Trident
Deedo IDDP-PUN-62Y5Completion was pushed back 4 months, to Apr 2029; no MahaRERA orders on record; 69% of its units are booked.
Dhankawadi, Pune 411043 · Property rates in Dhankawadi · by Shamraj Constructions
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2029
- This projectRegistered 8 Jun 2023, completion promised 31 Dec 2028, revised to 30 Apr 2029.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Oct 2026
- Primary sale · Jul 2026
- Primary sale · Jul 2026
- Primary sale · Jul 2026
- Primary sale · Jul 2026
- Primary sale · Jul 2026
- Primary sale · Jul 2026
- Primary sale · Jul 2026
- Primary sale · Jul 2026
- Primary sale · Jul 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Oct 2026 | Wing B | Primary sale | 885 sq ft | View Primary sale, Oct 2026 | |
| Jul 2026 | Wing C | Primary sale | 885 sq ft | View Primary sale, Jul 2026 | |
| Jul 2026 | Wing B | Primary sale | 885 sq ft | View Primary sale, Jul 2026 | |
| Jul 2026 | Wing C | Primary sale | 684 sq ft | View Primary sale, Jul 2026 | |
| Jul 2026 | Wing B | Primary sale | 684 sq ft | View Primary sale, Jul 2026 | |
| Jul 2026 | Wing B | Primary sale | 684 sq ft | View Primary sale, Jul 2026 | |
| Jul 2026 | Wing C | Primary sale | 684 sq ft | View Primary sale, Jul 2026 | |
| Jul 2026 | Wing B | Primary sale | 885 sq ft | View Primary sale, Jul 2026 | |
| Jul 2026 | Wing C | Primary sale | 684 sq ft | View Primary sale, Jul 2026 | |
| Jul 2026 | Wing C | Primary sale | 684 sq ft | View Primary sale, Jul 2026 |
3 buildings
Open a building to see every flat, floor by floor.
- Wing A13 floors · 52 units88% booked
- Wing B13 floors · 46 units65% booked
- Wing C13 floors · 52 units54% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100051240
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100051240 | 8 Jun 2023 | 31 Dec 2028 | 30 Apr 2029 | Shamraj Constructions | Project page |
Documents117
1 document held by Deedo, 116 filings listed on MahaRERA's project page
Finance
- PAN CardShamraj Construction Pan Card.pdf · uploaded 6 Apr 2023Source
Legal
Migrated
- 1 PAN CardShamraj Construction Pan Card.pdf · uploaded 6 Apr 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsVRK Other organization.pdf · uploaded 11 May 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsYSK other organization.pdf · uploaded 11 May 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsOther organizations SPD.pdf · uploaded 11 May 2023Source
Show all 117 documentsShow fewer documents
Migrated
- 4 Disclosure of Interest in Other Real Estate OrganizationsOrganizations IVK.pdf · uploaded 11 May 2023Source
- 1 Copy of the legal title reportSearch Report 24052023 .pdf · uploaded 30 May 2023Source
- 1 a Details of encumbrances concerned to FinanceFinanace Letter.pdf · uploaded 30 May 2023Source
- 1 b Details of encumbrances concerned to LegalFinanace Letter.pdf · uploaded 30 May 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentShamraj C C.pdf · uploaded 30 May 2023Source
- 1 Declaration in FORM BForm B Indrajit Sir.pdf · uploaded 30 May 2023Source
- 2 a Details of encumbrances concerned to FinanceLegal Encumberances Trident.pdf · uploaded 2 Jun 2023Source
- 2 b Details of encumbrances concerned to LegalLegal Encumberances Trident.pdf · uploaded 2 Jun 2023Source
- 1 Copy of Layout Approval (in case of layout)Sheet 1-7.pdf · uploaded 2 Jun 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentSheet 2-7.pdf · uploaded 2 Jun 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentSheet 3-7.pdf · uploaded 2 Jun 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentSheet 5-7.pdf · uploaded 2 Jun 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentSheet 6-7.pdf · uploaded 2 Jun 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentSheet 7-7.pdf · uploaded 2 Jun 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentSheet 4-7.pdf · uploaded 2 Jun 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentSheet no 4.pdf · uploaded 2 Jun 2023Source
- 1 Declaration about Commencement CertificateFormat D New.pdf · uploaded 2 Jun 2023Source
- 1 CERSAI detailsCersi declaration Trident.pdf · uploaded 2 Jun 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3 30052023.pdf · uploaded 2 Jun 2023Source
- 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 2 Jun 2023Source
- 1 Proforma of Agreement for sale23 Shamraj RERA FIRST AGREEMENT May 23 REVISED.pdf · uploaded 2 Jun 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameNew 34 Format A Bank Acct.pdf · uploaded 2 Jun 2023Source
- 1 Deviation Report with respect to Allotment letterNo deviation allotment.pdf · uploaded 2 Jun 2023Source
- 1 Deviation Report with respect to model copy of AgreementAgreement Deviation Report.pdf · uploaded 2 Jun 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 23 Trident Shamraj.pdf · uploaded 3 Aug 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 June 23 Trident Shamraj.pdf · uploaded 3 Aug 2023Source
- 1 Disclosure of sold/ booked inventoryONLY Sanctiond Disclosure of Sold booked inventory TRIDENT June 23.pdf · uploaded 3 Aug 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3 June 23 Trident Shamraj.pdf · uploaded 3 Aug 2023Source
- 2 Proforma of Agreement for saleUpload with D eviation Final Draft Agreement 25723.pdf · uploaded 3 Aug 2023Source
- 2 Deviation Report with respect to model copy of AgreementDEVIATION REPORT Agreement 310723.pdf · uploaded 3 Aug 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Shamraj Form 1 compressed.pdf · uploaded 20 Oct 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Shamraj Trident A Engineer Certificate Sept 23 Third.pdf · uploaded 20 Oct 2023Source
- 2 Disclosure of sold/ booked inventoryONLY Sanctiond Disclosure of Sold booked inventory TRIDENT Sept 23.pdf · uploaded 20 Oct 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Upload Form3 30092023 Shamraj Construction compressed.pdf · uploaded 20 Oct 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Jan 2024 December quarter compressed.pdf · uploaded 19 Jan 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Shamraj Trident A Engineer Certificate Dec 23 Fourth.pdf · uploaded 19 Jan 2024Source
- 3 Disclosure of sold/ booked inventoryONLY Sanctiond Disclosure of Sold booked inventory TRIDENT Dec 23.pdf · uploaded 19 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31 12 23 Shamraj Construction.pdf · uploaded 19 Jan 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT CERTIFICATE 5 APR 24 Fifth.pdf · uploaded 21 Apr 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 MMC Engineer Certificate MAR24.pdf · uploaded 21 Apr 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Shamraj Trident A Engineer Certificate Mar 24 Fifth.pdf · uploaded 21 Apr 2024Source
- 4 Disclosure of sold/ booked inventoryONLY Sanctiond Disclosure of Sold booked inventory TRIDENT MAR 24.pdf · uploaded 21 Apr 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31 03 24 Shamraj Construction.pdf · uploaded 21 Apr 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT CERTIFICATE 5 JULY 24 Sixth.pdf · uploaded 26 Jul 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Shamraj Trident A Engineer Certificate JUN 24 Sixth.pdf · uploaded 26 Jul 2024Source
- 5 Disclosure of sold/ booked inventoryONLY Sanctiond Disclosure of Sold booked inventory TRIDENT JUN 24.pdf · uploaded 26 Jul 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 AS 3062024 Shamraj Construction.pdf · uploaded 26 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT CERTIFICATE 10 Oct 24 Seventh.pdf · uploaded 22 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 3092024 Shamraj Construction.pdf · uploaded 22 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryONLY Sanctiond Disclosure of Sold booked inventory TRIDENT Sept 24.pdf · uploaded 22 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate 141024.pdf · uploaded 15 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT CERTIFICATE 10 Jan 25 Eigth.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryONLY Sanctiond Disclosure of Sold booked inventory TRIDENT Dec 25.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 AS 31122024 Shamraj Construction.pdf · uploaded 21 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer s Certificate Form 2 Dec 2024.pdf · uploaded 21 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 MArch 24 for updation.pdf · uploaded 2 Apr 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 2 Apr 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentSheet No1.pdf · uploaded 2 Apr 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentSheet No2.pdf · uploaded 2 Apr 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentSheet No3.pdf · uploaded 2 Apr 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentSheet No4.pdf · uploaded 2 Apr 2025Source
- 5 Building Plan Approval / NA Order for plotted developmentSheet No5.pdf · uploaded 2 Apr 2025Source
- 6 Building Plan Approval / NA Order for plotted developmentSheet No6.pdf · uploaded 2 Apr 2025Source
- 7 Building Plan Approval / NA Order for plotted developmentSheet No7.pdf · uploaded 2 Apr 2025Source
- 8 Building Plan Approval / NA Order for plotted developmentSheet No8.pdf · uploaded 2 Apr 2025Source
- 1 Declaration about Commencement CertificateRevised 2 Format D DECLARATION ABOUT COMMENCEMNT CERTIFICATE MAR 25.pdf · uploaded 2 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - 20032025_compressed.pdf · uploaded 4 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryCircular 29.pdf · uploaded 4 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A FY 2023-24.pdf · uploaded 4 Apr 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 FY 2023-24.pdf · uploaded 4 Apr 2025Source
- Form 1Form 1 ARCHITECT CERTIFICATE 14 July 25 Nineth.pdf · uploaded 10 Oct 2025Source
- Form 2Form 2 Engineers certificate July 25.pdf · uploaded 10 Oct 2025Source
- Form 3Form3RERA 3062025.pdf · uploaded 10 Oct 2025Source
- Disclosure of Sold and Booked InventoryONLY Sanctiond Disclosure of Sold booked inventory TRIDENT JUNE 25.pdf · uploaded 10 Oct 2025Source
- Withdrawal Update Form 1Form 1 bw Signed.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 2Form 2 Q2 2025.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 3Form 3 30 09 25 Shamraj Constructions.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 1TRIDENT Form 1 18012026.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 2Shamraj Form 2 19126.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 3Form 3 Shamraj Dec 25 200126.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 1Form 1 Architects Certificate.pdf · uploaded 14 May 2026Source
- Withdrawal Update Form 2Form 2 Engineers certificate.pdf · uploaded 14 May 2026Source
- Withdrawal Update Form 3Form 3 upto 31032026.pdf · uploaded 14 May 2026Source
- Withdrawal Update Form 1QPR Jun 26 Form 1 Architects Certificate.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2QPR Jun 26 Form 2 Engineers Certificate.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3QPR Jun 26 FORM 3 3062026 Shamraj Constructions.pdf · uploaded 20 Jul 2026Source
Technical
- DocumentSheet no 4.pdf · uploaded 2 Jun 2023Source
- DocumentSheet 1-7.pdf · uploaded 2 Jun 2023Source
- DocumentSheet 2-7.pdf · uploaded 2 Jun 2023Source
- DocumentSheet 3-7.pdf · uploaded 2 Jun 2023Source
- DocumentSheet 5-7.pdf · uploaded 2 Jun 2023Source
- DocumentSheet 6-7.pdf · uploaded 2 Jun 2023Source
- DocumentSheet 7-7.pdf · uploaded 2 Jun 2023Source
- DocumentSheet 4-7.pdf · uploaded 2 Jun 2023Source
- DocumentSheet No1.pdf · uploaded 2 Apr 2025Source
- DocumentSheet No2.pdf · uploaded 2 Apr 2025Source
- DocumentSheet No3.pdf · uploaded 2 Apr 2025Source
- DocumentSheet No4.pdf · uploaded 2 Apr 2025Source
- DocumentSheet No5.pdf · uploaded 2 Apr 2025Source
- DocumentSheet No6.pdf · uploaded 2 Apr 2025Source
- DocumentSheet No7.pdf · uploaded 2 Apr 2025Source
- DocumentSheet No8.pdf · uploaded 2 Apr 2025Source
Technical (Architect)
Technical (Engineer)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 9/7 CTS 171 PlotB Shri Shreedhar Cooprative Housing Society, S No 9/5
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- —150 units in all
- Address
- S No 9/5, 9/7 CTS 171 Plot-B Shri Shreedhar Cooprative Housing Society, Shri Shreedhar Cooperative Housing Society, Near Taljai MandirPIN 411043
- Village
- Dhankawadi, Haveli taluka
- Location
- 18.49426, 73.87233
- Land area for this project
- 3,440 sq m (37,029 sq ft)
- Permissible built-up area
- 14,077 sq m (1,51,523 sq ft)
- Sanctioned built-up area
- 13,830 sq m (1,48,868 sq ft)
- Recreational open space
- 0 sq m (0 sq ft)
- Designated bank account
- 99
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S No 9/5, 9/7 CTS 171 Plot-B Shri Shreedhar Cooprative Housing Society
Boundaries
- North
- Manavendranagar Society
- South
- Open Space and Plot A A1 A2
- East
- 18m DP Road
- West
- S No 9 hissa 6
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking150 units
150 units registered
| Building | Type | Carpet area | Units |
|---|---|---|---|
| Wing A | — | — | 52 |
| Wing B | — | — | 46 |
| Wing C | — | — | 52 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Mukta Kulkarni | — |
| Chartered accountant | Jayant Kamat | — |
| Engineer | J W Consultants Umesh Joshi | — |
| Engineer | Shafik Pangarkar | — |
| Other | Unik Infra | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Dhankawadi
- Panchtatva SerenityRERA PR1260002602424
- Siddhivinayak SerenityRERA PR1260002602420
- MarigoldRERA PM1260002602260
- Atharva Feryez Residence₹7,760 a sq ft
- Ramalay₹3,600 a sq ft
- Samruddhi SerenityRERA PR1260002601217
- SubhadrarjunRERA PM1260002600837
- Swanand Residency₹3,690 a sq ft
All 2,095 projects in Dhankawadi · Compare Trident with another project
Trident in numbers
Registered deals, summarised
Deedo has 63 registered documents at Trident, from Dec 2023 to Oct 2026: 36 sales, 8 leave and licence agreements, 18 mortgages. The median registered sale since Dec 2023 works out to about ₹11,800 per sq ft, at a median of ₹90 L a deal; 0% of sales were resales.
- What is the price per sq ft at Trident?
- The median registered sale since Dec 2023 works out to about ₹11,800 per sq ft, at a median of ₹90 L a deal; 0% of sales were resales.
- How many properties have been sold at Trident?
- 36 sales are registered at Trident.
- Are properties at Trident rented out?
- Yes: 8 leave and licence agreements are registered at Trident, at a median rent since Dec 2023 of about ₹28,000 a month with a deposit of about ₹70,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Trident by Deedo, last updated with deals registered in Oct 2026.
Latest deal · Primary sale · Oct 2026
₹50–75 L