Mayuk
Deedo IDDP-PUN-6SJJCompletion was pushed back 4 months, to Jul 2031; no MahaRERA orders on record; 18% of its units are booked.
Kothrud, Pune 411038 · Property rates in Kothrud · by Mayur Corporation
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Jul 2031
- This projectRegistered 21 May 2024, completion promised 31 Mar 2031, revised to 31 Jul 2031.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Oct 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Aug 2026
- Primary sale · Jul 2026
- Primary sale · Jul 2026
- Primary sale · Jul 2026
- Other · Jun 2026No amount
- Primary sale · Jun 2026
- Mortgage · Jun 2026No amount
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Oct 2026 | Wing A · 203 | Primary sale | 1,713 sq ft | View Primary sale, Oct 2026 | |
| Sep 2026 | Wing C · 1906 | Primary sale | 866 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Wing A · 201 | Primary sale | 1,368 sq ft | View Primary sale, Sep 2026 | |
| Aug 2026 | Wing B · 1602 | Primary sale | 1,717 sq ft | View Primary sale, Aug 2026 | |
| Jul 2026 | Wing C · 1005 | Primary sale | 872 sq ft | View Primary sale, Jul 2026 | |
| Jul 2026 | Wing C · 1604 | Primary sale | 870 sq ft | View Primary sale, Jul 2026 | |
| Jul 2026 | Wing B · 602 | Primary sale | 1,717 sq ft | View Primary sale, Jul 2026 | |
| Jun 2026 | Wing B · 1602 | Other | — | View Other, Jun 2026 | |
| Jun 2026 | Wing A · 303 | Primary sale | 1,713 sq ft | View Primary sale, Jun 2026 | |
| Jun 2026 | Main building · 1201A | Mortgage | — | View Mortgage, Jun 2026 |
3 buildings
Open a building to see every flat, floor by floor.
- Wing A21 floors · 84 units38% booked
- Wing B21 floors · 42 units19% booked
- Wing C21 floors · 142 units6% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100056198
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100056198 | 21 May 2024 | 31 Mar 2031 | 31 Jul 2031 | Mayur Corporation | Project page |
Documents178
1 document held by Deedo, 177 filings listed on MahaRERA's project page
Finance
- PAN CardMAYUR CORPORATION PAN CARD.PDF · uploaded 23 Apr 2024Source
Legal
- Declaration Form BFORM B (6).PDF · uploaded 23 Apr 2024Source
- Other – Legalannexure A Declaration Mayuk (1).pdf · uploaded 2 May 2024Source
- Legal Title reportSEARCH AND TITLE REPORT.PDF · uploaded 6 May 2024Source
- Legal Title reportLEGAL TITLE REPORT.PDF · uploaded 6 May 2024Source
- Other – Legal1] 20-4-24 PROPERTY CARD.PDF · uploaded 13 May 2024Source
- Other – Legal1] 20-4-24 SALE DEED MAYUR.PDF · uploaded 13 May 2024Source
Show all 178 documentsShow fewer documents
Legal
- Other – Legal1] NO DUES OF PAYMENT.PDF · uploaded 13 May 2024Source
Migrated
- 1 PAN CardMAYUR CORPORATION PAN CARD.PDF · uploaded 23 Apr 2024Source
- 1 a Details of encumbrances concerned to FinanceENCUMBRANCE CERTIFICATE.PDF · uploaded 23 Apr 2024Source
- 2 a Details of encumbrances concerned to FinanceLEGAL ENCUMBRANCE CERTIFICATE.PDF · uploaded 23 Apr 2024Source
- 1 b Details of encumbrances concerned to LegalENCUMBRANCE CERTIFICATE.PDF · uploaded 23 Apr 2024Source
- 2 b Details of encumbrances concerned to LegalLEGAL ENCUMBRANCE CERTIFICATE.PDF · uploaded 23 Apr 2024Source
- 1 Copy of Layout Approval (in case of layout)01-14 LAYOUT_11zon.pdf · uploaded 23 Apr 2024Source
- 1 Building Plan Approval / NA Order for plotted development02-14 BASEMENT PLAN_11zon.pdf · uploaded 23 Apr 2024Source
- 2 Building Plan Approval / NA Order for plotted development03-14 GROUND AND STILT PARKING_11zon.pdf · uploaded 23 Apr 2024Source
- 3 Building Plan Approval / NA Order for plotted development04-14 PODIUM AND RECREATION_11zon.pdf · uploaded 23 Apr 2024Source
- 4 Building Plan Approval / NA Order for plotted development05-14 A WING FLOOR PLAN_11zon.pdf · uploaded 23 Apr 2024Source
- 5 Building Plan Approval / NA Order for plotted development06-14 A WING REFUGE AND RECREATION FLOOR PLAN_11zon.pdf · uploaded 23 Apr 2024Source
- 6 Building Plan Approval / NA Order for plotted development07-14 A WING SECTION AND ELEVATION_11zon.pdf · uploaded 23 Apr 2024Source
- 7 Building Plan Approval / NA Order for plotted development08-14 B WING FLOOR AND REFUGE AND RECREATION PLAN_11zon.pdf · uploaded 23 Apr 2024Source
- 8 Building Plan Approval / NA Order for plotted development09-14 B WING SECTION AND ELEVATION_11zon.pdf · uploaded 23 Apr 2024Source
- 9 Building Plan Approval / NA Order for plotted development10-14 C WING FLOOR PLAN_11zon.pdf · uploaded 23 Apr 2024Source
- 10 Building Plan Approval / NA Order for plotted development11-14 C WING TYPICAL AND REFUGE FLOOR PLAN_11zon.pdf · uploaded 23 Apr 2024Source
- 11 Building Plan Approval / NA Order for plotted development12-14 C WING 17TH AND RECRATION FLOOR PLAN_11zon.pdf · uploaded 23 Apr 2024Source
- 12 Building Plan Approval / NA Order for plotted development13-14 C WING 18TH AND 19TH FLOOR PLAN_11zon.pdf · uploaded 23 Apr 2024Source
- 13 Building Plan Approval / NA Order for plotted development14-14 C WING SECTION AND ELEVATION PLAN_11zon.pdf · uploaded 23 Apr 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 23 Apr 2024Source
- 1 Declaration in FORM BFORM B (6).PDF · uploaded 23 Apr 2024Source
- 1 CERSAI detailsCERSAI DECLARATION.PDF · uploaded 23 Apr 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDISCLOSER OF INTEREST OF K B JHALA.PDF · uploaded 23 Apr 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDECLARATION OF INTEREST OF M J SHAH.PDF · uploaded 23 Apr 2024Source
- 1 Other – Technicalannexure A Declaration Mayuk (1).pdf · uploaded 23 Apr 2024Source
- 1 Other – Legalannexure A Declaration Mayuk (1).pdf · uploaded 2 May 2024Source
- 1 Copy of the legal title reportSEARCH AND TITLE REPORT.PDF · uploaded 6 May 2024Source
- 2 Copy of the legal title reportLEGAL TITLE REPORT.PDF · uploaded 6 May 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentCC VARIFICATION SCREENSHOT.pdf · uploaded 6 May 2024Source
- 1 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMENT CERTIFICATE (1).PDF · uploaded 6 May 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.PDF · uploaded 6 May 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEERS CERTIFICATE.PDF · uploaded 6 May 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)C A CETIFICATE_organized.pdf · uploaded 6 May 2024Source
- 1 Proforma of Allotment letterALLOTMENT REPORT.PDF · uploaded 6 May 2024Source
- 1 Proforma of Agreement for saleDRAFT AGREEMENT FOR SALE.pdf · uploaded 6 May 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDECLARATION ABOUT SEPERATE BANK ACCOUNT (1) (1).pdf · uploaded 6 May 2024Source
- 1 Deviation Report with respect to Allotment letterDEVIATION REPORT OF ALLOTMENT LETTER.PDF · uploaded 6 May 2024Source
- 1 Deviation Report with respect to model copy of AgreementDEVIATION FOR AGREEMENT OF SALE.PDF · uploaded 6 May 2024Source
- 2 Other – Legal1] 20-4-24 SALE DEED MAYUR.PDF · uploaded 13 May 2024Source
- 3 Other – Legal1] NO DUES OF PAYMENT.PDF · uploaded 13 May 2024Source
- 4 Other – Legal1] 20-4-24 PROPERTY CARD.PDF · uploaded 13 May 2024Source
- 2 Proforma of Agreement for saleDraft Agreement for Sale-2 July 2024.pdf · uploaded 2 Jul 2024Source
- 3 Proforma of Agreement for saleMAYUK - REVISED AGREEMENT FOR SALE.PDF · uploaded 2 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT MAYUK 2024.PDF · uploaded 7 Jul 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEERS MAYUK JULY 2024.PDF · uploaded 7 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A MAYUK 2024.PDF · uploaded 7 Jul 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)C A MAYUK JULY 2024.PDF · uploaded 7 Jul 2024Source
- 1 Disclosure of sold/ booked inventoryDISCLOSER OF BOOKING JULY 2024.PDF · uploaded 8 Jul 2024Source
- 1 Proforma of Agreement for saleDRAFT AGREEMENT FOR SALE OCT 2024.pdf · uploaded 10 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT KOTHRUD OCT 2024.PDF · uploaded 19 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)C A CERTIFICATE (1).PDF · uploaded 19 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryDISCLOSER OF BOOKINGS_compressed.pdf · uploaded 19 Oct 2024Source
- 1 Copy of Layout Approval (in case of layout)6-11-2024 REVISED LAYOUT 1-13.pdf · uploaded 9 Nov 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentREVISED COMMENCEMENT 06-11-2024.PDF · uploaded 9 Nov 2024Source
- 6 Building Plan Approval / NA Order for plotted development6-11-24 7-13 REVISED.pdf · uploaded 9 Nov 2024Source
- 12 Building Plan Approval / NA Order for plotted development6-11-24 13-13 REVISED.pdf · uploaded 9 Nov 2024Source
- 11 Building Plan Approval / NA Order for plotted development6-11-24 12-13 REVISED.pdf · uploaded 9 Nov 2024Source
- 10 Building Plan Approval / NA Order for plotted development6-11-24 11-13 REVISED.pdf · uploaded 9 Nov 2024Source
- 9 Building Plan Approval / NA Order for plotted development6-11-24 10-13 REVISED.pdf · uploaded 9 Nov 2024Source
- 8 Building Plan Approval / NA Order for plotted development6-11-24 9-13 REVISED.pdf · uploaded 9 Nov 2024Source
- 7 Building Plan Approval / NA Order for plotted development6-11-24 8-13 REVISED.pdf · uploaded 9 Nov 2024Source
- 5 Building Plan Approval / NA Order for plotted development6-11-24 6-13 REVISED.pdf · uploaded 9 Nov 2024Source
- 4 Building Plan Approval / NA Order for plotted development6-11-24 5-13 REVISED.pdf · uploaded 9 Nov 2024Source
- 3 Building Plan Approval / NA Order for plotted development6-11-24 4-13 REVISED.pdf · uploaded 9 Nov 2024Source
- 2 Building Plan Approval / NA Order for plotted development6-11-24 3-13 REVISED.pdf · uploaded 9 Nov 2024Source
- 1 Building Plan Approval / NA Order for plotted development6-11-24 2-13 REVISED.pdf · uploaded 9 Nov 2024Source
- 1 Declaration about Commencement CertificateREVISED DECLARATION ABOUT COMMENCEMENT.PDF · uploaded 9 Nov 2024Source
- 2 Proforma of Agreement for saleREVISED DRAFT-Agreement for Sale-DEC 24.pdf · uploaded 4 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT MAYUK JAN 25.PDF · uploaded 9 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)C A MAYUR JAN 25.PDF · uploaded 9 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEERS MAYUR JAN 25.PDF · uploaded 9 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryDISCLOSER MAYUR JAN 2025.PDF · uploaded 9 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A MAYUR JAN 25.PDF · uploaded 9 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT KOTHRUD APRIL 2025.PDF · uploaded 11 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)C A KOTHRUD APRIL 2025.PDF · uploaded 11 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEERS KOTHRUD APRIL 2025.PDF · uploaded 11 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryDISCLOSER KOTHRUD APRIL 2025.PDF · uploaded 11 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)ENGINEERS KOTHRUD 2025.PDF · uploaded 11 Apr 2025Source
- Withdrawal Update Form 1Form1.PDF · uploaded 20 Jul 2025Source
- Withdrawal Update Form 2Form 2.PDF · uploaded 20 Jul 2025Source
- Withdrawal Update Form 3Mayuk_20072025181239.PDF · uploaded 20 Jul 2025Source
- Withdrawal Update Form 1Form1.PDF · uploaded 22 Jul 2025Source
- Withdrawal Update Form 2Form 2.PDF · uploaded 22 Jul 2025Source
- Withdrawal Update Form 3Mayuk_20072025181239.PDF · uploaded 22 Jul 2025Source
- Form 5 (FY 2024-2025)Form-5 Mayuk 2024-2025.PDF · uploaded 30 Sep 2025Source
- Withdrawal Update Form 1Architect Certificate 2nd Q.PDF · uploaded 18 Oct 2025Source
- Withdrawal Update Form 1Withdrawal Update Form 1 · uploaded 18 Oct 2025Source
- Withdrawal Update Form 2ENGINEERS CERTIFICATE 2nd Q.PDF · uploaded 18 Oct 2025Source
- Withdrawal Update Form 2Withdrawal Update Form 2 · uploaded 18 Oct 2025Source
- Withdrawal Update Form 3CA Certificate 2nd Q.PDF · uploaded 18 Oct 2025Source
- Withdrawal Update Form 3Withdrawal Update Form 3 · uploaded 18 Oct 2025Source
- Withdrawal Update Form 1Architect Certificate 2nd Q.PDF · uploaded 20 Oct 2025Source
- Withdrawal Update Form 1Architect Certificate 2nd Q.PDF · uploaded 20 Oct 2025Source
- Withdrawal Update Form 1Architect Certificate 2nd Q.PDF · uploaded 20 Oct 2025Source
- Withdrawal Update Form 1Architect Certificate 2nd Q.PDF · uploaded 20 Oct 2025Source
- Withdrawal Update Form 2ENGINEERS CERTIFICATE 2nd Q.PDF · uploaded 20 Oct 2025Source
- Withdrawal Update Form 2ENGINEERS CERTIFICATE 2nd Q.PDF · uploaded 20 Oct 2025Source
- Withdrawal Update Form 2ENGINEERS CERTIFICATE 2nd Q.PDF · uploaded 20 Oct 2025Source
- Withdrawal Update Form 2ENGINEERS CERTIFICATE 2nd Q.PDF · uploaded 20 Oct 2025Source
- Withdrawal Update Form 3CA Certificate 2nd Q.PDF · uploaded 20 Oct 2025Source
- Withdrawal Update Form 3CA Certificate 2nd Q.PDF · uploaded 20 Oct 2025Source
- Withdrawal Update Form 3CA Certificate 2nd Q.PDF · uploaded 20 Oct 2025Source
- Withdrawal Update Form 3CA Certificate 2nd Q.PDF · uploaded 20 Oct 2025Source
- Withdrawal Update Form 1Architect Certificate 2nd Q.PDF · uploaded 21 Oct 2025Source
- Withdrawal Update Form 2ENGINEERS CERTIFICATE 2nd Q.PDF · uploaded 21 Oct 2025Source
- Withdrawal Update Form 3CA Certificate 2nd Q.PDF · uploaded 21 Oct 2025Source
- Withdrawal Update Form 1Architect Certificate Jan-2026.PDF · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2Engineer Certificate Jan-2026.PDF · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3CA Certificate Jan-2026.PDF · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1ARCHITECT CERTIFICATE MAYUR APRIL 2026.PDF · uploaded 17 Apr 2026Source
- Withdrawal Update Form 2ENGINEERS CERTIFICATE MAYUR APRIL 2026.PDF · uploaded 17 Apr 2026Source
- Withdrawal Update Form 3C A CERTIFICATE MAYUR APRIL 2026.PDF · uploaded 17 Apr 2026Source
- Withdrawal Update Form 1ARCHITECT CERTIFICATE MAYUR APRIL 2026.PDF · uploaded 28 May 2026Source
- Withdrawal Update Form 2ENGINEERS CERTIFICATE MAYUR APRIL 2026.PDF · uploaded 28 May 2026Source
- Withdrawal Update Form 3CA CERTIFICATE_.pdf · uploaded 28 May 2026Source
- Withdrawal Update Form 1FORM 1.PDF · uploaded 18 Jul 2026Source
- Withdrawal Update Form 2FORM 2.PDF · uploaded 18 Jul 2026Source
- Withdrawal Update Form 3FORM 3.PDF · uploaded 18 Jul 2026Source
- Form 5 (FY 2025-2026)Form 5 (25-26) MAYUK.PDF · uploaded 1 Oct 2026Source
Technical
- Document01-14 LAYOUT_11zon.pdf · uploaded 23 Apr 2024Source
- Document13-14 C WING 18TH AND 19TH FLOOR PLAN_11zon.pdf · uploaded 23 Apr 2024Source
- Document14-14 C WING SECTION AND ELEVATION PLAN_11zon.pdf · uploaded 23 Apr 2024Source
- Document12-14 C WING 17TH AND RECRATION FLOOR PLAN_11zon.pdf · uploaded 23 Apr 2024Source
- Document11-14 C WING TYPICAL AND REFUGE FLOOR PLAN_11zon.pdf · uploaded 23 Apr 2024Source
- Document10-14 C WING FLOOR PLAN_11zon.pdf · uploaded 23 Apr 2024Source
- Document02-14 BASEMENT PLAN_11zon.pdf · uploaded 23 Apr 2024Source
- Document03-14 GROUND AND STILT PARKING_11zon.pdf · uploaded 23 Apr 2024Source
- Document04-14 PODIUM AND RECREATION_11zon.pdf · uploaded 23 Apr 2024Source
- Document05-14 A WING FLOOR PLAN_11zon.pdf · uploaded 23 Apr 2024Source
- Document06-14 A WING REFUGE AND RECREATION FLOOR PLAN_11zon.pdf · uploaded 23 Apr 2024Source
- Document07-14 A WING SECTION AND ELEVATION_11zon.pdf · uploaded 23 Apr 2024Source
- Document08-14 B WING FLOOR AND REFUGE AND RECREATION PLAN_11zon.pdf · uploaded 23 Apr 2024Source
- Document09-14 B WING SECTION AND ELEVATION_11zon.pdf · uploaded 23 Apr 2024Source
- Other – Technicalannexure A Declaration Mayuk (1).pdf · uploaded 23 Apr 2024Source
- Document6-11-2024 REVISED LAYOUT 1-13.pdf · uploaded 9 Nov 2024Source
- Document6-11-24 2-13 REVISED.pdf · uploaded 9 Nov 2024Source
- Document6-11-24 3-13 REVISED.pdf · uploaded 9 Nov 2024Source
- Document6-11-24 4-13 REVISED.pdf · uploaded 9 Nov 2024Source
- Document6-11-24 5-13 REVISED.pdf · uploaded 9 Nov 2024Source
- Document6-11-24 6-13 REVISED.pdf · uploaded 9 Nov 2024Source
- Document6-11-24 7-13 REVISED.pdf · uploaded 9 Nov 2024Source
- Document6-11-24 8-13 REVISED.pdf · uploaded 9 Nov 2024Source
- Document6-11-24 9-13 REVISED.pdf · uploaded 9 Nov 2024Source
- Document6-11-24 10-13 REVISED.pdf · uploaded 9 Nov 2024Source
- Document6-11-24 11-13 REVISED.pdf · uploaded 9 Nov 2024Source
- Document6-11-24 12-13 REVISED.pdf · uploaded 9 Nov 2024Source
- Document6-11-24 13-13 REVISED.pdf · uploaded 9 Nov 2024Source
- Document01-14_.pdf · uploaded 28 May 2026Source
- Document02-14.pdf · uploaded 28 May 2026Source
- Document03-14.pdf · uploaded 28 May 2026Source
- Document04-14.pdf · uploaded 28 May 2026Source
- Document05-14.pdf · uploaded 28 May 2026Source
- Document06-14.pdf · uploaded 28 May 2026Source
- Document07-14.pdf · uploaded 28 May 2026Source
- Document08-14.pdf · uploaded 28 May 2026Source
- Document09-14.pdf · uploaded 28 May 2026Source
- Document10-14.pdf · uploaded 28 May 2026Source
- Document11-14.pdf · uploaded 28 May 2026Source
- Document12-14.pdf · uploaded 28 May 2026Source
- Document13-14.pdf · uploaded 28 May 2026Source
- Document14-14.pdf · uploaded 28 May 2026Source
- OthersFormat D.pdf · uploaded 28 May 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel CTS NO. 755/111/1
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 3 BHK, 3 BHK And P, Podium, 3BHK, 1BHK, 1 BHK AND Parking, 1 BHK AND PARKING, 1 BHK AND P OFFICE, 1BHK AND P OFFICE, 1BHKANDPOFFICE, 1RK, 3 BHK AND PARKING, 3BHK AND PARKING, Shop no 1, Shop no 2, Shop no 3, Shop no 4268 units in all
- Address
- Cts No. 755/111/1, Mayur ColonyPIN 411038
- Village
- Kothrud, Haveli taluka
- Location
- 18.50565, 73.81819
- Land area for this project
- 8,092 sq m (87,096 sq ft)
- Permissible built-up area
- 40,004 sq m (4,30,600 sq ft)
- Sanctioned built-up area
- 40,003 sq m (4,30,590 sq ft)
- Recreational open space
- 786 sq m (8,457 sq ft)
- Designated bank account
- 76
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
CTS NO. 755/111/1
Boundaries
- North
- By Cts No 755-88 To 755-94
- South
- By Part Of Cts No 755-111
- East
- By Cts No 832b-134
- West
- By Dp Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking268 units
48 of 268 units booked (18%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing A | 3 BHK | 105.15 sq m · 1,132 sq ft | 21 | 6 |
| Wing A | 3 BHK | 108.16 sq m · 1,164 sq ft | 21 | 0 |
| Wing A | 3 BHK | 112.93 sq m · 1,216 sq ft | 3 | 3 |
| Wing A | 3 BHK | 113.53 sq m · 1,222 sq ft | 3 | 3 |
| Wing A | 3 BHK | 134.22 sq m · 1,445 sq ft | 17 | 14 |
| Wing A | 3 BHK And P | 133.62 sq m · 1,438 sq ft | 18 | 6 |
| Wing A | Podium | 134.21 sq m · 1,445 sq ft | 1 | 0 |
| Wing B | 3BHK | 113.17 sq m · 1,218 sq ft | 3 | 0 |
Show all 27 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing B | 3BHK | 141.51 sq m · 1,523 sq ft | 21 | 6 |
| Wing B | 3BHK | 145.91 sq m · 1,571 sq ft | 18 | 2 |
| Wing C | 1BHK | 49.5 sq m · 533 sq ft | 2 | 0 |
| Wing C | 1 BHK AND Parking | 59.97 sq m · 646 sq ft | 16 | 3 |
| Wing C | 1 BHK AND PARKING | 62.2 sq m · 670 sq ft | 16 | 2 |
| Wing C | 1 BHK AND P OFFICE | 71.43 sq m · 769 sq ft | 30 | 0 |
| Wing C | 1BHK AND P OFFICE | 64.18 sq m · 691 sq ft | 18 | 1 |
| Wing C | 1BHK AND P OFFICE | 64.81 sq m · 698 sq ft | 14 | 0 |
| Wing C | 1BHK AND P OFFICE | 65.37 sq m · 704 sq ft | 18 | 1 |
| Wing C | 1BHKANDPOFFICE | 64.48 sq m · 694 sq ft | 16 | 0 |
| Wing C | 1RK | 31.85 sq m · 343 sq ft | 2 | 0 |
| Wing C | 1RK | 34.65 sq m · 373 sq ft | 1 | 0 |
| Wing C | 3 BHK AND PARKING | 128.32 sq m · 1,381 sq ft | 2 | 1 |
| Wing C | 3 BHK AND PARKING | 130.48 sq m · 1,404 sq ft | 2 | 0 |
| Wing C | 3BHK AND PARKING | 113.05 sq m · 1,217 sq ft | 1 | 0 |
| Wing C | Shop no 1 | 136.57 sq m · 1,470 sq ft | 1 | 0 |
| Wing C | Shop no 2 | 137.17 sq m · 1,476 sq ft | 1 | 0 |
| Wing C | Shop no 3 | 177.95 sq m · 1,915 sq ft | 1 | 0 |
| Wing C | Shop no 4 | 119.34 sq m · 1,285 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals8
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Prakash Kulkarni | — |
| Chartered accountant | Ameya Joshi | — |
| Chartered accountant | Ankur Mahendra Mehta | — |
| Chartered accountant | Nisarg Rajesh Shah | — |
| Engineer | G A Abhilare Consultants Pvt Ltd | — |
| Engineer | Kalpesh Hojage | — |
| Other | Hitesh Patel | — |
| Registered real estate agent | Sharad Arunkumar Goil | — |
Source: MahaRERA project page. Contact details are not shown.
Mayuk in numbers
Registered deals, summarised
Deedo has 32 registered documents at Mayuk, from Dec 2024 to Oct 2026: 18 sales, 13 mortgages. The median registered sale since Dec 2024 works out to about ₹20,300 per sq ft, at a median of ₹3.28 Cr a deal; 0% of sales were resales.
- What is the price per sq ft at Mayuk?
- The median registered sale since Dec 2024 works out to about ₹20,300 per sq ft, at a median of ₹3.28 Cr a deal; 0% of sales were resales.
- How many properties have been sold at Mayuk?
- 18 sales are registered at Mayuk.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Mayuk by Deedo, last updated with deals registered in Oct 2026.
Latest deal · Primary sale · Oct 2026
₹3.5–5 Cr