Skip to content
Commercial · 1 building · 220 unitsRERA P52100026749

Barcode

Deedo IDDP-PUN-TTTP

MahaRERA shows it completed, after its date was pushed back 3 years; no MahaRERA orders on record; 39% of its units are booked.

Moshi, Pune 412105 · Property rates in Moshi · by Essen Ventures

DeliveryCompletedCompletion / occupancy certificate on MahaRERA · after a 3 yrs extensionRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales39% booked86 of 220 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed, after its date was pushed back 3 years

  • This projectRegistered 22 Oct 2020, completion promised 30 Jun 2023, revised to 30 Jun 2026.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100026749
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210002674922 Oct 202030 Jun 202330 Jun 2026Essen VenturesProject page
Documents201

2 documents held by Deedo, 199 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Legal

  • Legal Title reportTitle Certificate EV.pdf · uploaded 15 Oct 2020Source
  • Declaration Form BDeclaration Form B.pdf · uploaded 15 Oct 2020Source
  • OtherSale Deed Rama Venture to Essen Venture_compressed (1)-compressed.pdf · uploaded 16 Oct 2020Source
  • OtherCompressed PDF MOU.pdf · uploaded 19 Oct 2020Source
  • OtherMOU FOR UNITS RV-EV Notary No 1337-2022 Dtd 09082022_11zon.pdf · uploaded 18 Aug 2022Source
  • Declaration Form BForm B - Essen Ventures.pdf · uploaded 8 Oct 2024Source
Show all 201 documentsShow fewer documents

Migrated

  • 1 Copy of the legal title reportTitle Certificate EV.pdf · uploaded 15 Oct 2020Source
  • 1 Details of encumbrancesEncumbrances.pdf · uploaded 15 Oct 2020Source
  • 1 Copy of Layout Approval (in case of layout)sheet No 1-5 Final.pdf · uploaded 15 Oct 2020Source
  • 1 Building Plan Approval / NA Order for plotted developmentsheet No 2-5 Final.pdf · uploaded 15 Oct 2020Source
  • 2 Building Plan Approval / NA Order for plotted developmentsheet No 3-5 Final.pdf · uploaded 15 Oct 2020Source
  • 3 Building Plan Approval / NA Order for plotted developmentsheet No 4-5 Final.pdf · uploaded 15 Oct 2020Source
  • 4 Building Plan Approval / NA Order for plotted developmentsheet No 5-5 Final.pdf · uploaded 15 Oct 2020Source
  • 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE Dtd 02 07 2020.pdf · uploaded 15 Oct 2020Source
  • 1 Declaration in FORM BDeclaration Form B.pdf · uploaded 15 Oct 2020Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Essen Venture.pdf · uploaded 15 Oct 2020Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 EV.pdf · uploaded 15 Oct 2020Source
  • 1 Proforma of Allotment letterModel Draft Agreement.pdf · uploaded 15 Oct 2020Source
  • 1 OtherSale Deed Rama Venture to Essen Venture_compressed (1)-compressed.pdf · uploaded 16 Oct 2020Source
  • 2 OtherCompressed PDF MOU.pdf · uploaded 19 Oct 2020Source
  • 2 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 15 Jan 2021Source
  • 5 Building Plan Approval / NA Order for plotted developmentFloor Plan 1.pdf · uploaded 15 Jan 2021Source
  • 6 Building Plan Approval / NA Order for plotted developmentFloor Plan 2.pdf · uploaded 15 Jan 2021Source
  • 7 Building Plan Approval / NA Order for plotted developmentFloor Plan 3.pdf · uploaded 15 Jan 2021Source
  • 2 Commencement Certificates / NA Order for plotted developmentCommencement 2021.pdf · uploaded 15 Jan 2021Source
  • 3 Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 12 Jun 2021Source
  • 8 Building Plan Approval / NA Order for plotted development3 4 Floor Plan 7.pdf · uploaded 12 Jun 2021Source
  • 9 Building Plan Approval / NA Order for plotted developmentFifth Floor Plan 8.pdf · uploaded 12 Jun 2021Source
  • 10 Building Plan Approval / NA Order for plotted developmentFirst Floor Plan 5.pdf · uploaded 12 Jun 2021Source
  • 11 Building Plan Approval / NA Order for plotted developmentFourth Basement 3.pdf · uploaded 12 Jun 2021Source
  • 12 Building Plan Approval / NA Order for plotted developmentGround 4.pdf · uploaded 12 Jun 2021Source
  • 13 Building Plan Approval / NA Order for plotted developmentSecond Basement 2.pdf · uploaded 12 Jun 2021Source
  • 14 Building Plan Approval / NA Order for plotted developmentSecond Floor Plan 6.pdf · uploaded 12 Jun 2021Source
  • 3 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT Dtd 11 05 2021.pdf · uploaded 12 Jun 2021Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Rera Certificate EV Barcode 12 06 2021.pdf · uploaded 12 Jun 2021Source
  • 1 Declaration about Commencement CertificateForm D Essen Venture.pdf · uploaded 18 Jun 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Essen Venture Form 2A.pdf · uploaded 18 Jun 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)EV Form 2A Barcode Mar 2021.pdf · uploaded 21 Jun 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 Essen Ventures.pdf · uploaded 21 Jun 2021Source
  • 1 Disclosure of sold/ booked inventoryESSEN VENTURES - Invenory.pdf · uploaded 22 Jun 2021Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Rera Certificate_Barcode EV_09082021_20210812.pdf · uploaded 13 Aug 2021Source
  • 2 Disclosure of sold/ booked inventoryBARCODE EV - Inventory_compressed.pdf · uploaded 4 Sep 2021Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Rera Certificate_Barcode_EV_05102021_compressed.pdf · uploaded 6 Oct 2021Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 BARCODE EV_compressed.pdf · uploaded 9 Oct 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2 BARCODE EV_compressed.pdf · uploaded 9 Oct 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Barcode - Essen Ventures_compressed.pdf · uploaded 11 Oct 2021Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Barcode EV Form 2A DEC-21 (2)_compressed.pdf · uploaded 11 Jan 2022Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 BARCODE EV_20220107_compressed.pdf · uploaded 12 Jan 2022Source
  • 4 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT Dtd 06012022-BARCODE 11zon 1.pdf · uploaded 15 Jan 2022Source
  • 2 Declaration about Commencement CertificateCOMMENCEMENT Dtd 060122 BARCODE Ev.pdf · uploaded 22 Jan 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)BARCODE Arch Certificate from 1 DEC-21_compressed.pdf · uploaded 22 Jan 2022Source
  • 3 Disclosure of sold/ booked inventoryBARCODE EV Inventory DEC-21_11zon.pdf · uploaded 24 Jan 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Barcode EV_compressed.pdf · uploaded 14 Apr 2022Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 BARCODE EV_11zon.pdf · uploaded 26 Apr 2022Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Barcode EV_11zon 140722.pdf · uploaded 14 Jul 2022Source
  • 4 Copy of Layout Approval (in case of layout)default 0001 LAYOUT PLAN_11zon.pdf · uploaded 30 Jul 2022Source
  • 15 Building Plan Approval / NA Order for plotted developmentdefault 0004 GROUND_11zon.pdf · uploaded 30 Jul 2022Source
  • 16 Building Plan Approval / NA Order for plotted developmentdefault 0005 FIRST FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • 17 Building Plan Approval / NA Order for plotted developmentdefault 0006 SECOND FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • 18 Building Plan Approval / NA Order for plotted developmentdefault 0007 THIRD FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • 19 Building Plan Approval / NA Order for plotted developmentdefault 0008 FOURTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • 20 Building Plan Approval / NA Order for plotted developmentdefault 0009 FIFTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • 21 Building Plan Approval / NA Order for plotted developmentdefault 0010 SIXTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • 22 Building Plan Approval / NA Order for plotted developmentdefault 0011 SEVENTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • 23 Building Plan Approval / NA Order for plotted developmentdefault 0012 EIGHTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • 24 Building Plan Approval / NA Order for plotted developmentdefault 0012 EIGHTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • 25 Building Plan Approval / NA Order for plotted developmentdefault 0013 NINTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • 26 Building Plan Approval / NA Order for plotted developmentdefault 0014 TENTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • 27 Building Plan Approval / NA Order for plotted developmentdefault 0015 TERRACE FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • 3 OtherMOU FOR UNITS RV-EV Notary No 1337-2022 Dtd 09082022_11zon.pdf · uploaded 18 Aug 2022Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 BARCODE EV_11zon.pdf · uploaded 11 Oct 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Barcode Ev GE 207 Essen Ventures_001905.pdf · uploaded 28 Oct 2022Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Barcode Ev DEC-22_11zon.pdf · uploaded 16 Jan 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Barcode Ev DEC-22_11zon.pdf · uploaded 16 Jan 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Barcode Ev DEC-22_11zon.pdf · uploaded 16 Jan 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Skyland MAR-23.pdf · uploaded 18 Apr 2023Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Barcode EV MAR-23_11zon.pdf · uploaded 5 May 2023Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 BARCODE EV 070723_1_11zon.pdf · uploaded 20 Jul 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Barcode EV.pdf · uploaded 8 Aug 2023Source
  • 4 Disclosure of sold/ booked inventoryBARCODE EV Inventory.pdf · uploaded 11 Oct 2023Source
  • 5 Disclosure of sold/ booked inventoryBARCODE EV Inventory.pdf · uploaded 11 Oct 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Barcode Ev SEPTEMBER-23.pdf · uploaded 18 Oct 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Barcode Ev SEPTEMBER-23.pdf · uploaded 18 Oct 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Barcode Ev SEPTEMBER-23.pdf · uploaded 18 Oct 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Barcode Ev SEPTEMBER-23.pdf · uploaded 20 Oct 2023Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 BARCODE EV 070723.pdf · uploaded 20 Oct 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Barcode Ev SEPTEMBER-23.pdf · uploaded 20 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Barcode Ev SEPTEMBER-23.pdf · uploaded 20 Oct 2023Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 BARCODE Ev SEP-23 071023_11zon.pdf · uploaded 30 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 BARCODE EV 01 APRIL 2022 TO 31 MARCH 2023.pdf · uploaded 28 Nov 2023Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Barcode (EV).pdf · uploaded 16 Jan 2024Source
  • 6 Disclosure of sold/ booked inventoryBarcode (EV).pdf · uploaded 19 Jan 2024Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Barcode (EV).pdf · uploaded 22 Jan 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Barcode (EV).pdf · uploaded 23 Jan 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Barcode (EV).pdf · uploaded 25 Jan 2024Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Barcode (EV).pdf · uploaded 10 Apr 2024Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A BARCODE - EV.pdf · uploaded 11 Apr 2024Source
  • 7 Disclosure of sold/ booked inventoryBarcode (EV).pdf · uploaded 12 Apr 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Barcode (EV).pdf · uploaded 17 Apr 2024Source
  • 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Barcode (EV).pdf · uploaded 17 Apr 2024Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)Barcode (EV).pdf · uploaded 13 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A BARCODE - EV.pdf · uploaded 13 Jul 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Barcode (EV).pdf · uploaded 16 Jul 2024Source
  • 8 Disclosure of sold/ booked inventoryBarcode (EV).pdf · uploaded 16 Jul 2024Source
  • 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)Barcode (EV).pdf · uploaded 19 Jul 2024Source
  • 1 Declaration in FORM BForm B - Essen Ventures.pdf · uploaded 8 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Barcode (EV).pdf · uploaded 19 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryBarcode (EV).pdf · uploaded 22 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Barcode (EV).pdf · uploaded 23 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Barcode (EV).pdf · uploaded 23 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - F Y 2023-24 - Barcode (EV).pdf · uploaded 23 Nov 2024Source
  • 1 Disclosure of sold/ booked inventoryBarcode (EV).pdf · uploaded 10 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Barcode (EV).pdf · uploaded 15 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Barcode (EV).pdf · uploaded 16 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Barcode (EV).pdf · uploaded 17 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Barcode (EV).pdf · uploaded 14 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Barcode (EV).pdf · uploaded 14 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryBarcode (EV).pdf · uploaded 14 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Barcode (EV).pdf · uploaded 15 Apr 2025Source
  • 1 Other – TechnicalPart Completion Certificate BARCODE dt-02-04-2025_compressed.pdf · uploaded 26 Apr 2025Source
  • Form 1Barcode (EV).pdf · uploaded 31 May 2025Source
  • Form 2Barcode (EV).pdf · uploaded 31 May 2025Source
  • Form 3Barcode (EV).pdf · uploaded 31 May 2025Source
  • Disclosure of Sold and Booked InventoryBarcode (EV).pdf · uploaded 31 May 2025Source
  • Form 2A (FY 2024-2025)Barcode (EV) - Form 2A (signed).pdf · uploaded 17 Jul 2025Source
  • Withdrawal Update Form 1Barcode (EV) - Form 1 (signed).pdf · uploaded 5 Sep 2025Source
  • Withdrawal Update Form 2Barcode (EV) - Form 2 (signed).pdf · uploaded 5 Sep 2025Source
  • Withdrawal Update Form 3Barcode (EV) - Form 3 (signed).pdf · uploaded 5 Sep 2025Source
  • Form 5 (FY 2023-2024)Form 5 - F Y 2023-24 - Barcode (EV).pdf · uploaded 8 Sep 2025Source
  • Withdrawal Update Form 1Barcode (EV) - Form 1 (signed).pdf · uploaded 19 Oct 2025Source
  • Withdrawal Update Form 2Barcode (EV) - Form 2 (signed).pdf · uploaded 19 Oct 2025Source
  • Withdrawal Update Form 3Barcode (EV) - Form 3 (signed).pdf · uploaded 19 Oct 2025Source
  • Withdrawal Update Form 1Barcode (EV) - Form 1 (signed).pdf · uploaded 14 Jan 2026Source
  • Withdrawal Update Form 2Barcode (EV) - Form 2 (signed).pdf · uploaded 14 Jan 2026Source
  • Withdrawal Update Form 3Barcode (EV) - Form 3 (signed).pdf · uploaded 14 Jan 2026Source
  • Withdrawal Update Form 1Barcode (EV) - Form 1 (signed).pdf · uploaded 18 Apr 2026Source
  • Withdrawal Update Form 2Barcode (EV) - Form 2 (signed).pdf · uploaded 18 Apr 2026Source
  • Withdrawal Update Form 3Barcode (EV) - Form 3 (signed).pdf · uploaded 18 Apr 2026Source
  • Form 2A (FY 2025-2026)Barcode (EV) - Form 2A (signed).pdf · uploaded 28 Apr 2026Source
  • Form 5 (FY 2024-2025)Form 5 - F Y 2024-25 - Barcode (EV).pdf · uploaded 28 Apr 2026Source
  • Withdrawal Update Form 1Barcode (EV) - Form 1 (signed).pdf · uploaded 19 Jul 2026Source
  • Withdrawal Update Form 2Barcode (EV) - Form 2 (signed).pdf · uploaded 19 Jul 2026Source
  • Withdrawal Update Form 3Barcode (EV) - Form 3 (signed).pdf · uploaded 19 Jul 2026Source
  • Occupational CertificatePart Completion Certificate BARCODE dt-02-04-2025.pdf · uploaded 25 Jul 2026Source
  • Occupational CertificateCompletion Certificate Barcode dt-29-06-2026.pdf · uploaded 25 Jul 2026Source

Technical

  • Documentsheet No 1-5 Final.pdf · uploaded 15 Oct 2020Source
  • Documentsheet No 2-5 Final.pdf · uploaded 15 Oct 2020Source
  • Documentsheet No 3-5 Final.pdf · uploaded 15 Oct 2020Source
  • Documentsheet No 4-5 Final.pdf · uploaded 15 Oct 2020Source
  • Documentsheet No 5-5 Final.pdf · uploaded 15 Oct 2020Source
  • DocumentLayout.pdf · uploaded 15 Jan 2021Source
  • DocumentFloor Plan 1.pdf · uploaded 15 Jan 2021Source
  • DocumentFloor Plan 2.pdf · uploaded 15 Jan 2021Source
  • DocumentFloor Plan 3.pdf · uploaded 15 Jan 2021Source
  • DocumentLayout Plan.pdf · uploaded 12 Jun 2021Source
  • Document3 4 Floor Plan 7.pdf · uploaded 12 Jun 2021Source
  • DocumentFifth Floor Plan 8.pdf · uploaded 12 Jun 2021Source
  • DocumentFirst Floor Plan 5.pdf · uploaded 12 Jun 2021Source
  • DocumentFourth Basement 3.pdf · uploaded 12 Jun 2021Source
  • DocumentGround 4.pdf · uploaded 12 Jun 2021Source
  • DocumentSecond Basement 2.pdf · uploaded 12 Jun 2021Source
  • DocumentSecond Floor Plan 6.pdf · uploaded 12 Jun 2021Source
  • Documentdefault 0001 LAYOUT PLAN_11zon.pdf · uploaded 30 Jul 2022Source
  • Documentdefault 0004 GROUND_11zon.pdf · uploaded 30 Jul 2022Source
  • Documentdefault 0005 FIRST FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • Documentdefault 0006 SECOND FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • Documentdefault 0007 THIRD FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • Documentdefault 0008 FOURTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • Documentdefault 0009 FIFTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • Documentdefault 0010 SIXTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • Documentdefault 0011 SEVENTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • Documentdefault 0012 EIGHTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • Documentdefault 0012 EIGHTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • Documentdefault 0013 NINTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • Documentdefault 0014 TENTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • Documentdefault 0015 TERRACE FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
  • Other – TechnicalPart Completion Certificate BARCODE dt-02-04-2025_compressed.pdf · uploaded 26 Apr 2025Source
  • Document01 Layout RV EV.pdf · uploaded 19 Jul 2026Source
  • Document02 1st(EV) and 2nd (RV) Basement.pdf · uploaded 19 Jul 2026Source
  • Document03 3rd(EV) and 4th (RV) Basement.pdf · uploaded 19 Jul 2026Source
  • Document04 Ground 1 to 3 and 20 to 33(EV) and 4 to 19(RV).pdf · uploaded 19 Jul 2026Source
  • Document05 1st 101 to 103 and 119 to 133(EV) and 104 to 118(RV).pdf · uploaded 19 Jul 2026Source
  • Document06 2nd EV.pdf · uploaded 19 Jul 2026Source
  • Document08 4th EV.pdf · uploaded 19 Jul 2026Source
  • Document10 6th EV.pdf · uploaded 19 Jul 2026Source
  • Document12 8th EV.pdf · uploaded 19 Jul 2026Source
  • Document13 9th 901-944(RV) and 945(EV).pdf · uploaded 19 Jul 2026Source
  • Document14 10th Kitchen and resturant 01(EV) and 02 and 03(RV).pdf · uploaded 19 Jul 2026Source
  • Document15 Terrace and Sec CC (EV and RV).pdf · uploaded 19 Jul 2026Source
  • Document16 Sec AA (EV and RV).pdf · uploaded 19 Jul 2026Source
  • DocumentCC.pdf · uploaded 19 Jul 2026Source

Technical (Architect)

  • DocumentBarcode (EV).pdf · uploaded 19 Oct 2024Source
  • DocumentBarcode (EV).pdf · uploaded 16 Jan 2025Source
  • DocumentBarcode (EV).pdf · uploaded 14 Apr 2025Source
  • DocumentBarcode (EV) - Form 1 (signed).pdf · uploaded 19 Jul 2026Source

Technical (Engineer)

  • DocumentBarcode (EV).pdf · uploaded 23 Oct 2024Source
  • DocumentBarcode (EV).pdf · uploaded 15 Jan 2025Source
  • DocumentBarcode (EV).pdf · uploaded 14 Apr 2025Source
  • DocumentBarcode (EV) - Form 2 (signed).pdf · uploaded 19 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel Gat No 129 Part, Plot 1 Borhadewadi

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Certificate Signed
Unit types
Office space, Shop220 units in all
Address
Gat No 129 Part, Plot 1 Borhadewadi, Moshi-Borhadewadi, BorhadewadiPIN 412105
Village
Moshi, Haveli taluka
Land area for this project
2,407 sq m (25,911 sq ft)
Permissible built-up area
9,999 sq m (1,07,630 sq ft)
Sanctioned built-up area
3,813 sq m (41,043 sq ft)
Designated bank account
85
Developed in phases
No

Survey, CTS, gat or plot numbers

Gat No 129 PartPlot 1 Borhadewadi

Land as published on MahaRERA's project page

Gat No 129 Part, Plot 1 Borhadewadi

Boundaries

North
Gat no 132 and Plot no 3 part
South
Plot No 2
East
Plot no 3
West
Proposed 24 mtr wide dp road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking220 units

86 of 220 units booked (39%), as the promoter reported to MahaRERA

Office space · 185 unitsShop · 35 units
TypeCarpet areaUnitsBooked
Office space16.54 sq m · 178 sq ft42
Office space17.61 sq m · 190 sq ft40
Office space17.68 sq m · 190 sq ft44
Office space18.19 sq m · 196 sq ft31
Office space18.25 sq m · 196 sq ft11
Office space19.22 sq m · 207 sq ft84
Office space20.06 sq m · 216 sq ft40
Office space21.03 sq m · 226 sq ft41
Show all 95 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Office space21.26 sq m · 229 sq ft40
Office space21.66 sq m · 233 sq ft30
Office space21.72 sq m · 234 sq ft11
Office space21.73 sq m · 234 sq ft31
Office space21.8 sq m · 235 sq ft11
Office space22.13 sq m · 238 sq ft42
Office space22.73 sq m · 245 sq ft31
Office space22.8 sq m · 245 sq ft11
Office space22.86 sq m · 246 sq ft42
Office space23.59 sq m · 254 sq ft31
Office space23.66 sq m · 255 sq ft11
Office space23.77 sq m · 256 sq ft40
Office space23.89 sq m · 257 sq ft30
Office space23.96 sq m · 258 sq ft11
Office space25.19 sq m · 271 sq ft41
Office space25.28 sq m · 272 sq ft31
Office space25.35 sq m · 273 sq ft31
Office space25.36 sq m · 273 sq ft11
Office space25.44 sq m · 274 sq ft11
Office space25.46 sq m · 274 sq ft31
Office space25.54 sq m · 275 sq ft11
Office space25.73 sq m · 277 sq ft42
Office space25.84 sq m · 278 sq ft40
Office space26.21 sq m · 282 sq ft31
Office space26.29 sq m · 283 sq ft11
Office space26.31 sq m · 283 sq ft31
Office space26.38 sq m · 284 sq ft11
Office space27.77 sq m · 299 sq ft10
Office space28.17 sq m · 303 sq ft40
Office space28.28 sq m · 304 sq ft31
Office space28.35 sq m · 305 sq ft11
Office space28.36 sq m · 305 sq ft31
Office space28.43 sq m · 306 sq ft11
Office space28.72 sq m · 309 sq ft40
Office space30.12 sq m · 324 sq ft40
Office space30.31 sq m · 326 sq ft31
Office space30.37 sq m · 327 sq ft11
Office space31.26 sq m · 336 sq ft40
Office space32.19 sq m · 346 sq ft41
Office space32.56 sq m · 350 sq ft31
Office space32.63 sq m · 351 sq ft11
Office space32.67 sq m · 352 sq ft30
Office space32.73 sq m · 352 sq ft11
Office space32.92 sq m · 354 sq ft41
Office space33.63 sq m · 362 sq ft40
Office space34.14 sq m · 367 sq ft41
Office space34.39 sq m · 370 sq ft42
Office space34.73 sq m · 374 sq ft31
Office space34.8 sq m · 375 sq ft11
Office space35.15 sq m · 378 sq ft31
Office space35.23 sq m · 379 sq ft11
Office space36.87 sq m · 397 sq ft41
Office space39.2 sq m · 422 sq ft31
Office space39.28 sq m · 423 sq ft11
Office space39.3 sq m · 423 sq ft31
Office space39.37 sq m · 424 sq ft11
Office space46.01 sq m · 495 sq ft30
Office space46.09 sq m · 496 sq ft11
Office space84.52 sq m · 910 sq ft30
Office space84.56 sq m · 910 sq ft11
Shop15.45 sq m · 166 sq ft10
Shop16.67 sq m · 179 sq ft10
Shop19.16 sq m · 206 sq ft22
Shop19.46 sq m · 209 sq ft22
Shop19.62 sq m · 211 sq ft22
Shop23.05 sq m · 248 sq ft21
Shop23.23 sq m · 250 sq ft11
Shop23.58 sq m · 254 sq ft11
Shop23.73 sq m · 255 sq ft10
Shop26.21 sq m · 282 sq ft11
Shop27.47 sq m · 296 sq ft11
Shop27.75 sq m · 299 sq ft11
Shop29.75 sq m · 320 sq ft22
Shop30.49 sq m · 328 sq ft11
Shop31.76 sq m · 342 sq ft11
Shop31.96 sq m · 344 sq ft10
Shop35.65 sq m · 384 sq ft10
Shop36.28 sq m · 391 sq ft11
Shop36.57 sq m · 394 sq ft11
Shop36.64 sq m · 394 sq ft11
Shop37.64 sq m · 405 sq ft11
Shop40 sq m · 431 sq ft11
Shop40.86 sq m · 440 sq ft11
Shop41.37 sq m · 445 sq ft20
Shop41.66 sq m · 448 sq ft20
Shop49.91 sq m · 537 sq ft20
Shop51.76 sq m · 557 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
Chartered accountantMadhusudan Jhanwar—
EngineerAkshay Nigade—
EngineerSantosh S Autade—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology