Others · 3 buildings · 406 unitsRERA P52100076759

18 Altitude

Deedo IDDP-PUN-KFCT

It is due for completion in Dec 2031, with no extension on record; no MahaRERA orders on record; 10% of its units are booked.

Chinchwad, Pune 411033 · Property rates in Chinchwad · by Gdsquare Infra Llp

DeliveryDue Dec 2031No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales10% booked39 of 406 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

It is due for completion in Dec 2031, with no extension on record

  • This projectRegistered 28 Jun 2024, completion promised 31 Dec 2031.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

3 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100076759
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210007675928 Jun 202431 Dec 203129 Apr 2030Gdsquare Infra LLPProject page
Documents164

2 documents held by Deedo, 162 filings listed on MahaRERA's project page

Registration certificate (2)

Finance

  • PAN CardGDSquare Infra LLP PAN.pdf · uploaded 2 Apr 2024Source
  • Other – FinanceFINANCE.pdf · uploaded 5 Jun 2024Source

Legal

  • Declaration Form BGD FORM B.pdf · uploaded 13 May 2024Source
  • Other – LegalPOA ASHOK SATHE.pdf · uploaded 5 Jun 2024Source
  • Other – LegalPOA Murlidhar L Sathe.pdf · uploaded 5 Jun 2024Source
  • Other – LegalPOA.pdf · uploaded 5 Jun 2024Source
Show all 164 documentsShow fewer documents

Legal

  • Other – LegalDocument 413.pdf · uploaded 10 Jun 2024Source
  • Legal Title reportsearch report 1_11zon.pdf · uploaded 10 Jun 2024Source

Migrated

  • 1 PAN CardGDSquare Infra LLP PAN.pdf · uploaded 2 Apr 2024Source
  • 1 Copy of Layout Approval (in case of layout)CHINCHWAD.pdf · uploaded 2 Apr 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentCHINCHWAD CC.pdf · uploaded 2 Apr 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in other Real Estate Organizations.pdf · uploaded 2 Apr 2024Source
  • 1 Deviation Report with respect to Allotment letterdeviation report of allotment letter.pdf · uploaded 2 Apr 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentA.pdf · uploaded 27 Apr 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentScan 2024-3-15 (2,56,44)_11zon.pdf · uploaded 27 Apr 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentScan 2024-3-15 (3,0,58)_11zon.pdf · uploaded 27 Apr 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentScan 2024-3-15 (3,1,37)_11zon.pdf · uploaded 27 Apr 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentScan 2024-3-15 (3,2,17)_11zon.pdf · uploaded 27 Apr 2024Source
  • 6 Building Plan Approval / NA Order for plotted developmentScan 2024-3-15 (3,3,4)_11zon.pdf · uploaded 27 Apr 2024Source
  • 1 Proforma of Allotment letterDocument 365.pdf · uploaded 2 May 2024Source
  • 1 Declaration in FORM BGD FORM B.pdf · uploaded 13 May 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM1.pdf · uploaded 13 May 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 13 May 2024Source
  • 1 Proforma of Agreement for sale18 Altitude Agreement Draft.pdf · uploaded 13 May 2024Source
  • 1 Declaration about Commencement CertificateCC.pdf · uploaded 14 May 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3_11zon.pdf · uploaded 14 May 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBANK ACCOUNT.pdf · uploaded 14 May 2024Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report.pdf · uploaded 14 May 2024Source
  • 1 Other – TechnicalANNEXURE A.pdf · uploaded 15 May 2024Source
  • 1 Other – LegalPOA ASHOK SATHE.pdf · uploaded 5 Jun 2024Source
  • 2 Other – LegalPOA Murlidhar L Sathe.pdf · uploaded 5 Jun 2024Source
  • 3 Other – LegalPOA.pdf · uploaded 5 Jun 2024Source
  • 1 Other – FinanceFINANCE.pdf · uploaded 5 Jun 2024Source
  • 1 Copy of the legal title reportsearch report 1_11zon.pdf · uploaded 10 Jun 2024Source
  • 1 a Details of encumbrances concerned to FinanceDocument 413_merged.pdf · uploaded 10 Jun 2024Source
  • 1 b Details of encumbrances concerned to LegalDocument 413_merged.pdf · uploaded 10 Jun 2024Source
  • 4 Other – LegalDocument 413.pdf · uploaded 10 Jun 2024Source
  • 1 CERSAI detailsCERSAI REPORT.pdf · uploaded 26 Jun 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 11 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 11 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 11 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 11 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 11 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 11 Oct 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 28 Nov 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 28 Nov 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 28 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)1.pdf · uploaded 1 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)3.pdf · uploaded 1 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)2.pdf · uploaded 1 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)31 03 2025.pdf · uploaded 23 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 31 03 2025.pdf · uploaded 23 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)31 03 2025.pdf · uploaded 23 Apr 2025Source
  • Withdrawal Update Form 130 06 2025.pdf · uploaded 22 Jul 2025Source
  • Withdrawal Update Form 130 06 2025.pdf · uploaded 22 Jul 2025Source
  • Withdrawal Update Form 130 06 2025.pdf · uploaded 22 Jul 2025Source
  • Withdrawal Update Form 130 06 2025.pdf · uploaded 22 Jul 2025Source
  • Withdrawal Update Form 130 06 2025.pdf · uploaded 22 Jul 2025Source
  • Withdrawal Update Form 230 06 2025.pdf · uploaded 22 Jul 2025Source
  • Withdrawal Update Form 230 06 2025.pdf · uploaded 22 Jul 2025Source
  • Withdrawal Update Form 230 06 2025.pdf · uploaded 22 Jul 2025Source
  • Withdrawal Update Form 230 06 2025.pdf · uploaded 22 Jul 2025Source
  • Withdrawal Update Form 230 06 2025.pdf · uploaded 22 Jul 2025Source
  • Withdrawal Update Form 3FORM 30 06 2025.pdf · uploaded 22 Jul 2025Source
  • Withdrawal Update Form 3FORM 30 06 2025.pdf · uploaded 22 Jul 2025Source
  • Withdrawal Update Form 3FORM 30 06 2025.pdf · uploaded 22 Jul 2025Source
  • Withdrawal Update Form 3FORM 30 06 2025.pdf · uploaded 22 Jul 2025Source
  • Withdrawal Update Form 3FORM 30 06 2025.pdf · uploaded 22 Jul 2025Source
  • Form 130 06 24.pdf · uploaded 30 Jul 2025Source
  • Form 130 09 2024.pdf · uploaded 30 Jul 2025Source
  • Form 131 12 2024.pdf · uploaded 30 Jul 2025Source
  • Form 131 03 2025.pdf · uploaded 30 Jul 2025Source
  • Form 230 06 2024.pdf · uploaded 30 Jul 2025Source
  • Form 230 09 2024.pdf · uploaded 30 Jul 2025Source
  • Form 231 12 2024.pdf · uploaded 30 Jul 2025Source
  • Form 231 03 2025.pdf · uploaded 30 Jul 2025Source
  • Form 3FORM 3 30 06 2024.pdf · uploaded 30 Jul 2025Source
  • Form 3FORM 3 30 09 2024.pdf · uploaded 30 Jul 2025Source
  • Form 3FORM 3 31 12 2024.pdf · uploaded 30 Jul 2025Source
  • Form 3FORM 3 31 03 2025.pdf · uploaded 30 Jul 2025Source
  • Disclosure of Sold and Booked Inventory30 6 24.pdf · uploaded 30 Jul 2025Source
  • Disclosure of Sold and Booked Inventory30 9 24.pdf · uploaded 30 Jul 2025Source
  • Disclosure of Sold and Booked Inventory31 12 24.pdf · uploaded 30 Jul 2025Source
  • Disclosure of Sold and Booked Inventory31 3 25.pdf · uploaded 30 Jul 2025Source
  • Form 5 (FY 2024-2025)FORM 5 31 3 25.pdf · uploaded 20 Aug 2025Source
  • Form 2A (FY 2024-2025)28 6 25 31 3 2025.pdf · uploaded 13 Oct 2025Source
  • Form 2A (FY 2025-2026)2025 2026.pdf · uploaded 13 Oct 2025Source
  • Withdrawal Update Form 130 09 2025.pdf · uploaded 21 Oct 2025Source
  • Withdrawal Update Form 130 09 2025.pdf · uploaded 21 Oct 2025Source
  • Withdrawal Update Form 230 09 2025.pdf · uploaded 21 Oct 2025Source
  • Withdrawal Update Form 230 09 2025.pdf · uploaded 21 Oct 2025Source
  • Withdrawal Update Form 3FORM 3 30 09 2025.pdf · uploaded 21 Oct 2025Source
  • Withdrawal Update Form 3FORM 3 30 09 2025.pdf · uploaded 21 Oct 2025Source
  • Withdrawal Update Form 131 12 2025.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 231 12 2025.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 3FORM 3 31 12 2025.pdf · uploaded 13 Jan 2026Source
  • Form 5 (FY 2025-2026)01 04 2025 31 03 2026.pdf · uploaded 15 Apr 2026Source
  • Withdrawal Update Form 131 03 2026.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 231 03 2026.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 3FORM 3 31 03 2026.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 130 06 2026.pdf · uploaded 13 Jul 2026Source
  • Withdrawal Update Form 230 06 2026.pdf · uploaded 13 Jul 2026Source
  • Withdrawal Update Form 3FORM 3 30 06 2026.pdf · uploaded 13 Jul 2026Source

Technical

  • DocumentCHINCHWAD.pdf · uploaded 2 Apr 2024Source
  • DocumentScan 2024-3-15 (3,1,37)_11zon.pdf · uploaded 27 Apr 2024Source
  • DocumentScan 2024-3-15 (3,2,17)_11zon.pdf · uploaded 27 Apr 2024Source
  • DocumentScan 2024-3-15 (3,3,4)_11zon.pdf · uploaded 27 Apr 2024Source
  • DocumentScan 2024-3-15 (2,56,44)_11zon.pdf · uploaded 27 Apr 2024Source
  • DocumentScan 2024-3-15 (3,0,58)_11zon.pdf · uploaded 27 Apr 2024Source
  • DocumentA.pdf · uploaded 27 Apr 2024Source
  • Other – TechnicalANNEXURE A.pdf · uploaded 15 May 2024Source
  • DocumentA Wing.pdf · uploaded 28 Jul 2025Source
  • DocumentB 1.pdf · uploaded 28 Jul 2025Source
  • DocumentB 2 3.pdf · uploaded 28 Jul 2025Source
  • DocumentB 4 5 8.pdf · uploaded 28 Jul 2025Source
  • DocumentB 9.pdf · uploaded 28 Jul 2025Source
  • DocumentC 6 7 8.pdf · uploaded 28 Jul 2025Source
  • DocumentC 9.pdf · uploaded 28 Jul 2025Source
  • DocumentC Mezzanine & 1 2 3 4 5.pdf · uploaded 28 Jul 2025Source
  • DocumentC Shop.pdf · uploaded 28 Jul 2025Source
  • DocumentIOD.pdf · uploaded 28 Jul 2025Source
  • Document1.pdf · uploaded 20 Oct 2025Source
  • Document2.pdf · uploaded 20 Oct 2025Source
  • Document3.pdf · uploaded 20 Oct 2025Source
  • Document4.pdf · uploaded 20 Oct 2025Source
  • Document5.pdf · uploaded 20 Oct 2025Source
  • Document6.pdf · uploaded 20 Oct 2025Source
  • Document7.pdf · uploaded 20 Oct 2025Source
  • Document8.pdf · uploaded 20 Oct 2025Source
  • Document9.pdf · uploaded 20 Oct 2025Source
  • Document10.pdf · uploaded 20 Oct 2025Source
  • Document11.pdf · uploaded 20 Oct 2025Source
  • Document12.pdf · uploaded 20 Oct 2025Source
  • Document13.pdf · uploaded 20 Oct 2025Source
  • Document14.pdf · uploaded 20 Oct 2025Source
  • Document1.pdf · uploaded 3 Sep 2026Source
  • Document2.pdf · uploaded 3 Sep 2026Source
  • Document3.pdf · uploaded 3 Sep 2026Source
  • Document4.pdf · uploaded 3 Sep 2026Source
  • Document5.pdf · uploaded 3 Sep 2026Source
  • Document6.pdf · uploaded 3 Sep 2026Source
  • Document7.pdf · uploaded 3 Sep 2026Source
  • Document8.pdf · uploaded 3 Sep 2026Source
  • Document9.pdf · uploaded 3 Sep 2026Source
  • Document10.pdf · uploaded 3 Sep 2026Source
  • Document11.pdf · uploaded 3 Sep 2026Source
  • Document12.pdf · uploaded 3 Sep 2026Source
  • Document13.pdf · uploaded 3 Sep 2026Source
  • Document14.pdf · uploaded 3 Sep 2026Source
  • DocumentCommencement dated.pdf · uploaded 3 Sep 2026Source

Technical (Architect)

  • DocumentFORM 1.pdf · uploaded 11 Oct 2024Source
  • DocumentFORM 1.pdf · uploaded 11 Oct 2024Source
  • DocumentFORM 1.pdf · uploaded 28 Nov 2024Source
  • Document1.pdf · uploaded 1 Feb 2025Source
  • Document31 03 2025.pdf · uploaded 23 Apr 2025Source
  • Document30 06 2026.pdf · uploaded 13 Jul 2026Source

Technical (Engineer)

  • DocumentFORM 2.pdf · uploaded 11 Oct 2024Source
  • DocumentFORM 2.pdf · uploaded 11 Oct 2024Source
  • DocumentFORM 2.pdf · uploaded 28 Nov 2024Source
  • Document2.pdf · uploaded 1 Feb 2025Source
  • Document31 03 2025.pdf · uploaded 23 Apr 2025Source
  • Document30 06 2026.pdf · uploaded 13 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 13/2(P), 13/3(P)

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
—406 units in all
Address
13/2(P), 13/3(P), CTS No 2011 (P), 18 ALTITUDE, CHINCHWADPIN 411033
Village
Chinchwad, Mulshi taluka
Land area for this project
14,100 sq m (1,51,771 sq ft)
Permissible built-up area
36,978 sq m (3,98,032 sq ft)
Sanctioned built-up area
36,978 sq m (3,98,032 sq ft)
Recreational open space
1,214 sq m (13,065 sq ft)
Designated bank account
76
Developed in phases
Yes

Survey, CTS, gat or plot numbers

13/2(P)13/3(P)CTS No 2011 (P)

Land as published on MahaRERA's project page

13/2(P) , 13/3(P), CTS No 2011 (P)

Boundaries

North
Dp Road
South
Open Plot
East
Open Plot
West
Non Dp Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking406 units

406 units registered

— · 406 units
BuildingTypeCarpet areaUnits
Wing A——10
Wing B——230
Wing C——166

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals7

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSonali U Patil—
Chartered accountantMohmedyasir A Bagwan—
Chartered accountantVinit D Achha—
EngineerKaustubh Dhanaji Pawar—
EngineerVaishnavi Sidharam Patil—
OtherArvind Kumar—
Registered real estate agentHomesca Realtors Private Limited—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Chinchwad

All 13 projects in Chinchwad · Compare 18 Altitude with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology