Deedo IDDP-PUN-TFWTMahaRERA shows it completed; no MahaRERA orders on record; 21% of its units are booked.
Erandwana, Pune 411004 · by Galaxy Hill Paradise Llp
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 2 Jan 2020, completion promised 30 Dec 2024.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Resale · Oct 2026
- Resale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Aug 2026
- Primary sale · Jul 2026
- Primary sale · Apr 2026
- Resale · Mar 2026
- Primary sale · Mar 2026
- Primary sale · Mar 2026
- Resale · Mar 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Oct 2026 | Wing A · 709 | Resale | 541 sq ft | View Resale, Oct 2026 | |
| Sep 2026 | Wing A · 1202 | Resale | 463 sq ft | View Resale, Sep 2026 | |
| Sep 2026 | Wing A · 809 | Primary sale | 541 sq ft | View Primary sale, Sep 2026 | |
| Aug 2026 | Wing A · 1311 | Primary sale | 487 sq ft | View Primary sale, Aug 2026 | |
| Jul 2026 | Wing A · 1304 | Primary sale | 532 sq ft | View Primary sale, Jul 2026 | |
| Apr 2026 | Wing A · 1209 | Primary sale | 541 sq ft | View Primary sale, Apr 2026 | |
| Mar 2026 | Wing A · 1008 | Resale | 489 sq ft | View Resale, Mar 2026 | |
| Mar 2026 | Wing A · 1210 | Primary sale | 541 sq ft | View Primary sale, Mar 2026 | |
| Mar 2026 | Wing A · 1310 | Primary sale | 541 sq ft | View Primary sale, Mar 2026 | |
| Mar 2026 | Wing A · 1107 | Resale | 463 sq ft | View Resale, Mar 2026 |
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100023728
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100023728 | 2 Jan 2020 | 30 Dec 2024 | 30 Dec 2024 | Galaxy Hill Paradise LLP | Project page |
Documents134
2 documents held by Deedo, 132 filings listed on MahaRERA's project page
Other
- OtherDate not statedView
Finance
- PAN CardGalaxy PAN.pdf · uploaded 23 Dec 2019Source
Legal
- Legal Title reportSearch And Title Report.pdf · uploaded 24 Dec 2019Source
- Declaration Form BFORM B_compressed.pdf · uploaded 26 Dec 2019Source
- OtherForm 5 - Galaxy Hill P LLP Build A.pdf · uploaded 29 Sep 2020Source
- Otherform 2A 2021_compressed.pdf · uploaded 1 Jul 2021Source
- OtherCONSENT OF ALLOTTEES_compressed.pdf · uploaded 5 Jul 2021Source
Show all 134 documentsShow fewer documents
Migrated
- 1 PAN CardGalaxy PAN.pdf · uploaded 23 Dec 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement.pdf · uploaded 23 Dec 2019Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 23 Dec 2019Source
- 1 Copy of the legal title reportSearch And Title Report.pdf · uploaded 24 Dec 2019Source
- 1 Details of encumbrancesEncumbrances Declaration.pdf · uploaded 24 Dec 2019Source
- 1 Copy of Layout Approval (in case of layout)HPSC5233_compressed.pdf · uploaded 24 Dec 2019Source
- 1 Proforma of Allotment letterAgreement For Sale.pdf · uploaded 24 Dec 2019Source
- 1 Building Plan Approval / NA Order for plotted developmentHPSC5231_compressed.pdf · uploaded 25 Dec 2019Source
- 2 Building Plan Approval / NA Order for plotted developmentHPSC5232_compressed.pdf · uploaded 25 Dec 2019Source
- 3 Building Plan Approval / NA Order for plotted developmentHPSC5239_compressed.pdf · uploaded 25 Dec 2019Source
- 1 Declaration in FORM BFORM B_compressed.pdf · uploaded 26 Dec 2019Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_compressed.pdf · uploaded 26 Dec 2019Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A-compressed.pdf · uploaded 17 Feb 2020Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 - Galaxy Hill P LLP Build A.pdf · uploaded 29 Sep 2020Source
- 1 OtherForm 5 - Galaxy Hill P LLP Build A.pdf · uploaded 29 Sep 2020Source
- 2 Copy of Layout Approval (in case of layout)DP Layout - 1 of 3_compressed.pdf · uploaded 3 Jun 2021Source
- 4 Building Plan Approval / NA Order for plotted developmentPage - 2_compressed.pdf · uploaded 3 Jun 2021Source
- 5 Building Plan Approval / NA Order for plotted developmentPage - 3_compressed.pdf · uploaded 3 Jun 2021Source
- 6 Building Plan Approval / NA Order for plotted developmentPage - 4_compressed.pdf · uploaded 3 Jun 2021Source
- 7 Building Plan Approval / NA Order for plotted developmentPage - 5_compressed.pdf · uploaded 3 Jun 2021Source
- 2 Commencement Certificates / NA Order for plotted developmentAnkur Associates_20210601175121.pdf · uploaded 3 Jun 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 2019-20.pdf · uploaded 28 Jun 2021Source
- 1 Declaration about Commencement CertificateDeclaration of commencement certificate.pdf · uploaded 29 Jun 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 5.pdf · uploaded 29 Jun 2021Source
- 1 Disclosure of sold/ booked inventoryDeclaration of sold and unsold_compressed.pdf · uploaded 29 Jun 2021View
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5.pdf · uploaded 29 Jun 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE 2021_compressed.pdf · uploaded 1 Jul 2021Source
- 2 Otherform 2A 2021_compressed.pdf · uploaded 1 Jul 2021Source
- 3 OtherCONSENT OF ALLOTTEES_compressed.pdf · uploaded 5 Jul 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-2021_compressed.pdf · uploaded 11 Aug 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2-2021_compressed.pdf · uploaded 11 Aug 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM -2A 2021_compressed.pdf · uploaded 11 Aug 2021Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A-WING A.pdf · uploaded 9 Oct 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 (2).pdf · uploaded 8 Jan 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 aura 2022_compressed.pdf · uploaded 13 Jan 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)form 2A 2022 (2)_compressed.pdf · uploaded 18 Jan 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 aura A.pdf · uploaded 25 Jan 2022Source
- 1 CERSAI detailsNirman Aura.pdf · uploaded 7 Feb 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 18 Aug 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 aura a 2022.pdf · uploaded 24 Aug 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Galaxy Hill P Rera-Annual Reports A Final.pdf · uploaded 1 Nov 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 AURA_compressed.pdf · uploaded 15 Nov 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)form 2a 31 mar 2020.pdf · uploaded 6 Feb 2023Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)form 2a 30 jun 2020.pdf · uploaded 6 Feb 2023Source
- 6 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)form 2a 30 sept 2020.pdf · uploaded 6 Feb 2023Source
- 7 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)form 2a 31 dec 2020.pdf · uploaded 6 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)form 2a 31 mar 2021.pdf · uploaded 6 Feb 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A 31 MAR 2022.pdf · uploaded 6 Feb 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A 30 JUNE 2022.pdf · uploaded 6 Feb 2023Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A 30 SEP 2022.pdf · uploaded 6 Feb 2023Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A 31 DEC 2022.pdf · uploaded 6 Feb 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 30 march 2020_compressed.pdf · uploaded 26 Jun 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 31 june 2020_compressed.pdf · uploaded 26 Jun 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 30 sept 2020 (2)_compressed.pdf · uploaded 26 Jun 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 31 dec 2020 (2)_compressed.pdf · uploaded 26 Jun 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 31 march 2021_compressed.pdf · uploaded 26 Jun 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 31 march 2022.pdf · uploaded 26 Jun 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 30 june 2022.pdf · uploaded 26 Jun 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 31 dec 2022 (2).pdf · uploaded 26 Jun 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 31 march 2023.pdf · uploaded 26 Jun 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 Form-3-31 march 2020.pdf · uploaded 7 Jul 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)2 Form 3 - 30 june 2020.pdf · uploaded 7 Jul 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)3 Form-03-30 sept 2020.pdf · uploaded 7 Jul 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)4 Form 03 - 31 dec 2020_compressed.pdf · uploaded 7 Jul 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)5 Form 3 -31 mar 2021.pdf · uploaded 7 Jul 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)6 Form 3-30 sept 2021.pdf · uploaded 7 Jul 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)4 From 3 - 31 dec 2020.pdf · uploaded 7 Jul 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)7 Form-03-31 dec 2021_compressed.pdf · uploaded 7 Jul 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)8 Form-3-31 march 2022.pdf · uploaded 7 Jul 2023Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)9 Form 3-30 sept 2022.pdf · uploaded 7 Jul 2023Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)11 form 3 aura 31 march 23_compressed.pdf · uploaded 7 Jul 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Form 2 31 March 2020.pdf · uploaded 10 Jul 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Form 2 30 June 2020.pdf · uploaded 10 Jul 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 Form 2 30 Sept 2020.pdf · uploaded 10 Jul 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 Form 2 31 Dec 2020.pdf · uploaded 10 Jul 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)5 Form 2 31 March 2021.pdf · uploaded 10 Jul 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 Form 2 30 June 2021.pdf · uploaded 10 Jul 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)7 Form 2 31 March 2022.pdf · uploaded 10 Jul 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)8 Form 2 30 Sept 2022.pdf · uploaded 10 Jul 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)9 Form 2 31 Dec 2022.pdf · uploaded 10 Jul 2023Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)10 Form 2 31 March 2023_compressed.pdf · uploaded 10 Jul 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2 A 31 march 2023.pdf · uploaded 10 Jul 2023Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)aura form 3 30 june 23_compressed.pdf · uploaded 17 Aug 2023Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 aura 30 june 2023.pdf · uploaded 25 Aug 2023Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30-06-2023.pdf · uploaded 29 Aug 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 30-06-2023.pdf · uploaded 29 Aug 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Galaxy Hill Form 5.pdf · uploaded 16 Sep 2023Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 aura 30 sept 2023_compressed.pdf · uploaded 18 Oct 2023Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 aura 31-12-23.pdf · uploaded 27 Jan 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 21 Feb 2024Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 21 Feb 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 29 Feb 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 29 Feb 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 11 Apr 2024Source
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 22 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.pdf · uploaded 22 May 2024Source
- 18 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Final.pdf · uploaded 22 May 2024Source
- 2 Disclosure of sold/ booked inventoryDisclosure of Sold Unsold Inventory Q1.pdf · uploaded 30 May 2024Source
- 3 Disclosure of sold/ booked inventoryDisclosure of Sold Unsold Inventory Q2.pdf · uploaded 30 May 2024Source
- 4 Disclosure of sold/ booked inventoryDisclosure of Sold Unsold Inventory Q3.pdf · uploaded 30 May 2024Source
- 5 Disclosure of sold/ booked inventoryDisclosure of Sold Unsold Inventory Q4.pdf · uploaded 30 May 2024Source
- 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - Nirman Aura A Building.pdf · uploaded 5 Aug 2024Source
- 6 Disclosure of sold/ booked inventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 5 Aug 2024View
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certifica Wing - A.pdf · uploaded 17 Oct 2024Source
- 2 Architect’s Certificate on Completion of Project (Form 4)FORM 4.pdf · uploaded 21 Oct 2024Source
- 3 Architect’s Certificate on Completion of Project (Form 4)FORM 4.pdf · uploaded 27 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 18 Nov 2024View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)AURA 30 SEPT 2024.pdf · uploaded 25 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 27 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Galaxy Hill P Rera-Annual Reports statement A Bldg.pdf · uploaded 28 Nov 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 aura 30 jun 2024.pdf · uploaded 6 Dec 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3_compressed.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate on Completion of Project (Form 4)FORM 4.pdf · uploaded 27 Jan 2025Source
Technical
- DocumentHPSC5233_compressed.pdf · uploaded 24 Dec 2019Source
- DocumentHPSC5231_compressed.pdf · uploaded 25 Dec 2019Source
- DocumentHPSC5232_compressed.pdf · uploaded 25 Dec 2019Source
- DocumentHPSC5239_compressed.pdf · uploaded 25 Dec 2019Source
- DocumentDP Layout - 1 of 3_compressed.pdf · uploaded 3 Jun 2021Source
- DocumentPage - 2_compressed.pdf · uploaded 3 Jun 2021Source
- DocumentPage - 3_compressed.pdf · uploaded 3 Jun 2021Source
- DocumentPage - 4_compressed.pdf · uploaded 3 Jun 2021Source
- DocumentPage - 5_compressed.pdf · uploaded 3 Jun 2021Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 2/5/1/1 AT AMBEGAON BUDRUK PUNE, 2/5/1/5
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Address
- S No 2/5/1/4, 2/5/1/5, 2/5/1/5/1, 2/5/1/6, 2/5/1/1 At Ambegaon Budruk Pune, Karve Road, ErandwanePIN 411004
- Village
- Pune (M Corp.), Pune City taluka
- Land area for this project
- 2,318 sq m (24,951 sq ft)
- Permissible built-up area
- 8,531 sq m (91,824 sq ft)
- Sanctioned built-up area
- 6,662 sq m (71,709 sq ft)
- Recreational open space
- 1,110 sq m (11,948 sq ft)
- Designated bank account
- 76
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S NO 2/5/1/4, 2/5/1/5, 2/5/1/5/1, 2/5/1/6, 2/5/1/1 AT AMBEGAON BUDRUK PUNE
Boundaries
- North
- S No 2 Part
- South
- Open Space Of The Same Project
- East
- S No 2 Part
- West
- S No 2 Part
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Prakash Kulkarni | — |
| Chartered accountant | Vinay Chordia | — |
| Engineer | Praful Rode | — |
| Other | G A Bhilare Consultants Pvt Ltd | — |
| Other | Sunshine Buildcon | — |
Source: MahaRERA project page. Contact details are not shown.
Nirman Aura Wing A in numbers
Registered deals, summarised
Deedo has 23 registered documents at Nirman Aura Wing A, from Jan 2026 to Oct 2026: 22 sales. The median registered sale since Jan 2026 works out to about ₹12,900 per sq ft, at a median of ₹62 L a deal; 18% of sales were resales.
- What is the price per sq ft at Nirman Aura Wing A?
- The median registered sale since Jan 2026 works out to about ₹12,900 per sq ft, at a median of ₹62 L a deal; 18% of sales were resales.
- How many properties have been sold at Nirman Aura Wing A?
- 22 sales are registered at Nirman Aura Wing A, 4 of them resales.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Nirman Aura Wing A by Deedo, last updated with deals registered in Oct 2026.
Latest deal · Resale · Oct 2026
₹50–75 L