Nyati Evania
Deedo IDDP-PUN-GEYEIt is due for completion in Apr 2030, with no extension on record; no MahaRERA orders on record; 0% of its units are booked.
Parvati, Pune 411030 · by Nyati Construction Private Limited
Buying a flat here?
See every deed registered on it.
It is due for completion in Apr 2030, with no extension on record
- This projectRegistered 27 Dec 2024, completion promised 30 Apr 2030.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
3 buildings
Open a building to see every flat, floor by floor.
- Building A25 floors · 150 units0% booked
- BUILDING A and B - COMMERCIAL7 floors · 77 units0% booked
- Building B25 floors · 150 units0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100078605
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100078605 | 27 Dec 2024 | 30 Apr 2030 | 30 Apr 2029 | Nyati Construction Private Limited | Project page |
Documents115
2 documents held by Deedo, 113 filings listed on MahaRERA's project page
Show all 115 documentsShow fewer documents
Migrated
- 1 a Details of encumbrances concerned to FinanceFINANCIAL ENCUMBERANCE.pdf · uploaded 18 Oct 2024Source
- 2 a Details of encumbrances concerned to FinanceLEGAL ENCUMBERANCE.pdf · uploaded 18 Oct 2024Source
- 1 Declaration in FORM BNCPL FORM B.pdf · uploaded 18 Oct 2024Source
- 1 CERSAI detailsNyati Evania CERSAI Search Report.pdf · uploaded 18 Oct 2024Source
- 2 CERSAI detailsFINANCIAL ENCUMBERANCE.pdf · uploaded 18 Oct 2024Source
- 1 b Details of encumbrances concerned to LegalFINANCIAL ENCUMBERANCE.pdf · uploaded 18 Oct 2024Source
- 2 b Details of encumbrances concerned to LegalLEGAL ENCUMBERANCE.pdf · uploaded 18 Oct 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDISCLOUSER PRANAV SIR.pdf · uploaded 18 Oct 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDISCLOUSER NDN.pdf · uploaded 18 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 21 Oct 2024Source
- 1 Deviation Report with respect to Allotment letterDeviation Allotment.pdf · uploaded 21 Oct 2024Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Sheet Agreement.pdf · uploaded 22 Oct 2024Source
- 1 Proforma of Allotment letterEVANIA Allotment Letter FINAL 24102024.pdf · uploaded 24 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 24 Oct 2024Source
- 1 Other – TechnicalEVANIA DECLARATION BY NCPL FOR ONE PLOT FINAL.pdf · uploaded 24 Oct 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectNyati Evania Disclosure for Finance.pdf · uploaded 24 Oct 2024Source
- 1 Declaration about Commencement CertificateDECLARATION ABOUT CC.pdf · uploaded 25 Oct 2024Source
- 8 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 4 Nov 2024Source
- 2 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 4 Nov 2024Source
- 3 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 4 Nov 2024Source
- 4 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 4 Nov 2024Source
- 5 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 4 Nov 2024Source
- 6 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 4 Nov 2024Source
- 7 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 4 Nov 2024Source
- 9 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 4 Nov 2024Source
- 10 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 4 Nov 2024Source
- 11 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 4 Nov 2024Source
- 12 Building Plan Approval / NA Order for plotted development12.pdf · uploaded 4 Nov 2024Source
- 13 Building Plan Approval / NA Order for plotted development13.pdf · uploaded 4 Nov 2024Source
- 1 Proforma of Agreement for saleEVANIA UNIT AGR 081124.pdf · uploaded 8 Nov 2024Source
- 1 Copy of Layout Approval (in case of layout)Sanction Layout.pdf · uploaded 26 Nov 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 26 Nov 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A Revised.pdf · uploaded 26 Nov 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B Revised.pdf · uploaded 26 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Nyati Evania CA Certificate.pdf · uploaded 13 Dec 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentVerification of CC.pdf · uploaded 13 Dec 2024Source
- 1 Copy of Layout Approval (in case of layout)01-Layout.pdf · uploaded 17 Mar 2025Source
- 1 Commencement Certificates / NA Order for plotted development00-CC .pdf · uploaded 17 Mar 2025Source
- 15 Building Plan Approval / NA Order for plotted development20-Terrace Floor B Bldg.pdf · uploaded 17 Mar 2025Source
- 14 Building Plan Approval / NA Order for plotted development19-Typical 1 5 9 B Bldg.pdf · uploaded 17 Mar 2025Source
- 13 Building Plan Approval / NA Order for plotted development18-Typical 2 3 4 B Bldg.pdf · uploaded 17 Mar 2025Source
- 12 Building Plan Approval / NA Order for plotted development16-Typical 1 5 9.pdf · uploaded 17 Mar 2025Source
- 11 Building Plan Approval / NA Order for plotted development15-Typical 2 3 4.pdf · uploaded 17 Mar 2025Source
- 10 Building Plan Approval / NA Order for plotted development13-5th Floor Refuge Floor.pdf · uploaded 17 Mar 2025Source
- 9 Building Plan Approval / NA Order for plotted development12-Typical 4th 6th Floor.pdf · uploaded 17 Mar 2025Source
- 8 Building Plan Approval / NA Order for plotted development11-3rd Floor.pdf · uploaded 17 Mar 2025Source
- 7 Building Plan Approval / NA Order for plotted development10-2nd Floor Parking.pdf · uploaded 17 Mar 2025Source
- 6 Building Plan Approval / NA Order for plotted development09-1st Floor A B Wing.pdf · uploaded 17 Mar 2025Source
- 5 Building Plan Approval / NA Order for plotted development08-Upper Ground Floor A B Wing.pdf · uploaded 17 Mar 2025Source
- 4 Building Plan Approval / NA Order for plotted development07-Lower Ground Parking.pdf · uploaded 17 Mar 2025Source
- 3 Building Plan Approval / NA Order for plotted development04-Typical Floor.pdf · uploaded 17 Mar 2025Source
- 2 Building Plan Approval / NA Order for plotted development03 - Basement Floor.pdf · uploaded 17 Mar 2025Source
- 1 Building Plan Approval / NA Order for plotted development02-Upper Ground Floor.pdf · uploaded 17 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 17 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 17 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 5 May 2025Source
- Form 2A (FY 2024-2025)Nyati Evania Form 2A 2024-2025.pdf · uploaded 23 Sep 2025Source
- Form 5 (FY 2024-2025)Nyati Evania - Consolidated DSC.pdf · uploaded 30 Sep 2025Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 29 Oct 2025Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 29 Oct 2025Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 29 Oct 2025Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 3Form 3 Q3.pdf · uploaded 17 Feb 2026Source
- Form 2A (FY 2025-2026)Nyati Evania Form 2A 2025-2026.pdf · uploaded 23 Apr 2026Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 28 Apr 2026Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 28 Apr 2026Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 28 Apr 2026Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 20 Jul 2026Source
- Form 5 (FY 2025-2026)Nyati Evania Form 5 - DSC.pdf · uploaded 26 Sep 2026Source
Technical
- DocumentBldg A B Elevation Section.pdf · uploaded 9 Oct 2024Source
- Other – TechnicalEVANIA DECLARATION BY NCPL FOR ONE PLOT FINAL.pdf · uploaded 24 Oct 2024Source
- Document13.pdf · uploaded 4 Nov 2024Source
- Document12.pdf · uploaded 4 Nov 2024Source
- Document11.pdf · uploaded 4 Nov 2024Source
- Document10.pdf · uploaded 4 Nov 2024Source
- Document9.pdf · uploaded 4 Nov 2024Source
- Document8.pdf · uploaded 4 Nov 2024Source
- Document7.pdf · uploaded 4 Nov 2024Source
- Document6.pdf · uploaded 4 Nov 2024Source
- Document5.pdf · uploaded 4 Nov 2024Source
- Document4.pdf · uploaded 4 Nov 2024Source
- Document3.pdf · uploaded 4 Nov 2024Source
- Document2.pdf · uploaded 4 Nov 2024Source
- DocumentSanction Layout.pdf · uploaded 26 Nov 2024Source
- Document01-Layout.pdf · uploaded 17 Mar 2025Source
- Document02-Upper Ground Floor.pdf · uploaded 17 Mar 2025Source
- Document03 - Basement Floor.pdf · uploaded 17 Mar 2025Source
- Document04-Typical Floor.pdf · uploaded 17 Mar 2025Source
- Document07-Lower Ground Parking.pdf · uploaded 17 Mar 2025Source
- Document08-Upper Ground Floor A B Wing.pdf · uploaded 17 Mar 2025Source
- Document09-1st Floor A B Wing.pdf · uploaded 17 Mar 2025Source
- Document10-2nd Floor Parking.pdf · uploaded 17 Mar 2025Source
- Document11-3rd Floor.pdf · uploaded 17 Mar 2025Source
- Document12-Typical 4th 6th Floor.pdf · uploaded 17 Mar 2025Source
- Document13-5th Floor Refuge Floor.pdf · uploaded 17 Mar 2025Source
- Document15-Typical 2 3 4.pdf · uploaded 17 Mar 2025Source
- Document16-Typical 1 5 9.pdf · uploaded 17 Mar 2025Source
- Document18-Typical 2 3 4 B Bldg.pdf · uploaded 17 Mar 2025Source
- Document19-Typical 1 5 9 B Bldg.pdf · uploaded 17 Mar 2025Source
- Document20-Terrace Floor B Bldg.pdf · uploaded 17 Mar 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel Final Plot No 28, Pune - 411 030
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 2 BHK LAND OWNER, 3BHK, 3 BHK LAND OWNER, 4BHK, 4 BHK LAND OWNER, Bungalow, Office land Owner, Office Land Owner, Office space, Showroom, Showroom Land Owner, 4 BHK LAND WNER377 units in all
- Address
- Survey No 135, Final Plot No 28, Sadashiv Peth, Pune - 411 030, Sadashiv Peth, Dandekar BridgePIN 411030
- Village
- Parvati, Haveli taluka
- Location
- 18.50331, 73.84743
- Land area for this project
- 9,561 sq m (1,02,914 sq ft)
- Permissible built-up area
- 69,151 sq m (7,44,330 sq ft)
- Sanctioned built-up area
- 69,151 sq m (7,44,330 sq ft)
- Recreational open space
- 1,178 sq m (12,684 sq ft)
- Designated bank account
- 85
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Survey No 135, Final Plot No 28, Sadashiv Peth, Pune - 411 030
Boundaries
- North
- 24 M Wide D P Road
- South
- Remaining land of the Sanctioned Building Layout
- East
- Remaining land out of final plot no 28
- West
- Remaining land out of Final plot no28 and Final 2B
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking377 units
0 of 377 units booked (0%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building A | 2BHK | 72.64 sq m · 782 sq ft | 18 | 0 |
| Building A | 2BHK | 79.35 sq m · 854 sq ft | 22 | 0 |
| Building A | 2 BHK LAND OWNER | 72.64 sq m · 782 sq ft | 7 | 0 |
| Building A | 2 BHK LAND OWNER | 83.15 sq m · 895 sq ft | 3 | 0 |
| Building A | 3BHK | 110.42 sq m · 1,189 sq ft | 19 | 0 |
| Building A | 3BHK | 116.57 sq m · 1,255 sq ft | 20 | 0 |
| Building A | 3BHK | 126.08 sq m · 1,357 sq ft | 5 | 0 |
| Building A | 3 BHK LAND OWNER | 110.42 sq m · 1,189 sq ft | 6 | 0 |
Show all 77 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building A | 3 BHK LAND OWNER | 116.57 sq m · 1,255 sq ft | 5 | 0 |
| Building A | 3 BHK LAND OWNER | 126.08 sq m · 1,357 sq ft | 2 | 0 |
| Building A | 4BHK | 145.9 sq m · 1,570 sq ft | 11 | 0 |
| Building A | 4BHK | 146.65 sq m · 1,579 sq ft | 19 | 0 |
| Building A | 4 BHK LAND OWNER | 145.9 sq m · 1,570 sq ft | 7 | 0 |
| Building A | 4 BHK LAND OWNER | 146.65 sq m · 1,579 sq ft | 6 | 0 |
| BUILDING A and B - COMMERCIAL | Bungalow | 535.76 sq m · 5,767 sq ft | 2 | 0 |
| BUILDING A and B - COMMERCIAL | Office land Owner | 126.66 sq m · 1,363 sq ft | 2 | 0 |
| BUILDING A and B - COMMERCIAL | Office Land Owner | 72.18 sq m · 777 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Office Land Owner | 114 sq m · 1,227 sq ft | 2 | 0 |
| BUILDING A and B - COMMERCIAL | Office Land Owner | 117.41 sq m · 1,264 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Office Land Owner | 123.32 sq m · 1,327 sq ft | 2 | 0 |
| BUILDING A and B - COMMERCIAL | Office Land Owner | 127.31 sq m · 1,370 sq ft | 2 | 0 |
| BUILDING A and B - COMMERCIAL | Office Land Owner | 129.15 sq m · 1,390 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Office Land Owner | 131.33 sq m · 1,414 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Office Land Owner | 141.33 sq m · 1,521 sq ft | 2 | 0 |
| BUILDING A and B - COMMERCIAL | Office Land Owner | 178.55 sq m · 1,922 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Office Land Owner | 191.06 sq m · 2,057 sq ft | 2 | 0 |
| BUILDING A and B - COMMERCIAL | Office Land Owner | 197.66 sq m · 2,128 sq ft | 2 | 0 |
| BUILDING A and B - COMMERCIAL | Office Land Owner | 227.69 sq m · 2,451 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Office Land Owner | 234.05 sq m · 2,519 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Office Land Owner | 287.18 sq m · 3,091 sq ft | 2 | 0 |
| BUILDING A and B - COMMERCIAL | Office Land Owner | 370.55 sq m · 3,989 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Office Land Owner | 535.76 sq m · 5,767 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Office space | 72.28 sq m · 778 sq ft | 3 | 0 |
| BUILDING A and B - COMMERCIAL | Office space | 114 sq m · 1,227 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Office space | 117.41 sq m · 1,264 sq ft | 3 | 0 |
| BUILDING A and B - COMMERCIAL | Office space | 123.32 sq m · 1,327 sq ft | 2 | 0 |
| BUILDING A and B - COMMERCIAL | Office space | 126.66 sq m · 1,363 sq ft | 2 | 0 |
| BUILDING A and B - COMMERCIAL | Office space | 127.31 sq m · 1,370 sq ft | 2 | 0 |
| BUILDING A and B - COMMERCIAL | Office space | 129.15 sq m · 1,390 sq ft | 2 | 0 |
| BUILDING A and B - COMMERCIAL | Office space | 131.33 sq m · 1,414 sq ft | 2 | 0 |
| BUILDING A and B - COMMERCIAL | Office space | 131.34 sq m · 1,414 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Office space | 141.33 sq m · 1,521 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Office space | 141.33 sq m · 1,521 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Office space | 178.55 sq m · 1,922 sq ft | 3 | 0 |
| BUILDING A and B - COMMERCIAL | Office space | 182.46 sq m · 1,964 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Office space | 191.06 sq m · 2,057 sq ft | 2 | 0 |
| BUILDING A and B - COMMERCIAL | Office space | 197.66 sq m · 2,128 sq ft | 2 | 0 |
| BUILDING A and B - COMMERCIAL | Office space | 227.69 sq m · 2,451 sq ft | 3 | 0 |
| BUILDING A and B - COMMERCIAL | Office space | 234.05 sq m · 2,519 sq ft | 2 | 0 |
| BUILDING A and B - COMMERCIAL | Office space | 238.9 sq m · 2,571 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Office space | 287.18 sq m · 3,091 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Office space | 287.19 sq m · 3,091 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Showroom | 238.21 sq m · 2,564 sq ft | 2 | 0 |
| BUILDING A and B - COMMERCIAL | Showroom | 251.6 sq m · 2,708 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Showroom | 252.69 sq m · 2,720 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Showroom | 289.85 sq m · 3,120 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Showroom | 404.7 sq m · 4,356 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Showroom | 532.15 sq m · 5,728 sq ft | 2 | 0 |
| BUILDING A and B - COMMERCIAL | Showroom Land Owner | 161.1 sq m · 1,734 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Showroom Land Owner | 245 sq m · 2,637 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Showroom Land Owner | 328.91 sq m · 3,540 sq ft | 1 | 0 |
| BUILDING A and B - COMMERCIAL | Showroom Land Owner | 361.23 sq m · 3,888 sq ft | 2 | 0 |
| BUILDING A and B - COMMERCIAL | Showroom Land Owner | 370.58 sq m · 3,989 sq ft | 1 | 0 |
| Building B | 2BHK | 72.64 sq m · 782 sq ft | 19 | 0 |
| Building B | 2BHK | 79.35 sq m · 854 sq ft | 17 | 0 |
| Building B | 2 BHK LAND OWNER | 72.64 sq m · 782 sq ft | 6 | 0 |
| Building B | 2 BHK LAND OWNER | 79.35 sq m · 854 sq ft | 8 | 0 |
| Building B | 3BHK | 110.42 sq m · 1,189 sq ft | 19 | 0 |
| Building B | 3BHK | 116.57 sq m · 1,255 sq ft | 19 | 0 |
| Building B | 3BHK | 126.08 sq m · 1,357 sq ft | 5 | 0 |
| Building B | 3 BHK LAND OWNER | 110.42 sq m · 1,189 sq ft | 6 | 0 |
| Building B | 3 BHK LAND OWNER | 116.57 sq m · 1,255 sq ft | 6 | 0 |
| Building B | 3 BHK LAND OWNER | 126.08 sq m · 1,357 sq ft | 2 | 0 |
| Building B | 4BHK | 145.9 sq m · 1,570 sq ft | 13 | 0 |
| Building B | 4BHK | 146.65 sq m · 1,579 sq ft | 15 | 0 |
| Building B | 4 BHK LAND OWNER | 146.65 sq m · 1,579 sq ft | 10 | 0 |
| Building B | 4 BHK LAND WNER | 145.9 sq m · 1,570 sq ft | 5 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals16
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Sanjeev Mukund Mehta | — |
| Architect | Shirish Dasnurkar | — |
| Chartered accountant | Nicky Hiranand Milani | — |
| Engineer | Achyut Watve | — |
| Engineer | Santosh Ligade | — |
| Engineer | Vishwanath Dhande | — |
| Registered real estate agent | Anish Neema | — |
| Registered real estate agent | Bhushan Rajendra Shinde | — |
Show all 16 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Registered real estate agent | Chander Lekhraj hirani | — |
| Registered real estate agent | Kedar Subhash Pathak | — |
| Registered real estate agent | Raviraj Gangaprasad Thanvi | — |
| Registered real estate agent | Roshan Pradeep Salunkhe | — |
| Registered real estate agent | Sagar Kaluram Ranpise | — |
| Registered real estate agent | Sarang Kishanrao Madrewar | — |
| Registered real estate agent | Venkatesh Dattatray Dhondale | — |
| Registered real estate agent | Vijay Madanlal Anand | — |
Source: MahaRERA project page. Contact details are not shown.