Sky Gardens
Deedo IDDP-PUN-EZDMIt is due for completion in Aug 2027, with no extension on record; no MahaRERA orders on record.
Mohammadwadi, Pune 411048 · Property rates in Mohammadwadi · by Apk Landmarks LLP
Buying a flat here?
See every deed registered on it.
It is due for completion in Aug 2027, with no extension on record
- This projectRegistered 12 Jun 2018, completion promised 31 Aug 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Nov 2026
- Primary sale · Oct 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Jun 2026
- Primary sale · Jun 2026
- Primary sale · Jun 2026
- Primary sale · Apr 2026No amount
- Primary sale · Mar 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Nov 2026 | Main building · 1009 | Primary sale | 666 sq ft | View Primary sale, Nov 2026 | |
| Oct 2026 | Main building · 104 | Primary sale | 667 sq ft | View Primary sale, Oct 2026 | |
| Sep 2026 | Sky Gardens · 1104 | Primary sale | 667 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Sky Gardens · 103 | Primary sale | 670 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Sky Gardens · 102 | Primary sale | 672 sq ft | View Primary sale, Sep 2026 | |
| Jun 2026 | Sky Gardens · 604 | Primary sale | 667 sq ft | View Primary sale, Jun 2026 | |
| Jun 2026 | Sky Gardens · 601 | Primary sale | 672 sq ft | View Primary sale, Jun 2026 | |
| Jun 2026 | Sky Gardens · 307 | Primary sale | 666 sq ft | View Primary sale, Jun 2026 | |
| Apr 2026 | Sky Gardens · 410 | Primary sale | 742 sq ft | View Primary sale, Apr 2026 | |
| Mar 2026 | Sky Gardens · 1210 | Primary sale | 666 sq ft | View Primary sale, Mar 2026 |
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100016753
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100016753 | 12 Jun 2018 | 31 Aug 2027 | 31 Aug 2027 | Apk Landmarks LLP | Project page |
Documents167
1 document held by Deedo, 166 filings listed on MahaRERA's project page
Finance
Legal
Show all 167 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)Temp01625.pdf · uploaded 2 Jun 2018Source
- 1 Building Plan Approval (IOD)Temp01626.pdf · uploaded 2 Jun 2018Source
- 2 Building Plan Approval (IOD)Temp01627.pdf · uploaded 2 Jun 2018Source
- 3 Building Plan Approval (IOD)03 06 gym pmc sanction plan scan copy.pdf · uploaded 2 Jun 2018Source
- 4 Building Plan Approval (IOD)Temp01629-ilovepdf-compressed.pdf · uploaded 2 Jun 2018Source
- 5 Building Plan Approval (IOD)Temp01630.pdf · uploaded 2 Jun 2018Source
- 6 Building Plan Approval (IOD)Temp01631.pdf · uploaded 2 Jun 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentPMC COMMENCEMENT BUILDING AND LAYOUT (1mb) - Copy.pdf · uploaded 2 Jun 2018Source
- 1 Declaration in FORM Bdeclaration cum affidavit001-ilovepdf-compressed.pdf · uploaded 2 Jun 2018Source
- 1 Proforma of Allotment letterRera agreement (2) (1).pdf · uploaded 2 Jun 2018Source
- 2 Proforma of Allotment letterAllotment letter.pdf · uploaded 2 Jun 2018Source
- 1 Certificates of CA (Form 3)Form 3 RCC1-ilovepdf-compressed.pdf · uploaded 4 Jun 2018Source
- 3 Proforma of Allotment letterRERA AGREEMENT GENERAL PDF.pdf · uploaded 19 Apr 2019Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect vilas yele 31 dec 2019 architect002.pdf · uploaded 8 Dec 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect vilas yele 30 june 2019 architect001.pdf · uploaded 8 Dec 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect vilas yele 31 Mar 2020 architect003.pdf · uploaded 8 Dec 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect vilas yele 30 June 2020 architect004.pdf · uploaded 8 Dec 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect vilas yele 30 Sept 2020 architect005.pdf · uploaded 8 Dec 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect vilas yele 31 Dec 2020 architect006.pdf · uploaded 8 Dec 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect vilas yele 31 Mar 2021 architect007.pdf · uploaded 8 Dec 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect vilas yele 30 June 2021 architect008.pdf · uploaded 8 Dec 2022Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect vilas yele 30 Sept 2021 architect009.pdf · uploaded 8 Dec 2022Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect vilas yele 31 Dec 2021 architect010.pdf · uploaded 8 Dec 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)FORM 2017-18.pdf · uploaded 8 Dec 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM 2018-19.pdf · uploaded 8 Dec 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 2019-20.pdf · uploaded 8 Dec 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 2020-21.pdf · uploaded 8 Dec 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 2021-22.pdf · uploaded 8 Dec 2022Source
- 2 Certificates of CA (Form 3)RERA FORM-3 30-06-2019_compressed.pdf · uploaded 28 Mar 2023Source
- 3 Certificates of CA (Form 3)RERA FORM-3 30-09-2019_compressed.pdf · uploaded 28 Mar 2023Source
- 4 Certificates of CA (Form 3)RERA FORM-3 31-12-2019_compressed.pdf · uploaded 28 Mar 2023Source
- 5 Certificates of CA (Form 3)RERA FORM-3 31-03-2020_compressed.pdf · uploaded 28 Mar 2023Source
- 6 Certificates of CA (Form 3)RERA FORM-3 30-06-2020_compressed.pdf · uploaded 28 Mar 2023Source
- 7 Certificates of CA (Form 3)RERA FORM-3 30-09-2020_compressed.pdf · uploaded 28 Mar 2023Source
- 8 Certificates of CA (Form 3)RERA FORM-3 31-12-2020_compressed.pdf · uploaded 28 Mar 2023Source
- 9 Certificates of CA (Form 3)RERA FORM-3 31-03-2021_compressed.pdf · uploaded 28 Mar 2023Source
- 10 Certificates of CA (Form 3)RERA FORM-3 30-06-2021_compressed.pdf · uploaded 28 Mar 2023Source
- 11 Certificates of CA (Form 3)RERA FORM-3 30-09-2021_compressed.pdf · uploaded 28 Mar 2023Source
- 12 Certificates of CA (Form 3)RERA FORM-3 31-03-2022_compressed.pdf · uploaded 28 Mar 2023Source
- 13 Certificates of CA (Form 3)RERA FORM-3 31-12-2021_compressed.pdf · uploaded 28 Mar 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 29 Mar 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 29 Mar 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 29 Mar 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 29 Mar 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)5 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 29 Mar 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 29 Mar 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)7 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 29 Mar 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)8 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 29 Mar 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)9 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 29 Mar 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)10 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 29 Mar 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)11 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 29 Mar 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)12 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 29 Mar 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)13 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 29 Mar 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)QUALITY ENGINEERS CERTIFICATE FORM 2A DT 31032020.pdf · uploaded 29 Mar 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)QUALITY ENGINEERS CERTIFICATE FORM 2A DT 31032021.pdf · uploaded 29 Mar 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)QUALITY ENGINEERS CERTIFICATE FORM 2A DT 31032022.pdf · uploaded 29 Mar 2023Source
- 14 Certificates of CA (Form 3)FORM 3.pdf · uploaded 30 May 2024Source
- 15 Certificates of CA (Form 3)30092022.pdf · uploaded 30 May 2024Source
- 16 Certificates of CA (Form 3)31122022.pdf · uploaded 30 May 2024Source
- 17 Certificates of CA (Form 3)3132023.pdf · uploaded 30 May 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 2022-23.pdf · uploaded 10 Jun 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arkhitect certificate 22-23.pdf · uploaded 15 Jun 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)30-09-2022.pdf · uploaded 15 Jun 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)31-12-2022.pdf · uploaded 15 Jun 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)31-03-2023.pdf · uploaded 15 Jun 2024Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Qtr 1st 23-24.PDF · uploaded 15 Jun 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Qtr 2nd 23-24.PDF · uploaded 15 Jun 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Qtr 3rd 23-24.PDF · uploaded 15 Jun 2024Source
- 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Qtr 4th 23-24.PDF · uploaded 15 Jun 2024Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)30-06-2022.pdf · uploaded 15 Jun 2024Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)30-09-2022.pdf · uploaded 15 Jun 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)31-12-2022.pdf · uploaded 15 Jun 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)31-03-2023.pdf · uploaded 15 Jun 2024Source
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engee Qtr 1st 23-24.PDF · uploaded 15 Jun 2024Source
- 19 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engee Qtr 2nd 23-24.PDF · uploaded 15 Jun 2024Source
- 20 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engee Qtr 3rd 23-24.PDF · uploaded 15 Jun 2024Source
- 21 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engee Qtr 4th 23-24.PDF · uploaded 15 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)31-3-2023.pdf · uploaded 15 Jun 2024Source
- 18 Certificates of CA (Form 3)Form 3 Qtr 1st 23-24_1.pdf · uploaded 15 Jun 2024Source
- 19 Certificates of CA (Form 3)Form 3 Qtr 2nd 23-24_2.pdf · uploaded 15 Jun 2024Source
- 20 Certificates of CA (Form 3)Form 3 Qtr 3rd 23-24_3.pdf · uploaded 15 Jun 2024Source
- 21 Certificates of CA (Form 3)Form 3 Qtr 4Th 23-24_4.pdf · uploaded 15 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Engineers Quality certificate for the year 23-24.pdf · uploaded 8 Jul 2024Source
- 2 PAN CardAPK LANDMARKS LLP,PAN.pdf · uploaded 29 Jul 2024Source
- 1 Copy of Layout Approval (in case of layout)1-6.pdf · uploaded 12 Nov 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 12 Nov 2024Source
- 1 Building Plan Approval (IOD)2-6.pdf · uploaded 12 Nov 2024Source
- 2 Building Plan Approval (IOD)3-6.pdf · uploaded 12 Nov 2024Source
- 3 Building Plan Approval (IOD)4-6.pdf · uploaded 12 Nov 2024Source
- 4 Building Plan Approval (IOD)5-6.pdf · uploaded 12 Nov 2024Source
- 5 Building Plan Approval (IOD)6-6.pdf · uploaded 12 Nov 2024Source
- 1 Declaration about Commencement CertificateAPK LANDMARK DECARATION ABOUT CC.pdf · uploaded 13 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 05-08-2024.pdf · uploaded 24 Dec 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 18-10-2024_compressed.pdf · uploaded 24 Dec 2024Source
- 1 Certificates of CA (Form 3)Form 3 CA Certificate_compressed.pdf · uploaded 24 Dec 2024Source
- 2 Certificates of CA (Form 3)Form 3_merged (2).pdf · uploaded 24 Dec 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 10-10-2024_compressed.pdf · uploaded 24 Dec 2024Source
- 1 Proforma of Agreement for sale3 Proforma of Allotment letter.pdf · uploaded 3 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q3.pdf · uploaded 19 Jun 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q4.pdf · uploaded 19 Jun 2025Source
- 1 Certificates of CA (Form 3)Form 3 APK.pdf · uploaded 19 Jun 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q3_compressed.pdf · uploaded 19 Jun 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q4_compressed.pdf · uploaded 19 Jun 2025Source
- 1 CERSAI detailsSelf Declaraion CERSAI.pdf · uploaded 21 Jun 2025Source
- 1 Deviation Report with respect to Allotment letterDeviations Allotment Letter.pdf · uploaded 21 Jun 2025Source
- 1 Deviation Report with respect to model copy of AgreementDeviations Agreement.pdf · uploaded 21 Jun 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure OREO Anil Aswani.pdf · uploaded 21 Jun 2025Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure OREO Jitu Punjabi.pdf · uploaded 21 Jun 2025Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsDisclosure OREO Kumar Karamchandani.pdf · uploaded 21 Jun 2025Source
- 1 a Details of encumbrances concerned to FinanceEncumbrances Skygarden.pdf · uploaded 29 Jul 2025Source
- 2 a Details of encumbrances concerned to FinanceFinance Encubarance.pdf · uploaded 29 Jul 2025Source
- 3 a Details of encumbrances concerned to FinanceLegal Encubrnace.pdf · uploaded 29 Jul 2025Source
- 1 Disclosure of sold/ booked inventoryPromoters Disclosure.pdf · uploaded 29 Jul 2025Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A.pdf · uploaded 29 Jul 2025Source
- 1 b Details of encumbrances concerned to LegalEncumbrances Skygarden.pdf · uploaded 29 Jul 2025Source
- 2 b Details of encumbrances concerned to LegalFinance Encubarance.pdf · uploaded 29 Jul 2025Source
- 3 b Details of encumbrances concerned to LegalLegal Encubrnace.pdf · uploaded 29 Jul 2025Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B.pdf · uploaded 29 Jul 2025Source
- 1 Disclosure for secured/unsecured finance availed for the projectDeclaration Secuard Unsecurd Loan.pdf · uploaded 29 Jul 2025Source
- Withdrawal Update Form 1Form 1 Q1.pdf · uploaded 8 Jan 2026Source
- Withdrawal Update Form 1Form 1 Q2.pdf · uploaded 8 Jan 2026Source
- Withdrawal Update Form 2Form 2 Q1.pdf · uploaded 8 Jan 2026Source
- Withdrawal Update Form 2Form 2 Q2.pdf · uploaded 8 Jan 2026Source
- Withdrawal Update Form 3Form 3 Q1.pdf · uploaded 8 Jan 2026Source
- Withdrawal Update Form 3Form 3 Q2_compressed.pdf · uploaded 8 Jan 2026Source
- Form 2A (FY 2024-2025)Form 2A FY 2024-25 APK.pdf · uploaded 8 Jan 2026Source
- Form 5 (FY 2024-2025)APK LANDMARKS-FORM 5.pdf · uploaded 8 Jan 2026Source
- Withdrawal Update Form 1Form 1 Q3.pdf · uploaded 9 Jan 2026Source
- Withdrawal Update Form 2Form 2 Q3.pdf · uploaded 9 Jan 2026Source
- Withdrawal Update Form 3Form 3 Q3_compressed.pdf · uploaded 9 Jan 2026Source
- Withdrawal Update Form 1Form 1 Q4.pdf · uploaded 22 Jun 2026Source
- Withdrawal Update Form 2Form 2 Q4.pdf · uploaded 22 Jun 2026Source
- Withdrawal Update Form 3Form 3 Q4_F.pdf · uploaded 22 Jun 2026Source
- Withdrawal Update Form 1Form 1 Q1 APK.pdf · uploaded 3 Sep 2026Source
- Withdrawal Update Form 2Form 2 Q1 APK.pdf · uploaded 3 Sep 2026Source
- Withdrawal Update Form 3Form 3 26-27 Q1 APK.pdf · uploaded 3 Sep 2026Source
- Form 2A (FY 2025-2026)Form 2A FY 2025-26.pdf · uploaded 3 Sep 2026Source
Technical
- DocumentTemp01625.pdf · uploaded 2 Jun 2018Source
- DocumentTemp01626.pdf · uploaded 2 Jun 2018Source
- DocumentTemp01627.pdf · uploaded 2 Jun 2018Source
- Document03 06 gym pmc sanction plan scan copy.pdf · uploaded 2 Jun 2018Source
- DocumentTemp01629-ilovepdf-compressed.pdf · uploaded 2 Jun 2018Source
- DocumentTemp01630.pdf · uploaded 2 Jun 2018Source
- DocumentTemp01631.pdf · uploaded 2 Jun 2018Source
- Document1-6.pdf · uploaded 12 Nov 2024Source
- Document2-6.pdf · uploaded 12 Nov 2024Source
- Document3-6.pdf · uploaded 12 Nov 2024Source
- Document4-6.pdf · uploaded 12 Nov 2024Source
- Document5-6.pdf · uploaded 12 Nov 2024Source
- Document6-6.pdf · uploaded 12 Nov 2024Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel SR.NO 20
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK425 units in all
- Address
- Sr.no 20, Internal Road, Palace Orchid, MohammadwadiPIN 411048
- Village
- Mohammadwadi, Haveli taluka
- Location
- 18.46519, 73.90773
- Land area for this project
- 13,500 sq m (1,45,313 sq ft)
- Permissible built-up area
- 31,547 sq m (3,39,572 sq ft)
- Sanctioned built-up area
- 15,012 sq m (1,61,592 sq ft)
- Recreational open space
- 1,228 sq m (13,223 sq ft)
- Designated bank account
- 109
- Developed in phases
- No
- Also registered as
- स्काय गार्डन, Skay Gardans, स्काय गार्डन्स, Skay Gardan, Skay Gardens, Skay Garden
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
SR.NO 20
Boundaries
- North
- Stream Nala
- South
- Survey Number 21
- East
- Survey Number 20 Hissa Number 8
- West
- Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking425 units
47 of 425 units booked (11%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 68.89 sq m · 742 sq ft | 425 | 47 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals24
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Abhikalpan Architects And Planners | — |
| Engineer | Ga Bhilare Consultants Pvt Ltd | — |
| Engineer | Structure Vizion | — |
| Other | Nac Buildcon Pvtltd | — |
| Registered real estate agent | 360 Realtors LLP | — |
| Registered real estate agent | Amit Surendra Partani | — |
| Registered real estate agent | Ashish Modi | — |
| Registered real estate agent | Deepakkumar Rameshlal Advani | — |
Show all 24 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Registered real estate agent | Dhruba Prasad Gupta | — |
| Registered real estate agent | Fatema Mustafa Kachwala | — |
| Registered real estate agent | Kprbsk Realtors Private Limited | — |
| Registered real estate agent | Kutubuddin Gulamali Khumanpurwala | — |
| Registered real estate agent | Latifa Munaf Inamdar | — |
| Registered real estate agent | Murtaza Husaini Hathaiwala | — |
| Registered real estate agent | Optimus Realtors | — |
| Registered real estate agent | Pearlquest Associates Pvt Ltd | — |
| Registered real estate agent | Propurban Advisory Services Private Limited | — |
| Registered real estate agent | Rohit Rajendra Sawant | — |
| Registered real estate agent | Saideep Satish Patil | — |
| Registered real estate agent | Santosh Ashok Mamidwar | — |
| Registered real estate agent | Team Sync India Private Limited | — |
| Registered real estate agent | Vikas Das | — |
| Registered real estate agent | Vivek Vikas Gogawale | — |
| Registered real estate agent | Wg Cdr Verindar Kumar Jandial | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Mohammadwadi
- Verve Villas at Raheja SterlingRERA PR1260002602621
- LumiereRERA PR1260002602223
- Basil Fab 11RERA PM1260002601008
- Ganga GenesiaRERA PR1261012600621
- StellarisRERA PM1260002600384
- Bhoomi ArcadiaRERA PR1260002502900
- T4 named Astra of Raheja Galaxy in RV PremiereRERA PR1260002502831
- 5 Senses iLifeRERA PR1260002502681
All 1,034 projects in Mohammadwadi · Compare Sky Gardens with another project
Sky Gardens in numbers
Registered deals, summarised
Deedo has 72 registered documents at Sky Gardens, from Mar 2025 to Nov 2026: 60 sales, 11 mortgages. The median registered sale since Mar 2025 works out to about ₹8,600 per sq ft, at a median of ₹58 L a deal; 0% of sales were resales.
- What is the price per sq ft at Sky Gardens?
- The median registered sale since Mar 2025 works out to about ₹8,600 per sq ft, at a median of ₹58 L a deal; 0% of sales were resales.
- How many properties have been sold at Sky Gardens?
- 60 sales are registered at Sky Gardens.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Sky Gardens by Deedo, last updated with deals registered in Nov 2026.
Latest deal · Primary sale · Nov 2026
₹50–75 L