Residential / Group Housing · 1 building · 24 unitsRERA P52100017380

Dwarkadheesh Residency

Deedo IDDP-PUN-FCRS

Completion was pushed back 3 years and 6 months, to Dec 2026; no MahaRERA orders on record; 79% of its units are booked.

Dehu, Pune 412109 · by Harichandra Rambhau Satav

DeliveryExtended 3 yrs 6 moPromised Jun 2023 · now due Dec 2026RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales79% booked19 of 24 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 3 years and 6 months, to Dec 2026

  • This projectRegistered 9 Aug 2018, completion promised 30 Jun 2023, revised to 31 Dec 2026.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100017380
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000173809 Aug 201830 Jun 202331 Dec 2026Harichandra Rambhau SatavProject page
Documents148

2 documents held by Deedo, 146 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Finance

  • PAN CardHARICHANDRA SATAV PAN CARD.pdf · uploaded 20 Jul 2018Source

Legal

  • Legal Title reportSEARCH REPORT.pdf · uploaded 20 Jul 2018Source
  • Declaration Form BFORM B HARICHANDRA R SATAV.pdf · uploaded 20 Jul 2018Source
  • Other – LegalHAKKA SODPATRA VINOD SATAV FAMILY.pdf · uploaded 30 Jan 2023Source
  • Other – LegalHAKKA SODPATRA RAJA KHEDEKAR.pdf · uploaded 30 Jan 2023Source
  • Other – LegalHAKKA SODPATRA ARUN R SATAV.pdf · uploaded 30 Jan 2023Source
Show all 148 documentsShow fewer documents

Legal

  • Other – LegalPAWOR OF ATH VINOD SATAV FAMILY.pdf · uploaded 30 Jan 2023Source
  • Declaration Form BFORM B NEW.pdf · uploaded 7 Jun 2024Source

Migrated

  • 1 PAN CardHARICHANDRA SATAV PAN CARD.pdf · uploaded 20 Jul 2018Source
  • 1 Copy of the legal title reportSEARCH REPORT.pdf · uploaded 20 Jul 2018Source
  • 1 Details of encumbrancesSEARCH REPORT.pdf · uploaded 20 Jul 2018Source
  • 1 Copy of Layout Approval (in case of layout)PLAN 2.pdf · uploaded 20 Jul 2018Source
  • 1 Building Plan Approval (IOD)PLAN 1.pdf · uploaded 20 Jul 2018Source
  • 1 Commencement Certificates / NA Order for plotted developmentSANCTION PLAN.pdf · uploaded 20 Jul 2018Source
  • 1 Declaration in FORM BFORM B HARICHANDRA R SATAV.pdf · uploaded 20 Jul 2018Source
  • 1 Certificates of CA (Form 3)CA CERTIFICATES.pdf · uploaded 20 Jul 2018Source
  • 1 Proforma of Allotment letterAgreement Vishwas Satav Final ppp.pdf · uploaded 1 Aug 2018Source
  • 1 Proforma of Agreement for saleSALES AGREEMENT DRAFT .pdf · uploaded 30 Jan 2023Source
  • 1 Other – LegalHAKKA SODPATRA VINOD SATAV FAMILY.pdf · uploaded 30 Jan 2023Source
  • 2 Other – LegalHAKKA SODPATRA RAJA KHEDEKAR.pdf · uploaded 30 Jan 2023Source
  • 3 Other – LegalHAKKA SODPATRA ARUN R SATAV.pdf · uploaded 30 Jan 2023Source
  • 4 Other – LegalPAWOR OF ATH VINOD SATAV FAMILY.pdf · uploaded 30 Jan 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 QUTER 18-19.pdf · uploaded 29 May 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 QUTER 18-19.pdf · uploaded 29 May 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 QUTER 18-19.pdf · uploaded 29 May 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 QUTER 18-19.pdf · uploaded 29 May 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 QUTER 2019-20.pdf · uploaded 29 May 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 QUTER 2019-20.pdf · uploaded 29 May 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 QUTER 2019-20.pdf · uploaded 29 May 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 QUTER 2019-20.pdf · uploaded 29 May 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 QUTER 2020-21.pdf · uploaded 29 May 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 QUTER 2020-21.pdf · uploaded 29 May 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 QUTER 2020-21.pdf · uploaded 29 May 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 QUTER 2020-21.pdf · uploaded 29 May 2024Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 QUTER 21-22.pdf · uploaded 29 May 2024Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 QUTER 21-22.pdf · uploaded 29 May 2024Source
  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 QUTER 21-22.pdf · uploaded 29 May 2024Source
  • 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 QUTER 21-22.pdf · uploaded 29 May 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 QUTER 18-19.pdf · uploaded 30 May 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 QUTER 18-19.pdf · uploaded 30 May 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 QUTER 18-19.pdf · uploaded 30 May 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)4 QUTER 18-19.pdf · uploaded 30 May 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 quter 19-20.pdf · uploaded 30 May 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 quter 19-20.pdf · uploaded 30 May 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 quter 19-20.pdf · uploaded 30 May 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)4 quter 19-20.pdf · uploaded 30 May 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 QUTER 20-21.pdf · uploaded 30 May 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 QUTER 20-21.pdf · uploaded 30 May 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 QUTER 20-21.pdf · uploaded 30 May 2024Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)4 QUTER 20-21.pdf · uploaded 30 May 2024Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 quter 21-22.pdf · uploaded 30 May 2024Source
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 quter 21-22.pdf · uploaded 30 May 2024Source
  • 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 quter 21-22.pdf · uploaded 30 May 2024Source
  • 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)4 quter 21-22.pdf · uploaded 30 May 2024Source
  • 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 QUTER 22-23.pdf · uploaded 30 May 2024Source
  • 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 QUTER 22-23.pdf · uploaded 30 May 2024Source
  • 19 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 QUTER 22-23.pdf · uploaded 30 May 2024Source
  • 20 Architect’s Certificate of Percentage of Completion of Work (Form 1)4 QUTER 22-23.pdf · uploaded 30 May 2024Source
  • 21 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 quter 23-24.pdf · uploaded 30 May 2024Source
  • 22 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 quter 23-24.pdf · uploaded 30 May 2024Source
  • 23 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 quter 23-24.pdf · uploaded 30 May 2024Source
  • 24 Architect’s Certificate of Percentage of Completion of Work (Form 1)4 quter 23-24.pdf · uploaded 30 May 2024Source
  • 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 QUTER 22-23.pdf · uploaded 30 May 2024Source
  • 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 QUTER 22-23.pdf · uploaded 30 May 2024Source
  • 19 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 QUTER 22-23.pdf · uploaded 30 May 2024Source
  • 20 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 QUTER 22-23.pdf · uploaded 30 May 2024Source
  • 21 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 QUTER 23-24.pdf · uploaded 30 May 2024Source
  • 22 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 QUTER 23-24.pdf · uploaded 30 May 2024Source
  • 23 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 QUTER 23-24.pdf · uploaded 30 May 2024Source
  • 24 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 QUTER 23-24.pdf · uploaded 30 May 2024Source
  • 2 Details of encumbrancesENCUMBRANCE DECLARATION.pdf · uploaded 31 May 2024Source
  • 3 a Details of encumbrances concerned to FinanceENCUMBRANCE DECLARATION.pdf · uploaded 31 May 2024Source
  • 1 b Details of encumbrances concerned to LegalENCUMBRANCE DECLARATION.pdf · uploaded 31 May 2024Source
  • 1 Declaration about Commencement CertificateDeclaration about Commencement Certificate.pdf · uploaded 31 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A 2020.pdf · uploaded 31 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A 2021.pdf · uploaded 31 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A 2022.pdf · uploaded 31 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A 2023.pdf · uploaded 31 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A 2024.pdf · uploaded 31 May 2024Source
  • 1 Disclosure of sold/ booked inventoryresolution consent for extension .pdf · uploaded 31 May 2024Source
  • 2 Certificates of CA (Form 3)FORM 03 DEC 2018.pdf · uploaded 31 May 2024Source
  • 3 Certificates of CA (Form 3)FORM 03 JUNE 2018.pdf · uploaded 31 May 2024Source
  • 4 Certificates of CA (Form 3)FORM 03 MARCH 19.pdf · uploaded 31 May 2024Source
  • 5 Certificates of CA (Form 3)FORM 03 SEPT 2018.pdf · uploaded 31 May 2024Source
  • 6 Certificates of CA (Form 3)FORM 03 JUNE 19.pdf · uploaded 31 May 2024Source
  • 7 Certificates of CA (Form 3)FORM 03 SEPT 19.pdf · uploaded 31 May 2024Source
  • 8 Certificates of CA (Form 3)FORM 03 DEC 19.pdf · uploaded 31 May 2024Source
  • 9 Certificates of CA (Form 3)FORM 03 MARCH 20.pdf · uploaded 31 May 2024Source
  • 10 Certificates of CA (Form 3)FORM 03 JUNE 20.pdf · uploaded 31 May 2024Source
  • 11 Certificates of CA (Form 3)FORM 03 SEPT 20.pdf · uploaded 31 May 2024Source
  • 12 Certificates of CA (Form 3)FORM 03 DEC 20.pdf · uploaded 31 May 2024Source
  • 13 Certificates of CA (Form 3)FORM 03 MARCH 21.pdf · uploaded 31 May 2024Source
  • 14 Certificates of CA (Form 3)FORM 03 JUNE 2021.pdf · uploaded 31 May 2024Source
  • 15 Certificates of CA (Form 3)FORM 03 SEPT 2021.pdf · uploaded 31 May 2024Source
  • 16 Certificates of CA (Form 3)FORM 03 DEC 2021.pdf · uploaded 31 May 2024Source
  • 17 Certificates of CA (Form 3)FORM 03 MARCH 2022.pdf · uploaded 31 May 2024Source
  • 18 Certificates of CA (Form 3)FORM 03 JUNE 22.pdf · uploaded 31 May 2024Source
  • 19 Certificates of CA (Form 3)FORM 03 SEPT 22.pdf · uploaded 31 May 2024Source
  • 20 Certificates of CA (Form 3)FORM 03 DEC 22.pdf · uploaded 31 May 2024Source
  • 21 Certificates of CA (Form 3)FORM 03 MARCH 23.pdf · uploaded 31 May 2024Source
  • 22 Certificates of CA (Form 3)FORM 03 JUNE 23.pdf · uploaded 31 May 2024Source
  • 23 Certificates of CA (Form 3)FORM 03 SEPT 23.pdf · uploaded 31 May 2024Source
  • 24 Certificates of CA (Form 3)FORM 03 DEC 23.pdf · uploaded 31 May 2024Source
  • 25 Certificates of CA (Form 3)FORM 03 MARCH 24.pdf · uploaded 31 May 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDISCLOSURE OF INTEREST ANNEXURE A.pdf · uploaded 31 May 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)form 05 17-18.pdf · uploaded 31 May 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)form 05 18-19.pdf · uploaded 31 May 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)form 05 19-20.pdf · uploaded 31 May 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)form 05 20-21.pdf · uploaded 31 May 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)form 05 22-23.pdf · uploaded 31 May 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)form 05 21-22.pdf · uploaded 31 May 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDECLATATION BANK ACCOUNT.pdf · uploaded 31 May 2024Source
  • 1 Deviation Report with respect to Allotment letterALLOTMENT LETTER ANNEXURE i_compressed.pdf · uploaded 31 May 2024Source
  • 2 Declaration in FORM BFORM B NEW.pdf · uploaded 7 Jun 2024Source
  • Form 130 june 2024.pdf · uploaded 3 Jul 2026Source
  • Form 230 Jun 2024.pdf · uploaded 3 Jul 2026Source
  • Form 3jun 2024.pdf · uploaded 3 Jul 2026Source
  • Disclosure of Sold and Booked Inventoryjune 2024.pdf · uploaded 3 Jul 2026Source
  • Form 130 sept 2024.pdf · uploaded 5 Jul 2026Source
  • Form 230 sep 2024.pdf · uploaded 5 Jul 2026Source
  • Form 3Sep 2024.pdf · uploaded 5 Jul 2026Source
  • Disclosure of Sold and Booked Inventorysep 2024.pdf · uploaded 5 Jul 2026Source
  • Form 130 dec 2024.pdf · uploaded 5 Jul 2026Source
  • Form 231Dec 2024.pdf · uploaded 5 Jul 2026Source
  • Disclosure of Sold and Booked Inventoryas on dec 2024.pdf · uploaded 5 Jul 2026Source
  • Form 3dec 2024.pdf · uploaded 5 Jul 2026Source
  • Form 131 mar 2025.pdf · uploaded 5 Jul 2026Source
  • Form 231 Mar 2025.pdf · uploaded 5 Jul 2026Source
  • Form 3Mar 2025.pdf · uploaded 5 Jul 2026Source
  • Disclosure of Sold and Booked Inventorymar 2025.pdf · uploaded 5 Jul 2026Source
  • Withdrawal Update Form 1June 2025.pdf · uploaded 7 Jul 2026Source
  • Withdrawal Update Form 1Sept 2025.pdf · uploaded 7 Jul 2026Source
  • Withdrawal Update Form 1Dec 2025.pdf · uploaded 7 Jul 2026Source
  • Withdrawal Update Form 1March 2026.pdf · uploaded 7 Jul 2026Source
  • Withdrawal Update Form 2JUNE 2025.pdf · uploaded 7 Jul 2026Source
  • Withdrawal Update Form 2SEPT 25.pdf · uploaded 7 Jul 2026Source
  • Withdrawal Update Form 2DEC 2025.pdf · uploaded 7 Jul 2026Source
  • Withdrawal Update Form 2MARCH 26.pdf · uploaded 7 Jul 2026Source
  • Withdrawal Update Form 3JUNE 2025.pdf · uploaded 7 Jul 2026Source
  • Withdrawal Update Form 3sep 25.pdf · uploaded 7 Jul 2026Source
  • Withdrawal Update Form 3Dec 25.pdf · uploaded 7 Jul 2026Source
  • Withdrawal Update Form 3Mar 26.pdf · uploaded 7 Jul 2026Source

Technical

  • DocumentPLAN 1.pdf · uploaded 20 Jul 2018Source
  • DocumentPLAN 2.pdf · uploaded 20 Jul 2018Source

Technical (Architect)

  • DocumentMarch 2026.pdf · uploaded 7 Jul 2026Source

Technical (Engineer)

  • DocumentMARCH 26.pdf · uploaded 7 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 1398, 1399

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1 BHK, 1BHK, 1 RK24 units in all
Address
1398, 1399, 1400, Near Shrikrishna Mandhir, MalwadiPIN 412109
Village
Dehu, Haveli taluka
Land area for this project
1,347 sq m (14,496 sq ft)
Permissible built-up area
830 sq m (8,930 sq ft)
Sanctioned built-up area
830 sq m (8,930 sq ft)
Developed in phases
No

Survey, CTS, gat or plot numbers

139813991400

Land as published on MahaRERA's project page

1398,1399,1400

Boundaries

North
Malwadi Bokewadi Road
South
Cts No 1398
East
Cts No 1399 1398
West
Cts No 1398

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking24 units

19 of 24 units booked (79%), as the promoter reported to MahaRERA

1 BHK · 12 units1BHK · 8 units1 RK · 4 units
TypeCarpet areaUnitsBooked
1 BHK28.78 sq m · 310 sq ft43
1 BHK32.28 sq m · 347 sq ft44
1 BHK42.56 sq m · 458 sq ft43
1BHK30.34 sq m · 327 sq ft43
1BHK32.23 sq m · 347 sq ft43
1 RK23.65 sq m · 255 sq ft43

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMilind Jagatap—
Chartered accountantTejali Desarda Sujit Desarda—
EngineerSwapnil BHAUSAHEB Kudnar—
EngineerSwapnil Kudnar—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology