Marigold Villas
Deedo IDDP-PUN-27DZCompletion was pushed back 4 months, to Jul 2028; no MahaRERA orders on record; 3% of its units are booked.
Lonavala (M Cl), Pune 410403 · by Shri Narayani Developers
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Jul 2028
- This projectRegistered 22 Sep 2023, completion promised 31 Mar 2028, revised to 31 Jul 2028.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
35 buildings
Open a building to see every flat, floor by floor.
- Type - A Tenament No - 011 floor · 1 unit0% booked
- Type -A Tenament No - 021 floor · 1 unit0% booked
- Type - A Tenament No - 031 floor · 1 unit0% booked
- Type -A Tenament No - 041 floor · 1 unit100% booked
- Type - A Tenament No - 301 floor · 1 unit0% booked
- Type - A Tenament No - 311 floor · 1 unit0% booked
- Type -A Tenament No - 321 floor · 1 unit0% booked
- Type - A Tentament No -291 floor · 1 unit0% booked
- Type - B Tenament No - 051 floor · 1 unit0% booked
- Type - B Tenament No - 061 floor · 1 unit0% booked
- Type - B Tenament No - 071 floor · 1 unit0% booked
- Type - C Tenament No - 081 floor · 1 unit0% booked
Show all 35 buildingsShow fewer buildings
- Type - C Tenament No - 091 floor · 1 unit0% booked
- Type -C Tenament No - 101 floor · 1 unit0% booked
- Type - C Tentament No - 181 floor · 1 unit0% booked
- Type - C Tentament No - 191 floor · 1 unit0% booked
- Type - C Tentament No - 201 floor · 1 unit0% booked
- Type - D Tenement No - 111 floor · 1 unit0% booked
- Type - D Tentament No - 121 floor · 1 unit0% booked
- Type - E Tentament No - 131 floor · 1 unit0% booked
- Type - E Tentament No - 141 floor · 1 unit0% booked
- Type - E Tentament No - 151 floor · 1 unit0% booked
- Type - F Tentament No - 161 floor · 1 unit0% booked
- Type - F Tentament No - 171 floor · 1 unit0% booked
- Type - G Tentament N0 - 221 floor · 1 unit0% booked
- Type - G Tentament No - 211 floor · 1 unit0% booked
- Type - G Tentament No -231 floor · 1 unit0% booked
- Type - G Tentament No - 241 floor · 1 unit0% booked
- Type -H Tentament No - 251 floor · 1 unit0% booked
- Type - H Tentament No - 261 floor · 1 unit0% booked
- Type - H Tentament No - 271 floor · 1 unit0% booked
- Type - H Tentament No - 281 floor · 1 unit0% booked
- Type - I Tenament No - 331 floor · 1 unit0% booked
- Type - I Tenament No - 341 floor · 1 unit0% booked
- Type - I Tenament No - 351 floor · 1 unit0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100052739
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100052739 | 22 Sep 2023 | 31 Mar 2028 | 31 Jul 2028 | Shri Narayani Developers | Project page |
Documents114
1 document held by Deedo, 113 filings listed on MahaRERA's project page
Finance
- PAN CardPan Narayani.pdf · uploaded 3 Jun 2023Source
Legal
Migrated
- 1 PAN CardPan Narayani.pdf · uploaded 3 Jun 2023Source
- 1 Copy of the legal title reportCopy of the legal title report_11zon.pdf · uploaded 12 Jun 2023Source
- 1 Copy of Layout Approval (in case of layout)Copy of Layout Approval (in case of layout).pdf · uploaded 12 Jun 2023Source
- 1 Proforma of Allotment letterProforma of Allotment letter.pdf · uploaded 12 Jun 2023Source
Show all 114 documentsShow fewer documents
Migrated
- 1 Deviation Report with respect to Allotment letterDeviation Report with respect to Allotment letter.pdf · uploaded 12 Jun 2023Source
- 1 Declaration in FORM BForm B_11zon (1).pdf · uploaded 22 Jun 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 22 Jun 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Rera_11zon.pdf · uploaded 27 Jun 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 FINAL.pdf · uploaded 28 Jun 2023Source
- 1 a Details of encumbrances concerned to FinanceDetails of encumbrances concerned to Legal.pdf · uploaded 3 Jul 2023Source
- 1 b Details of encumbrances concerned to LegalDetails of encumbrances concerned to Legal.pdf · uploaded 3 Jul 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificates NA Order for plotted development.pdf · uploaded 5 Jul 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeprate Bank Format A.pdf · uploaded 17 Jul 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentBUIDING PLAN.pdf · uploaded 18 Jul 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Real Estate Organizations - ALL.pdf · uploaded 18 Jul 2023Source
- 1 Declaration about Commencement CertificateDeclaration about Commencement Certificate - Format D.pdf · uploaded 19 Jul 2023Source
- 1 CERSAI detailsCERSAI_Search_Report_200274933662_For_Asset_Based_Search_20_07_2023_12_54_09_467.pdf · uploaded 20 Jul 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentA B.pdf · uploaded 8 Aug 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentC.pdf · uploaded 8 Aug 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentE F G.pdf · uploaded 8 Aug 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentH I.pdf · uploaded 8 Aug 2023Source
- 1 Proforma of Agreement for saleDRAFT AFS.pdf · uploaded 8 Aug 2023Source
- 1 Deviation Report with respect to model copy of AgreementNO DEVIATION IN AFS.pdf · uploaded 8 Aug 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Narayani Rera Dec 2023 Form 1 (2).pdf · uploaded 21 Feb 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM -2 DEC -23.pdf · uploaded 21 Feb 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM -03 DEC- 23.pdf · uploaded 21 Feb 2024Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFORMAT - A.pdf · uploaded 21 Feb 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 31032024.pdf · uploaded 8 Aug 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 30062024.pdf · uploaded 8 Aug 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 31032024.pdf · uploaded 13 Aug 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 30062024.pdf · uploaded 13 Aug 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 31032024.pdf · uploaded 13 Aug 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 30062024.pdf · uploaded 13 Aug 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 310324.pdf · uploaded 13 Aug 2024Source
- 1 Disclosure of sold/ booked inventorySOLD BOOKED INVENTORY 30062023.pdf · uploaded 13 Aug 2024Source
- 2 Disclosure of sold/ booked inventorySOLD BOOKED INVENTORY 31122023.pdf · uploaded 13 Aug 2024Source
- 3 Disclosure of sold/ booked inventorySOLD BOOKED INVENTORY 31032024.pdf · uploaded 13 Aug 2024Source
- 4 Disclosure of sold/ booked inventorySOLD BOOKED INVENTORY 30062024.pdf · uploaded 13 Aug 2024Source
- 5 Disclosure of sold/ booked inventorySOLD BOOKED INVENTORY 30092023.pdf · uploaded 13 Aug 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 FY 202324.pdf · uploaded 13 Aug 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_compressed (1).pdf · uploaded 4 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_compressed (1).pdf · uploaded 4 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 4 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 4 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_compressed.pdf · uploaded 4 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM -2_compressed.pdf · uploaded 4 Feb 2025Source
- 1 Disclosure of sold/ booked inventorySOLD BOOKED.pdf · uploaded 4 Feb 2025Source
- Withdrawal Update Form 1form 1_compressed.pdf · uploaded 13 Apr 2026Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 13 Apr 2026Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 13 Apr 2026Source
- Form 1form 1_compressed.pdf · uploaded 22 May 2026Source
- Form 2FORM 2.pdf · uploaded 22 May 2026Source
- Form 3FORM 3.pdf · uploaded 22 May 2026Source
- Disclosure of Sold and Booked InventorySOLD BOOKED INVENTORY 30062024.pdf · uploaded 22 May 2026Source
- Form 1form1_compressed.pdf · uploaded 22 May 2026Source
- Form 2FORM -2.pdf · uploaded 22 May 2026Source
- Form 3form 3.pdf · uploaded 22 May 2026Source
- Disclosure of Sold and Booked InventorySOLD BOOKED.pdf · uploaded 22 May 2026Source
- Form 1FORM 1_compressed (1).pdf · uploaded 22 May 2026Source
- Form 2FORM 2.pdf · uploaded 22 May 2026Source
- Form 3FORM 3.pdf · uploaded 22 May 2026Source
- Disclosure of Sold and Booked InventorySOLD BOOKED.pdf · uploaded 22 May 2026Source
- Form 1FORM 1 30062024.pdf · uploaded 22 May 2026Source
- Form 2FORM 2 30062024.pdf · uploaded 22 May 2026Source
- Form 3FORM 3 30062024.pdf · uploaded 22 May 2026Source
- Disclosure of Sold and Booked InventorySOLD BOOKED INVENTORY 30062024.pdf · uploaded 22 May 2026Source
- Form 1FORM 1 31032024.pdf · uploaded 22 May 2026Source
- Form 2FORM 2 31032024.pdf · uploaded 22 May 2026Source
- Form 3FORM 3 31032024.pdf · uploaded 22 May 2026Source
- Disclosure of Sold and Booked InventorySOLD BOOKED INVENTORY 31032024.pdf · uploaded 22 May 2026Source
- Form 1FORM -1 DEC -23.pdf · uploaded 22 May 2026Source
- Form 2FORM -2 DEC -23.pdf · uploaded 22 May 2026Source
- Form 3FORM -03 DEC- 23.pdf · uploaded 22 May 2026Source
- Disclosure of Sold and Booked InventorySold Inventory Dec -23.pdf · uploaded 22 May 2026Source
- Withdrawal Update Form 1form 1_compressed.pdf · uploaded 22 May 2026Source
- Withdrawal Update Form 1form 1_compressed.pdf · uploaded 22 May 2026Source
- Withdrawal Update Form 1form 1_compressed.pdf · uploaded 22 May 2026Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 22 May 2026Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 22 May 2026Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 22 May 2026Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 22 May 2026Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 22 May 2026Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 22 May 2026Source
- Withdrawal Update Form 1Architect Certificate date_ 30_06_2025 (1)_compressed.pdf · uploaded 25 May 2026Source
- Withdrawal Update Form 1Architect Certificate date_ 30_06_2025 (1)_compressed.pdf · uploaded 25 May 2026Source
- Withdrawal Update Form 2Engineer Certificate 30_06_2025.pdf · uploaded 25 May 2026Source
- Withdrawal Update Form 2Engineer Certificate 30_06_2025.pdf · uploaded 25 May 2026Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 25 May 2026Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 25 May 2026Source
- Withdrawal Update Form 1Architect Certificate Form_ 1 Date _ 30_09_2025_compressed.pdf · uploaded 6 Jun 2026Source
- Withdrawal Update Form 1Architect Certificate Form_ 1 Date _ 30_09_2025_compressed.pdf · uploaded 6 Jun 2026Source
- Withdrawal Update Form 2Engineer Certificate Form_2 Date _ 30_09_2025.pdf · uploaded 6 Jun 2026Source
- Withdrawal Update Form 2Engineer Certificate Form_2 Date _ 30_09_2025.pdf · uploaded 6 Jun 2026Source
- Withdrawal Update Form 3FORM 3_compressed (1).pdf · uploaded 6 Jun 2026Source
- Withdrawal Update Form 3FORM 3_compressed (1).pdf · uploaded 6 Jun 2026Source
- Withdrawal Update Form 1Architect Certificate Form_1 Date_ 31_12_2025_compressed.pdf · uploaded 9 Jun 2026Source
- Withdrawal Update Form 2Engineer Certificate Form_2 Date_ 31_12_2025.pdf · uploaded 9 Jun 2026Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 9 Jun 2026Source
Technical
- DocumentCopy of Layout Approval (in case of layout).pdf · uploaded 12 Jun 2023Source
- DocumentBUIDING PLAN.pdf · uploaded 18 Jul 2023Source
- DocumentA B.pdf · uploaded 8 Aug 2023Source
- DocumentC.pdf · uploaded 8 Aug 2023Source
- DocumentE F G.pdf · uploaded 8 Aug 2023Source
- DocumentH I.pdf · uploaded 8 Aug 2023Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel S r NO 58/1
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- Bungalow35 units in all
- Address
- S r NO 58/1, MAWAL, PUNEPIN 410403
- Village
- Lonavala (M Cl), Mawal taluka
- Land area for this project
- 13,900 sq m (1,49,618 sq ft)
- Permissible built-up area
- 5,136 sq m (55,288 sq ft)
- Sanctioned built-up area
- 5,136 sq m (55,288 sq ft)
- Designated bank account
- 85
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S r NO 58/1
Boundaries
- North
- Mumbai Pune Express Highway
- South
- Sr No 57
- East
- D P Road
- West
- Parsi Colony
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking35 units
1 of 35 units booked (3%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Type - A Tenament No - 01 | Bungalow | 138.29 sq m · 1,489 sq ft | 1 | 0 |
| Type -A Tenament No - 02 | Bungalow | 138.29 sq m · 1,489 sq ft | 1 | 0 |
| Type - A Tenament No - 03 | Bungalow | 138.29 sq m · 1,489 sq ft | 1 | 0 |
| Type -A Tenament No - 04 | Bungalow | 138.29 sq m · 1,489 sq ft | 1 | 1 |
| Type - A Tenament No - 30 | Bungalow | 138.29 sq m · 1,489 sq ft | 1 | 0 |
| Type - A Tenament No - 31 | Bungalow | 138.29 sq m · 1,489 sq ft | 1 | 0 |
| Type -A Tenament No - 32 | Bungalow | 138.29 sq m · 1,489 sq ft | 1 | 0 |
| Type - A Tentament No -29 | Bungalow | 138.29 sq m · 1,489 sq ft | 1 | 0 |
Show all 35 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Type - B Tenament No - 05 | Bungalow | 138.29 sq m · 1,489 sq ft | 1 | 0 |
| Type - B Tenament No - 06 | Bungalow | 138.29 sq m · 1,489 sq ft | 1 | 0 |
| Type - B Tenament No - 07 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - C Tenament No - 08 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - C Tenament No - 09 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type -C Tenament No - 10 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - C Tentament No - 18 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - C Tentament No - 19 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - C Tentament No - 20 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - D Tenement No - 11 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - D Tentament No - 12 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - E Tentament No - 13 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - E Tentament No - 14 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - E Tentament No - 15 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - F Tentament No - 16 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - F Tentament No - 17 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - G Tentament N0 - 22 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - G Tentament No - 21 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - G Tentament No -23 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - G Tentament No - 24 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type -H Tentament No - 25 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - H Tentament No - 26 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - H Tentament No - 27 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - H Tentament No - 28 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - I Tenament No - 33 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - I Tenament No - 34 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
| Type - I Tenament No - 35 | Bungalow | 133.76 sq m · 1,440 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Hemant D Bankar | — |
| Chartered accountant | Ganesh D Devkar | — |
| Engineer | Prathamesh Konalikar | — |
| Engineer | Shravan Rathi | — |
| Engineer | Vinod D Pawar | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Lonavala (M Cl)
- Girnar ResidencyRERA PR1260002601773
- RaindropRERA P52100080029
- Golan HeightsRERA P52100079189
- One LonvalaRERA P52100077828
- Bliss EstatesRERA P52100056088
- Atarkya ApartmentRERA P52100055416
- Hills and LakesRERA P52100054235
- Reliable GreensRERA P52100053278
All 40 projects in Lonavala (M Cl) · Compare Marigold Villas with another project