Abhang Recidency
Deedo IDDP-PUN-V1Q2Completion was pushed back 3 years, to Jun 2027; no MahaRERA orders on record; 20% of its units are booked.
Dehu, Pune 411031 · by Sai Developers
Buying a flat here?
See every deed registered on it.
Completion was pushed back 3 years, to Jun 2027
- This projectRegistered 24 Nov 2020, completion promised 30 Jun 2024, revised to 30 Jun 2027.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100027212
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100027212 | 24 Nov 2020 | 30 Jun 2024 | 30 Jun 2027 | Sai Developers | Project page |
Documents161
2 documents held by Deedo, 159 filings listed on MahaRERA's project page
Finance
- PAN CardVISHWANATH JARE PAN CARD.pdf · uploaded 21 Nov 2020Source
Legal
Show all 161 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)Plan Layout.pdf · uploaded 17 Oct 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentComencement Certificate.pdf · uploaded 17 Oct 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentComencement Certificate.pdf · uploaded 17 Oct 2020Source
- 1 Declaration in FORM Bform b vishwanath jare.pdf · uploaded 17 Oct 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 RERA.pdf · uploaded 28 Oct 2020Source
- 1 Proforma of Allotment letterALLOTMENT LETTER AND AGREEMENT TO SALE DEED.pdf · uploaded 28 Oct 2020Source
- 1 PAN CardVISHWANATH JARE PAN CARD.pdf · uploaded 21 Nov 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 1 7 22 TO 30 09 22.pdf · uploaded 28 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 1-4-22 to 30-6-22.pdf · uploaded 28 Jul 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 1 10 to 31 12 22.pdf · uploaded 28 Jul 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 JAN 23 TO MARCH 23.pdf · uploaded 28 Jul 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 4 23 to 30 6 23.pdf · uploaded 28 Jul 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 1 7 23 to 30 9 23.pdf · uploaded 28 Jul 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 1 10 23 to 31 10 23.pdf · uploaded 28 Jul 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 JAN 24 TO MARCH 24.pdf · uploaded 28 Jul 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 APRIL 24 TO JUNE 24.pdf · uploaded 28 Jul 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 april 21 to March 22_0001.pdf · uploaded 28 Jul 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 april 22 to March 233_0001.pdf · uploaded 28 Jul 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 april 23 to June 23_0001.pdf · uploaded 28 Jul 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 July 23 to sept 23_0001.pdf · uploaded 28 Jul 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 oct 23 to Dec-23_0001.pdf · uploaded 28 Jul 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 jan-24 to march 24_0001.pdf · uploaded 28 Jul 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 april 24 to june 24_0001.pdf · uploaded 28 Jul 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2 Dec 20 to March 21_0001.pdf · uploaded 28 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A 31 MARCH 21.pdf · uploaded 28 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A 31 MARCH 22.pdf · uploaded 28 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 1 APRIL 22 TO MARCH 23.pdf · uploaded 28 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 1 4 23 TO 30 6 23.pdf · uploaded 28 Jul 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 1 7 23 TO 30 9 23.pdf · uploaded 28 Jul 2024Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 1 10 23 TO 31 12 23.pdf · uploaded 28 Jul 2024Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 1 1 24 TO 31 3 24.pdf · uploaded 28 Jul 2024Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 1 4 24 TO 30 6 24.pdf · uploaded 28 Jul 2024Source
- 1 Disclosure of sold/ booked inventoryDisclosure_0001.pdf · uploaded 28 Jul 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)TABLE F APRIL 21- MARCH 22_0001.pdf · uploaded 28 Jul 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 april 21 to 31 march 22.pdf · uploaded 28 Jul 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 april 22 to march 23.pdf · uploaded 28 Jul 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 april 23 to 30 june 23.pdf · uploaded 28 Jul 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 july to 30 sep 23.pdf · uploaded 28 Jul 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 oct 23 to 31 dec 23.pdf · uploaded 28 Jul 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 jan 24 to 31 march 24.pdf · uploaded 28 Jul 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 april 24 to 30 june 24.pdf · uploaded 28 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)1 april 22 to march 23.pdf · uploaded 28 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)1 april 21 to 31 march 22.pdf · uploaded 28 Jul 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)21-22.pdf · uploaded 28 Jul 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)22-23.pdf · uploaded 28 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)23-24.pdf · uploaded 28 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)dec 20 to march 21.pdf · uploaded 30 Jul 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFCATE REVALID FINAL.pdf · uploaded 9 Aug 2024Source
- 2 Declaration in FORM Bform b_0001.pdf · uploaded 12 Aug 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)NOV TO DEC 20.pdf · uploaded 12 Aug 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)JAN 21 TO MARCH 21.pdf · uploaded 12 Aug 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)APRIL 21 TO JUNE 21.pdf · uploaded 12 Aug 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)JULY 21 TO SEP 21.pdf · uploaded 12 Aug 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)OCT 21 TO DEC 21.pdf · uploaded 12 Aug 2024Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)JAN 22 MARCH 22.pdf · uploaded 12 Aug 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)APRIL 22 TO JUNE 22.pdf · uploaded 12 Aug 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)JULY TO SEP 22.pdf · uploaded 12 Aug 2024Source
- 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)OCT 22 TO DEC 22.pdf · uploaded 12 Aug 2024Source
- 19 Architect’s Certificate of Percentage of Completion of Work (Form 1)JAN TO MARCH 23.pdf · uploaded 12 Aug 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)01 FROM-2 Nov 20-Dec 20 ENGINEERS CERTIFICATE.pdf · uploaded 12 Aug 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)02 FROM-2 jan 21-march 21 ENGINEERS CERTIFICATE.pdf · uploaded 12 Aug 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)03 FROM-2 April 21-June 21 ENGINEERS CERTIFICATE.pdf · uploaded 12 Aug 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)04 FROM-2 July-Sep 21 ENGINEERS CERTIFICATE.pdf · uploaded 12 Aug 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)05 FROM-2 Oct 21-Dec 21 ENGINEERS CERTIFICATE.pdf · uploaded 12 Aug 2024Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)06 FROM-2 Jan 22-March ENGINEERS CERTIFICATE.pdf · uploaded 12 Aug 2024Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)07 FROM-2 April 22- June 22 ENGINEER CERTIFICATE_0001.pdf · uploaded 12 Aug 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)08 FROM-2 July 22-Sep 22 ENGINEERS CERTIFICATE.pdf · uploaded 12 Aug 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)09 FROM-2 oct 22-Dec 22 ENGINEERS CERTIFICATE.pdf · uploaded 12 Aug 2024Source
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)10 FROM-2 Jan 23-Marh 23 ENGINEERS CERTIFICATE.pdf · uploaded 12 Aug 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)ENGINEERS CERTIFICATE 31-12-2020_0001.pdf · uploaded 12 Aug 2024Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)ENGINEERS CERTIFICATE 31-03-2021_0001.pdf · uploaded 12 Aug 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)ENGINEERS CERTIFICATE 30-06-2021_0001.pdf · uploaded 12 Aug 2024Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)ENGINEERS CERTIFICATE 30-09-2021_0001.pdf · uploaded 12 Aug 2024Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)ENGINEERS CERTIFICATE 31-12-2021_0001.pdf · uploaded 12 Aug 2024Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)ENGINEERS CERTIFICATE 31-03-2022_0001.pdf · uploaded 12 Aug 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)ENGINEERS CERTIFICATE 30-06-2022_0001.pdf · uploaded 12 Aug 2024Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)ENGINEERS CERTIFICATE 30-09-2022_0001.pdf · uploaded 12 Aug 2024Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)ENGINEERS CERTIFICATE 31-12-2022_0001.pdf · uploaded 12 Aug 2024Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)ENGINEERS CERTIFICATE 31-03-2022_0001.pdf · uploaded 12 Aug 2024Source
- 6 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)ENGINEERS CERTIFICATE 31-03-2023_0001.pdf · uploaded 12 Aug 2024Source
- 3 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)form 5 declaration.pdf · uploaded 12 Aug 2024Source
- 2 Copy of Layout Approval (in case of layout)Sanction Plan Abhang Residency, Dehu_compressed.pdf · uploaded 13 Aug 2024Source
- 20 Architect’s Certificate of Percentage of Completion of Work (Form 1)april 23 to june 23.pdf · uploaded 13 Aug 2024Source
- 21 Architect’s Certificate of Percentage of Completion of Work (Form 1)july to sep 23.pdf · uploaded 13 Aug 2024Source
- 22 Architect’s Certificate of Percentage of Completion of Work (Form 1)oct to dec 23.pdf · uploaded 13 Aug 2024Source
- 23 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 jan 24 to march 24.pdf · uploaded 13 Aug 2024Source
- 24 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 April 24 to June 24.pdf · uploaded 13 Aug 2024Source
- 6 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A 2023-24.pdf · uploaded 13 Aug 2024Source
- 2 Disclosure of sold/ booked inventorydisclosure of sold unsold inventory.pdf · uploaded 13 Aug 2024Source
- 3 Disclosure of sold/ booked inventorydeclaration sold unsold inventory.pdf · uploaded 13 Aug 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)nov 20 to dec 20.pdf · uploaded 13 Aug 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)jan to march 21.pdf · uploaded 13 Aug 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)april 21 to june 21 form 3.pdf · uploaded 13 Aug 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)july to sep 21.pdf · uploaded 13 Aug 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)oct 21 to dec 21.pdf · uploaded 13 Aug 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)jan 22 to march 22.pdf · uploaded 13 Aug 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)april 22 to june 22.pdf · uploaded 13 Aug 2024Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)july to sep 22.pdf · uploaded 13 Aug 2024Source
- 18 CA Certificate on Project Cost & Fund withdrawal (Form 3)oct to dec 22.pdf · uploaded 13 Aug 2024Source
- 19 CA Certificate on Project Cost & Fund withdrawal (Form 3)jan to march 23.pdf · uploaded 13 Aug 2024Source
- 20 CA Certificate on Project Cost & Fund withdrawal (Form 3)april to june 23.pdf · uploaded 13 Aug 2024Source
- 21 CA Certificate on Project Cost & Fund withdrawal (Form 3)july to sep 23.pdf · uploaded 13 Aug 2024Source
- 22 CA Certificate on Project Cost & Fund withdrawal (Form 3)oct to dec 23.pdf · uploaded 13 Aug 2024Source
- 23 CA Certificate on Project Cost & Fund withdrawal (Form 3)jan to march 24.pdf · uploaded 13 Aug 2024Source
- 24 CA Certificate on Project Cost & Fund withdrawal (Form 3)april to june 24.pdf · uploaded 13 Aug 2024Source
- 4 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)21-22_merged FINAL.pdf · uploaded 13 Aug 2024Source
- 3 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)fy 2022 23 final.pdf · uploaded 13 Aug 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)fy 23 24 final.pdf · uploaded 13 Aug 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q2 Form 1 Arc Ajit Thakur.pdf · uploaded 20 Jan 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q3 Form 1 Arc Ajit Thakur.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 for 01072024 to30092024.pdf · uploaded 20 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 for 01102024TO31122024.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)From-2 010724TO300924.pdf · uploaded 20 Jan 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)From-2 EC 011024311224.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD Abhang Resi20.pdf · uploaded 20 Jan 2025Source
- Form 1form 1 April 24 to June 24.pdf · uploaded 17 May 2025Source
- Form 2form 2 april 24 to june 24_0001.pdf · uploaded 17 May 2025Source
- Form 3april to june 24.pdf · uploaded 17 May 2025Source
- Disclosure of Sold and Booked Inventorydisclosure of sold unsold inventory.pdf · uploaded 17 May 2025Source
- Form 1form 1.pdf · uploaded 23 May 2025Source
- Form 2Form 2 signed.pdf · uploaded 23 May 2025Source
- Form 3form 3 signed.pdf · uploaded 23 May 2025Source
- Disclosure of Sold and Booked Inventorydisclosure of sold unsold.pdf · uploaded 23 May 2025Source
- Form 1Form-1 Archiitect's Certificate 1st Qtr 25-26.pdf · uploaded 14 Aug 2025Source
- Form 2Form-2 Engineer's Certificate 1st Qtr 25-26.pdf · uploaded 14 Aug 2025Source
- Form 3Abhang Residency sign.pdf · uploaded 14 Aug 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Abhang Residency 1st 25-26.pdf · uploaded 14 Aug 2025Source
- Form 2From-2 Sai Developers Abhang Residecy Qtr-2.pdf · uploaded 28 Nov 2025Source
- Disclosure of Sold and Booked InventoryDiscolsure of Sold Abhang Residency.pdf · uploaded 28 Nov 2025Source
- Form 1Form 1 Qtr-2 Architect's Certificate Sai Developers_page-0001.pdf · uploaded 28 Nov 2025Source
- Form 3from 3.pdf · uploaded 28 Nov 2025Source
- Form 1Form 1 q3.pdf · uploaded 21 Jan 2026Source
- Form 2signed form 2.pdf · uploaded 21 Jan 2026Source
- Form 3form 3.pdf · uploaded 21 Jan 2026Source
- Disclosure of Sold and Booked Inventory3Q 25-26 SOLD UNSOLD Abhang Residency Sai Developers.pdf · uploaded 21 Jan 2026Source
- Form 5 (FY 2024-2025)form 5 sai developer signed.pdf · uploaded 5 Feb 2026Source
- Form 2A (FY 2024-2025)Form2A Engineers Certificate Signed.pdf · uploaded 17 Feb 2026Source
- Form 1Form1.pdf · uploaded 27 Apr 2026Source
- Form 2Form 2.pdf · uploaded 27 Apr 2026Source
- Form 3Form3-.pdf · uploaded 27 Apr 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold sign.pdf · uploaded 27 Apr 2026Source
- Withdrawal Update Form 1Sai Developers Form 1_0001.pdf · uploaded 24 Jul 2026Source
- Withdrawal Update Form 2Q-1 2026-27 FORM-2 ENGG CERTIFICATE_SAI DEVELOPERS.pdf · uploaded 24 Jul 2026Source
- Withdrawal Update Form 3Form3 final.pdf · uploaded 24 Jul 2026Source
Technical
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 41
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- —20 units in all
- Address
- 41, 43, 44, Cts 41, 43, 44 Dehu, DehuPIN 411031
- Village
- Dehu, Haveli taluka
- Location
- 18.71767, 73.76709
- Land area for this project
- 336 sq m (3,617 sq ft)
- Permissible built-up area
- 479 sq m (5,161 sq ft)
- Sanctioned built-up area
- 479 sq m (5,161 sq ft)
- Recreational open space
- 336 sq m (3,617 sq ft)
- Designated bank account
- 220
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
41,43,44
Boundaries
- North
- PLOT OF Mr SADASHIV CHAVHAN
- South
- Plot Of Chitamani Lagade Andnikalje
- East
- Small Road Plot 101
- West
- Road 6 Meter
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking20 units
20 units registered
| Type | Carpet area | Units |
|---|---|---|
| — | — | 20 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Ajit Thakur | — |
| Architect | Sudesh Ashok Kulange | — |
| Chartered accountant | Kaustubh Gore | — |
| Chartered accountant | prashantsing MOHANSING PARDESHI | — |
| Engineer | Atul Bharat Suryawanshi | — |
Source: MahaRERA project page. Contact details are not shown.