Vallabhniwas Co-Op Housing Society Ltd
Deedo IDDP-PUN-DYQ3MahaRERA shows it completed; no MahaRERA orders on record; 100% of its units are booked.
Kothrud, Pune 411038 · Property rates in Kothrud · by Swojas Realtors Llp · 67% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 10 Sep 2022, completion promised 31 Dec 2025.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Rental · 36 mo · Oct 2026
- Rental · Sep 2026
- Primary sale · Jun 2026
- Rental · May 2026
- Rental · Mar 2026
- Mortgage · Mar 2026No amount
- Rental · Jan 2026
- Rental · 22 mo · Jan 2026
- Resale · Sep 2025
- Other · Sep 2025No amount
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Oct 2026 | Main building · 303 | Rental | — | View Rental, Oct 2026 | |
| Sep 2026 | Not on record | Rental | — | View Rental, Sep 2026 | |
| Jun 2026 | Main building · 901 | Primary sale | 1,268 sq ft | View Primary sale, Jun 2026 | |
| May 2026 | Main building · 901 | Rental | — | View Rental, May 2026 | |
| Mar 2026 | Main building · 403 | Rental | — | View Rental, Mar 2026 | |
| Mar 2026 | Main building · 901 | Mortgage | — | View Mortgage, Mar 2026 | |
| Jan 2026 | Not on record | Rental | — | View Rental, Jan 2026 | |
| Jan 2026 | Main building · 901 | Rental | — | View Rental, Jan 2026 | |
| Sep 2025 | Main building · 204 | Resale | 1,102 sq ft | View Resale, Sep 2025 | |
| Sep 2025 | Not on record | Other | 11,840 sq ft | View Other, Sep 2025 |
4 buildings
Open a building to see every flat, floor by floor.
- Main buildingSize not on record
- NinethSize not on record100% booked
- Vallabh Co Op Housing Society Ltd11 floors · 40 units100% booked
- Main buildingSize not on record100% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100046809
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100046809 | 10 Sep 2022 | 31 Dec 2025 | 31 Dec 2025 | Swojas Realtors LLP | Project page |
Documents138
37 documents held by Deedo, 101 filings listed on MahaRERA's project page
Show all 138 documentsShow fewer documents
Other (36)
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
Finance
- PAN CardSWOJAS REALTORS LLP-PAN.pdf · uploaded 18 Jun 2022Source
Legal
- OtherDEV AGREEMENT INDEX 2.pdf · uploaded 18 Jun 2022Source
- OtherBOOKING LETTER.pdf · uploaded 18 Jun 2022Source
- OtherINTEND LETTER.pdf · uploaded 18 Jun 2022Source
- OtherPROPERTY CARD.pdf · uploaded 18 Jun 2022Source
- OtherSWOJAS REALTORS LLP PARTNERSHIP DEED.pdf · uploaded 18 Jun 2022Source
- Legal Title reportTITLE SEARCH REPORT.pdf · uploaded 18 Jun 2022Source
- OtherSELF DECLARATION ABOUT ENCUMBRANCES.pdf · uploaded 19 Jul 2022Source
- Declaration Form BFORM B DECLARATION PROMOTOR.pdf · uploaded 18 Aug 2022Source
Migrated
- 1 PAN CardSWOJAS REALTORS LLP-PAN.pdf · uploaded 18 Jun 2022Source
- 1 Copy of the legal title reportTITLE SEARCH REPORT.pdf · uploaded 18 Jun 2022Source
- 1 Copy of Layout Approval (in case of layout)DEMARCATION.pdf · uploaded 18 Jun 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 18 Jun 2022Source
- 1 OtherDEV AGREEMENT INDEX 2.pdf · uploaded 18 Jun 2022Source
- 2 OtherBOOKING LETTER.pdf · uploaded 18 Jun 2022Source
- 3 OtherINTEND LETTER.pdf · uploaded 18 Jun 2022Source
- 4 OtherPROPERTY CARD.pdf · uploaded 18 Jun 2022Source
- 5 OtherSWOJAS REALTORS LLP PARTNERSHIP DEED.pdf · uploaded 18 Jun 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentREVISED COMMENCEMENT CERTIFICATE.pdf · uploaded 7 Jul 2022Source
- 1 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMENT 2.pdf · uploaded 7 Jul 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentREVISED SANCTIONED PLAN 1.pdf · uploaded 8 Jul 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentREVISED SANCTIONED PLAN 2.pdf · uploaded 8 Jul 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentREVISED SANCTIONED PLAN 3.pdf · uploaded 8 Jul 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentREVISED SANCTIONED PLAN 4.pdf · uploaded 8 Jul 2022Source
- 1 b Details of encumbrances concerned to LegalDEVIATION REPORT CONCERNED TO LEGAL.pdf · uploaded 9 Jul 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200241768223_For_Asset_Based_Search_08_07_2022_23_09_29_412.pdf · uploaded 9 Jul 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameEscrow Account Declaration.pdf · uploaded 9 Jul 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE.pdf · uploaded 11 Jul 2022Source
- 1 a Details of encumbrances concerned to FinanceENCUMBRANCES UNDERTAKING.pdf · uploaded 19 Jul 2022Source
- 1 Deviation Report with respect to Allotment letterDEVIATION REPORT ALLOTMENT LETTER.pdf · uploaded 19 Jul 2022Source
- 1 Deviation Report with respect to model copy of AgreementDEVIATION REPORT AGREEMENT FOR SALE.pdf · uploaded 19 Jul 2022Source
- 6 OtherSELF DECLARATION ABOUT ENCUMBRANCES.pdf · uploaded 19 Jul 2022Source
- 1 Proforma of Allotment letterDRAFT AGREEMENT TO SALE.pdf · uploaded 1 Aug 2022Source
- 2 Proforma of Allotment letterALLOTMENT LETTER NEW.pdf · uploaded 1 Aug 2022Source
- 1 Declaration in FORM BFORM B DECLARATION PROMOTOR.pdf · uploaded 18 Aug 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCT CERTIFICATE.pdf · uploaded 15 Jan 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE.pdf · uploaded 15 Jan 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)VALLABH.pdf · uploaded 20 Jan 2023Source
- 1 Disclosure of sold/ booked inventoryvallabh.pdf · uploaded 20 Feb 2023View
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Swojas Vallabhniwas - Form 1 - 2022-23 - Q4.pdf · uploaded 20 Apr 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 2 - Swojas Vallabhniwas - March 2023.pdf · uploaded 20 Apr 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Swojas Vallabhniwas - Form 3 - 2022-23 - Q4.pdf · uploaded 20 Apr 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vallabhniwas - Form 1 - 23-24 Q2.pdf · uploaded 18 Jul 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vallabhniwas - Form 2 - 23-24 Q2.pdf · uploaded 18 Jul 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vallabhniwas - Form 3 - 23-24 Q2.pdf · uploaded 18 Jul 2023Source
- 2 Disclosure of sold/ booked inventoryVallabhniwas.pdf · uploaded 20 Jul 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Vallabhniwas - Form 2A - 22-23.pdf · uploaded 29 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)AUDIT REPORT 2022-23.pdf · uploaded 30 Sep 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)AUDIT REPORT 2022-23.pdf · uploaded 30 Sep 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vallabh - Form 1 - 23-24 Q2.pdf · uploaded 16 Oct 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vallabh - Form 2 - 23-24 Q2.pdf · uploaded 16 Oct 2023Source
- 3 Disclosure of sold/ booked inventoryVallabh - Sold Unsold Inventory - 23-24 Q2.pdf · uploaded 16 Oct 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vallabh - Form 3 - 23-24 Q2.pdf · uploaded 16 Oct 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Swojas Vallabhniwas - Form 1 - 2023-24 - Q3.pdf · uploaded 19 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Swojas Vallabhniwas - Form 2 - 2023-24 - Q3.pdf · uploaded 19 Jan 2024Source
- 4 Disclosure of sold/ booked inventorySwojas Vallabhniwas - Sold Unsold - 2023-24 - Q3.pdf · uploaded 19 Jan 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Swojas Vallabhniwas - Form 3 - 2023-24 - Q3.pdf · uploaded 19 Jan 2024Source
- 5 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 25 Jan 2024Source
- 6 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 25 Jan 2024Source
- 7 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 25 Jan 2024Source
- 8 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 25 Jan 2024Source
- 9 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 25 Jan 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentREVISED COMMENCEMENT 2.pdf · uploaded 25 Jan 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vallabh - Form 1 - 23-24 Q4.pdf · uploaded 19 Apr 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vallabh - Form 2 - 23-24 Q4.pdf · uploaded 19 Apr 2024Source
- 5 Disclosure of sold/ booked inventoryVallabh - Sold Unsold - 23-24 Q4.pdf · uploaded 19 Apr 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vallabh - Form 3 - 23-24 Q4.pdf · uploaded 19 Apr 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Swojas Vallabh - Form 1 - FY24-25 Q1.pdf · uploaded 18 Jul 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Swojas Vallabh - Form 2 - FY24-25 Q1.pdf · uploaded 18 Jul 2024Source
- 6 Disclosure of sold/ booked inventorySwojas Vallabh - Sold Unsold - FY24-25 Q1.pdf · uploaded 18 Jul 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Swojas Vallabh - Form 3 - FY24-25 Q1.pdf · uploaded 18 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vallabhniwas - Form 1 - 2024-25 - Q2.pdf · uploaded 20 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vallabhniwas - Form 3 - 2024-25 - Q2.pdf · uploaded 20 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryVallabhniwas - Sold Unsold - 2024-25 - Q2.pdf · uploaded 20 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Vallabhniwas - Form 5.pdf · uploaded 20 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vallabh Architect Certificate.pdf · uploaded 23 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vallabh CA Certificate.pdf · uploaded 23 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 9 - Swojas Vallabhniwas - Form 2 - 24-25 Q2 - Copy.pdf · uploaded 23 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryVallabh Inventory report.pdf · uploaded 23 Jan 2025View
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCOMPLETION CERTIFICATE.pdf · uploaded 10 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Swojas Vallabh FY24-25 Q4.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Swojas Vallabh FY24-25 Q4.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Swojas Vallabh FY24-25 Q4.pdf · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryVallabh Inventory Report(2).pdf · uploaded 19 Apr 2025View
Technical
- DocumentDEMARCATION.pdf · uploaded 18 Jun 2022Source
- DocumentREVISED SANCTIONED PLAN 1.pdf · uploaded 8 Jul 2022Source
- DocumentREVISED SANCTIONED PLAN 2.pdf · uploaded 8 Jul 2022Source
- DocumentREVISED SANCTIONED PLAN 3.pdf · uploaded 8 Jul 2022Source
- DocumentREVISED SANCTIONED PLAN 4.pdf · uploaded 8 Jul 2022Source
- Document1.pdf · uploaded 25 Jan 2024Source
- Document2.pdf · uploaded 25 Jan 2024Source
- Document3.pdf · uploaded 25 Jan 2024Source
- Document4.pdf · uploaded 25 Jan 2024Source
- Document5.pdf · uploaded 25 Jan 2024Source
Technical (Architect)
- DocumentSwojas Vallabh - Form 1 - FY24-25 Q1.pdf · uploaded 18 Jul 2024Source
- DocumentVallabhniwas - Form 1 - 2024-25 - Q2.pdf · uploaded 20 Oct 2024Source
- DocumentVallabh Architect Certificate.pdf · uploaded 23 Jan 2025Source
- DocumentForm 1 - Swojas Vallabh FY24-25 Q4.pdf · uploaded 19 Apr 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel PLOT NO 25 CTS NO 868 S NO 121+122
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, 3BHK40 units in all
- Address
- Plot No 25 Cts No 868 S No 121+122, Paud Road, Rambaug ColonyPIN 411038
- Village
- Kothrud, Haveli taluka
- Location
- 18.51019, 73.81234
- Land area for this project
- 1,100 sq m (11,840 sq ft)
- Permissible built-up area
- 3,520 sq m (37,885 sq ft)
- Sanctioned built-up area
- 3,520 sq m (37,885 sq ft)
- Designated bank account
- 190
- Developed in phases
- No
- Also registered as
- Vallabh Nivas, Vallabh Niwas, वल्लभ निवास
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
PLOT NO 25 CTS NO 868 S NO 121+122
Boundaries
- North
- Colony Road
- South
- Plot No 27 Rambaug Colony
- East
- Plot No 26 Rambaug Colony
- West
- Plot No 25 Rambaug Colony
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking40 units
40 of 40 units booked (100%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 39 sq m · 420 sq ft | 1 | 1 |
| 1BHK | 41 sq m · 441 sq ft | 1 | 1 |
| 1BHK | 55 sq m · 592 sq ft | 1 | 1 |
| 2BHK | 53 sq m · 570 sq ft | 1 | 1 |
| 2BHK | 56 sq m · 603 sq ft | 1 | 1 |
| 2BHK | 58 sq m · 624 sq ft | 6 | 6 |
| 2BHK | 59 sq m · 635 sq ft | 2 | 2 |
| 2BHK | 61 sq m · 657 sq ft | 3 | 3 |
Show all 24 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 61.96 sq m · 667 sq ft | 1 | 1 |
| 2BHK | 66 sq m · 710 sq ft | 1 | 1 |
| 2BHK | 72 sq m · 775 sq ft | 1 | 1 |
| 2BHK | 74 sq m · 797 sq ft | 2 | 2 |
| 2BHK | 77 sq m · 829 sq ft | 1 | 1 |
| 2BHK | 83 sq m · 893 sq ft | 1 | 1 |
| 2BHK | 85 sq m · 915 sq ft | 1 | 1 |
| 2BHK | 91 sq m · 980 sq ft | 4 | 4 |
| 2BHK | 97 sq m · 1,044 sq ft | 1 | 1 |
| 3BHK | 76 sq m · 818 sq ft | 2 | 2 |
| 3BHK | 84 sq m · 904 sq ft | 1 | 1 |
| 3BHK | 85 sq m · 915 sq ft | 3 | 3 |
| 3BHK | 106 sq m · 1,141 sq ft | 1 | 1 |
| 3BHK | 106.74 sq m · 1,149 sq ft | 1 | 1 |
| 3BHK | 113 sq m · 1,216 sq ft | 1 | 1 |
| 3BHK | 125 sq m · 1,345 sq ft | 2 | 2 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Auron Design | — |
| Chartered accountant | Supriya Abhijit Mundada | — |
| Engineer | Siddharth Joshi | — |
| Other | Adv Pradeep Nannajkar | — |
| Other | G A Bhilare Consultants Pvt Ltd | — |
Source: MahaRERA project page. Contact details are not shown.
Vallabhniwas Co-Op Housing Society Ltd in numbers
Registered deals, summarised
Deedo has 98 registered documents at Vallabhniwas Co-Op Housing Society Ltd, from Feb 2015 to Oct 2026: 47 sales, 28 leave and licence agreements, 12 mortgages. The median registered sale since Feb 2015 works out to about ₹15,400 per sq ft, at a median of ₹73 L a deal; 9% of sales were resales.
- What is the price per sq ft at Vallabhniwas Co-Op Housing Society Ltd?
- The median registered sale since Feb 2015 works out to about ₹15,400 per sq ft, at a median of ₹73 L a deal; 9% of sales were resales.
- How many properties have been sold at Vallabhniwas Co-Op Housing Society Ltd?
- 47 sales are registered at Vallabhniwas Co-Op Housing Society Ltd, 4 of them resales.
- Are properties at Vallabhniwas Co-Op Housing Society Ltd rented out?
- Yes: 28 leave and licence agreements are registered at Vallabhniwas Co-Op Housing Society Ltd, at a median rent since Feb 2015 of about ₹17,000 a month with a deposit of about ₹75,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Vallabhniwas Co-Op Housing Society Ltd by Deedo, last updated with deals registered in Oct 2026.
Latest deal · Rental · Oct 2026
₹20–50k / month