Park West
Deedo IDDP-PUN-XSJ3Completion was pushed back 4 months, to Apr 2029; no MahaRERA orders on record; 75% of its units are booked.
Kiwale, Pune 412101 · Property rates in Kiwale · by Hapse Spaces
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2029
- This projectRegistered 22 Mar 2024, completion promised 31 Dec 2028, revised to 30 Apr 2029.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
4 buildings
Open a building to see every flat, floor by floor.
- Park West A Wing10 floors · 58 units55% booked
- Park West B Wing22 floors · 128 units81% booked
- Park West C Wing22 floors · 128 units74% booked
- Park West D Wing12 floors · 24 units88% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100055374
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100055374 | 22 Mar 2024 | 31 Dec 2028 | 30 Apr 2029 | Hapse Spaces | Project page |
Documents150
1 document held by Deedo, 149 filings listed on MahaRERA's project page
Finance
Show all 150 documentsShow fewer documents
Legal
Migrated
- 1 PAN Card1 HAPSE SPACES PAN.pdf · uploaded 15 Feb 2024Source
- 1 a Details of encumbrances concerned to FinanceNo Financial Encumbrances.pdf · uploaded 15 Feb 2024Source
- 2 a Details of encumbrances concerned to FinanceNo legal Encumbrances.pdf · uploaded 15 Feb 2024Source
- 1 b Details of encumbrances concerned to LegalNo Financial Encumbrances.pdf · uploaded 15 Feb 2024Source
- 2 b Details of encumbrances concerned to LegalNo legal Encumbrances.pdf · uploaded 15 Feb 2024Source
- 1 Copy of Layout Approval (in case of layout)Layout highlighted.pdf · uploaded 15 Feb 2024Source
- 1 Commencement Certificates / NA Order for plotted development3 Commencment Certificate Hapse Spaces.pdf · uploaded 15 Feb 2024Source
- 1 Proforma of Allotment letterAnnexure 1 Allotment Letter.pdf · uploaded 15 Feb 2024Source
- 1 Deviation Report with respect to Allotment letterNo Deviation - Allotment Letter.pdf · uploaded 15 Feb 2024Source
- 1 CERSAI detailsCersai Report.pdf · uploaded 16 Feb 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 Other – Finance.pdf · uploaded 16 Feb 2024Source
- 1 Copy of the legal title reportTitle Reprt_compressed.pdf · uploaded 20 Feb 2024Source
- 1 Declaration about Commencement CertificateDec About Commencement Certificate (1).pdf · uploaded 20 Feb 2024Source
- 1 Declaration in FORM BForm B Rera Affidavit upload.pdf · uploaded 20 Feb 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsPromoter Declarations-1.pdf · uploaded 20 Feb 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsPromoter Declarations-2.pdf · uploaded 20 Feb 2024Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsPromoter Declarations-3.pdf · uploaded 20 Feb 2024Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsPromoter Declarations-4.pdf · uploaded 20 Feb 2024Source
- 5 Disclosure of Interest in Other Real Estate OrganizationsPromoter Declarations-5.pdf · uploaded 20 Feb 2024Source
- 6 Disclosure of Interest in Other Real Estate OrganizationsPromoter Declarations-6.pdf · uploaded 20 Feb 2024Source
- 1 Proforma of Agreement for saleafs.pdf · uploaded 20 Feb 2024Source
- 1 Deviation Report with respect to model copy of AgreementDeviation wrt AFS.pdf · uploaded 20 Feb 2024Source
- 1 Building Plan Approval / NA Order for plotted development1 Basement floor plan.pdf · uploaded 27 Feb 2024Source
- 2 Building Plan Approval / NA Order for plotted development2 Ground floor plan.pdf · uploaded 27 Feb 2024Source
- 3 Building Plan Approval / NA Order for plotted development4 of 10.pdf · uploaded 27 Feb 2024Source
- 4 Building Plan Approval / NA Order for plotted development5 of 10.pdf · uploaded 27 Feb 2024Source
- 5 Building Plan Approval / NA Order for plotted development6 of 10.pdf · uploaded 27 Feb 2024Source
- 6 Building Plan Approval / NA Order for plotted development7 of 10.pdf · uploaded 27 Feb 2024Source
- 7 Building Plan Approval / NA Order for plotted development8 of 10.pdf · uploaded 27 Feb 2024Source
- 8 Building Plan Approval / NA Order for plotted development9 of 10.pdf · uploaded 27 Feb 2024Source
- 9 Building Plan Approval / NA Order for plotted development10 of 10.pdf · uploaded 27 Feb 2024Source
- 1 Other – LegalUpload Sale deed and 712.pdf · uploaded 7 Mar 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same10 seperate bank details.pdf · uploaded 8 Mar 2024Source
- 2 Other – LegalOrder 50 Park West.pdf · uploaded 8 Mar 2024Source
- 1 Other – TechnicalCC screenshot.pdf · uploaded 8 Mar 2024Source
- 3 Other – LegalHAPSE SPACES NEW PARTNERSHIP DEED_11zon.pdf · uploaded 14 Mar 2024Source
- 2 Other – TechnicalOrder 50.pdf · uploaded 14 Mar 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Final Form 1.pdf · uploaded 20 Apr 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Final Form 2.pdf · uploaded 20 Apr 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Upload.pdf · uploaded 20 Apr 2024Source
- 2 Copy of Layout Approval (in case of layout)Master Layout Plan Rotate Compress.pdf · uploaded 2 May 2024Source
- 10 Building Plan Approval / NA Order for plotted developmentB -wing Elevation Floor Plan.pdf · uploaded 2 May 2024Source
- 11 Building Plan Approval / NA Order for plotted developmentBasement plan ABCD Rotate_compressed.pdf · uploaded 2 May 2024Source
- 12 Building Plan Approval / NA Order for plotted developmentClub House 1st , 2nd ,Terrace Floor plan.pdf · uploaded 2 May 2024Source
- 13 Building Plan Approval / NA Order for plotted developmentC-wing 1st to 22th.pdf · uploaded 2 May 2024Source
- 14 Building Plan Approval / NA Order for plotted developmentC-wing Elevation Floor Plan.pdf · uploaded 2 May 2024Source
- 15 Building Plan Approval / NA Order for plotted developmentC-wing Terrace floor Plan.pdf · uploaded 2 May 2024Source
- 16 Building Plan Approval / NA Order for plotted developmentD-wing 1st to 12th Floor Plan.pdf · uploaded 2 May 2024Source
- 17 Building Plan Approval / NA Order for plotted developmentD-Wing Elevation Floor Plan.pdf · uploaded 2 May 2024Source
- 18 Building Plan Approval / NA Order for plotted developmentElevation Floor Plan A Wing.pdf · uploaded 2 May 2024Source
- 19 Building Plan Approval / NA Order for plotted developmentLayout C-CPlan.pdf · uploaded 2 May 2024Source
- 20 Building Plan Approval / NA Order for plotted developmentPodium 1 parking plan ABCD_compressed.pdf · uploaded 2 May 2024Source
- 21 Building Plan Approval / NA Order for plotted developmentPodium 2 Parking Plan ABCD.pdf · uploaded 2 May 2024Source
- 22 Building Plan Approval / NA Order for plotted developmentRotate Ground Floor.pdf · uploaded 2 May 2024Source
- 23 Building Plan Approval / NA Order for plotted developmentSection A -A Layout_compressed.pdf · uploaded 2 May 2024Source
- 24 Building Plan Approval / NA Order for plotted developmentB.pdf · uploaded 2 May 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentNew Commencement Plan-1-4.pdf · uploaded 2 May 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 18 Jul 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Final.pdf · uploaded 18 Jul 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Uploaded_compressed.pdf · uploaded 18 Jul 2024Source
- 1 Disclosure of sold/ booked inventorySold Circular 31-3-2024_compressed.pdf · uploaded 20 Jul 2024Source
- 2 Disclosure of sold/ booked inventorySold Circular 30-06-2024_compressed.pdf · uploaded 20 Jul 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectLoan upload.pdf · uploaded 2 Aug 2024Source
- 1 Other – Legalनारायण हापसे निवूत्ती पत्र_compressed.pdf · uploaded 8 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate .pdf · uploaded 20 Oct 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 UPLOAD.pdf · uploaded 20 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEERS CERTIFICATE PROJECT COST.pdf · uploaded 20 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD-BOOKED INVENTORY.pdf · uploaded 20 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 FY 2023-24 Final.pdf · uploaded 12 Dec 2024Source
- 1 Copy of Layout Approval (in case of layout)LAYOUT PLAN_compressed.pdf · uploaded 27 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed.pdf · uploaded 15 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Final_compressed.pdf · uploaded 15 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Rera_compressed.pdf · uploaded 15 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySold Circular Final_compressed.pdf · uploaded 15 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Uploaded_compressed.pdf · uploaded 20 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.pdf · uploaded 15 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Final.pdf · uploaded 20 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Final_compressed.pdf · uploaded 20 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 20 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySold Circular_compressed.pdf · uploaded 20 Apr 2025Source
- 1 Copy of Layout Approval (in case of layout)Highlighted layout plan_compressed.pdf · uploaded 30 Apr 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCommincement New 2025 March (1).pdf · uploaded 30 Apr 2025Source
- Form 1Form 1 Final.pdf · uploaded 17 Jul 2025Source
- Form 2Form 2.pdf · uploaded 17 Jul 2025Source
- Form 3Form 3 Final_compressed.pdf · uploaded 17 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Circular_compressed.pdf · uploaded 17 Jul 2025Source
- Form 5 (FY 2024-2025)Form 5 FY 24-25.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 1From 1 Architectu0027s Letter.pdf · uploaded 27 Nov 2025Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 27 Nov 2025Source
- Withdrawal Update Form 3RERA FORM 3.pdf · uploaded 27 Nov 2025Source
- Withdrawal Update Form 1Form 1 Q2.pdf · uploaded 26 Dec 2025Source
- Withdrawal Update Form 2Form 2 Q2.pdf · uploaded 26 Dec 2025Source
- Withdrawal Update Form 3Form 3 Q2 - 1_compressed.pdf · uploaded 26 Dec 2025Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1Form 1_compressed.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2Form 2 Uploaded.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3Form 3 Final.pdf · uploaded 20 Jul 2026Source
Technical
- DocumentLayout highlighted.pdf · uploaded 15 Feb 2024Source
- Document1 Basement floor plan.pdf · uploaded 27 Feb 2024Source
- Document2 Ground floor plan.pdf · uploaded 27 Feb 2024Source
- Document4 of 10.pdf · uploaded 27 Feb 2024Source
- Document5 of 10.pdf · uploaded 27 Feb 2024Source
- Document6 of 10.pdf · uploaded 27 Feb 2024Source
- Document7 of 10.pdf · uploaded 27 Feb 2024Source
- Document8 of 10.pdf · uploaded 27 Feb 2024Source
- Document9 of 10.pdf · uploaded 27 Feb 2024Source
- Document10 of 10.pdf · uploaded 27 Feb 2024Source
- Other – TechnicalCC screenshot.pdf · uploaded 8 Mar 2024Source
- Other – TechnicalOrder 50.pdf · uploaded 14 Mar 2024Source
- DocumentMaster Layout Plan Rotate Compress.pdf · uploaded 2 May 2024Source
- DocumentB -wing Elevation Floor Plan.pdf · uploaded 2 May 2024Source
- DocumentBasement plan ABCD Rotate_compressed.pdf · uploaded 2 May 2024Source
- DocumentClub House 1st , 2nd ,Terrace Floor plan.pdf · uploaded 2 May 2024Source
- DocumentC-wing 1st to 22th.pdf · uploaded 2 May 2024Source
- DocumentC-wing Elevation Floor Plan.pdf · uploaded 2 May 2024Source
- DocumentC-wing Terrace floor Plan.pdf · uploaded 2 May 2024Source
- DocumentD-wing 1st to 12th Floor Plan.pdf · uploaded 2 May 2024Source
- DocumentD-Wing Elevation Floor Plan.pdf · uploaded 2 May 2024Source
- DocumentElevation Floor Plan A Wing.pdf · uploaded 2 May 2024Source
- DocumentLayout C-CPlan.pdf · uploaded 2 May 2024Source
- DocumentPodium 1 parking plan ABCD_compressed.pdf · uploaded 2 May 2024Source
- DocumentPodium 2 Parking Plan ABCD.pdf · uploaded 2 May 2024Source
- DocumentRotate Ground Floor.pdf · uploaded 2 May 2024Source
- DocumentSection A -A Layout_compressed.pdf · uploaded 2 May 2024Source
- DocumentB.pdf · uploaded 2 May 2024Source
- DocumentLAYOUT PLAN_compressed.pdf · uploaded 27 Dec 2024Source
- DocumentHighlighted layout plan_compressed.pdf · uploaded 30 Apr 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel S. NO. 74/2/1
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- —338 units in all
- Address
- S. No. 74/2/1, Kiwale, KiwalePIN 412101
- Village
- Kiwale, Haveli taluka
- Location
- 18.66032, 73.73142
- Land area for this project
- 10,216 sq m (1,09,966 sq ft)
- Permissible built-up area
- 41,710 sq m (4,48,960 sq ft)
- Sanctioned built-up area
- 25,841 sq m (2,78,149 sq ft)
- Recreational open space
- 978 sq m (10,531 sq ft)
- Designated bank account
- 76
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S. NO. 74/2/1
Boundaries
- North
- Property Of Sakshi Construction
- South
- Prop Of Yashwantrao Andchandrakant Taras Sham Gade
- East
- Property Of Hb Builders And Developers
- West
- Property Of Sagar Hapse And Rahul Hapse
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking338 units
338 units registered
| Building | Type | Carpet area | Units |
|---|---|---|---|
| Park West A Wing | — | — | 58 |
| Park West B Wing | — | — | 128 |
| Park West C Wing | — | — | 128 |
| Park West D Wing | — | — | 24 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | I P Associates | — |
| Chartered accountant | Pgmj And Associates | — |
| Engineer | S S Kokane | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Kiwale
- Miracle - IIRERA PR1260002601874
- Sukhwani Palmera Reserves Phase IRERA PR1260002601641
- BlessingsRERA PM1260002601556
- The Rising Phase-3RERA PR1262022601361
- CitrineRERA PR1260002601192
- Rudraksh HomeRERA PR1260002601195
- 73 ParkRERA PR1260002601181
- Mangalam StarviewRERA PM1260002601151
All 123 projects in Kiwale · Compare Park West with another project