Others · 5 buildings · 167 unitsRERA P52100035129

Elina Lite

Deedo IDDP-PUN-7CH6

MahaRERA shows it completed; no MahaRERA orders on record; 83% of its units are booked.

Mohammadwadi, Pune 411060 · Property rates in Mohammadwadi · by Chaphalkar Karandikar Developers · 50% of its projects kept the RERA date

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales83% booked138 of 167 units · as the promoter reported to MahaRERAPrice₹6,530 /sq ft19.8% below Mohammadwadi · 182 registered sales

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • This projectRegistered 10 May 2022, completion promised 31 Jan 2026.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

All 345 deeds →
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Nov 2026Wing B · 1303Rental—View Rental, Nov 2026
Oct 2026Wing C · 603Rental—View Rental, Oct 2026
Oct 2026Wing B · 1102Rental—View Rental, Oct 2026
Sep 2026Wing A Wing B Wing C · B-101Rental—View Rental, Sep 2026
Sep 2026Wing A Wing B Wing C · A-1402Rental—View Rental, Sep 2026
Sep 2026Wing A Wing B Wing C · A-404Rental—View Rental, Sep 2026
Sep 2026Wing A Wing B Wing C · A-203Rental—View Rental, Sep 2026
Sep 2026Wing A Wing B Wing C · A-1403Rental—View Rental, Sep 2026
Sep 2026Wing A Wing B Wing C · A-601Rental—View Rental, Sep 2026
Sep 2026Wing C · 104Primary sale741 sq ftView Primary sale, Sep 2026

5 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100035129
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210003512910 May 202231 Jan 202631 Jan 2026Chaphalkar Karandikar DevelopersProject page
Documents107

1 document held by Deedo, 106 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Card2 PAN CARD .PDF · uploaded 29 Apr 2022Source

Legal

  • Legal Title reportCircular 28 _ FORM A.pdf · uploaded 2 May 2022Source
  • Declaration Form B1 Declaration FORM B - Revised.pdf · uploaded 2 May 2022Source
  • Other – LegalSELF DECLARATION - ELINA LITE 'D'.pdf · uploaded 20 Dec 2022Source
  • Other – LegalSelf Declaration litigation - Elina Lite.pdf · uploaded 28 Jul 2023Source
  • Other – LegalAdd collector order-Appeal no 5772021 tarwade and others.pdf · uploaded 28 Jul 2023Source

Migrated

  • 1 PAN Card2 PAN CARD .PDF · uploaded 29 Apr 2022Source
Show all 107 documentsShow fewer documents

Migrated

  • 1 Details of encumbrances3 Details Non Encumbrances.pdf · uploaded 29 Apr 2022Source
  • 1 Copy of Layout Approval (in case of layout)Layout_1 Plan.pdf · uploaded 29 Apr 2022Source
  • 2 Copy of Layout Approval (in case of layout)Layout_2.pdf · uploaded 29 Apr 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentPlan 1_3.pdf · uploaded 29 Apr 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentPlan 2_3.pdf · uploaded 29 Apr 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentPlan 3_3.pdf · uploaded 29 Apr 2022Source
  • 1 Declaration about Commencement CertificateDeclaration about Commencement Certificate by Developer.pdf · uploaded 29 Apr 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)5 Architects Certificate.pdf · uploaded 29 Apr 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 Certificate of Engineer.pdf · uploaded 29 Apr 2022Source
  • 1 Proforma of Allotment letterDraft Allotment and ATS ELINA LITE.pdf · uploaded 29 Apr 2022Source
  • 1 Copy of the legal title reportCircular 28 _ FORM A.pdf · uploaded 2 May 2022Source
  • 1 Declaration in FORM B1 Declaration FORM B - Revised.pdf · uploaded 2 May 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA CA FORM 3 REGISTRATION.pdf · uploaded 2 May 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 6 May 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report_200236767543_For_Asset_Based_Search_06_05_2022_16_13_09_077.pdf · uploaded 6 May 2022Source
  • 4 Building Plan Approval / NA Order for plotted development01-04-.pdf · uploaded 16 Nov 2022Source
  • 5 Building Plan Approval / NA Order for plotted development02-04-.pdf · uploaded 16 Nov 2022Source
  • 6 Building Plan Approval / NA Order for plotted development03-04-.pdf · uploaded 16 Nov 2022Source
  • 7 Building Plan Approval / NA Order for plotted development04-04-.pdf · uploaded 16 Nov 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentC C Rev1 .pdf · uploaded 16 Nov 2022Source
  • 1 Other – LegalSELF DECLARATION - ELINA LITE 'D'.pdf · uploaded 20 Dec 2022Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory Elina Lite.pdf · uploaded 20 Jan 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameForm A Declaration of Bank account Elina Lite.pdf · uploaded 20 Jan 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2 A Elina Lite 21-22.pdf · uploaded 23 Jan 2023Source
  • 2 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory Elina Lite 2.pdf · uploaded 10 Apr 2023Source
  • 2 Other – LegalSelf Declaration litigation - Elina Lite.pdf · uploaded 28 Jul 2023Source
  • 3 Other – LegalAdd collector order-Appeal no 5772021 tarwade and others.pdf · uploaded 28 Jul 2023Source
  • 8 Building Plan Approval / NA Order for plotted developmentPLAN 01_06.pdf · uploaded 1 Sep 2023Source
  • 9 Building Plan Approval / NA Order for plotted developmentPLAN 02_06.pdf · uploaded 1 Sep 2023Source
  • 10 Building Plan Approval / NA Order for plotted developmentPLAN 03_06.pdf · uploaded 1 Sep 2023Source
  • 11 Building Plan Approval / NA Order for plotted developmentPLAN 04_06.pdf · uploaded 1 Sep 2023Source
  • 12 Building Plan Approval / NA Order for plotted developmentPLAN 05_06.pdf · uploaded 1 Sep 2023Source
  • 13 Building Plan Approval / NA Order for plotted developmentPLAN 06_06.pdf · uploaded 1 Sep 2023Source
  • 3 Commencement Certificates / NA Order for plotted developmentCC 01 SEPT 2023.pdf · uploaded 1 Sep 2023Source
  • 3 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory Elina Lite.pdf · uploaded 22 Nov 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31-12-2022.pdf · uploaded 6 Dec 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31-03-2023.pdf · uploaded 6 Dec 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30-092023.pdf · uploaded 6 Dec 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Elina Lite 22-23.pdf · uploaded 6 Dec 2023Source
  • 4 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory 3.pdf · uploaded 6 Dec 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q3 2023-24.PDF · uploaded 1 Feb 2024Source
  • 5 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory Q 3.pdf · uploaded 12 Feb 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q4 2023-24.pdf · uploaded 20 Apr 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q4 23- 24.pdf · uploaded 20 Apr 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q4 23-24.pdf · uploaded 20 Apr 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q1 24-25.pdf · uploaded 20 Jul 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q1 24-25.pdf · uploaded 20 Jul 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q1 24-25.pdf · uploaded 20 Jul 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ELINA LIVA Q2.pdf · uploaded 19 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 ELINA LITE Q2.pdf · uploaded 19 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ELINA LITE Q2.pdf · uploaded 19 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryCKD Elina Lite Disclosure of Inventory Q2 24-25.pdf · uploaded 19 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)CKD - ELINA LITE RERA FORM 5 (2023-2024).pdf · uploaded 26 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Elina Lite Q3.pdf · uploaded 24 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Elina Lite Q3.pdf · uploaded 24 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Elina Lite Q3.pdf · uploaded 24 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of sold Inventory Elina Lite Q3.pdf · uploaded 24 Jan 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 4 Feb 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentPLAN 1_6.pdf · uploaded 4 Feb 2025Source
  • 2 Building Plan Approval / NA Order for plotted developmentPLAN 2_6.pdf · uploaded 4 Feb 2025Source
  • 3 Building Plan Approval / NA Order for plotted developmentPLAN 3_6.pdf · uploaded 4 Feb 2025Source
  • 4 Building Plan Approval / NA Order for plotted developmentPLAN 4_6.pdf · uploaded 4 Feb 2025Source
  • 5 Building Plan Approval / NA Order for plotted developmentPLAN 5_6.pdf · uploaded 4 Feb 2025Source
  • 6 Building Plan Approval / NA Order for plotted developmentPLAN 6_6.pdf · uploaded 4 Feb 2025Source
  • Form 5 (FY 2024-2025)Form 5- Elina Lite24-25.pdf · uploaded 24 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Q1 2025-26.pdf · uploaded 29 Oct 2025Source
  • Withdrawal Update Form 2Form 2 Q1 2025-26_compressed.pdf · uploaded 29 Oct 2025Source
  • Withdrawal Update Form 3Form 3 Q1 2025-26_compressed.pdf · uploaded 29 Oct 2025Source
  • Withdrawal Update Form 1Form 1- Elina Lite Sep 2025.pdf · uploaded 31 Oct 2025Source
  • Withdrawal Update Form 2Form 2- Elina Lite Sep 2025.pdf · uploaded 31 Oct 2025Source
  • Withdrawal Update Form 3Form 3 Q1 2025-26_compressed.pdf · uploaded 31 Oct 2025Source
  • Occupational CertificateOccupancy Certificate Elina Lite Plot D .pdf · uploaded 31 Oct 2025Source

Technical

  • DocumentLayout_1 Plan.pdf · uploaded 29 Apr 2022Source
  • DocumentLayout_2.pdf · uploaded 29 Apr 2022Source
  • DocumentPlan 1_3.pdf · uploaded 29 Apr 2022Source
  • DocumentPlan 2_3.pdf · uploaded 29 Apr 2022Source
  • DocumentPlan 3_3.pdf · uploaded 29 Apr 2022Source
  • Document01-04-.pdf · uploaded 16 Nov 2022Source
  • Document02-04-.pdf · uploaded 16 Nov 2022Source
  • Document03-04-.pdf · uploaded 16 Nov 2022Source
  • Document04-04-.pdf · uploaded 16 Nov 2022Source
  • DocumentPLAN 01_06.pdf · uploaded 1 Sep 2023Source
  • DocumentPLAN 02_06.pdf · uploaded 1 Sep 2023Source
  • DocumentPLAN 03_06.pdf · uploaded 1 Sep 2023Source
  • DocumentPLAN 04_06.pdf · uploaded 1 Sep 2023Source
  • DocumentPLAN 05_06.pdf · uploaded 1 Sep 2023Source
  • DocumentPLAN 06_06.pdf · uploaded 1 Sep 2023Source
  • DocumentPLAN 1_6.pdf · uploaded 4 Feb 2025Source
  • DocumentPLAN 2_6.pdf · uploaded 4 Feb 2025Source
  • DocumentPLAN 3_6.pdf · uploaded 4 Feb 2025Source
  • DocumentPLAN 4_6.pdf · uploaded 4 Feb 2025Source
  • DocumentPLAN 5_6.pdf · uploaded 4 Feb 2025Source
  • DocumentPLAN 6_6.pdf · uploaded 4 Feb 2025Source

Technical (Architect)

  • DocumentFORM 1 ELINA LIVA Q2.pdf · uploaded 19 Oct 2024Source
  • DocumentForm 1 Elina Lite Q3.pdf · uploaded 24 Jan 2025Source
  • DocumentForm 1- Elina Lite Sep 2025.pdf · uploaded 31 Oct 2025Source

Technical (Engineer)

  • DocumentFORM 2 ELINA LITE Q2.pdf · uploaded 19 Oct 2024Source
  • DocumentForm 2 Elina Lite Q3.pdf · uploaded 24 Jan 2025Source
  • DocumentForm 2- Elina Lite Sep 2025.pdf · uploaded 31 Oct 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 43/1 to 12/44/46/1/2/3/D 43/5(P)

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
2BHK, 3BHK, Shop167 units in all
Address
43/1 to 12/44/46/1/2/3/D 43/5(P), S M Ghule Road, Off NIBMPIN 411060
Village
Mohammadwadi, Haveli taluka
Land area for this project
3,488 sq m (37,544 sq ft)
Permissible built-up area
15,192 sq m (1,63,525 sq ft)
Sanctioned built-up area
4,743 sq m (51,057 sq ft)
Recreational open space
330 sq m (3,552 sq ft)
Designated bank account
203
Developed in phases
No
Also registered as
Elina Lait, एलिना लाईट

Survey, CTS, gat or plot numbers

43/1 to 12/44/46/1/2/3/D 43/5(P)

Land as published on MahaRERA's project page

43/1 to 12/44/46/1/2/3/D 43/5(P)

Boundaries

North
Survey No 43 P
South
DP Road
East
Survey No 42
West
Survey No 43 P

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking167 units

138 of 167 units booked (83%), as the promoter reported to MahaRERA

2BHK · 104 units3BHK · 54 unitsShop · 9 units
TypeCarpet areaUnitsBooked
2BHK54.54 sq m · 587 sq ft10
2BHK61.93 sq m · 667 sq ft5344
2BHK68.82 sq m · 741 sq ft4839
2BHK78.07 sq m · 840 sq ft11
2BHK84.46 sq m · 909 sq ft11
3BHK84.66 sq m · 911 sq ft11
3BHK90.45 sq m · 974 sq ft11
3BHK91.18 sq m · 981 sq ft4434
Show all 20 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
3BHK91.29 sq m · 983 sq ft66
3BHK151.55 sq m · 1,631 sq ft11
3BHK167.66 sq m · 1,805 sq ft11
Shop59.87 sq m · 644 sq ft11
Shop63.54 sq m · 684 sq ft11
Shop63.78 sq m · 687 sq ft11
Shop66.81 sq m · 719 sq ft11
Shop67.73 sq m · 729 sq ft11
Shop67.82 sq m · 730 sq ft11
Shop72.61 sq m · 782 sq ft11
Shop74.79 sq m · 805 sq ft11
Shop87.42 sq m · 941 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals8

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPinnac Aecl Pvt Ltd—
Chartered accountantP S Achaliya and Co—
EngineerPrashant Doke—
Registered real estate agentAbbas Faiz—
Registered real estate agentAditya Prashant Desai—
Registered real estate agentAtul Ankush Ingulkar—
Registered real estate agentDhiraj Shamrao Ghatage—
Registered real estate agentGautamchand Dudhediya—

Source: MahaRERA project page. Contact details are not shown.

Elina Lite in numbers

Registered deals, summarised

Deedo has 343 registered documents at Elina Lite, from Jan 2016 to Nov 2026: 182 sales, 142 leave and licence agreements, 12 mortgages. The median registered sale since Jan 2016 works out to about ₹6,500 per sq ft, at a median of ₹55 L a deal; 4% of sales were resales.

What is the price per sq ft at Elina Lite?
The median registered sale since Jan 2016 works out to about ₹6,500 per sq ft, at a median of ₹55 L a deal; 4% of sales were resales.
How many properties have been sold at Elina Lite?
182 sales are registered at Elina Lite, 7 of them resales.
Are properties at Elina Lite rented out?
Yes: 142 leave and licence agreements are registered at Elina Lite, at a median rent since Jan 2016 of about ₹24,000 a month with a deposit of about ₹60,000.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Elina Lite by Deedo, last updated with deals registered in Nov 2026.

Latest deal · Rental · Nov 2026

₹20–50k / month

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology