Ivory Vivanta
Deedo IDDP-PUN-5M12Completion was pushed back 4 months, to Dec 2028; no MahaRERA orders on record; 85% of its units are booked.
Kothrud, Pune 411038 · Property rates in Kothrud · by Ivory Constructions
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Dec 2028
- This projectRegistered 10 Feb 2025, completion promised 31 Aug 2028, revised to 31 Dec 2028.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Rental · Oct 2026
- Rental · Aug 2026
- Primary sale · Aug 2026
- Primary sale · Aug 2026
- Primary sale · Aug 2026
- Rental · Aug 2026
- Rental · Aug 2026
- Rental · Jul 2026
- Primary sale · Jul 2026
- Rental · 36 mo · Jul 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Oct 2026 | Vedant · 30 | Rental | — | View Rental, Oct 2026 | |
| Aug 2026 | Vedant · 7 | Rental | — | View Rental, Aug 2026 | |
| Aug 2026 | Main building · 101 | Primary sale | 764 sq ft | View Primary sale, Aug 2026 | |
| Aug 2026 | Main building · 102 | Primary sale | 776 sq ft | View Primary sale, Aug 2026 | |
| Aug 2026 | Main building · 701 | Primary sale | 1,113 sq ft | View Primary sale, Aug 2026 | |
| Aug 2026 | Vedant · 33 | Rental | — | View Rental, Aug 2026 | |
| Aug 2026 | Vedant · 32 | Rental | — | View Rental, Aug 2026 | |
| Jul 2026 | Vedant · 28/B | Rental | — | View Rental, Jul 2026 | |
| Jul 2026 | Main building · 904 | Primary sale | 1,382 sq ft | View Primary sale, Jul 2026 | |
| Jul 2026 | Vedant · 17 | Rental | — | View Rental, Jul 2026 |
4 buildings
Open a building to see every flat, floor by floor.
- Building (P52100079159)Size not on record85% booked
- Main building3% built12 floors · 40 units
- Main buildingSize not on record
- Wing ASize not on record
Floors and units from the registration certificate annexures and MahaRERA's project page. Construction % is the average of the developer's own declared activity progress to MahaRERA, not an inspection.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100079159
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100079159 | 10 Feb 2025 | 31 Aug 2028 | 31 Dec 2028 | Ivory Constructions | Project page |
Documents116
44 documents held by Deedo, 72 filings listed on MahaRERA's project page
Building plan (3)
Show all 116 documentsShow fewer documents
Other (25)
- Other28 Dec 2024ViewSource
- Other1 Jan 2025ViewSource
- Other1 Feb 2025ViewSource
- Other13 Mar 2025ViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
Form 1 (6)
Form 5
- Form 529 Sep 2025View
Document library
- a Details of encumbrances concerned to FinanceFinancial Encumbrance Certificate1.pdf · uploaded 22 Dec 2024View
- a Details of encumbrances concerned to Finance2LEGAL encumbarance.pdf · uploaded 22 Dec 2024View
- b Details of encumbrances concerned to LegalFinancial Encumbrance Certificate1.pdf · uploaded 22 Dec 2024View
- b Details of encumbrances concerned to Legal2LEGAL encumbarance.pdf · uploaded 22 Dec 2024View
- Copy of Layout Approval (in case of layout)layout plan.pdf · uploaded 22 Dec 2024View
- Building Plan Approval / NA Order for plotted developmentFLOOR PAN 22.pdf · uploaded 22 Dec 2024View
- Building Plan Approval / NA Order for plotted developmentFloor plan 3.pdf · uploaded 22 Dec 2024View
- Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 22 Dec 2024View
- Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf · uploaded 22 Dec 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Architect’s Certificate of Percentage of Completion of Work (Form 1)_page-0001.pdf · uploaded 22 Dec 2024View
- CERSAI detailsCERSAI DECLARATION.pdf · uploaded 22 Dec 2024View
- Disclosure of Interest in Other Real Estate OrganizationsDisclosure of interest in other organisations.pdf · uploaded 22 Dec 2024View
- Disclosure for secured/unsecured finance availed for the projectsecured unsecured finance availed for the project 02.pdf · uploaded 22 Dec 2024View
- Other – TechnicalA - DECLARATION CUM UNDERTAKING (1).pdf · uploaded 22 Dec 2024View
- Declaration in FORM BFORM B 1_compressed.pdf · uploaded 22 Dec 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)ENG FORM IVORY.pdf · uploaded 26 Dec 2024View
- Proforma of Allotment letterProforma of Allotment Letter Final.pdf · uploaded 26 Dec 2024View
- Declaration about all RERA Designated Bank Accounts (Format A)FORMAT B BANK 1.pdf · uploaded 26 Dec 2024View
- Deviation Report with respect to Allotment letterDeviation Report with respect to Allotment letter final.pdf · uploaded 26 Dec 2024View
- Deviation Report with respect to model copy of AgreementDEVIATION REPORT WITH RESPECT TO MODEL COPY OF AGREEMENT .pdf · uploaded 26 Dec 2024View
- Other – FinanceDeclaration.pdf · uploaded 28 Dec 2024View
- Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)-7_page-0001.pdf · uploaded 1 Jan 2025View
- Other – Legal20240701143235.pdf · uploaded 13 Jan 2025View
- Other – Legal20240701143252.pdf · uploaded 13 Jan 2025View
- Other – Legal20240701143319.pdf · uploaded 13 Jan 2025View
- Copy of the legal title reportIVORY SEARCH REPORT (2).pdf · uploaded 29 Jan 2025View
- Proforma of Agreement for saleagreement.pdf · uploaded 1 Feb 2025View
- Proforma of Agreement for saleIvory Constructions.pdf · uploaded 13 Mar 2025View
- Deviation Report with respect to model copy of AgreementDeviation Report Agreement (1).pdf · uploaded 13 Mar 2025View
- Commencement Certificates / NA Order for plotted developmentCommencement certificate.pdf · uploaded 13 Mar 2025View
- Copy of Layout Approval (in case of layout)Ivory Vivanta Sanction Plan.pdf · uploaded 13 Mar 2025View
- Building Plan Approval / NA Order for plotted developmentIvory Vivanta Sanction Plan 2 of 5 (1)_compressed.pdf · uploaded 13 Mar 2025View
- Building Plan Approval / NA Order for plotted developmentIvory Vivanta Sanction Plan 3 of 5 (1)_compressed.pdf · uploaded 13 Mar 2025View
- Building Plan Approval / NA Order for plotted developmentIvory Vivanta Sanction Plan 4 of 5 (1)_compressed.pdf · uploaded 13 Mar 2025View
- Building Plan Approval / NA Order for plotted developmentIvory Vivanta Sanction Plan 5 of 5 (1)_compressed.pdf · uploaded 13 Mar 2025View
- Proforma of Agreement for saleIVERY format document.pdf · uploaded 17 Apr 2025View
- Deviation Report with respect to model copy of Agreementivery Deviation report of Amendment 2.pdf · uploaded 17 Apr 2025View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 19 Apr 2025View
- Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 19 Apr 2025View
- Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A.pdf · uploaded 19 Apr 2025View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Architect’s Certificate of Percentage of Completion of Work (Form 1)-1_page-0001.pdf · uploaded 20 Apr 2025View
- Form 1Form 1_Architech Certificate_April 2025 to June 2025.pdf · uploaded 19 Jul 2025View
- Form 2Form 2_Engineer Certificate_April 2025 to June 2025.pdf · uploaded 19 Jul 2025View
- Disclosure of Sold and Booked InventorySold-Unsold List_April 2025 to June 2025.pdf · uploaded 19 Jul 2025View
- Form 5 (FY 2024-2025)Form 5_2024-25_Ivory.pdf · uploaded 29 Sep 2025View
- Form 1Form 1_Architech Certificate_July 2025 to Sept 2025.pdf · uploaded 18 Oct 2025View
- Form 2Form 2_Engineer Certificate_July 2025 to Sept 2025.pdf · uploaded 18 Oct 2025View
- Disclosure of Sold and Booked InventorySold-Unsold List_July 2025 to Sept 2025.pdf · uploaded 18 Oct 2025View
- Form 1Form 1_Architech Certificate_October 2025 to December 2025.pdf · uploaded 17 Jan 2026View
- Form 2Form 2_Engineer Certificate_October 2025 to December 2025.pdf · uploaded 17 Jan 2026View
- Disclosure of Sold and Booked InventorySold-Unsold List_October 2025 to December 2025.pdf · uploaded 17 Jan 2026View
- Form 1Form 1_Architech Certificate_January 2026 to February 2026.pdf · uploaded 20 Apr 2026View
- Form 2Form 2_Engineer Certificate__January 2026 to February 2026.pdf · uploaded 20 Apr 2026View
- Disclosure of Sold and Booked InventorySold-Unsold__January 2026 to February 2026.pdf · uploaded 20 Apr 2026View
- Form 1Form 1_Architech Certificate_July 2026 to Sept 2026.pdf · uploaded 19 Oct 2026View
- Form 2Form 2_Engineer Certificate_July 2026 to Sept 2026.pdf · uploaded 19 Oct 2026View
- Disclosure of Sold and Booked InventorySold-Unsold List_July 2026 to Sept 2026.pdf · uploaded 19 Oct 2026View
Promoter documents
Technical documents
- Layout Approvallayout plan.pdfView
- Building Plan ApprovalFLOOR PAN 22.pdfView
- Building Plan ApprovalFloor plan 3.pdfView
- Layout ApprovalIvory Vivanta Sanction Plan.pdfView
- Building Plan ApprovalIvory Vivanta Sanction Plan 2 of 5 (1)_compressed.pdfView
- Building Plan ApprovalIvory Vivanta Sanction Plan 3 of 5 (1)_compressed.pdfView
- Building Plan ApprovalIvory Vivanta Sanction Plan 4 of 5 (1)_compressed.pdfView
- Building Plan ApprovalIvory Vivanta Sanction Plan 5 of 5 (1)_compressed.pdfView
Other legal documents
Financial documents
- Other – FinanceDeclaration.pdf · uploaded 28 Dec 2024View
Proforma allotment letter
- Proforma allotment letterProforma of Allotment Letter Final.pdfView
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 28, 29 CTS NO 752 (P)
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Active
- Unit types
- Executive member, Executivemember, Exeecutivemember, Rehab flat 1001, Rehab flat 1002, Rehab flat 1004, Rehab flat 1101, Rehab flat 201, Rehab flat 202, Rehab flat 301, Rehab flat 302, Rehab flat 303, Rehab flat 304, Rehab flat 401, Rehab flat 402, Rehab flat 502, Rehab flat 601, Rehab flat 603, Rehab flat 604, Rehab flat 703, Rehab flat 704, Rehab flat 80140 units in all
- Address
- Survey Number 133/12b To 25b, 28 & 29 Cts No 752 (P), Plot No 8+9 Mrutyunjay Co Op Hos Society, Kothrud, KothrudPIN 411038
- Village
- Kothrud, Haveli taluka
- Land area for this project
- 990 sq m (10,657 sq ft)
- Permissible built-up area
- 4,924 sq m (52,998 sq ft)
- Sanctioned built-up area
- 4,752 sq m (51,146 sq ft)
- Recreational open space
- 0 sq m (0 sq ft)
- Litigation declared by promoter
- None declared
- Financial encumbrance declared
- None declared
- Also registered as
- Varadavant, वरदवंत, Varadvant Kothrud
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
SURVEY NUMBER 133/12B TO 25B, 28 & 29 CTS NO 752 (P),PLOT NO 8+9 MRUTYUNJAY CO OP HOS SOCIETY
Boundaries
- North
- Plot No 10
- South
- Cts No 752 Part Plot No 7
- East
- 40 Feet Dp Road
- West
- Survey No 133 12b
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking40 units · 74 parking spaces
40 units registered
| Type | Carpet area | Units |
|---|---|---|
| Executive member | 71.01 sq m · 764 sq ft | 1 |
| Executive member | 76.38 sq m · 822 sq ft | 1 |
| Executive member | 99.74 sq m · 1,074 sq ft | 1 |
| Executive member | 99.74 sq m · 1,074 sq ft | 2 |
| Executive member | 116.5 sq m · 1,254 sq ft | 1 |
| Executive member | 128.8 sq m · 1,386 sq ft | 1 |
| Executivemember | 26.97 sq m · 290 sq ft | 1 |
| Executivemember | 72.07 sq m · 776 sq ft | 1 |
Show all 38 unit rowsShow fewer unit rows
| Type | Carpet area | Units |
|---|---|---|
| Executivemember | 73.73 sq m · 794 sq ft | 1 |
| Executivemember | 74.14 sq m · 798 sq ft | 1 |
| Executivemember | 75.24 sq m · 810 sq ft | 1 |
| Executivemember | 75.24 sq m · 810 sq ft | 1 |
| Executivemember | 77.62 sq m · 835 sq ft | 2 |
| Executivemember | 92.08 sq m · 991 sq ft | 1 |
| Executivemember | 99.74 sq m · 1,074 sq ft | 1 |
| Executivemember | 103.4 sq m · 1,113 sq ft | 1 |
| Executivemember | 108.5 sq m · 1,168 sq ft | 1 |
| Executivemember | 133.4 sq m · 1,436 sq ft | 1 |
| Exeecutivemember | 75.24 sq m · 810 sq ft | 1 |
| Rehab flat 1001 | 106.8 sq m · 1,150 sq ft | 1 |
| Rehab flat 1002 | 83.98 sq m · 904 sq ft | 1 |
| Rehab flat 1004 | 86.73 sq m · 934 sq ft | 1 |
| Rehab flat 1101 | 178.9 sq m · 1,926 sq ft | 1 |
| Rehab flat 201 | 71 sq m · 764 sq ft | 1 |
| Rehab flat 202 | 72.07 sq m · 776 sq ft | 1 |
| Rehab flat 301 | 71 sq m · 764 sq ft | 1 |
| Rehab flat 302 | 72.07 sq m · 776 sq ft | 1 |
| Rehab flat 303 | 69.04 sq m · 743 sq ft | 1 |
| Rehab flat 304 | 67.39 sq m · 725 sq ft | 1 |
| Rehab flat 401 | 71 sq m · 764 sq ft | 1 |
| Rehab flat 402 | 72.07 sq m · 776 sq ft | 1 |
| Rehab flat 502 | 78.49 sq m · 845 sq ft | 1 |
| Rehab flat 601 | 128.74 sq m · 1,386 sq ft | 1 |
| Rehab flat 603 | 82.25 sq m · 885 sq ft | 1 |
| Rehab flat 604 | 105.93 sq m · 1,140 sq ft | 1 |
| Rehab flat 703 | 82.25 sq m · 885 sq ft | 1 |
| Rehab flat 704 | 86.73 sq m · 934 sq ft | 1 |
| Rehab flat 801 | 154.63 sq m · 1,664 sq ft | 1 |
Parking
| Type | Two-wheeler | Four-wheeler | Bus | Visitor | Total |
|---|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 0 | 50 |
| Open Space | 0 | 0 | 0 | 0 | 24 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Construction progress2 buildings and areas
Work completed, as the promoter reported it to MahaRERA (Form 1)
Ivory Vivanta
Show all 11 activitiesShow fewer activities
Common areas and amenities
Show all 15 activitiesShow fewer activities
Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Ankur Associates | — |
| Chartered accountant | CA Swanand V Agashe | — |
| Chartered accountant | Sanjay W Bhalerao | — |
| Engineer | Balasaheb S Arjun | — |
Source: MahaRERA project page. Contact details are not shown.
Ivory Vivanta in numbers
Registered deals, summarised
Deedo has 139 registered documents at Ivory Vivanta, from Jan 2015 to Oct 2026: 16 sales, 111 leave and licence agreements, 1 mortgage. The median registered sale since Jan 2015 works out to about ₹17,000 per sq ft, at a median of ₹61 L a deal; 6% of sales were resales.
- What is the price per sq ft at Ivory Vivanta?
- The median registered sale since Jan 2015 works out to about ₹17,000 per sq ft, at a median of ₹61 L a deal; 6% of sales were resales.
- How many properties have been sold at Ivory Vivanta?
- 16 sales are registered at Ivory Vivanta, 1 of them a resale.
- Are properties at Ivory Vivanta rented out?
- Yes: 111 leave and licence agreements are registered at Ivory Vivanta, at a median rent since Jan 2015 of about ₹17,000 a month with a deposit of about ₹40,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Ivory Vivanta by Deedo, last updated with deals registered in Oct 2026.
Latest deal · Rental · Oct 2026
₹20–50k / month