Residential / Group Housing · 4 buildings · 120 unitsRERA P52100020848

Solitaire Homes Pashan

Deedo IDDP-PUN-XYHG

MahaRERA shows it completed; no MahaRERA orders on record.

Pashan, Pune 411045 · Property rates in Pashan · by Ashok Dhanraj Chordia

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readPrice₹9,200 /sq ft9.4% below Pashan · 125 registered sales

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • This projectRegistered 15 May 2019, completion promised 30 Dec 2023.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

All 249 deeds →
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Aug 2025Not on recordResale772 sq ftView Resale, Aug 2025
Jul 2025Unit 109Primary sale772 sq ftView Primary sale, Jul 2025
Jul 2025Not on recordResale732 sq ftView Resale, Jul 2025
Jun 2025Not on recordPrimary sale732 sq ftView Primary sale, Jun 2025
Jun 2024Not on recordResale741 sq ftView Resale, Jun 2024
Nov 2023Not on recordPrimary sale556 sq ftView Primary sale, Nov 2023
Nov 2023Not on recordPrimary sale742 sq ftView Primary sale, Nov 2023
Sep 2023Not on recordPrimary sale556 sq ftView Primary sale, Sep 2023
Aug 2023Not on recordPrimary sale556 sq ftView Primary sale, Aug 2023
Jul 2023Not on recordPrimary sale556 sq ftView Primary sale, Jul 2023

4 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100020848
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210002084815 May 201930 Dec 202330 Dec 2023Ashok Dhanraj ChordiaProject page
Documents206

2 documents held by Deedo, 204 filings listed on MahaRERA's project page

Registration certificate

Other

  • OtherDate not statedView

Finance

  • PAN CardAshok Chordia New Pan Card.pdf · uploaded 19 Apr 2019Source

Legal

  • Legal Title reportTSR.pdf · uploaded 19 Apr 2019Source
  • Declaration Form BForm B_compressed.pdf · uploaded 7 May 2019Source
  • Other13th Floor Declaration.pdf · uploaded 24 Dec 2019Source
  • OtherSHP - Declaration Letter.pdf · uploaded 27 May 2021Source
  • Legal Title reportTSR_29092021_PASHAN HOMES_compressed.pdf · uploaded 19 Oct 2021Source
Show all 206 documentsShow fewer documents

Migrated

  • 1 PAN CardAshok Chordia New Pan Card.pdf · uploaded 19 Apr 2019Source
  • 1 Copy of the legal title reportTSR.pdf · uploaded 19 Apr 2019Source
  • 1 Copy of Layout Approval (in case of layout)6 6.pdf · uploaded 19 Apr 2019Source
  • 1 Building Plan Approval (IOD)1 6.pdf · uploaded 19 Apr 2019Source
  • 2 Building Plan Approval (IOD)2 6.pdf · uploaded 19 Apr 2019Source
  • 3 Building Plan Approval (IOD)3 6.pdf · uploaded 19 Apr 2019Source
  • 4 Building Plan Approval (IOD)4 6.pdf · uploaded 19 Apr 2019Source
  • 5 Building Plan Approval (IOD)5 6.pdf · uploaded 19 Apr 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 19 Apr 2019Source
  • 1 Details of encumbrances3 Encumbarance Certificate.pdf · uploaded 7 May 2019Source
  • 1 Declaration in FORM BForm B_compressed.pdf · uploaded 7 May 2019Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certi Sol Homes.pdf · uploaded 7 May 2019Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg Certi.pdf · uploaded 7 May 2019Source
  • 1 Certificates of CA (Form 3)CA Certificates Solitaire Home Pashan.pdf · uploaded 7 May 2019Source
  • 1 Proforma of Allotment letterATS Solitaire Homes Pashan.pdf · uploaded 7 May 2019Source
  • 2 Proforma of Allotment letterAllotment Letter Soliatire Homes Pashan.pdf · uploaded 7 May 2019Source
  • 6 Building Plan Approval (IOD)1 2.pdf · uploaded 4 Dec 2019Source
  • 7 Building Plan Approval (IOD)1 6.pdf · uploaded 4 Dec 2019Source
  • 8 Building Plan Approval (IOD)2 2.pdf · uploaded 4 Dec 2019Source
  • 9 Building Plan Approval (IOD)2 6.pdf · uploaded 4 Dec 2019Source
  • 10 Building Plan Approval (IOD)3 6.pdf · uploaded 4 Dec 2019Source
  • 11 Building Plan Approval (IOD)4 6.pdf · uploaded 4 Dec 2019Source
  • 12 Building Plan Approval (IOD)5 6.pdf · uploaded 4 Dec 2019Source
  • 13 Building Plan Approval (IOD)6 6.pdf · uploaded 4 Dec 2019Source
  • 2 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 4 Dec 2019Source
  • 1 Other13th Floor Declaration.pdf · uploaded 24 Dec 2019Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Solitaire Homes Pashan.pdf · uploaded 19 Feb 2021Source
  • 2 Details of encumbrancesSHP - Encumbrances.pdf · uploaded 24 Mar 2021Source
  • 2 Copy of Layout Approval (in case of layout)01-09.pdf · uploaded 25 May 2021Source
  • 14 Building Plan Approval (IOD)01-09.pdf · uploaded 25 May 2021Source
  • 15 Building Plan Approval (IOD)02-09.pdf · uploaded 25 May 2021Source
  • 16 Building Plan Approval (IOD)03-09.pdf · uploaded 25 May 2021Source
  • 17 Building Plan Approval (IOD)04-09.pdf · uploaded 25 May 2021Source
  • 18 Building Plan Approval (IOD)05-09.pdf · uploaded 25 May 2021Source
  • 19 Building Plan Approval (IOD)06-09.pdf · uploaded 25 May 2021Source
  • 20 Building Plan Approval (IOD)07-09.pdf · uploaded 25 May 2021Source
  • 21 Building Plan Approval (IOD)08-09.pdf · uploaded 25 May 2021Source
  • 22 Building Plan Approval (IOD)09-09.pdf · uploaded 25 May 2021Source
  • 3 Commencement Certificates / NA Order for plotted developmentCC183219 15112019.pdf · uploaded 25 May 2021Source
  • 2 OtherSHP - Declaration Letter.pdf · uploaded 27 May 2021Source
  • 1 Disclosure of sold/ booked inventoryHOME PASHAN.pdf · uploaded 6 Jul 2021Source
  • 2 Disclosure of sold/ booked inventoryHP 2.pdf · uploaded 6 Jul 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)SHP Form 2A May-21.pdf · uploaded 16 Jul 2021Source
  • 3 Disclosure of sold/ booked inventorySHP Building 1.pdf · uploaded 13 Aug 2021Source
  • 4 Disclosure of sold/ booked inventorySHP Building 2.pdf · uploaded 13 Aug 2021Source
  • 3 Copy of Layout Approval (in case of layout)1.pdf · uploaded 2 Sep 2021Source
  • 23 Building Plan Approval (IOD)2.pdf · uploaded 2 Sep 2021Source
  • 24 Building Plan Approval (IOD)3.pdf · uploaded 2 Sep 2021Source
  • 25 Building Plan Approval (IOD)4.pdf · uploaded 2 Sep 2021Source
  • 26 Building Plan Approval (IOD)5.pdf · uploaded 2 Sep 2021Source
  • 27 Building Plan Approval (IOD)6.pdf · uploaded 2 Sep 2021Source
  • 28 Building Plan Approval (IOD)7.pdf · uploaded 2 Sep 2021Source
  • 29 Building Plan Approval (IOD)8.pdf · uploaded 2 Sep 2021Source
  • 4 Commencement Certificates / NA Order for plotted developmentCC dtd 30062021.pdf · uploaded 2 Sep 2021Source
  • 1 Declaration about Commencement CertificateSHP 30.pdf · uploaded 4 Sep 2021Source
  • 2 Declaration about Commencement CertificateSHP 15.pdf · uploaded 4 Sep 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)SHP 2A June-21.pdf · uploaded 9 Sep 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)SOLITAIRE HOMES PASHAN PROJECT.pdf · uploaded 30 Sep 2021Source
  • 5 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD SHP B1.pdf · uploaded 7 Oct 2021Source
  • 6 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD SHP B2.pdf · uploaded 7 Oct 2021Source
  • 2 Copy of the legal title reportTSR_29092021_PASHAN HOMES_compressed.pdf · uploaded 19 Oct 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)SHP Form 2A Mar 20.pdf · uploaded 8 Nov 2021Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)SHP Form 2A Mar 21.pdf · uploaded 8 Nov 2021Source
  • 3 Declaration about Commencement Certificate13 SOLITAIRE HOMES PASHAN DEC 2021.pdf · uploaded 8 Jan 2022Source
  • 7 Disclosure of sold/ booked inventorySHP Building 1-2 Sold Disclosure Dec 2021.pdf · uploaded 8 Jan 2022Source
  • 4 Declaration about Commencement CertificateSolitaire Homes Pashan.pdf · uploaded 7 Apr 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report SHP.pdf · uploaded 6 Aug 2022Source
  • 8 Disclosure of sold/ booked inventorySHP SOld_compressed.pdf · uploaded 11 Aug 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Solitaire Home Pashan.pdf · uploaded 30 Sep 2022Source
  • 9 Disclosure of sold/ booked inventorySHP_Sep_22.pdf · uploaded 21 Oct 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A SHP Dec-22.pdf · uploaded 20 Jan 2023Source
  • 10 Disclosure of sold/ booked inventorySold_Disclosure_SHP_Dec_22.pdf · uploaded 27 Jan 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A SHP March 2023.pdf · uploaded 12 Apr 2023Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate SHP.pdf · uploaded 21 Apr 2023Source
  • 11 Disclosure of sold/ booked inventorySolitaire Homes Pashan_March23.pdf · uploaded 12 May 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A SHP June 23.pdf · uploaded 28 Jul 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - SHP - Sept - 2023.pdf · uploaded 6 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 - SHP FY 22-23.pdf · uploaded 13 Oct 2023Source
  • 12 Disclosure of sold/ booked inventorySHP Sept 23 Sold disclosure.pdf · uploaded 20 Oct 2023View
  • 1 Architect’s Certificate on Completion of Project (Form 4)Form 4 - SHP.pdf · uploaded 5 Nov 2024Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)Pashan-Society Registration Certificate.pdf · uploaded 6 Nov 2024Source
  • 2 Architect’s Certificate on Completion of Project (Form 4)Form 4 - SHP.pdf · uploaded 13 Nov 2024Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - SHP - Sept 22.pdf · uploaded 2 Dec 2024Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1- SHP - Jun 2019.pdf · uploaded 2 Dec 2024Source
  • 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 -SHP - Mar 23.pdf · uploaded 2 Dec 2024Source
  • 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - SHP - Dec 22.pdf · uploaded 2 Dec 2024Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1-SHP Pashan _ Jun 22.pdf · uploaded 2 Dec 2024Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1-SHP Certificate.pdf · uploaded 2 Dec 2024Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - SHP - Dec 21.pdf · uploaded 2 Dec 2024Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 -SHP- Sept 21.pdf · uploaded 2 Dec 2024Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1-SHP- Mar 2021.pdf · uploaded 2 Dec 2024Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1- SHP - Sept 2019.pdf · uploaded 2 Dec 2024Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1- SHP - Dec 2019.pdf · uploaded 2 Dec 2024Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form -1- SHP -Mar 2020.pdf · uploaded 2 Dec 2024Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - Jun 2020.pdf · uploaded 2 Dec 2024Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - SHP - Sept 20.pdf · uploaded 2 Dec 2024Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - SHP - Dec 2020.pdf · uploaded 2 Dec 2024Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 -SHP- Jun 21.pdf · uploaded 2 Dec 2024Source
  • 9 Certificates of CA (Form 3)Form 3 - SHP - Jun 21.pdf · uploaded 2 Dec 2024Source
  • 16 Certificates of CA (Form 3)Form 3- SHP - Mar 23.pdf · uploaded 2 Dec 2024Source
  • 15 Certificates of CA (Form 3)Form 3 - SHP - Dec 22.pdf · uploaded 2 Dec 2024Source
  • 14 Certificates of CA (Form 3)Form 3 - SHP - Sept 22.pdf · uploaded 2 Dec 2024Source
  • 13 Certificates of CA (Form 3)Form 3-SHP Pashan _ Jun 22.pdf · uploaded 2 Dec 2024Source
  • 12 Certificates of CA (Form 3)Form 3- SHP - Mar 22.pdf · uploaded 2 Dec 2024Source
  • 11 Certificates of CA (Form 3)Form 3 - SHP - Dec 21.pdf · uploaded 2 Dec 2024Source
  • 10 Certificates of CA (Form 3)Form 3 - SHP - Sept 21.pdf · uploaded 2 Dec 2024Source
  • 7 Certificates of CA (Form 3)Form -3- SHP Dec -2020.pdf · uploaded 2 Dec 2024Source
  • 6 Certificates of CA (Form 3)Form -3- SHP Sept-2020.pdf · uploaded 2 Dec 2024Source
  • 5 Certificates of CA (Form 3)Form -3- SHP Jun 2020.pdf · uploaded 2 Dec 2024Source
  • 4 Certificates of CA (Form 3)Form -3- SHP Mar 2020.pdf · uploaded 2 Dec 2024Source
  • 3 Certificates of CA (Form 3)Form -3- SHP Dec- 2019.pdf · uploaded 2 Dec 2024Source
  • 2 Certificates of CA (Form 3)Form -3- SHP Sept-2019.pdf · uploaded 2 Dec 2024Source
  • 1 Certificates of CA (Form 3)Form -3- SHP Jun-2019.pdf · uploaded 2 Dec 2024Source
  • 8 Certificates of CA (Form 3)Form 3 - SHP - Mar 21.pdf · uploaded 2 Dec 2024Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - SHP -Sept 20.pdf · uploaded 2 Dec 2024Source
  • 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - SHP -Mar 23.pdf · uploaded 2 Dec 2024Source
  • 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - SHP -Dec 22.pdf · uploaded 2 Dec 2024Source
  • 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - SHP - Sept 22.pdf · uploaded 2 Dec 2024Source
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - SHP - Jun 22.pdf · uploaded 2 Dec 2024Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - SHP - Mar 22.pdf · uploaded 2 Dec 2024Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - SHP -Dec 21.pdf · uploaded 2 Dec 2024Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - SHP -Sept 21.pdf · uploaded 2 Dec 2024Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - SHP -Jun 21.pdf · uploaded 2 Dec 2024Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - SHP -Mar 21.pdf · uploaded 2 Dec 2024Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - SHP - Dec 20.pdf · uploaded 2 Dec 2024Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - SHP -Jun 20.pdf · uploaded 2 Dec 2024Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - SHP -Mar 20.pdf · uploaded 2 Dec 2024Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - SHP - Dec 19.pdf · uploaded 2 Dec 2024Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - SHP -Sept 19.pdf · uploaded 2 Dec 2024Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - SHP - Jun19.pdf · uploaded 2 Dec 2024Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentForm 4 - Revised - SHP.pdf · uploaded 2 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)SHP - FY 23-24 - Form 5.pdf · uploaded 13 Dec 2024Source

Technical

  • Document6 6.pdf · uploaded 19 Apr 2019Source
  • Document5 6.pdf · uploaded 19 Apr 2019Source
  • Document3 6.pdf · uploaded 19 Apr 2019Source
  • Document4 6.pdf · uploaded 19 Apr 2019Source
  • Document2 6.pdf · uploaded 19 Apr 2019Source
  • Document1 6.pdf · uploaded 19 Apr 2019Source
  • Document1 2.pdf · uploaded 4 Dec 2019Source
  • Document1 6.pdf · uploaded 4 Dec 2019Source
  • Document2 2.pdf · uploaded 4 Dec 2019Source
  • Document2 6.pdf · uploaded 4 Dec 2019Source
  • Document3 6.pdf · uploaded 4 Dec 2019Source
  • Document4 6.pdf · uploaded 4 Dec 2019Source
  • Document5 6.pdf · uploaded 4 Dec 2019Source
  • Document6 6.pdf · uploaded 4 Dec 2019Source
  • Document01-09.pdf · uploaded 25 May 2021Source
  • Document01-09.pdf · uploaded 25 May 2021Source
  • Document02-09.pdf · uploaded 25 May 2021Source
  • Document03-09.pdf · uploaded 25 May 2021Source
  • Document04-09.pdf · uploaded 25 May 2021Source
  • Document05-09.pdf · uploaded 25 May 2021Source
  • Document06-09.pdf · uploaded 25 May 2021Source
  • Document07-09.pdf · uploaded 25 May 2021Source
  • Document08-09.pdf · uploaded 25 May 2021Source
  • Document09-09.pdf · uploaded 25 May 2021Source
  • Document1.pdf · uploaded 2 Sep 2021Source
  • Document2.pdf · uploaded 2 Sep 2021Source
  • Document3.pdf · uploaded 2 Sep 2021Source
  • Document4.pdf · uploaded 2 Sep 2021Source
  • Document5.pdf · uploaded 2 Sep 2021Source
  • Document6.pdf · uploaded 2 Sep 2021Source
  • Document7.pdf · uploaded 2 Sep 2021Source
  • Document8.pdf · uploaded 2 Sep 2021Source

Technical (Architect)

  • DocumentArchitect Certi Sol Homes.pdf · uploaded 7 May 2019Source
  • DocumentForm 1- SHP - Jun 2019.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 1- SHP - Sept 2019.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 1- SHP - Dec 2019.pdf · uploaded 2 Dec 2024Source
  • DocumentForm -1- SHP -Mar 2020.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 1 - Jun 2020.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 1 - SHP - Sept 20.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 1 - SHP - Dec 2020.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 1-SHP- Mar 2021.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 1 -SHP- Jun 21.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 1 -SHP- Sept 21.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 1 - SHP - Dec 21.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 1-SHP Certificate.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 1-SHP Pashan _ Jun 22.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 1 - SHP - Sept 22.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 1 - SHP - Dec 22.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 1 -SHP - Mar 23.pdf · uploaded 2 Dec 2024Source

Technical (Engineer)

  • DocumentEngg Certi.pdf · uploaded 7 May 2019Source
  • DocumentForm 2 - SHP - Jun19.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 2 - SHP -Sept 19.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 2 - SHP - Dec 19.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 2 - SHP -Mar 20.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 2 - SHP -Jun 20.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 2 - SHP -Sept 20.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 2 - SHP - Dec 20.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 2 - SHP -Mar 21.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 2 - SHP -Jun 21.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 2 - SHP -Sept 21.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 2 - SHP -Dec 21.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 2 - SHP - Mar 22.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 2 - SHP - Jun 22.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 2 - SHP - Sept 22.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 2 - SHP -Dec 22.pdf · uploaded 2 Dec 2024Source
  • DocumentForm 2 - SHP -Mar 23.pdf · uploaded 2 Dec 2024Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 708 S.No. 146/3A/3B/1, C. T. S. NO.672 To 681

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
—, 1BHK, 2BHK, Studio120 units in all
Address
C. T. S. NO.672 To 681 AND 708 S.No. 146/3A/3B/1, PLOT NO. 2, PASHAN, PUNE, PASHAN, PASHANPIN 411045
Village
Pashan, Haveli taluka
Land area for this project
3,200 sq m (34,444 sq ft)
Permissible built-up area
8,617 sq m (92,753 sq ft)
Sanctioned built-up area
8,617 sq m (92,753 sq ft)
Recreational open space
313 sq m (3,373 sq ft)
Designated bank account
171
Developed in phases
Yes

Survey, CTS, gat or plot numbers

708 S.No. 146/3A/3B/1C. T. S. NO.672 To 681PLOT NO. 2

Land as published on MahaRERA's project page

C. T. S. NO.672 To 681 AND 708 S.No. 146/3A/3B/1,PLOT NO. 2, PASHAN, PUNE

Boundaries

North
24m W D P Road
South
Adj Ctc No 709 S No 50 P
East
Adj S No 146 P
West
Adj Ctc No 682 To 707 S No 146 P

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking120 units

120 of 120 units booked (100%), as the promoter reported to MahaRERA

— · 0 units1BHK · 11 units2BHK · 108 unitsStudio · 1 unit
BuildingTypeCarpet areaUnitsBooked
b——00
Building 1 - 1st Floor To 5th Floor1BHK42.08 sq m · 453 sq ft55
Building 1 - 1st Floor To 5th Floor2BHK58.9 sq m · 634 sq ft55
Building 1 - 1st Floor To 5th Floor2BHK59.09 sq m · 636 sq ft44
Building 1 - 1st Floor To 5th Floor2BHK59.27 sq m · 638 sq ft3434
Building 1 - 1st Floor To 5th Floor2BHK59.46 sq m · 640 sq ft11
Building 1 - 1st Floor To 5th Floor2BHK59.92 sq m · 645 sq ft11
Building 2 - 6th Floor To 12th Floor1BHK42.08 sq m · 453 sq ft66
Show all 12 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Building 2 - 6th Floor To 12th Floor2BHK58.9 sq m · 634 sq ft77
Building 2 - 6th Floor To 12th Floor2BHK59.09 sq m · 636 sq ft77
Building 2 - 6th Floor To 12th Floor2BHK59.27 sq m · 638 sq ft4949
Building 2 - 6th Floor To 12th FloorStudio29.36 sq m · 316 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAmit Ghate Architect—
Chartered accountantRsva—
Chartered accountantSPAK And Co—
EngineerDelcon Consultants India Private Limited—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Pashan

All 1,214 projects in Pashan · Compare Solitaire Homes Pashan with another project

Solitaire Homes Pashan in numbers

Registered deals, summarised

Deedo has 249 registered documents at Solitaire Homes Pashan, from Oct 2019 to Oct 2026: 125 sales, 58 leave and licence agreements, 63 mortgages. The median registered sale since Oct 2019 works out to about ₹9,200 per sq ft, at a median of ₹67 L a deal; 2% of sales were resales.

What is the price per sq ft at Solitaire Homes Pashan?
The median registered sale since Oct 2019 works out to about ₹9,200 per sq ft, at a median of ₹67 L a deal; 2% of sales were resales.
How many properties have been sold at Solitaire Homes Pashan?
125 sales are registered at Solitaire Homes Pashan, 3 of them resales.
Are properties at Solitaire Homes Pashan rented out?
Yes: 58 leave and licence agreements are registered at Solitaire Homes Pashan, at a median rent since Oct 2019 of about ₹27,000 a month with a deposit of about ₹60,000.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Solitaire Homes Pashan by Deedo, last updated with deals registered in Oct 2026.

Latest deal · Resale · Aug 2025

₹75 L–1 Cr

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology