Pristine Allure Part 1
Deedo IDDP-PUN-Q1ZXCompletion was pushed back 4 months, to Apr 2028; no MahaRERA orders on record; 94% of its units are booked.
Haveli, Maharashtra 411014 · Property rates in Haveli · by Mahalaxmi Shelters
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2028
- This projectRegistered 10 May 2022, completion promised 31 Dec 2027, revised to 30 Apr 2028.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Sep 2026 | D Wing · 606 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | C Wing · 901 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | E Wing · 1105 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | E Wing · 404 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | D Wing · 1106 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | C Wing · 702 | Rental | — | View Rental, Sep 2026 | |
| Aug 2026 | E Wing · 1006 | Rental | — | View Rental, Aug 2026 | |
| Aug 2026 | C Wing · 703 | Rental | — | View Rental, Aug 2026 | |
| Aug 2026 | D Wing · 1203 | Rental | — | View Rental, Aug 2026 | |
| Jul 2026 | E Wing · 401 | Rental | — | View Rental, Jul 2026 |
4 buildings
Open a building to see every flat, floor by floor.
- C Wing13 floors · 77 units90% booked
- D Wing13 floors · 78 units95% booked
- E Wing13 floors · 78 units96% booked
- F Wing13 floors · 78 units95% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100045237
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100045237 | 10 May 2022 | 31 Dec 2027 | 30 Apr 2028 | Mahalaxmi Shelters | Project page |
Documents181
1 document held by Deedo, 180 filings listed on MahaRERA's project page
Finance
- PAN CardPAN Card.pdf · uploaded 29 Apr 2022Source
Legal
- Declaration Form BAffidavit Form B Final.pdf · uploaded 18 Apr 2022Source
- Legal Title reportLegal basic.pdf · uploaded 30 Apr 2022Source
- Legal Title reportTitle Reportpt1.pdf · uploaded 30 Apr 2022Source
- Legal Title reportTitle Reportpt2.pdf · uploaded 30 Apr 2022Source
- Legal Title reportTitle Reportpt3.pdf · uploaded 30 Apr 2022Source
- Legal Title report1 Copy of the legal title report (1).pdf · uploaded 22 Aug 2023Source
Show all 181 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)FULL PROJECT LAYOUT.pdf · uploaded 2 Mar 2022Source
- 2 Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 2 Mar 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentCOMM 1 1.pdf · uploaded 2 Mar 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentCOMM 1 2.pdf · uploaded 2 Mar 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentCOMM 1 3.pdf · uploaded 2 Mar 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentC DRG 1.pdf · uploaded 2 Mar 2022Source
- 5 Building Plan Approval / NA Order for plotted developmentC DRG 2.pdf · uploaded 2 Mar 2022Source
- 6 Building Plan Approval / NA Order for plotted developmentD 1.pdf · uploaded 2 Mar 2022Source
- 7 Building Plan Approval / NA Order for plotted developmentD 2.pdf · uploaded 2 Mar 2022Source
- 8 Building Plan Approval / NA Order for plotted developmentE 1.pdf · uploaded 2 Mar 2022Source
- 9 Building Plan Approval / NA Order for plotted developmentE 2.pdf · uploaded 2 Mar 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentComencement Certf.pdf · uploaded 2 Mar 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 9 Mar 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 12 Mar 2022Source
- 1 Details of encumbrancesNo Encumbrance Declaration.pdf · uploaded 18 Apr 2022Source
- 1 Declaration about Commencement CertificateDeclaration of CC.pdf · uploaded 18 Apr 2022Source
- 1 Declaration in FORM BAffidavit Form B Final.pdf · uploaded 18 Apr 2022Source
- 1 CERSAI detailsUndertakeing.pdf · uploaded 18 Apr 2022Source
- 1 Proforma of Allotment letterAllotmentFinal.pdf · uploaded 18 Apr 2022Source
- 2 Proforma of Allotment letterAgreement to Sale - Allure.pdf · uploaded 18 Apr 2022Source
- 1 PAN CardPAN Card.pdf · uploaded 29 Apr 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)MAHALAXMI pristine 29-04-2022.pdf · uploaded 29 Apr 2022Source
- 1 Copy of the legal title reportLegal basic.pdf · uploaded 30 Apr 2022Source
- 2 Copy of the legal title reportTitle Reportpt1.pdf · uploaded 30 Apr 2022Source
- 3 Copy of the legal title reportTitle Reportpt2.pdf · uploaded 30 Apr 2022Source
- 4 Copy of the legal title reportTitle Reportpt3.pdf · uploaded 30 Apr 2022Source
- 3 Proforma of Allotment letterDraft Agr Final Pristine Allure.pdf · uploaded 1 Oct 2022Source
- 3 Copy of Layout Approval (in case of layout)1-29-compressed.pdf · uploaded 28 Dec 2022Source
- 4 Copy of Layout Approval (in case of layout)2-29-compressed.pdf · uploaded 28 Dec 2022Source
- 10 Building Plan Approval / NA Order for plotted development10-29-compressed.pdf · uploaded 28 Dec 2022Source
- 11 Building Plan Approval / NA Order for plotted development11-29.pdf · uploaded 28 Dec 2022Source
- 12 Building Plan Approval / NA Order for plotted development12-29-compressed.pdf · uploaded 28 Dec 2022Source
- 13 Building Plan Approval / NA Order for plotted development13-29.pdf · uploaded 28 Dec 2022Source
- 14 Building Plan Approval / NA Order for plotted development14-29 -compressed.pdf · uploaded 28 Dec 2022Source
- 15 Building Plan Approval / NA Order for plotted development15-29-compressed.pdf · uploaded 28 Dec 2022Source
- 16 Building Plan Approval / NA Order for plotted development16-29.pdf · uploaded 28 Dec 2022Source
- 17 Building Plan Approval / NA Order for plotted development17-29-compressed.pdf · uploaded 28 Dec 2022Source
- 18 Building Plan Approval / NA Order for plotted development18-29-compressed.pdf · uploaded 28 Dec 2022Source
- 19 Building Plan Approval / NA Order for plotted development19-29.pdf · uploaded 28 Dec 2022Source
- 20 Building Plan Approval / NA Order for plotted development20-29-compressed.pdf · uploaded 28 Dec 2022Source
- 21 Building Plan Approval / NA Order for plotted development21-29-compressed.pdf · uploaded 28 Dec 2022Source
- 22 Building Plan Approval / NA Order for plotted development22-29.pdf · uploaded 28 Dec 2022Source
- 23 Building Plan Approval / NA Order for plotted development23-29-compressed.pdf · uploaded 28 Dec 2022Source
- 24 Building Plan Approval / NA Order for plotted development24-29.pdf · uploaded 28 Dec 2022Source
- 25 Building Plan Approval / NA Order for plotted development25-29-compressed.pdf · uploaded 28 Dec 2022Source
- 26 Building Plan Approval / NA Order for plotted development26-29.pdf · uploaded 28 Dec 2022Source
- 27 Building Plan Approval / NA Order for plotted development27-29-compressed.pdf · uploaded 28 Dec 2022Source
- 28 Building Plan Approval / NA Order for plotted development28-29-compressed.pdf · uploaded 28 Dec 2022Source
- 29 Building Plan Approval / NA Order for plotted development29-29.pdf · uploaded 28 Dec 2022Source
- 30 Building Plan Approval / NA Order for plotted development3-29.pdf · uploaded 28 Dec 2022Source
- 31 Building Plan Approval / NA Order for plotted development4-29.pdf · uploaded 28 Dec 2022Source
- 32 Building Plan Approval / NA Order for plotted development5-29-compressed.pdf · uploaded 28 Dec 2022Source
- 33 Building Plan Approval / NA Order for plotted development6-29.pdf · uploaded 28 Dec 2022Source
- 34 Building Plan Approval / NA Order for plotted development7-29.pdf · uploaded 28 Dec 2022Source
- 35 Building Plan Approval / NA Order for plotted development8-29.pdf · uploaded 28 Dec 2022Source
- 36 Building Plan Approval / NA Order for plotted development9 - 29-compressed.pdf · uploaded 29 Dec 2022Source
- 1 Proforma of Agreement for saleRevised Draft Agreement Allure.pdf · uploaded 5 Jan 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)2)Architects certificate sep-22.pdf · uploaded 27 Jan 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2)Engg certificate sep-22.pdf · uploaded 27 Jan 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)3)Architect certificate 30012023.pdf · uploaded 30 Jan 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)3)Engineering certificate 27012023.pdf · uploaded 30 Jan 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Both Sign Sept 2022_compressed.pdf · uploaded 8 Mar 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate 4_compressed.pdf · uploaded 4 Apr 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers certificate 4.pdf · uploaded 4 Apr 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate 5.pdf · uploaded 6 Jul 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate 5.pdf · uploaded 6 Jul 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FROM 3_31122022 final_compressed.pdf · uploaded 6 Jul 2023Source
- 2 a Details of encumbrances concerned to Finance1 b Details of encumbrances concerned to Legal - Part 1 .pdf · uploaded 2 Aug 2023Source
- 1 b Details of encumbrances concerned to Legal1 b Details of encumbrances concerned to Legal - Part 1 .pdf · uploaded 2 Aug 2023Source
- 3 a Details of encumbrances concerned to FinancePArt 1 - 1a Details of Encumbrances Concerned to Finance.pdf · uploaded 4 Aug 2023Source
- 2 b Details of encumbrances concerned to LegalPArt 1 - 1a Details of Encumbrances Concerned to Finance.pdf · uploaded 4 Aug 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Pristine allure part 1-c.pdf · uploaded 16 Aug 2023Source
- 5 Copy of the legal title report1 Copy of the legal title report (1).pdf · uploaded 22 Aug 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA 1 Arc Cert 230930.pdf · uploaded 17 Oct 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)RERA 1 Engg Cert 230930.pdf · uploaded 17 Oct 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)4 Form 3 Part-1 30 SEP.pdf · uploaded 17 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Part-1 2022-23.pdf · uploaded 23 Oct 2023Source
- 1 Disclosure of sold/ booked inventory20231025144522 (1).pdf · uploaded 25 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Adobe Scan 25 Oct 2023.pdf · uploaded 25 Oct 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Pristine Allure Form 3.pdf · uploaded 27 Oct 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)PART 1.pdf · uploaded 15 Feb 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Part-1 31st dec 2023.pdf · uploaded 15 Feb 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Part-1.pdf · uploaded 15 Feb 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A- Quality Assurance Part 1 23-24.pdf · uploaded 16 May 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate Part 1.pdf · uploaded 18 May 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Part 1.pdf · uploaded 18 May 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Part 1 240331.pdf · uploaded 27 May 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form-5 Part 1.pdf · uploaded 7 Aug 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)20240809 Arc Cert Part 1_page-0001.pdf · uploaded 14 Aug 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)20240809 Engg Cert Part 1.pdf · uploaded 14 Aug 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)240630 Form 3 Part 1.pdf · uploaded 17 Aug 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)240930 Form-1 Part 1.pdf · uploaded 18 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Part 1_compressed.pdf · uploaded 18 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)240930 Form-2 Part 1.pdf · uploaded 18 Oct 2024Source
- 1 a Details of encumbrances concerned to FinanceFinancial Encumbrances Allure Part 1_page-0001.pdf · uploaded 11 Nov 2024Source
- 1 b Details of encumbrances concerned to LegalFinancial Encumbrances Allure Part 1_page-0001.pdf · uploaded 11 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)241231 Form 1 Part 1.pdf · uploaded 28 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Pristine Allure Part 1.pdf · uploaded 28 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Part 1-Form 2 - 31122024.pdf · uploaded 28 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)250331 Architects Certificate Allure Part 1.pdf · uploaded 6 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)250331 CA Certificate Allure Part 1.pdf · uploaded 6 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)250331 Engineers Certificate Allure Part 1.pdf · uploaded 6 May 2025Source
- Form 1Form 1 - Pristine Allure Part 1 as on June 2025.pdf · uploaded 22 Sep 2025Source
- Form 2Form 2 - Pristine Allure Part 1 as on June 2025.pdf · uploaded 22 Sep 2025Source
- Form 3Form 3 - Pristine Allure Part 1 as on June 2025.pdf · uploaded 22 Sep 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 - Pristine Allure Part 1 as on June 2025.pdf · uploaded 22 Sep 2025Source
- Form 2A (FY 2024-2025)Form 2A - Pristine Allure Part 1 FY 2024-25.pdf · uploaded 24 Sep 2025Source
- Form 5 (FY 2024-2025)Form 5 - Pristine Allure Part 1 FY 2024-25.pdf · uploaded 26 Sep 2025Source
- Form 1Form 1 - Pristine Allure Part 1 as on Sept 2025.pdf · uploaded 19 Dec 2025Source
- Form 2Form 2 - Pristine Allure Part 1 as on Sept 2025.pdf · uploaded 19 Dec 2025Source
- Form 3Form 3 - Pristine Allure Part 1 as on Sept 2025.pdf · uploaded 19 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 - Pristine Allure Part 1 as on Sept 2025.pdf · uploaded 19 Dec 2025Source
- Form 1Form 1 - Pristine Allure Part 1 as on Dec 2025.pdf · uploaded 22 Jan 2026Source
- Form 2Form 2 - Pristine Allure Part 1 as on Dec 2025.pdf · uploaded 22 Jan 2026Source
- Form 3Form 3 - Pristine Allure Part 1 as on Dec 2025.pdf · uploaded 22 Jan 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - Pristine Allure Part 1 as on Dec 2025.pdf · uploaded 22 Jan 2026Source
- Form 1260331 Architects Certificate Allure Part 1.pdf · uploaded 20 Apr 2026Source
- Form 2260331 Engineers Certificate Allure Part 1.pdf · uploaded 20 Apr 2026Source
- Form 3260331 CA Certificate Allure Part 1.pdf · uploaded 20 Apr 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - PRISTINE ALLURE PART 1.pdf · uploaded 20 Apr 2026Source
- Form 1260630 - Architects Certificate Allure Part 1.pdf · uploaded 10 Jul 2026Source
- Form 2Pristine_Allure_Part_1_Form2_Q1_2026-27_10-07-2026_05-11.pdf · uploaded 10 Jul 2026Source
- Form 3Pristine_Allure_Part_1_Form3_Q1_2026-27_10-07-2026_05-08_doc1.pdf · uploaded 10 Jul 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - PRISTINE ALLURE PART 1 AS ON JUNE 2026.pdf · uploaded 10 Jul 2026Source
- Form 2A (FY 2025-2026)Form-2A Pristine Allure Part 1 For FY 2025-26.pdf · uploaded 23 Sep 2026Source
- Form 5 (FY 2025-2026)Form 5 - Pristine Allure Part 1 FY 2025-26.pdf · uploaded 23 Sep 2026Source
Technical
- DocumentFULL PROJECT LAYOUT.pdf · uploaded 2 Mar 2022Source
- DocumentLAYOUT.pdf · uploaded 2 Mar 2022Source
- DocumentCOMM 1 1.pdf · uploaded 2 Mar 2022Source
- DocumentCOMM 1 2.pdf · uploaded 2 Mar 2022Source
- DocumentCOMM 1 3.pdf · uploaded 2 Mar 2022Source
- DocumentC DRG 1.pdf · uploaded 2 Mar 2022Source
- DocumentC DRG 2.pdf · uploaded 2 Mar 2022Source
- DocumentD 1.pdf · uploaded 2 Mar 2022Source
- DocumentD 2.pdf · uploaded 2 Mar 2022Source
- DocumentE 1.pdf · uploaded 2 Mar 2022Source
- DocumentE 2.pdf · uploaded 2 Mar 2022Source
- Document1-29-compressed.pdf · uploaded 28 Dec 2022Source
- Document2-29-compressed.pdf · uploaded 28 Dec 2022Source
- Document10-29-compressed.pdf · uploaded 28 Dec 2022Source
- Document11-29.pdf · uploaded 28 Dec 2022Source
- Document12-29-compressed.pdf · uploaded 28 Dec 2022Source
- Document13-29.pdf · uploaded 28 Dec 2022Source
- Document14-29 -compressed.pdf · uploaded 28 Dec 2022Source
- Document15-29-compressed.pdf · uploaded 28 Dec 2022Source
- Document16-29.pdf · uploaded 28 Dec 2022Source
- Document17-29-compressed.pdf · uploaded 28 Dec 2022Source
- Document18-29-compressed.pdf · uploaded 28 Dec 2022Source
- Document19-29.pdf · uploaded 28 Dec 2022Source
- Document20-29-compressed.pdf · uploaded 28 Dec 2022Source
- Document21-29-compressed.pdf · uploaded 28 Dec 2022Source
- Document22-29.pdf · uploaded 28 Dec 2022Source
- Document23-29-compressed.pdf · uploaded 28 Dec 2022Source
- Document24-29.pdf · uploaded 28 Dec 2022Source
- Document25-29-compressed.pdf · uploaded 28 Dec 2022Source
- Document26-29.pdf · uploaded 28 Dec 2022Source
- Document27-29-compressed.pdf · uploaded 28 Dec 2022Source
- Document28-29-compressed.pdf · uploaded 28 Dec 2022Source
- Document29-29.pdf · uploaded 28 Dec 2022Source
- Document3-29.pdf · uploaded 28 Dec 2022Source
- Document4-29.pdf · uploaded 28 Dec 2022Source
- Document5-29-compressed.pdf · uploaded 28 Dec 2022Source
- Document6-29.pdf · uploaded 28 Dec 2022Source
- Document7-29.pdf · uploaded 28 Dec 2022Source
- Document8-29.pdf · uploaded 28 Dec 2022Source
- Document9 - 29-compressed.pdf · uploaded 29 Dec 2022Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvals
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1.5 BHK FLAT, 1.5 BHK INC HSG FLAT, 1 BHK FLAT, 2.5 BHK FLAT, 2BHK, 3BHK, 1BHK311 units in all
- Address
- S No 20/2a + 20/2b/1 Kharadi, 45 Mtr Wide D P Road Hadapasar Kharadi Road, Near Mundhwa BridgePIN 411014
- Location
- 18.53875, 73.93271
- Land area for this project
- 8,205 sq m (88,314 sq ft)
- Permissible built-up area
- 37,946 sq m (4,08,452 sq ft)
- Sanctioned built-up area
- 34,946 sq m (3,76,160 sq ft)
- Recreational open space
- 861 sq m (9,272 sq ft)
- Designated bank account
- 76
- Developed in phases
- Yes
Land as published on MahaRERA's project page
S NO 20/2A + 20/2B/1 KHARADI
Boundaries
- North
- S No 20 Part
- South
- S No 20 Part
- East
- 45 Mtr Wide D P Rd And Bal Part Of Pristine Allure
- West
- PMC Proposed 18 Mtr Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking311 units
292 of 311 units booked (94%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| C Wing | 1.5 BHK FLAT | 49.31 sq m · 531 sq ft | 21 | 20 |
| C Wing | 1.5 BHK FLAT | 49.53 sq m · 533 sq ft | 3 | 0 |
| C Wing | 1.5 BHK FLAT | 49.53 sq m · 533 sq ft | 3 | 1 |
| C Wing | 1.5 BHK INC HSG FLAT | 49.31 sq m · 531 sq ft | 49 | 47 |
| C Wing | 1 BHK FLAT | 36.27 sq m · 390 sq ft | 1 | 1 |
| D Wing | 2.5 BHK FLAT | 72.01 sq m · 775 sq ft | 13 | 13 |
| D Wing | 2.5 BHK FLAT | 72.66 sq m · 782 sq ft | 13 | 12 |
| D Wing | 2BHK | 61.83 sq m · 666 sq ft | 2 | 2 |
Show all 33 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| D Wing | 2BHK | 62.14 sq m · 669 sq ft | 12 | 12 |
| D Wing | 2BHK | 62.36 sq m · 671 sq ft | 1 | 0 |
| D Wing | 2BHK | 64.73 sq m · 697 sq ft | 1 | 0 |
| D Wing | 3BHK | 77.33 sq m · 832 sq ft | 11 | 10 |
| D Wing | 3BHK | 79.18 sq m · 852 sq ft | 12 | 12 |
| D Wing | 3BHK | 79.39 sq m · 855 sq ft | 1 | 1 |
| D Wing | 3BHK | 80.22 sq m · 863 sq ft | 12 | 12 |
| E Wing | 2.5 BHK FLAT | 72.01 sq m · 775 sq ft | 13 | 12 |
| E Wing | 2.5 BHK FLAT | 72.66 sq m · 782 sq ft | 13 | 12 |
| E Wing | 2BHK | 61.83 sq m · 666 sq ft | 2 | 2 |
| E Wing | 2BHK | 62.14 sq m · 669 sq ft | 12 | 12 |
| E Wing | 2BHK | 62.36 sq m · 671 sq ft | 1 | 1 |
| E Wing | 2BHK | 64.73 sq m · 697 sq ft | 1 | 0 |
| E Wing | 3BHK | 77.33 sq m · 832 sq ft | 11 | 11 |
| E Wing | 3BHK | 79.18 sq m · 852 sq ft | 12 | 12 |
| E Wing | 3BHK | 79.39 sq m · 855 sq ft | 1 | 1 |
| E Wing | 3BHK | 80.22 sq m · 863 sq ft | 12 | 12 |
| F Wing | 1BHK | 43.15 sq m · 464 sq ft | 2 | 2 |
| F Wing | 1BHK | 49.27 sq m · 530 sq ft | 2 | 1 |
| F Wing | 2BHK | 62.46 sq m · 672 sq ft | 22 | 22 |
| F Wing | 2BHK | 62.67 sq m · 675 sq ft | 1 | 1 |
| F Wing | 2BHK | 62.67 sq m · 675 sq ft | 1 | 1 |
| F Wing | 2BHK | 62.9 sq m · 677 sq ft | 46 | 45 |
| F Wing | 2BHK | 63.11 sq m · 679 sq ft | 2 | 0 |
| F Wing | 2BHK | 63.11 sq m · 679 sq ft | 2 | 2 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals2
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Engineer | Praful Jagtap | — |
| Engineer | Sumit Pardeshi | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Haveli
- Menlo Sky SuitesRERA PR1260002602755
- SkylineRERA PR1260002602737
- Aer ResidencesRERA PM1260002602708
- Namo CasaRERA PR1260002602720
- Rajmudra Nagari 2RERA PM1260002602701
- Sai Residency Cooperative Housing Society LimitedRERA PR1260002602726
- Sunrise LuminaraRERA PR1260002602702
- SuramyaRERA PR1260002602717
All 61,314 projects in Haveli · Compare Pristine Allure Part 1 with another project
Pristine Allure Part 1 in numbers
Registered deals, summarised
Deedo has 73 registered documents at Pristine Allure Part 1, from Feb 2026 to Sep 2026: 73 leave and licence agreements.
- Are properties at Pristine Allure Part 1 rented out?
- Yes: 73 leave and licence agreements are registered at Pristine Allure Part 1, at a median rent since Feb 2026 of about ₹32,000 a month with a deposit of about ₹64,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Pristine Allure Part 1 by Deedo, last updated with deals registered in Sep 2026.
Latest deal · Rental · Sep 2026
₹10–20k / month