Aishwaryam One Moshi
Deedo IDDP-PUN-AMQXIt is due for completion in Dec 2027, with no extension on record; no MahaRERA orders on record.
Chikhali, Pune 412114 · Property rates in Chikhali · by Sai Essen Developers · 40% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
It is due for completion in Dec 2027, with no extension on record
- This projectRegistered 21 Nov 2023, completion promised 31 Dec 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Nov 2026
- Primary sale · Nov 2026
- Primary sale · Nov 2026
- Primary sale · Oct 2026
- Primary sale · Oct 2026
- Primary sale · Oct 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Nov 2026 | Main building · 19 | Primary sale | 230 sq ft | View Primary sale, Nov 2026 | |
| Nov 2026 | Main building · 5 | Primary sale | 206 sq ft | View Primary sale, Nov 2026 | |
| Nov 2026 | Main building · 36 | Primary sale | 426 sq ft | View Primary sale, Nov 2026 | |
| Oct 2026 | Main building · 8 | Primary sale | 204 sq ft | View Primary sale, Oct 2026 | |
| Oct 2026 | Main building · 1 | Primary sale | 406 sq ft | View Primary sale, Oct 2026 | |
| Oct 2026 | Main building · 17 | Primary sale | 371 sq ft | View Primary sale, Oct 2026 | |
| Sep 2026 | Building A · 13 | Primary sale | 251 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Building A · 2 | Primary sale | 381 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Building A · 8 | Primary sale | 322 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Building A · 3 | Primary sale | 380 sq ft | View Primary sale, Sep 2026 |
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100053655
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100053655 | 21 Nov 2023 | 31 Dec 2027 | 31 Dec 2027 | Sai Essen Developers | Project page |
Documents166
1 document held by Deedo, 165 filings listed on MahaRERA's project page
Finance
Show all 166 documentsShow fewer documents
Legal
Migrated
- 1 PAN Card01 SED PANCARD.pdf · uploaded 29 Sep 2023Source
- 1 Copy of the legal title report02 LEGAL TITLE REPORT.pdf · uploaded 29 Sep 2023Source
- 1 Building Plan Approval / NA Order for plotted development06 A NA ORDER.pdf · uploaded 29 Sep 2023Source
- 1 Commencement Certificates / NA Order for plotted development07 COMMENCEMENT CERTIFICATE.pdf · uploaded 29 Sep 2023Source
- 1 Declaration about Commencement Certificate08 DECLARATION ABOUT COMMENMENT CERRIFICATE.pdf · uploaded 29 Sep 2023Source
- 1 Declaration in FORM B09 DECLARATION FORM B.pdf · uploaded 29 Sep 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)10 FORM 1.pdf · uploaded 29 Sep 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)11 FORM 2.pdf · uploaded 29 Sep 2023Source
- 1 CERSAI details16 CERSAI.pdf · uploaded 29 Sep 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)17 FORM 3.pdf · uploaded 29 Sep 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclouser narendra sir.pdf · uploaded 29 Sep 2023Source
- 2 Disclosure of Interest in Other Real Estate Organizationsdisclouser of ashok mane.pdf · uploaded 29 Sep 2023Source
- 3 Disclosure of Interest in Other Real Estate Organizationsdisclouser of deepak mane.pdf · uploaded 29 Sep 2023Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsDisclouser of surendra sir.pdf · uploaded 29 Sep 2023Source
- 5 Disclosure of Interest in Other Real Estate OrganizationsDisclouser satish sir.pdf · uploaded 29 Sep 2023Source
- 6 Disclosure of Interest in Other Real Estate Organizationsdiscoluser Nitin bhimsen.pdf · uploaded 29 Sep 2023Source
- 1 Proforma of Allotment letter24 ALLOTMENT LETTER.pdf · uploaded 29 Sep 2023Source
- 1 Proforma of Agreement for sale23 AGREEMENT TO SALE Aishwaryam One Moshi.pdf · uploaded 29 Sep 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same34 BANK ACCOUNT DETAILS (FROMAT A).pdf · uploaded 29 Sep 2023Source
- 1 Deviation Report with respect to Allotment letter35 DEVIATION REPORT TO ALLOTMENT LETTER.pdf · uploaded 29 Sep 2023Source
- 1 Deviation Report with respect to model copy of Agreement36 A DEVIATION REPORT COPY OF AGREEMENT-1-6.pdf · uploaded 29 Sep 2023Source
- 1 a Details of encumbrances concerned to Finance03 FINANCIAL ENCUMBRANCES.pdf · uploaded 6 Oct 2023Source
- 2 a Details of encumbrances concerned to Finance04 LEGAL ENCUMBRANCE.pdf · uploaded 6 Oct 2023Source
- 1 b Details of encumbrances concerned to Legal03 FINANCIAL ENCUMBRANCES.pdf · uploaded 6 Oct 2023Source
- 2 b Details of encumbrances concerned to Legal04 LEGAL ENCUMBRANCE.pdf · uploaded 6 Oct 2023Source
- 2 Deviation Report with respect to model copy of Agreement36 B DEVIATION REPORT COPY OF AGREEMENT-7-13.pdf · uploaded 6 Oct 2023Source
- 1 Copy of Layout Approval (in case of layout)05 IOD PLAN compressed.pdf · uploaded 12 Oct 2023Source
- 2 Building Plan Approval / NA Order for plotted development01 LAYOUT compressed.pdf · uploaded 12 Oct 2023Source
- 3 Building Plan Approval / NA Order for plotted development02 UPPER GROUND FLOOR PLAN.pdf · uploaded 20 Oct 2023Source
- 4 Building Plan Approval / NA Order for plotted development03 LOWER GROUND FLOOR.pdf · uploaded 20 Oct 2023Source
- 5 Building Plan Approval / NA Order for plotted development04 FIRST FLOOR PLAN.pdf · uploaded 20 Oct 2023Source
- 6 Building Plan Approval / NA Order for plotted development05 SECOND FLOOR.pdf · uploaded 20 Oct 2023Source
- 7 Building Plan Approval / NA Order for plotted development06 THIRD FLOOR PLAN.pdf · uploaded 20 Oct 2023Source
- 8 Building Plan Approval / NA Order for plotted development07 FOURTH FLOOR PLAN.pdf · uploaded 20 Oct 2023Source
- 9 Building Plan Approval / NA Order for plotted development08 FIFTH FLOOR PLAN.pdf · uploaded 20 Oct 2023Source
- 10 Building Plan Approval / NA Order for plotted development09 SIXTH FLOOR FPLAN.pdf · uploaded 20 Oct 2023Source
- 11 Building Plan Approval / NA Order for plotted development10 SEVENTH FLOOR PLAN.pdf · uploaded 20 Oct 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 31-12-2023.pdf · uploaded 19 Jan 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 (Q3-OCT-DEC)2023.pdf · uploaded 19 Jan 2024Source
- 1 Disclosure of sold/ booked inventory(Q3 2023-24) DISCOLSURE OF SOLD BOOKED INVENTORY.pdf · uploaded 19 Jan 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 (Q-3 2023-24).pdf · uploaded 19 Jan 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 (Q4-2023-24).pdf · uploaded 13 Apr 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 (Q4-2023-23) Aishwaryam One Moshi,.pdf · uploaded 19 Apr 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 (Q4-2023-24) ONE MOSHI compressed.pdf · uploaded 20 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 2024.pdf · uploaded 29 Apr 2024Source
- 2 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD UNSOLD (Q1 2024-25) AISH ONE.pdf · uploaded 10 Jul 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Q1(2024-25) APRIL- JUNE AISH ONE MOSHI.pdf · uploaded 19 Jul 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Q1(2024-25) AISH ONE MOSHI.pdf · uploaded 19 Jul 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Q1(2024-25) APRIL-JUNE ONE MOSHI.pdf · uploaded 20 Jul 2024Source
- 1 a Details of encumbrances concerned to FinanceFINANCE ENCUMBRANCE (1).pdf · uploaded 9 Oct 2024Source
- 1 b Details of encumbrances concerned to LegalFINANCE ENCUMBRANCE (1).pdf · uploaded 9 Oct 2024Source
- 1 Other – FinanceMortgage Deed STCI 163-2024 dated 02-01-2024 scan_20240102_192857_c-5.pdf · uploaded 9 Oct 2024Source
- 2 Other – FinanceSanction Letter Signed Aishwaryam One Moshi scan_20240102_142634_c_compressed.pdf · uploaded 9 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Q2 2024-25) July- sept Aish one moshi.pdf · uploaded 18 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Q2 2024-25) JULY - SEPT AISH ONE MOSHI.pdf · uploaded 18 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)AISH ONE MOSHI.pdf · uploaded 19 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryAish one moshi.pdf · uploaded 19 Oct 2024Source
- 1 CERSAI detailsCERSAI Search Report.pdf · uploaded 2 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Q3 OCT-DEC 2024 ONE MOSHI.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Q3 OCT-DEC 2024 ONE MOSHI.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Q3 OCT-DEC 2024 ONE MOSHI.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySold booked inventory ONE MOSHI.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Q4 JAN-MARCH 2025 AISH ONE MOSHI.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Q4 JAN-MARCH 2025 ONE MOSHI.pdf · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySOLD BOOKED INVENTORY Q4- JAN-MARCH 2025 GAURAV ONE MOSHI.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 JAN-MARCH 2025 ONE MOSHI.pdf · uploaded 20 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 2025 ONE MOSHI.pdf · uploaded 21 Apr 2025Source
- Form 1FORM 1 Q4 JAN-MARCH 2025 AISH ONE MOSHI.pdf · uploaded 18 Aug 2025Source
- Form 2FORM 2 Q4 JAN-MARCH 2025 ONE MOSHI.pdf · uploaded 18 Aug 2025Source
- Form 3FORM 3 JAN-MARCH 2025 ONE MOSHI.pdf · uploaded 18 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD BOOKED INVENTORY Q4- JAN-MARCH 2025 GAURAV ONE MOSHI.pdf · uploaded 18 Aug 2025Source
- Form 16 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 19 Aug 2025Source
- Form 15 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 19 Aug 2025Source
- Form 14 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 19 Aug 2025Source
- Form 26 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 19 Aug 2025Source
- Form 25 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 19 Aug 2025Source
- Form 24 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 19 Aug 2025Source
- Form 36 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf · uploaded 19 Aug 2025Source
- Form 35 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf · uploaded 19 Aug 2025Source
- Form 34 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf · uploaded 19 Aug 2025Source
- Disclosure of Sold and Booked Inventory4 Disclosure of sold_ booked inventory.pdf · uploaded 19 Aug 2025Source
- Disclosure of Sold and Booked Inventory3 Disclosure of sold_ booked inventory.pdf · uploaded 19 Aug 2025Source
- Disclosure of Sold and Booked Inventory2 Disclosure of sold_ booked inventory.pdf · uploaded 19 Aug 2025Source
- Withdrawal Update Form 1One Moshi Form 1 June 25.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 2One Moshi Form 2 June 25 RERA.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 3One Moshi Form 3 June 25 (1).pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 1One moshi form sep - 25.pdf · uploaded 25 Oct 2025Source
- Withdrawal Update Form 2One moshi form 2 sep-25.pdf · uploaded 25 Oct 2025Source
- Withdrawal Update Form 3One moshi form 3 september - 2025.pdf · uploaded 25 Oct 2025Source
- Withdrawal Update Form 1One Moshi form 1 dec.pdf · uploaded 8 Feb 2026Source
- Withdrawal Update Form 1One Moshi form 1 dec.pdf · uploaded 8 Feb 2026Source
- Withdrawal Update Form 2One moshi form 2 sep-25.pdf · uploaded 8 Feb 2026Source
- Withdrawal Update Form 2One moshi form 2 Dec.pdf · uploaded 8 Feb 2026Source
- Withdrawal Update Form 3One moshi form 3 Dec.pdf · uploaded 8 Feb 2026Source
- Withdrawal Update Form 3One moshi form 3 Dec.pdf · uploaded 8 Feb 2026Source
- Form 5 (FY 2024-2025)Form 5 one Moshi Signed.pdf · uploaded 13 Feb 2026Source
- Form 2A (FY 2024-2025)form2a One Moshi.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 1One Moshi form 1.pdf · uploaded 24 Apr 2026Source
- Withdrawal Update Form 2One moshi form 2.pdf · uploaded 24 Apr 2026Source
- Withdrawal Update Form 3One Moshi form 3 March.pdf · uploaded 24 Apr 2026Source
- Withdrawal Update Form 1One Moshi June form 1.pdf · uploaded 17 Jul 2026Source
- Withdrawal Update Form 2One Moshi June form 2.pdf · uploaded 17 Jul 2026Source
- Withdrawal Update Form 3One Moshi June form 3.pdf · uploaded 17 Jul 2026Source
- Form 5 (FY 2025-2026)Form 5.pdf · uploaded 10 Sep 2026Source
- Form 2A (FY 2025-2026)Form 2A.pdf · uploaded 22 Sep 2026Source
Technical
- Document06 A NA ORDER.pdf · uploaded 29 Sep 2023Source
- Document05 IOD PLAN compressed.pdf · uploaded 12 Oct 2023Source
- Document01 LAYOUT compressed.pdf · uploaded 12 Oct 2023Source
- Document02 UPPER GROUND FLOOR PLAN.pdf · uploaded 20 Oct 2023Source
- Document03 LOWER GROUND FLOOR.pdf · uploaded 20 Oct 2023Source
- Document04 FIRST FLOOR PLAN.pdf · uploaded 20 Oct 2023Source
- Document05 SECOND FLOOR.pdf · uploaded 20 Oct 2023Source
- Document06 THIRD FLOOR PLAN.pdf · uploaded 20 Oct 2023Source
- Document07 FOURTH FLOOR PLAN.pdf · uploaded 20 Oct 2023Source
- Document08 FIFTH FLOOR PLAN.pdf · uploaded 20 Oct 2023Source
- Document09 SIXTH FLOOR FPLAN.pdf · uploaded 20 Oct 2023Source
- Document10 SEVENTH FLOOR PLAN.pdf · uploaded 20 Oct 2023Source
- DocumentLayout.pdf · uploaded 12 Jan 2026Source
- DocumentSanctioned plan 5.pdf · uploaded 12 Jan 2026Source
- DocumentSanctioned plan 2.pdf · uploaded 12 Jan 2026Source
- DocumentSanctioned plan 3.pdf · uploaded 12 Jan 2026Source
- DocumentSanctioned plan 4.pdf · uploaded 12 Jan 2026Source
- DocumentSanctioned plan 6.pdf · uploaded 12 Jan 2026Source
- DocumentSanctioned plan 7.pdf · uploaded 12 Jan 2026Source
- DocumentSanctioned plan 8.pdf · uploaded 12 Jan 2026Source
- DocumentSanctioned plan 9.pdf · uploaded 12 Jan 2026Source
- DocumentSanctioned plan 10.pdf · uploaded 12 Jan 2026Source
- DocumentSanctioned plan 11.pdf · uploaded 12 Jan 2026Source
- DocumentSanctioned plan 12.pdf · uploaded 12 Jan 2026Source
- DocumentSanctioned plan 13.pdf · uploaded 12 Jan 2026Source
- DocumentSanctioned plan 14.pdf · uploaded 12 Jan 2026Source
- DocumentSanctioned plan 15.pdf · uploaded 12 Jan 2026Source
- DocumentSanctioned plan 2.pdf · uploaded 1 Apr 2026Source
- DocumentSanctioned plan 3.pdf · uploaded 1 Apr 2026Source
- DocumentSanctioned plan 4.pdf · uploaded 1 Apr 2026Source
- DocumentSanctioned plan 5.pdf · uploaded 1 Apr 2026Source
- DocumentSanctioned plan 6.pdf · uploaded 1 Apr 2026Source
- DocumentSanctioned plan 7.pdf · uploaded 1 Apr 2026Source
- DocumentSanctioned plan 8.pdf · uploaded 1 Apr 2026Source
- DocumentSanctioned plan 9.pdf · uploaded 1 Apr 2026Source
- DocumentSanctioned plan 10.pdf · uploaded 1 Apr 2026Source
- DocumentSanctioned plan 11.pdf · uploaded 1 Apr 2026Source
- DocumentSanctioned plan 12.pdf · uploaded 1 Apr 2026Source
- DocumentSanctioned plan 13.pdf · uploaded 1 Apr 2026Source
- DocumentSanctioned plan 14.pdf · uploaded 1 Apr 2026Source
- DocumentSanctioned plan 15.pdf · uploaded 1 Apr 2026Source
- DocumentHighlighted Layout.pdf · uploaded 13 Jul 2026Source
Technical (Architect)
- DocumentFORM 1 Q2 2024-25) July- sept Aish one moshi.pdf · uploaded 18 Oct 2024Source
- DocumentFORM 1 Q3 OCT-DEC 2024 ONE MOSHI.pdf · uploaded 20 Jan 2025Source
- DocumentFORM 1 Q4 JAN-MARCH 2025 AISH ONE MOSHI.pdf · uploaded 19 Apr 2025Source
- DocumentOne Moshi June form 1.pdf · uploaded 17 Jul 2026Source
Technical (Engineer)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel G. No 72/1P of Mouje-Chikhali
As registered with MahaRERA and published on its project page
- Project type
- Commercial
- Status on MahaRERA
- Certificate Signed
- Unit types
- Banquet, Box ofc and back ofc, Food court, Food stall, Game zone, Restaurant, Room, Screen, Shop197 units in all
- Address
- Gat No 72(P), Near Snbp International School, Moshi, ChikhaliPIN 412114
- Village
- Chikhali, Haveli taluka
- Location
- 18.68499, 73.83227
- Land area for this project
- 7,500 sq m (80,729 sq ft)
- Permissible built-up area
- 21,600 sq m (2,32,500 sq ft)
- Sanctioned built-up area
- 20,921 sq m (2,25,196 sq ft)
- Recreational open space
- 750 sq m (8,073 sq ft)
- Designated bank account
- 76
- Developed in phases
- No
- Also registered as
- Aishvaryam Van Moshi, ऐश्वर्यम वन मोशी
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
G. No 72/1P of Mouje-Chikhali
Boundaries
- North
- Gat No 94p-Aishwaryam Hamara Phase I
- South
- 24 Mtr Wide Dp Road
- East
- Part Of Gat No 72
- West
- Gat No 94p
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking197 units
10 of 197 units booked (5%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Banquet | 557.93 sq m · 6,006 sq ft | 1 | 0 |
| Banquet | 582.35 sq m · 6,268 sq ft | 1 | 0 |
| Banquet | 783.49 sq m · 8,433 sq ft | 1 | 0 |
| Box ofc and back ofc | 59.04 sq m · 636 sq ft | 1 | 0 |
| Food court | 641.79 sq m · 6,908 sq ft | 1 | 0 |
| Food court | 778.39 sq m · 8,379 sq ft | 1 | 0 |
| Food stall | 48.28 sq m · 520 sq ft | 6 | 0 |
| Food stall | 48.75 sq m · 525 sq ft | 3 | 0 |
Show all 98 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Food stall | 58.25 sq m · 627 sq ft | 2 | 0 |
| Food stall | 59.48 sq m · 640 sq ft | 1 | 0 |
| Food stall | 88.3 sq m · 950 sq ft | 1 | 0 |
| Game zone | 938.71 sq m · 10,104 sq ft | 1 | 0 |
| Restaurant | 299.25 sq m · 3,221 sq ft | 1 | 0 |
| Restaurant | 308.4 sq m · 3,320 sq ft | 1 | 0 |
| Restaurant | 345.62 sq m · 3,720 sq ft | 1 | 0 |
| Room | 27.25 sq m · 293 sq ft | 4 | 0 |
| Room | 28.58 sq m · 308 sq ft | 6 | 0 |
| Room | 29.3 sq m · 315 sq ft | 12 | 0 |
| Room | 30.67 sq m · 330 sq ft | 16 | 0 |
| Room | 30.68 sq m · 330 sq ft | 4 | 0 |
| Room | 30.71 sq m · 331 sq ft | 4 | 0 |
| Room | 31.28 sq m · 337 sq ft | 6 | 0 |
| Room | 34.41 sq m · 370 sq ft | 4 | 0 |
| Room | 50.35 sq m · 542 sq ft | 2 | 0 |
| Room | 68.41 sq m · 736 sq ft | 2 | 0 |
| Screen | 265.75 sq m · 2,861 sq ft | 1 | 0 |
| Screen | 303.62 sq m · 3,268 sq ft | 1 | 0 |
| Screen | 317.68 sq m · 3,419 sq ft | 1 | 0 |
| Screen | 324.64 sq m · 3,494 sq ft | 1 | 0 |
| Screen | 324.76 sq m · 3,496 sq ft | 1 | 0 |
| Shop | 17.33 sq m · 187 sq ft | 1 | 0 |
| Shop | 21.17 sq m · 228 sq ft | 2 | 0 |
| Shop | 25.76 sq m · 277 sq ft | 6 | 0 |
| Shop | 26.08 sq m · 281 sq ft | 2 | 1 |
| Shop | 26.35 sq m · 284 sq ft | 1 | 0 |
| Shop | 26.36 sq m · 284 sq ft | 3 | 0 |
| Shop | 26.79 sq m · 288 sq ft | 1 | 0 |
| Shop | 27.69 sq m · 298 sq ft | 1 | 0 |
| Shop | 27.85 sq m · 300 sq ft | 3 | 0 |
| Shop | 28.33 sq m · 305 sq ft | 2 | 2 |
| Shop | 28.68 sq m · 309 sq ft | 2 | 1 |
| Shop | 28.72 sq m · 309 sq ft | 1 | 0 |
| Shop | 29.32 sq m · 316 sq ft | 2 | 0 |
| Shop | 29.49 sq m · 317 sq ft | 1 | 0 |
| Shop | 29.68 sq m · 319 sq ft | 1 | 0 |
| Shop | 31.03 sq m · 334 sq ft | 1 | 0 |
| Shop | 31.3 sq m · 337 sq ft | 1 | 1 |
| Shop | 31.35 sq m · 337 sq ft | 2 | 2 |
| Shop | 32.89 sq m · 354 sq ft | 1 | 0 |
| Shop | 33.78 sq m · 364 sq ft | 2 | 0 |
| Shop | 33.8 sq m · 364 sq ft | 1 | 0 |
| Shop | 34.02 sq m · 366 sq ft | 5 | 1 |
| Shop | 34.06 sq m · 367 sq ft | 1 | 1 |
| Shop | 35.3 sq m · 380 sq ft | 4 | 0 |
| Shop | 36.06 sq m · 388 sq ft | 1 | 0 |
| Shop | 36.18 sq m · 389 sq ft | 3 | 0 |
| Shop | 36.33 sq m · 391 sq ft | 1 | 0 |
| Shop | 36.4 sq m · 392 sq ft | 2 | 0 |
| Shop | 36.45 sq m · 392 sq ft | 2 | 0 |
| Shop | 36.48 sq m · 393 sq ft | 1 | 0 |
| Shop | 36.57 sq m · 394 sq ft | 1 | 0 |
| Shop | 37.94 sq m · 408 sq ft | 2 | 0 |
| Shop | 37.98 sq m · 409 sq ft | 1 | 0 |
| Shop | 37.98 sq m · 409 sq ft | 1 | 0 |
| Shop | 38.02 sq m · 409 sq ft | 1 | 0 |
| Shop | 38.02 sq m · 409 sq ft | 1 | 0 |
| Shop | 38.89 sq m · 419 sq ft | 1 | 0 |
| Shop | 39.38 sq m · 424 sq ft | 3 | 0 |
| Shop | 40.09 sq m · 432 sq ft | 1 | 0 |
| Shop | 40.2 sq m · 433 sq ft | 1 | 0 |
| Shop | 40.73 sq m · 438 sq ft | 2 | 0 |
| Shop | 41.28 sq m · 444 sq ft | 2 | 0 |
| Shop | 41.28 sq m · 444 sq ft | 2 | 0 |
| Shop | 42.33 sq m · 456 sq ft | 1 | 0 |
| Shop | 44.2 sq m · 476 sq ft | 2 | 0 |
| Shop | 44.58 sq m · 480 sq ft | 1 | 0 |
| Shop | 46.78 sq m · 504 sq ft | 3 | 0 |
| Shop | 47.1 sq m · 507 sq ft | 2 | 0 |
| Shop | 47.51 sq m · 511 sq ft | 2 | 0 |
| Shop | 47.62 sq m · 513 sq ft | 1 | 1 |
| Shop | 50.46 sq m · 543 sq ft | 2 | 0 |
| Shop | 50.54 sq m · 544 sq ft | 1 | 0 |
| Shop | 53.96 sq m · 581 sq ft | 1 | 0 |
| Shop | 54.82 sq m · 590 sq ft | 1 | 0 |
| Shop | 60.27 sq m · 649 sq ft | 1 | 0 |
| Shop | 62.48 sq m · 673 sq ft | 1 | 0 |
| Shop | 62.55 sq m · 673 sq ft | 1 | 0 |
| Shop | 68.3 sq m · 735 sq ft | 1 | 0 |
| Shop | 68.92 sq m · 742 sq ft | 1 | 0 |
| Shop | 71.2 sq m · 766 sq ft | 1 | 0 |
| Shop | 72.28 sq m · 778 sq ft | 1 | 0 |
| Shop | 74.39 sq m · 801 sq ft | 1 | 0 |
| Shop | 74.47 sq m · 802 sq ft | 1 | 0 |
| Shop | 81.22 sq m · 874 sq ft | 1 | 0 |
| Shop | 89.28 sq m · 961 sq ft | 1 | 0 |
| Shop | 89.5 sq m · 963 sq ft | 1 | 0 |
| Shop | 146.85 sq m · 1,581 sq ft | 1 | 0 |
| Shop | 148.12 sq m · 1,594 sq ft | 3 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals7
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | AB Architects | — |
| Chartered accountant | Oswal Solanki | — |
| Chartered accountant | Oswal Solanki And Associates | — |
| Chartered accountant | Sheetal Jindal | — |
| Engineer | Akshay Tambe | — |
| Engineer | sneha sawant | — |
| Engineer | Strudcom Consultants | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Chikhali
- The ForestiaRERA PM1260002602656
- Kshitij HomesRERA PR1260002602559
- Paradise VistaRERA PR1260002602535
- Miracle Madhubon ARERA PR1260002602171
- Vrinda ResidencyRERA PR1260002601218
- Landson KeysRERA PM1260002601127
- Santiago Skyarc₹7,220 a sq ft
- Anant₹7,170 a sq ft
All 2,448 projects in Chikhali · Compare Aishwaryam One Moshi with another project
Aishwaryam One Moshi in numbers
Registered deals, summarised
Deedo has 44 registered documents at Aishwaryam One Moshi, from Jan 2024 to Nov 2026: 37 sales, 2 leave and licence agreements, 5 mortgages. The median registered sale since Jan 2024 works out to about ₹17,200 per sq ft, at a median of ₹50 L a deal; 0% of sales were resales.
- What is the price per sq ft at Aishwaryam One Moshi?
- The median registered sale since Jan 2024 works out to about ₹17,200 per sq ft, at a median of ₹50 L a deal; 0% of sales were resales.
- How many properties have been sold at Aishwaryam One Moshi?
- 37 sales are registered at Aishwaryam One Moshi.
- Are properties at Aishwaryam One Moshi rented out?
- Yes: 2 leave and licence agreements are registered at Aishwaryam One Moshi.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Aishwaryam One Moshi by Deedo, last updated with deals registered in Nov 2026.
Latest deal · Primary sale · Nov 2026
₹50–75 L