Residential / Group Housing · 5 buildings · 347 unitsRERA P52100020055

Aayush Park - III

Deedo IDDP-PUN-B5PJ

Its promised completion date, Dec 2024, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 97% of its units are booked.

Katavi, Pune 410507 · by Earnest And Shah Ventures · 67% of its projects kept the RERA date

Delivery1 yr 11 mo past duePromised Dec 2024 · no extension on record · not shown completedRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales97% booked337 of 347 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Its promised completion date, Dec 2024, has passed and MahaRERA does not show it completed

  • This projectRegistered 25 Mar 2019, completion promised 30 Dec 2024, and still not shown completed today.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

5 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100020055
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210002005525 Mar 201930 Dec 202430 Dec 2024Earnest and Shah VenturesProject page
Documents133

2 documents held by Deedo, 131 filings listed on MahaRERA's project page

Registration certificate

Other

  • OtherDate not statedView

Finance

  • PAN CardPAN.pdf · uploaded 13 Feb 2019Source

Legal

  • Declaration Form BForm-B.pdf · uploaded 13 Feb 2019Source
  • Legal Title reportTitle Reports Gat No 40-1.pdf · uploaded 13 Feb 2019Source
  • Legal Title reportTitle Reports Gat No 41.pdf · uploaded 13 Feb 2019Source
  • Declaration Form BForm B 26092019.pdf · uploaded 30 Sep 2019Source
  • Legal Title reportTitle Report 17092019.pdf · uploaded 30 Sep 2019Source
Show all 133 documentsShow fewer documents

Legal

  • OtherLease Deed No-4585.pdf · uploaded 30 Oct 2019Source
  • OtherSupplementary Lease Agreement.pdf · uploaded 11 Mar 2020Source

Migrated

  • 1 PAN CardPAN.pdf · uploaded 13 Feb 2019Source
  • 1 Copy of the legal title reportTitle Reports Gat No 40-1.pdf · uploaded 13 Feb 2019Source
  • 2 Copy of the legal title reportTitle Reports Gat No 41.pdf · uploaded 13 Feb 2019Source
  • 1 Details of encumbrancesDeclaration for No Encumbrance.pdf · uploaded 13 Feb 2019Source
  • 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 13 Feb 2019Source
  • 1 Building Plan Approval (IOD)Bldg A B C 1.pdf · uploaded 13 Feb 2019Source
  • 2 Building Plan Approval (IOD)Bldg A B C 2.pdf · uploaded 13 Feb 2019Source
  • 3 Building Plan Approval (IOD)Bldg A B C 3.pdf · uploaded 13 Feb 2019Source
  • 4 Building Plan Approval (IOD)Club_House_Plan.pdf · uploaded 13 Feb 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 13 Feb 2019Source
  • 1 Declaration in FORM BForm-B.pdf · uploaded 13 Feb 2019Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architecture_Cretificate.pdf · uploaded 13 Feb 2019Source
  • 1 Certificates of CA (Form 3)RERA CA cerificate - BW.pdf · uploaded 13 Feb 2019Source
  • 1 Proforma of Allotment letterDraft of Unit Agreement Aayush Park III.pdf · uploaded 18 Mar 2019Source
  • 3 Copy of the legal title reportTitle Report 17092019.pdf · uploaded 30 Sep 2019Source
  • 2 Declaration in FORM BForm B 26092019.pdf · uploaded 30 Sep 2019Source
  • 1 Annual Audit Report of Statutory CA (Form 5)Form 5.pdf · uploaded 30 Sep 2019Source
  • 2 Proforma of Allotment letterUnit Agreement.pdf · uploaded 30 Sep 2019Source
  • 2 Details of encumbrancesDeclaration for No Encumbrance.pdf · uploaded 3 Oct 2019Source
  • 3 Details of encumbrancesMortgage Deed - Page No-1-19.pdf · uploaded 3 Oct 2019Source
  • 4 Details of encumbrancesMortgage Deed -Page-20-38.pdf · uploaded 3 Oct 2019Source
  • 5 Details of encumbrancesMortgage Deed - Page-39-57.pdf · uploaded 3 Oct 2019Source
  • 1 OtherLease Deed No-4585.pdf · uploaded 30 Oct 2019Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Sept 2019.pdf · uploaded 19 Dec 2019Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate_Sept 2019.pdf · uploaded 19 Dec 2019Source
  • 2 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 19 Dec 2019Source
  • 2 OtherSupplementary Lease Agreement.pdf · uploaded 11 Mar 2020Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Ar Certificate Dec 19.pdf · uploaded 12 May 2020Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Dec 2019.pdf · uploaded 12 May 2020Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2 A.pdf · uploaded 12 May 2020Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A Sept 2019.pdf · uploaded 12 May 2020Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A Dec 2019.pdf · uploaded 12 May 2020Source
  • 3 Certificates of CA (Form 3)CA RERA Certificate Dec 2019.pdf · uploaded 12 May 2020Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Aayush Park-III RERA Cetificate June 2020 (1).pdf · uploaded 14 Sep 2020Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Enginners Certificate June 2020.pdf · uploaded 14 Sep 2020Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A.pdf · uploaded 14 Sep 2020Source
  • 4 Certificates of CA (Form 3)CA Certificate - Form 3 - June 2020 (1).pdf · uploaded 14 Sep 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5.pdf · uploaded 30 Sep 2020Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architech Certificate June 21.pdf · uploaded 5 Aug 2021Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Jun-21.pdf · uploaded 5 Aug 2021Source
  • 5 Certificates of CA (Form 3)Form 3 CA RERA Certificate June-21.pdf · uploaded 5 Aug 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form2A quality Certificate.pdf · uploaded 6 Aug 2021Source
  • 1 Declaration about Commencement CertificateDISCLOSURE OF SOLD-BOOKED INVENTORY B-BLD.pdf · uploaded 30 Aug 2021Source
  • 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD-BOOKED INVENTORY A-BLD.pdf · uploaded 30 Aug 2021Source
  • 2 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD-BOOKED INVENTORY B-BLD.pdf · uploaded 30 Aug 2021Source
  • 3 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD-BOOKED INVENTORY C-BLD.pdf · uploaded 30 Aug 2021View
  • 2 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf · uploaded 13 Sep 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Aayush Park 3 Form 5-compressed.pdf · uploaded 30 Sep 2021Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Architect Certificate Sept 21.pdf · uploaded 2 Nov 2021Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Sept 21.pdf · uploaded 2 Nov 2021Source
  • 5 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A.pdf · uploaded 2 Nov 2021Source
  • 6 Certificates of CA (Form 3)CA Certificate Sept 21.pdf · uploaded 9 Nov 2021Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 1 Feb 2022Source
  • 7 Certificates of CA (Form 3)Form 3.pdf · uploaded 3 Feb 2022Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 3 Aug 2022Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)RERA Engineers Certificate June22.pdf · uploaded 3 Aug 2022Source
  • 8 Certificates of CA (Form 3)Form 3.pdf · uploaded 3 Aug 2022Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 21 Oct 2022Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Cert.pdf · uploaded 21 Oct 2022Source
  • 9 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 21 Oct 2022Source
  • 4 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD-BOOKED INVENTORY A-BLD.pdf · uploaded 31 Oct 2022Source
  • 5 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD-BOOKED INVENTORY B-BLD.pdf · uploaded 31 Oct 2022Source
  • 6 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD-BOOKED INVENTORY C-BLD.pdf · uploaded 31 Oct 2022View
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)AP III Society Registration For Certificate.pdf · uploaded 31 Oct 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5.pdf · uploaded 17 Dec 2022Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 19 Jan 2023Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 19 Jan 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form2A quality Certificate.pdf · uploaded 19 Jan 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A.pdf · uploaded 19 Jan 2023Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architecture_Cretificate.pdf · uploaded 30 Jan 2023Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Ar Certificate.pdf · uploaded 30 Jan 2023Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate March 2020.pdf · uploaded 30 Jan 2023Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate March 2020.pdf · uploaded 30 Jan 2023Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architects Certificate.pdf · uploaded 30 Jan 2023Source
  • 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Mar 21.pdf · uploaded 30 Jan 2023Source
  • 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 30 Jan 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Phase-III.pdf · uploaded 31 Jan 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 31 Jan 2023Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate March 2020.pdf · uploaded 31 Jan 2023Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Form 2.pdf · uploaded 31 Jan 2023Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Form-2.pdf · uploaded 31 Jan 2023Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Form-2.pdf · uploaded 31 Jan 2023Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 31 Jan 2023Source
  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Certificate.pdf · uploaded 31 Jan 2023Source
  • 6 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Engineers Certificate Form 2.pdf · uploaded 31 Jan 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)RERA Form 5 2018-19.pdf · uploaded 31 Jan 2023Source
  • 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate - Dec 2022.pdf · uploaded 1 Feb 2023Source
  • 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2 - Dec 2022.pdf · uploaded 1 Feb 2023Source
  • 7 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A Dec 2019.pdf · uploaded 1 Feb 2023Source
  • 8 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A March 2020.pdf · uploaded 1 Feb 2023Source
  • 9 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Quality Certificate form 2A.pdf · uploaded 1 Feb 2023Source
  • 10 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2 -Mar 19.pdf · uploaded 1 Feb 2023Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)RERA Form 2A Dec 2020.pdf · uploaded 1 Feb 2023Source
  • 5 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Certificate.pdf · uploaded 1 Feb 2023Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A.pdf · uploaded 1 Feb 2023Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2 -June 22.pdf · uploaded 1 Feb 2023Source
  • 5 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A -Sep 22.pdf · uploaded 1 Feb 2023Source
  • 6 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A -Dec 22.pdf · uploaded 1 Feb 2023Source
  • 10 Certificates of CA (Form 3)RERA CA cerificate - BW.pdf · uploaded 1 Feb 2023Source
  • 11 Certificates of CA (Form 3)CA Certificate Form3.pdf · uploaded 1 Feb 2023Source
  • 12 Certificates of CA (Form 3)RERA CA Certificate - Form 3 - Mar 2020.pdf · uploaded 1 Feb 2023Source
  • 13 Certificates of CA (Form 3)Form 3.pdf · uploaded 1 Feb 2023Source
  • 14 Certificates of CA (Form 3)RERA Form 3 Dec 2020.pdf · uploaded 1 Feb 2023Source
  • 15 Certificates of CA (Form 3)Form 3 CA Certificate.pdf · uploaded 1 Feb 2023Source
  • 16 Certificates of CA (Form 3)Form 3 CA RERA Certificate.pdf · uploaded 1 Feb 2023Source
  • 17 Certificates of CA (Form 3)Form 3 - Dec 2022.pdf · uploaded 1 Feb 2023Source
  • 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 3 Feb 2023Source
  • 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Ar Certifcate.pdf · uploaded 8 May 2023Source
  • 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate.pdf · uploaded 8 May 2023Source
  • 7 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A.pdf · uploaded 8 May 2023Source
  • 18 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 8 May 2023Source
  • 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Ar Certifcate.pdf · uploaded 18 Aug 2023Source
  • 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng Certificate.pdf · uploaded 18 Aug 2023Source
  • 19 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 18 Aug 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)5 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf · uploaded 27 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5.pdf · uploaded 5 Nov 2024Source

Technical

  • DocumentBldg A B C 1.pdf · uploaded 13 Feb 2019Source
  • DocumentBldg A B C 2.pdf · uploaded 13 Feb 2019Source
  • DocumentBldg A B C 3.pdf · uploaded 13 Feb 2019Source
  • DocumentClub_House_Plan.pdf · uploaded 13 Feb 2019Source
  • DocumentLayout.pdf · uploaded 13 Feb 2019Source

Technical (Architect)

  • DocumentAr Certifcate.pdf · uploaded 18 Aug 2023Source

Technical (Engineer)

  • DocumentEng Certificate.pdf · uploaded 18 Aug 2023Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 41, Survy No 40/1

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, ONE BHK TYPE 1, TWO BHK TYPE 1, ONE BHK TYPE 2, TWO BHK TYPE 2347 units in all
Address
Survy No 40/1, 41, Talegaon Katvi Road, KatviPIN 410507
Village
Katavi, Mawal taluka
Land area for this project
13,800 sq m (1,48,542 sq ft)
Permissible built-up area
24,481 sq m (2,63,511 sq ft)
Sanctioned built-up area
21,931 sq m (2,36,063 sq ft)
Recreational open space
1,353 sq m (14,567 sq ft)
Designated bank account
171
Developed in phases
Yes

Survey, CTS, gat or plot numbers

41Survy No 40/1

Land as published on MahaRERA's project page

Survy No 40/1, 41

Boundaries

North
By M D R Road 104
South
By Land Bearing Gat No 40-2-3
East
By Land Bearing Gat No 40-3
West
By Land Bearing Gat No 59

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking347 units

337 of 347 units booked (97%), as the promoter reported to MahaRERA

1BHK · 62 units2BHK · 64 unitsONE BHK TYPE 1 · 85 unitsTWO BHK TYPE 1 · 111 unitsONE BHK TYPE 2 · 24 unitsTWO BHK TYPE 2 · 1 unit
BuildingTypeCarpet areaUnitsBooked
A1BHK34.6 sq m · 372 sq ft6259
A2BHK53.65 sq m · 577 sq ft6458
BONE BHK TYPE 134.6 sq m · 372 sq ft6261
BTWO BHK TYPE 153.65 sq m · 577 sq ft6464
CONE BHK TYPE 131.9 sq m · 343 sq ft2323
CONE BHK TYPE 232.1 sq m · 346 sq ft2424
CTWO BHK TYPE 143.5 sq m · 468 sq ft4747
CTWO BHK TYPE 258.85 sq m · 633 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectA Design Studio—
Chartered accountantCA Kunal Jhamvar—
EngineerNitinkumar Mohanlal Jain—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Katavi

All 10 projects in Katavi · Compare Aayush Park - III with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology