2026 | |
| Jul 2026 | Main building · 303 | Primary sale | 599 sq ft | View Primary sale, Jul 2026 | |
| Mar 2026 | Main building · 302 | Primary sale | 727 sq ft | View Primary sale, Mar 2026 | |
| Nov 2025 | Main building · 301 | Primary sale | 727 sq ft | View Primary sale, Nov 2025 | |
| Oct 2025 | Main building · 202 | Primary sale | 727 sq ft | View Primary sale, Oct 2025 | |
| Feb 2025 | Main building · 103 | Primary sale | 599 sq ft | View Primary sale, Feb 2025 | |
| Jan 2024 | Main building · 604 | Primary sale | 758 sq ft | View Primary sale, Jan 2024 | |
| Dec 2023 | Main building · 603 | Primary sale | 599 sq ft | View Primary sale, Dec 2023 | |
| Dec 2023 | Main building · 402 | Primary sale | 727 sq ft | View Primary sale, Dec 2023 | |
| Oct 2023 | Main building · 605 | Primary sale | 875 sq ft | View Primary sale, Oct 2023 |
3 buildings
Open a building to see every flat, floor by floor.
- B-Capital Commercial1 floor · 2 units0% booked
- B-Capital Residential7 floors · 35 units26% booked
- Main buildingSize not on record
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100050869
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100050869 | 9 May 2023 | 31 Mar 2028 | 31 Jul 2028 | Rahul Vasant Bhegade | Project page |
Documents116
1 document held by Deedo, 115 filings listed on MahaRERA's project page
Finance
- PAN CardPAN-.pdf · uploaded 30 Mar 2023Source
Legal
Show all 116 documentsShow fewer documents
Migrated
- 1 b Details of encumbrances concerned to LegalENCMB.pdf · uploaded 30 Mar 2023Source
- 1 Copy of Layout Approval (in case of layout)MERGE PLAN.pdf · uploaded 30 Mar 2023Source
- 1 Declaration in FORM BFORM B.pdf · uploaded 30 Mar 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE FINAL.pdf · uploaded 30 Mar 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM NO 3.pdf · uploaded 30 Mar 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentPLAN ALL IN ONE.pdf · uploaded 3 Apr 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 3 Apr 2023Source
- 1 CERSAI detailsCERCAI REPORT.pdf · uploaded 3 Apr 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDISCLOUSUER OF INT.pdf · uploaded 3 Apr 2023Source
- 2 a Details of encumbrances concerned to Financeencmb.pdf · uploaded 18 Apr 2023Source
- 2 b Details of encumbrances concerned to Legalencmb.pdf · uploaded 18 Apr 2023Source
- 1 Declaration about Commencement Certificateform d.pdf · uploaded 18 Apr 2023Source
- 2 CERSAI detailscercai.pdf · uploaded 18 Apr 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the samebank account letter.pdf · uploaded 18 Apr 2023Source
- 1 Proforma of Agreement for saleRERA-Draft Rahul Bhegade 2023.pdf · uploaded 25 Apr 2023Source
- 1 Proforma of Allotment letterALLOTMENT FINAL.pdf · uploaded 25 Apr 2023Source
- 1 Deviation Report with respect to Allotment letterDEVIATION 1_merged FINAL.pdf · uploaded 25 Apr 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation RERA-Draft Rahul Bhegade 2023.pdf · uploaded 25 Apr 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1(30-06-2023).pdf · uploaded 1 Feb 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1(30-09-2023).pdf · uploaded 1 Feb 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1(30-12-2023).pdf · uploaded 1 Feb 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2(30-06-2023).pdf · uploaded 1 Feb 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2(30-09-2023).pdf · uploaded 1 Feb 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2(30-12-2023).pdf · uploaded 1 Feb 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3(Q1).pdf · uploaded 1 Feb 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3(Q2).pdf · uploaded 1 Feb 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3(Q3).pdf · uploaded 1 Feb 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)F 1 Q1_compressed.pdf · uploaded 12 Mar 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)F 1 Q2_compressed.pdf · uploaded 12 Mar 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)F 1 Q3_compressed.pdf · uploaded 12 Mar 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)F 2 Q1_compressed.pdf · uploaded 12 Mar 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)F 2 Q2_compressed.pdf · uploaded 12 Mar 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)F 2 Q3_compressed.pdf · uploaded 12 Mar 2024Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD Q1.pdf · uploaded 12 Mar 2024Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD Q2.pdf · uploaded 12 Mar 2024Source
- 3 Disclosure of sold/ booked inventorySOLD UNSOLD Q3.pdf · uploaded 12 Mar 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)F 3 Q1_compressed.pdf · uploaded 12 Mar 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)F 3 Q2_compressed.pdf · uploaded 12 Mar 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3 Q3_compressed.pdf · uploaded 12 Mar 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 B CAP.pdf · uploaded 20 Apr 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 B CAP.pdf · uploaded 20 Apr 2024Source
- 4 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 20 Apr 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 B CAP.pdf · uploaded 20 Apr 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1(ARCHITECH CERTIFICATE).pdf · uploaded 29 Jul 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM -2(ENGINEERS CERTIFICATE).pdf · uploaded 29 Jul 2024Source
- 5 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD.pdf · uploaded 29 Jul 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3.pdf · uploaded 29 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM NO 1_compressed.pdf · uploaded 18 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM NO 3.pdf · uploaded 18 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM NO 2.pdf · uploaded 18 Oct 2024Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 18 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM NO 1 31-12-2024.pdf · uploaded 18 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM NO 3 31-12-2024.pdf · uploaded 18 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM NO 2 31-12-2024.pdf · uploaded 18 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD 31-12-2024.pdf · uploaded 18 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM1 ARCHITECH CERTIFICATE.pdf · uploaded 19 Apr 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)form no 1 s.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM NO 3.pdf · uploaded 19 Apr 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form no 3sign.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ENGINEER.pdf · uploaded 19 Apr 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 s.pdf · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 19 Apr 2025Source
- 2 Disclosure of sold/ booked inventorysold s.pdf · uploaded 19 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form2A-Quality Certificate.pdf · uploaded 19 Apr 2025Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)form no 2as.pdf · uploaded 19 Apr 2025Source
- Form 1Form-1 architech Certificate.pdf · uploaded 21 Jul 2025Source
- Form 2Form-2 Engineer Ceritificate.pdf · uploaded 21 Jul 2025Source
- Form 3Form-3 CA.pdf · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 21 Jul 2025Source
- Form 1form 1 BHEGADE.pdf · uploaded 21 Jul 2025Source
- Form 2FORM 2 BHEGADE.pdf · uploaded 21 Jul 2025Source
- Form 3FORM 3 BHEGADE.pdf · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventorySOLD BHEGADE.pdf · uploaded 21 Jul 2025Source
- Form 2A (FY 2023-2024)FORM 2A 2024 25 b.pdf · uploaded 28 Jul 2025Source
- Form 2A (FY 2024-2025)FORM 2A 2023 24 b.pdf · uploaded 28 Jul 2025Source
- Form 5 (FY 2023-2024)FORM 5 capital b 24.pdf · uploaded 28 Jul 2025Source
- Form 5 (FY 2024-2025)FORM 5 capital b 25.pdf · uploaded 28 Jul 2025Source
- Withdrawal Update Form 1FORM 1 0.pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 2Form 2 0.pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 3REVISED FORM 3.pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 1Architech certificate Form 1.pdf · uploaded 4 Apr 2026Source
- Withdrawal Update Form 1Architech certificate Form 1_.pdf · uploaded 4 Apr 2026Source
- Withdrawal Update Form 2Form -2 Certificate.pdf · uploaded 4 Apr 2026Source
- Withdrawal Update Form 2Form -2 Certificate_.pdf · uploaded 4 Apr 2026Source
- Withdrawal Update Form 3REVISED FORM 3.pdf · uploaded 4 Apr 2026Source
- Withdrawal Update Form 3form 3.pdf · uploaded 4 Apr 2026Source
- Withdrawal Update Form 1FORM 1 (2).pdf · uploaded 21 Apr 2026Source
- Withdrawal Update Form 2FORM 2 (2) (1).pdf · uploaded 21 Apr 2026Source
- Withdrawal Update Form 3FORM 3 (7).pdf · uploaded 21 Apr 2026Source
- Form 2A (FY 2025-2026)FORM2A 25- 26.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 1Q 1 Form1architech certificate.pdf · uploaded 12 Jul 2026Source
- Withdrawal Update Form 2Q 1Form 2 engineer certificate.pdf · uploaded 12 Jul 2026Source
- Withdrawal Update Form 3Q 1 Form 3.pdf · uploaded 12 Jul 2026Source
- Withdrawal Update Form 1ARCHITECH CERTIFICATE-FORM1.pdf · uploaded 9 Oct 2026Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 9 Oct 2026Source
- Withdrawal Update Form 3FORM -3.pdf · uploaded 9 Oct 2026Source
Technical
Technical (Architect)
- DocumentFORM NO 1_compressed.pdf · uploaded 18 Oct 2024Source
- DocumentFORM NO 1 31-12-2024.pdf · uploaded 18 Jan 2025Source
- DocumentFORM1 ARCHITECH CERTIFICATE.pdf · uploaded 19 Apr 2025Source
- Documentform no 1 s.pdf · uploaded 19 Apr 2025Source
- DocumentARCHITECH CERTIFICATE-FORM1.pdf · uploaded 9 Oct 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel S NO 19(Pt) CTS NO 637(Pt)
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- Shop, 2BHK, 3BHK37 units in all
- Address
- S NO 19(Pt) CTS NO 637(Pt), 60 FT ROAD, PIMPLE GURAVPIN 411061
- Village
- Pimpale Gurav, Haveli taluka
- Location
- 18.61911, 73.80480
- Land area for this project
- 3,066 sq m (33,002 sq ft)
- Permissible built-up area
- 3,851 sq m (41,450 sq ft)
- Sanctioned built-up area
- 3,851 sq m (41,450 sq ft)
- Recreational open space
- 0 sq m (0 sq ft)
- Designated bank account
- 154
- Developed in phases
- Yes
- Also registered as
- Bi Kepital, बी कॅपिटल, B Kepital
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S NO 19(Pt) CTS NO 637(Pt)
Boundaries
- North
- S No 18
- South
- S No 15
- East
- S No 19
- West
- 18 Mtr Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking37 units
9 of 37 units booked (24%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| B-Capital Commercial | Shop | 186.82 sq m · 2,011 sq ft | 1 | 0 |
| B-Capital Commercial | Shop | 241.7 sq m · 2,602 sq ft | 1 | 0 |
| B-Capital Residential | 2BHK | 55.64 sq m · 599 sq ft | 7 | 3 |
| B-Capital Residential | 2BHK | 67.52 sq m · 727 sq ft | 14 | 3 |
| B-Capital Residential | 2BHK | 70.39 sq m · 758 sq ft | 7 | 2 |
| B-Capital Residential | 3BHK | 81.27 sq m · 875 sq ft | 7 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | I P Associates | — |
| Chartered accountant | Sanjay Bhalerao | — |
| Chartered accountant | Swanand V Agashe Agashe | — |
| Engineer | Avinash Ramdas Sutar Sutar | — |
| Engineer | Prema Andege ANDEGE | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Pimpale Gurav
- Eastern River Residency Wing IjRERA PM1264042602523
- Samrajya B WingRERA PR1260002602189
- Krishna Prabha AanganRERA PR1260002502021
- Dnyandeep DreamRERA PR1260002501186
- 7 Avenue₹12,240 a sq ft
- 1 Priority Rathod Business ZoneRERA P52100079455
- Samrajya Wing GH₹11,380 a sq ft
- 10 Elite Akasa₹10,460 a sq ft
All 1,652 projects in Pimpale Gurav · Compare B-Capital with another project
B-Capital in numbers
Registered deals, summarised
Deedo has 19 registered documents at B-Capital, from Jul 2023 to Sep 2026: 14 sales, 4 mortgages. The median registered sale since Jul 2023 works out to about ₹8,300 per sq ft, at a median of ₹61 L a deal; 0% of sales were resales.
- What is the price per sq ft at B-Capital?
- The median registered sale since Jul 2023 works out to about ₹8,300 per sq ft, at a median of ₹61 L a deal; 0% of sales were resales.
- How many properties have been sold at B-Capital?
- 14 sales are registered at B-Capital.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at B-Capital by Deedo, last updated with deals registered in Sep 2026.
Latest deal · Primary sale · Aug 2026
₹75 L–1 Cr