Others · 4 buildings · 95 unitsRERA P52100019821

Epic Phase 1

Deedo IDDP-PUN-6GR5

MahaRERA shows it completed; no MahaRERA orders on record; 98% of its units are booked.

Haveli, Maharashtra 411027 · Property rates in Haveli · by Yashada World · 33% of its projects kept the RERA date

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales98% booked93 of 95 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • This projectRegistered 5 Mar 2019, completion promised 30 Dec 2025.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

4 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100019821
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000198215 Mar 201930 Dec 202530 Dec 2025Yashada WorldProject page
Documents113

2 documents held by Deedo, 111 filings listed on MahaRERA's project page

Registration certificate

Other

  • OtherDate not statedView

Finance

  • PAN CardYashada World Pan Card.pdf · uploaded 19 Feb 2021Source

Legal

  • Legal Title reportSearch Report.pdf · uploaded 14 Feb 2019Source
  • Declaration Form BForm B Epic.pdf · uploaded 14 Feb 2019Source
  • Declaration Form BDecalaration Form B 30 Dec 2020.pdf · uploaded 19 Feb 2021Source

Migrated

  • 1 Copy of the legal title reportSearch Report.pdf · uploaded 14 Feb 2019Source
  • 1 Details of encumbrancesEPIC Encumbrances.pdf · uploaded 14 Feb 2019Source
Show all 113 documentsShow fewer documents

Migrated

  • 1 Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 14 Feb 2019Source
  • 1 Building Plan Approval (IOD)LAYOUT.pdf · uploaded 14 Feb 2019Source
  • 1 Declaration in FORM BForm B Epic.pdf · uploaded 14 Feb 2019Source
  • 1 Certificates of CA (Form 3)EPIC form 3 ist updation UDIN - CCF12022019-min-compressed.pdf · uploaded 14 Feb 2019Source
  • 1 Proforma of Allotment letterAgreement - EPIC - Draft.pdf · uploaded 14 Feb 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT-compressed.pdf · uploaded 26 Feb 2019Source
  • 2 Building Plan Approval (IOD)2 A B BLDG.pdf · uploaded 27 Feb 2019Source
  • 3 Building Plan Approval (IOD)3 A B BLDG.pdf · uploaded 27 Feb 2019Source
  • 4 Building Plan Approval (IOD)4 A B.pdf · uploaded 27 Feb 2019Source
  • 5 Building Plan Approval (IOD)5 A B BLDG.pdf · uploaded 27 Feb 2019Source
  • 6 Building Plan Approval (IOD)6 A B BLDG.pdf · uploaded 27 Feb 2019Source
  • 7 Building Plan Approval (IOD)8 E BLDG.pdf · uploaded 27 Feb 2019Source
  • 1 Form 2AEPIV 2A March 19.pdf · uploaded 18 Jun 2019Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Epic Form 1 Sep 19_compressed.pdf · uploaded 9 Oct 2019Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)EPIC Form 2 Sep19.pdf · uploaded 9 Oct 2019Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)form 5 yashada world FY 18-19.pdf · uploaded 14 Dec 2019Source
  • 2 Form 2AForm 2A for Sep 2019 Epic.PDF · uploaded 7 Jan 2020Source
  • 3 Form 2AForm 2A for Dec 2019_Epic.PDF · uploaded 7 Jan 2020Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.PDF · uploaded 16 Jan 2020Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 16 Jan 2020Source
  • 2 Certificates of CA (Form 3)form 3.pdf · uploaded 16 Jan 2020Source
  • 2 Details of encumbrancesXerox Scan_05082020120352.PDF · uploaded 5 Aug 2020Source
  • 4 Form 2AEngg Certificate_Epic_June 2020-compressed.pdf · uploaded 11 Nov 2020Source
  • 3 Certificates of CA (Form 3)Form 3 june 2020_11112020113703_compressed_compressed_compressed-compressed.pdf · uploaded 11 Nov 2020Source
  • 2 Proforma of Allotment letterEPIC DRAFT (2).pdf · uploaded 25 Dec 2020Source
  • 4 Certificates of CA (Form 3)form 3 EPIC PHASE 1.pdf · uploaded 28 Dec 2020Source
  • 1 PAN CardYashada World Pan Card.pdf · uploaded 19 Feb 2021Source
  • 2 Copy of Layout Approval (in case of layout)LAYOUT PLAN NO - 01.pdf · uploaded 19 Feb 2021Source
  • 8 Building Plan Approval (IOD)PLAN NO - 02.pdf · uploaded 19 Feb 2021Source
  • 9 Building Plan Approval (IOD)PLAN NO - 03.pdf · uploaded 19 Feb 2021Source
  • 10 Building Plan Approval (IOD)PLAN NO - 04.pdf · uploaded 19 Feb 2021Source
  • 11 Building Plan Approval (IOD)PLAN NO - 05.pdf · uploaded 19 Feb 2021Source
  • 12 Building Plan Approval (IOD)PLAN NO - 06.pdf · uploaded 19 Feb 2021Source
  • 13 Building Plan Approval (IOD)PLAN NO - 07.pdf · uploaded 19 Feb 2021Source
  • 14 Building Plan Approval (IOD)PLAN NO - 12.pdf · uploaded 19 Feb 2021Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC - EPIC - 2020.pdf · uploaded 19 Feb 2021Source
  • 2 Declaration in FORM BDecalaration Form B 30 Dec 2020.pdf · uploaded 19 Feb 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)form 5 YW EPIC Phase I 31 03 2020.pdf · uploaded 30 Mar 2021Source
  • 1 Declaration about Commencement CertificateDECLARATION FOR EPIC.pdf · uploaded 28 Sep 2021Source
  • 5 Form 2AFORM 2A EPIC PH 1 JUNE 2021.PDF · uploaded 28 Sep 2021Source
  • 1 Disclosure of sold/ booked inventoryEPIC SOLD UNSOLD.PDF · uploaded 28 Sep 2021Source
  • 5 Certificates of CA (Form 3)FORM 3 EPIC PAHSE I 31 03 2021.pdf · uploaded 28 Sep 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A EPIC PH 1 JUNE 2021.PDF · uploaded 6 Oct 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Yashada World Phase I Form 5 FY 20-21.pdf · uploaded 11 Jun 2022Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentEPIC A B OC 29 6 22.pdf · uploaded 30 Jun 2022Source
  • 1 CERSAI detailsCERSAI Search Report 200250830833 EPIC.PDF · uploaded 9 Nov 2022Source
  • 2 Disclosure of sold/ booked inventorySold unsold epic sold unsold sept 2022.pdf · uploaded 28 Dec 2022Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)EPIC A B SOCIETY FORMATION.pdf · uploaded 30 Dec 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Yashada World EPIC Form 5 Phase I 21 22.pdf · uploaded 13 Feb 2023Source
  • 2 Architect’s Certificate on Completion of Project (Form 4)Form 4 A B Bldg 29 06 2022.pdf · uploaded 3 Apr 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Phase 1.pdf · uploaded 30 May 2023Source
  • 3 Disclosure of sold/ booked inventoryEPIC (1).pdf · uploaded 30 May 2023View
  • 6 Certificates of CA (Form 3)Epic 1_31052023160245 March 23.pdf · uploaded 1 Jun 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Epic Ph-I March 2022.pdf · uploaded 1 Aug 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Epic Ph-1 _March 2023.PDF · uploaded 1 Aug 2023Source
  • 3 a Details of encumbrances concerned to FinanceEpic one legal ensumbrance 23082023121508.PDF · uploaded 23 Aug 2023Source
  • 1 b Details of encumbrances concerned to LegalEpic one legal ensumbrance 23082023121508.PDF · uploaded 23 Aug 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Epic Ph-1 June 2023.PDF · uploaded 23 Aug 2023Source
  • 7 Certificates of CA (Form 3)Form 3 Epic Ph-1 June 2023 (1).pdf · uploaded 23 Aug 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameEpic one ac decalaration 23082023121350.PDF · uploaded 23 Aug 2023Source
  • 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPART COMPLITION CERTIFICATE C D E BUILD.pdf · uploaded 25 Aug 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)ph-1 2022-2023.pdf · uploaded 10 Nov 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 epic ph 1 dec 2023.pdf · uploaded 8 Feb 2024Source
  • 8 Certificates of CA (Form 3)Yashada world phase i_31012024171331 DEC 2023.pdf · uploaded 8 Feb 2024Source
  • 9 Certificates of CA (Form 3)Epic phase 1 UP TO 31 3 2024.pdf · uploaded 22 Apr 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2a ph1_17072024130308.PDF · uploaded 17 Jul 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ar Letter Phase-I form 1 june 2024.pdf · uploaded 31 Jul 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Epic phase 1 form 2_31072024163008.PDF · uploaded 31 Jul 2024Source
  • 10 Certificates of CA (Form 3)Epic phase 1 form 3 june 2024.PDF · uploaded 31 Jul 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)EPIC PHASE 1- FORM 2-MARCH 2024.PDF · uploaded 18 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)EPIC PH-1_FROM 1_SEPT 2024.PDF · uploaded 19 Oct 2024Source
  • 2 Certificates of CA (Form 3)EPIC PH-1_FROM 3_SEPT 2024.PDF · uploaded 19 Oct 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)EPIC PHASE-1 FORM 2-SEPT 2024.PDF · uploaded 19 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)EPIC FORM 1_DEC 2024.PDF · uploaded 16 Jan 2025Source
  • 1 Certificates of CA (Form 3)Epic Phase 1 Form 3 Dec 2024.PDF · uploaded 16 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)EPIC_FORM 2_DEC 2024.PDF · uploaded 16 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Epic- Phase1 March2025 form1.PDF · uploaded 19 Apr 2025Source
  • 1 Certificates of CA (Form 3)Epic phase 1- Form 3- March2025.PDF · uploaded 19 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Epic- Phase1 March2025 form2.PDF · uploaded 19 Apr 2025Source
  • 1 Form 2AEpic- Phase1 March2025 form2A.PDF · uploaded 19 Apr 2025Source

Technical

  • DocumentLAYOUT.pdf · uploaded 14 Feb 2019Source
  • DocumentLAYOUT.pdf · uploaded 14 Feb 2019Source
  • Document2 A B BLDG.pdf · uploaded 27 Feb 2019Source
  • Document3 A B BLDG.pdf · uploaded 27 Feb 2019Source
  • Document4 A B.pdf · uploaded 27 Feb 2019Source
  • Document5 A B BLDG.pdf · uploaded 27 Feb 2019Source
  • Document6 A B BLDG.pdf · uploaded 27 Feb 2019Source
  • Document8 E BLDG.pdf · uploaded 27 Feb 2019Source
  • DocumentLAYOUT PLAN NO - 01.pdf · uploaded 19 Feb 2021Source
  • DocumentPLAN NO - 02.pdf · uploaded 19 Feb 2021Source
  • DocumentPLAN NO - 03.pdf · uploaded 19 Feb 2021Source
  • DocumentPLAN NO - 04.pdf · uploaded 19 Feb 2021Source
  • DocumentPLAN NO - 05.pdf · uploaded 19 Feb 2021Source
  • DocumentPLAN NO - 06.pdf · uploaded 19 Feb 2021Source
  • DocumentPLAN NO - 07.pdf · uploaded 19 Feb 2021Source
  • DocumentPLAN NO - 12.pdf · uploaded 19 Feb 2021Source

Technical (Architect)

  • DocumentAr Letter Phase-I form 1 june 2024.pdf · uploaded 31 Jul 2024Source
  • DocumentEPIC PH-1_FROM 1_SEPT 2024.PDF · uploaded 19 Oct 2024Source
  • DocumentEPIC FORM 1_DEC 2024.PDF · uploaded 16 Jan 2025Source
  • DocumentEpic- Phase1 March2025 form1.PDF · uploaded 19 Apr 2025Source

Technical (Engineer)

  • DocumentEpic phase 1 form 2_31072024163008.PDF · uploaded 31 Jul 2024Source
  • DocumentEPIC PHASE 1- FORM 2-MARCH 2024.PDF · uploaded 18 Oct 2024Source
  • DocumentEPIC PHASE-1 FORM 2-SEPT 2024.PDF · uploaded 19 Oct 2024Source
  • DocumentEPIC_FORM 2_DEC 2024.PDF · uploaded 16 Jan 2025Source
  • DocumentEpic- Phase1 March2025 form2.PDF · uploaded 19 Apr 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvals

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
2BHK, 3BHK, 5BHK & more, 1BHK95 units in all
Address
S No - 18/1/1 P Pimpale Nilakh, Dp Road, VishalnagarPIN 411027
Village
Pimpri Chinchawad (M Corp.), Haveli taluka
Land area for this project
2,748 sq m (29,578 sq ft)
Permissible built-up area
13,392 sq m (1,44,145 sq ft)
Sanctioned built-up area
6,679 sq m (71,890 sq ft)
Designated bank account
88
Developed in phases
Yes

Land as published on MahaRERA's project page

S NO - 18/1/1 P PIMPALE NILAKH

Boundaries

North
S No 19
South
S No 18 Remaining
East
12 Mtr Dp Road
West
S No 18 Remaining

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking95 units

93 of 95 units booked (98%), as the promoter reported to MahaRERA

2BHK · 35 units3BHK · 40 units5BHK & more · 1 unit1BHK · 19 units
BuildingTypeCarpet areaUnitsBooked
A Building2BHK60.27 sq m · 649 sq ft55
A Building2BHK60.32 sq m · 649 sq ft44
A Building2BHK65.88 sq m · 709 sq ft11
A Building2BHK67.47 sq m · 726 sq ft44
A Building2BHK68.03 sq m · 732 sq ft33
A Building2BHK79.45 sq m · 855 sq ft11
A Building3BHK110.09 sq m · 1,185 sq ft55
A Building3BHK110.16 sq m · 1,186 sq ft55
Show all 25 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
A Building3BHK117.09 sq m · 1,260 sq ft44
A Building3BHK117.13 sq m · 1,261 sq ft55
A Building5BHK & more189.78 sq m · 2,043 sq ft11
B Building2BHK60.13 sq m · 647 sq ft77
B Building2BHK67 sq m · 721 sq ft55
B Building2BHK67.31 sq m · 725 sq ft44
B Building2BHK73.37 sq m · 790 sq ft10
B Building3BHK91.05 sq m · 980 sq ft55
B Building3BHK91.89 sq m · 989 sq ft55
B Building3BHK95.24 sq m · 1,025 sq ft11
B Building3BHK104.76 sq m · 1,128 sq ft54
B Building3BHK105.59 sq m · 1,137 sq ft55
E Building MHADA1BHK37.26 sq m · 401 sq ft11
E Building MHADA1BHK37.99 sq m · 409 sq ft66
E Building MHADA1BHK44.74 sq m · 482 sq ft55
E Building MHADA1BHK44.88 sq m · 483 sq ft66
E Building MHADA1BHK52.02 sq m · 560 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSankalp Designer Vinod Chitnis—
OtherStrudcom Consultants Pvt Ltd—
Registered real estate agentRK's Marketing—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Haveli

All 61,315 projects in Haveli · Compare Epic Phase 1 with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology