Deedo IDDP-PUN-7CH6MahaRERA shows it completed; no MahaRERA orders on record; 83% of its units are booked.
Mohammadwadi, Pune 411060 · Property rates in Mohammadwadi · by Chaphalkar Karandikar Developers · 50% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 10 May 2022, completion promised 31 Jan 2026.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Rental · 22 mo · Nov 2026
- Rental · Oct 2026
- Rental · Oct 2026
- Rental · 22 mo · Sep 2026
- Rental · 22 mo · Sep 2026
- Rental · 22 mo · Sep 2026
- Rental · 22 mo · Sep 2026
- Rental · Sep 2026
- Rental · Sep 2026
- Primary sale · Sep 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Nov 2026 | Wing B · 1303 | Rental | — | View Rental, Nov 2026 | |
| Oct 2026 | Wing C · 603 | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | Wing B · 1102 | Rental | — | View Rental, Oct 2026 | |
| Sep 2026 | Wing A Wing B Wing C · B-101 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | Wing A Wing B Wing C · A-1402 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | Wing A Wing B Wing C · A-404 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | Wing A Wing B Wing C · A-203 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | Wing A Wing B Wing C · A-1403 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | Wing A Wing B Wing C · A-601 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | Wing C · 104 | Primary sale | 741 sq ft | View Primary sale, Sep 2026 |
5 buildings
Open a building to see every flat, floor by floor.
- Main buildingSize not on record
- Wing ASize not on record
- Wing A Wing B Wing C14 floors · 167 units83% booked
- Wing BSize not on record
- Wing CSize not on record
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100035129
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100035129 | 10 May 2022 | 31 Jan 2026 | 31 Jan 2026 | Chaphalkar Karandikar Developers | Project page |
Documents107
1 document held by Deedo, 106 filings listed on MahaRERA's project page
Finance
- PAN Card2 PAN CARD .PDF · uploaded 29 Apr 2022Source
Legal
- Legal Title reportCircular 28 _ FORM A.pdf · uploaded 2 May 2022Source
- Declaration Form B1 Declaration FORM B - Revised.pdf · uploaded 2 May 2022Source
- Other – LegalSELF DECLARATION - ELINA LITE 'D'.pdf · uploaded 20 Dec 2022Source
- Other – LegalSelf Declaration litigation - Elina Lite.pdf · uploaded 28 Jul 2023Source
- Other – LegalAdd collector order-Appeal no 5772021 tarwade and others.pdf · uploaded 28 Jul 2023Source
Migrated
- 1 PAN Card2 PAN CARD .PDF · uploaded 29 Apr 2022Source
Show all 107 documentsShow fewer documents
Migrated
- 1 Details of encumbrances3 Details Non Encumbrances.pdf · uploaded 29 Apr 2022Source
- 1 Copy of Layout Approval (in case of layout)Layout_1 Plan.pdf · uploaded 29 Apr 2022Source
- 2 Copy of Layout Approval (in case of layout)Layout_2.pdf · uploaded 29 Apr 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 1_3.pdf · uploaded 29 Apr 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentPlan 2_3.pdf · uploaded 29 Apr 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentPlan 3_3.pdf · uploaded 29 Apr 2022Source
- 1 Declaration about Commencement CertificateDeclaration about Commencement Certificate by Developer.pdf · uploaded 29 Apr 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)5 Architects Certificate.pdf · uploaded 29 Apr 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 Certificate of Engineer.pdf · uploaded 29 Apr 2022Source
- 1 Proforma of Allotment letterDraft Allotment and ATS ELINA LITE.pdf · uploaded 29 Apr 2022Source
- 1 Copy of the legal title reportCircular 28 _ FORM A.pdf · uploaded 2 May 2022Source
- 1 Declaration in FORM B1 Declaration FORM B - Revised.pdf · uploaded 2 May 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA CA FORM 3 REGISTRATION.pdf · uploaded 2 May 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 6 May 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200236767543_For_Asset_Based_Search_06_05_2022_16_13_09_077.pdf · uploaded 6 May 2022Source
- 4 Building Plan Approval / NA Order for plotted development01-04-.pdf · uploaded 16 Nov 2022Source
- 5 Building Plan Approval / NA Order for plotted development02-04-.pdf · uploaded 16 Nov 2022Source
- 6 Building Plan Approval / NA Order for plotted development03-04-.pdf · uploaded 16 Nov 2022Source
- 7 Building Plan Approval / NA Order for plotted development04-04-.pdf · uploaded 16 Nov 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentC C Rev1 .pdf · uploaded 16 Nov 2022Source
- 1 Other – LegalSELF DECLARATION - ELINA LITE 'D'.pdf · uploaded 20 Dec 2022Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory Elina Lite.pdf · uploaded 20 Jan 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameForm A Declaration of Bank account Elina Lite.pdf · uploaded 20 Jan 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2 A Elina Lite 21-22.pdf · uploaded 23 Jan 2023Source
- 2 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory Elina Lite 2.pdf · uploaded 10 Apr 2023Source
- 2 Other – LegalSelf Declaration litigation - Elina Lite.pdf · uploaded 28 Jul 2023Source
- 3 Other – LegalAdd collector order-Appeal no 5772021 tarwade and others.pdf · uploaded 28 Jul 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentPLAN 01_06.pdf · uploaded 1 Sep 2023Source
- 9 Building Plan Approval / NA Order for plotted developmentPLAN 02_06.pdf · uploaded 1 Sep 2023Source
- 10 Building Plan Approval / NA Order for plotted developmentPLAN 03_06.pdf · uploaded 1 Sep 2023Source
- 11 Building Plan Approval / NA Order for plotted developmentPLAN 04_06.pdf · uploaded 1 Sep 2023Source
- 12 Building Plan Approval / NA Order for plotted developmentPLAN 05_06.pdf · uploaded 1 Sep 2023Source
- 13 Building Plan Approval / NA Order for plotted developmentPLAN 06_06.pdf · uploaded 1 Sep 2023Source
- 3 Commencement Certificates / NA Order for plotted developmentCC 01 SEPT 2023.pdf · uploaded 1 Sep 2023Source
- 3 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory Elina Lite.pdf · uploaded 22 Nov 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31-12-2022.pdf · uploaded 6 Dec 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31-03-2023.pdf · uploaded 6 Dec 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30-092023.pdf · uploaded 6 Dec 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Elina Lite 22-23.pdf · uploaded 6 Dec 2023Source
- 4 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory 3.pdf · uploaded 6 Dec 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q3 2023-24.PDF · uploaded 1 Feb 2024Source
- 5 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory Q 3.pdf · uploaded 12 Feb 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q4 2023-24.pdf · uploaded 20 Apr 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q4 23- 24.pdf · uploaded 20 Apr 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q4 23-24.pdf · uploaded 20 Apr 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q1 24-25.pdf · uploaded 20 Jul 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q1 24-25.pdf · uploaded 20 Jul 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q1 24-25.pdf · uploaded 20 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ELINA LIVA Q2.pdf · uploaded 19 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 ELINA LITE Q2.pdf · uploaded 19 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ELINA LITE Q2.pdf · uploaded 19 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryCKD Elina Lite Disclosure of Inventory Q2 24-25.pdf · uploaded 19 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)CKD - ELINA LITE RERA FORM 5 (2023-2024).pdf · uploaded 26 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Elina Lite Q3.pdf · uploaded 24 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Elina Lite Q3.pdf · uploaded 24 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Elina Lite Q3.pdf · uploaded 24 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of sold Inventory Elina Lite Q3.pdf · uploaded 24 Jan 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 4 Feb 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentPLAN 1_6.pdf · uploaded 4 Feb 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentPLAN 2_6.pdf · uploaded 4 Feb 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentPLAN 3_6.pdf · uploaded 4 Feb 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentPLAN 4_6.pdf · uploaded 4 Feb 2025Source
- 5 Building Plan Approval / NA Order for plotted developmentPLAN 5_6.pdf · uploaded 4 Feb 2025Source
- 6 Building Plan Approval / NA Order for plotted developmentPLAN 6_6.pdf · uploaded 4 Feb 2025Source
- Form 5 (FY 2024-2025)Form 5- Elina Lite24-25.pdf · uploaded 24 Oct 2025Source
- Withdrawal Update Form 1Form 1 Q1 2025-26.pdf · uploaded 29 Oct 2025Source
- Withdrawal Update Form 2Form 2 Q1 2025-26_compressed.pdf · uploaded 29 Oct 2025Source
- Withdrawal Update Form 3Form 3 Q1 2025-26_compressed.pdf · uploaded 29 Oct 2025Source
- Withdrawal Update Form 1Form 1- Elina Lite Sep 2025.pdf · uploaded 31 Oct 2025Source
- Withdrawal Update Form 2Form 2- Elina Lite Sep 2025.pdf · uploaded 31 Oct 2025Source
- Withdrawal Update Form 3Form 3 Q1 2025-26_compressed.pdf · uploaded 31 Oct 2025Source
- Occupational CertificateOccupancy Certificate Elina Lite Plot D .pdf · uploaded 31 Oct 2025Source
Technical
- DocumentLayout_1 Plan.pdf · uploaded 29 Apr 2022Source
- DocumentLayout_2.pdf · uploaded 29 Apr 2022Source
- DocumentPlan 1_3.pdf · uploaded 29 Apr 2022Source
- DocumentPlan 2_3.pdf · uploaded 29 Apr 2022Source
- DocumentPlan 3_3.pdf · uploaded 29 Apr 2022Source
- Document01-04-.pdf · uploaded 16 Nov 2022Source
- Document02-04-.pdf · uploaded 16 Nov 2022Source
- Document03-04-.pdf · uploaded 16 Nov 2022Source
- Document04-04-.pdf · uploaded 16 Nov 2022Source
- DocumentPLAN 01_06.pdf · uploaded 1 Sep 2023Source
- DocumentPLAN 02_06.pdf · uploaded 1 Sep 2023Source
- DocumentPLAN 03_06.pdf · uploaded 1 Sep 2023Source
- DocumentPLAN 04_06.pdf · uploaded 1 Sep 2023Source
- DocumentPLAN 05_06.pdf · uploaded 1 Sep 2023Source
- DocumentPLAN 06_06.pdf · uploaded 1 Sep 2023Source
- DocumentPLAN 1_6.pdf · uploaded 4 Feb 2025Source
- DocumentPLAN 2_6.pdf · uploaded 4 Feb 2025Source
- DocumentPLAN 3_6.pdf · uploaded 4 Feb 2025Source
- DocumentPLAN 4_6.pdf · uploaded 4 Feb 2025Source
- DocumentPLAN 5_6.pdf · uploaded 4 Feb 2025Source
- DocumentPLAN 6_6.pdf · uploaded 4 Feb 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 43/1 to 12/44/46/1/2/3/D 43/5(P)
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 3BHK, Shop167 units in all
- Address
- 43/1 to 12/44/46/1/2/3/D 43/5(P), S M Ghule Road, Off NIBMPIN 411060
- Village
- Mohammadwadi, Haveli taluka
- Location
- 18.47547, 73.91085
- Land area for this project
- 3,488 sq m (37,544 sq ft)
- Permissible built-up area
- 15,192 sq m (1,63,525 sq ft)
- Sanctioned built-up area
- 4,743 sq m (51,057 sq ft)
- Recreational open space
- 330 sq m (3,552 sq ft)
- Designated bank account
- 203
- Developed in phases
- No
- Also registered as
- Elina Lait, एलिना लाईट
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
43/1 to 12/44/46/1/2/3/D 43/5(P)
Boundaries
- North
- Survey No 43 P
- South
- DP Road
- East
- Survey No 42
- West
- Survey No 43 P
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking167 units
138 of 167 units booked (83%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 54.54 sq m · 587 sq ft | 1 | 0 |
| 2BHK | 61.93 sq m · 667 sq ft | 53 | 44 |
| 2BHK | 68.82 sq m · 741 sq ft | 48 | 39 |
| 2BHK | 78.07 sq m · 840 sq ft | 1 | 1 |
| 2BHK | 84.46 sq m · 909 sq ft | 1 | 1 |
| 3BHK | 84.66 sq m · 911 sq ft | 1 | 1 |
| 3BHK | 90.45 sq m · 974 sq ft | 1 | 1 |
| 3BHK | 91.18 sq m · 981 sq ft | 44 | 34 |
Show all 20 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 3BHK | 91.29 sq m · 983 sq ft | 6 | 6 |
| 3BHK | 151.55 sq m · 1,631 sq ft | 1 | 1 |
| 3BHK | 167.66 sq m · 1,805 sq ft | 1 | 1 |
| Shop | 59.87 sq m · 644 sq ft | 1 | 1 |
| Shop | 63.54 sq m · 684 sq ft | 1 | 1 |
| Shop | 63.78 sq m · 687 sq ft | 1 | 1 |
| Shop | 66.81 sq m · 719 sq ft | 1 | 1 |
| Shop | 67.73 sq m · 729 sq ft | 1 | 1 |
| Shop | 67.82 sq m · 730 sq ft | 1 | 1 |
| Shop | 72.61 sq m · 782 sq ft | 1 | 1 |
| Shop | 74.79 sq m · 805 sq ft | 1 | 1 |
| Shop | 87.42 sq m · 941 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals8
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Pinnac Aecl Pvt Ltd | — |
| Chartered accountant | P S Achaliya and Co | — |
| Engineer | Prashant Doke | — |
| Registered real estate agent | Abbas Faiz | — |
| Registered real estate agent | Aditya Prashant Desai | — |
| Registered real estate agent | Atul Ankush Ingulkar | — |
| Registered real estate agent | Dhiraj Shamrao Ghatage | — |
| Registered real estate agent | Gautamchand Dudhediya | — |
Source: MahaRERA project page. Contact details are not shown.
Elina Lite in numbers
Registered deals, summarised
Deedo has 343 registered documents at Elina Lite, from Jan 2016 to Nov 2026: 182 sales, 142 leave and licence agreements, 12 mortgages. The median registered sale since Jan 2016 works out to about ₹6,500 per sq ft, at a median of ₹55 L a deal; 4% of sales were resales.
- What is the price per sq ft at Elina Lite?
- The median registered sale since Jan 2016 works out to about ₹6,500 per sq ft, at a median of ₹55 L a deal; 4% of sales were resales.
- How many properties have been sold at Elina Lite?
- 182 sales are registered at Elina Lite, 7 of them resales.
- Are properties at Elina Lite rented out?
- Yes: 142 leave and licence agreements are registered at Elina Lite, at a median rent since Jan 2016 of about ₹24,000 a month with a deposit of about ₹60,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Elina Lite by Deedo, last updated with deals registered in Nov 2026.
Latest deal · Rental · Nov 2026
₹20–50k / month