SingaPune

Deedo IDDP-PUN-6BCT

Completion was pushed back 4 months, to Apr 2029; no MahaRERA orders on record; 32% of its units are booked.

Charholi, Pune 412105 · by Xrbia Mirth Properties Llp

DeliveryExtended 4 moPromised Dec 2028 · now due Apr 2029RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales32% booked734 of 2,283 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2029

  • P52100021543Registered 8 Jul 2019, completion promised 30 Dec 2028, revised to 30 Apr 2029.
  • P52100021544Registered 8 Jul 2019, completion promised 30 Dec 2028, revised to 30 Apr 2029.
  • P52100021752Registered 23 Jul 2019, completion promised 30 Dec 2028, revised to 30 Apr 2029.

No extension certificate on record.

3 registrations · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

9 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrations3
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000215438 Jul 201930 Dec 202830 Apr 2029Xrbia Mirth Properties LLPProject page
P521000215448 Jul 201930 Dec 202830 Apr 2029Xrbia Mirth Properties LLPProject page
P5210002175223 Jul 201930 Dec 202830 Apr 2029Xrbia Mirth Properties LLPProject page
Documents619

3 documents held by Deedo, 616 filings listed on MahaRERA's project page

Registration certificate (3)

  • Registration certificateP52100021543 · 8 Sep 2021ViewSource
  • Registration certificateP52100021544 · 8 Sep 2021ViewSource
  • Registration certificateP52100021752 · 8 Sep 2021ViewSource

Legal

  • OtherP52100021752 · Proposed Larger Layout.pdf · uploaded 25 Jun 2019Source
  • Legal Title reportP52100021752 · TSR.pdf · uploaded 25 Jun 2019Source
  • OtherP52100021544 · Xrbia Dhanori Ph 2_Future Buildings.pdf · uploaded 3 Jul 2019Source
  • OtherP52100021544 · Proposed Larger Layout.pdf · uploaded 3 Jul 2019Source
  • Legal Title reportP52100021544 · TSR.pdf · uploaded 3 Jul 2019Source
Show all 619 documentsShow fewer documents

Legal

  • Declaration Form BP52100021544 · Form B_Xrbia Dhanori Ph 2.pdf · uploaded 3 Jul 2019Source
  • OtherP52100021752 · Xrbia Dhanori Ph 3_Future Buildings.pdf · uploaded 3 Jul 2019Source
  • Declaration Form BP52100021752 · Form B_Xrbia Dhanori Ph 3.pdf · uploaded 3 Jul 2019Source
  • OtherP52100021543 · Proposed Larger Layout.pdf · uploaded 3 Jul 2019Source
  • OtherP52100021543 · Xrbia Dhanori Ph 1_Future Buildings.pdf · uploaded 3 Jul 2019Source
  • Legal Title reportP52100021543 · TSR.pdf · uploaded 3 Jul 2019Source
  • Declaration Form BP52100021543 · Form B_Xrbia Dhanori Ph 1.pdf · uploaded 3 Jul 2019Source

Migrated

  • 1 Copy of the legal title reportP52100021752 · TSR.pdf · uploaded 25 Jun 2019Source
  • 1 Copy of Layout Approval (in case of layout)P52100021752 · Sanction Plan_Compressed.pdf · uploaded 25 Jun 2019Source
  • 1 Building Plan Approval (IOD)P52100021752 · Sanction Plan_Compressed.pdf · uploaded 25 Jun 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100021752 · Comencement Certificate.pdf · uploaded 25 Jun 2019Source
  • 1 OtherP52100021752 · Proposed Larger Layout.pdf · uploaded 25 Jun 2019Source
  • 1 Copy of the legal title reportP52100021544 · TSR.pdf · uploaded 3 Jul 2019Source
  • 1 Details of encumbrancesP52100021544 · Xrbia Dhanori Ph 2_Encumbarances.pdf · uploaded 3 Jul 2019Source
  • 1 Copy of Layout Approval (in case of layout)P52100021544 · Sanction Plan_Compressed.pdf · uploaded 3 Jul 2019Source
  • 1 Building Plan Approval (IOD)P52100021544 · Comencement Certificate.pdf · uploaded 3 Jul 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100021544 · Comencement Certificate.pdf · uploaded 3 Jul 2019Source
  • 1 Declaration in FORM BP52100021544 · Form B_Xrbia Dhanori Ph 2.pdf · uploaded 3 Jul 2019Source
  • 1 Certificates of CA (Form 3)P52100021544 · CA Certificate_Form 3_Xrbia Dhanori Ph 2.pdf · uploaded 3 Jul 2019Source
  • 1 Proforma of Allotment letterP52100021544 · Xrbia Dhanori Ph 2_Agreement Declaration.pdf · uploaded 3 Jul 2019Source
  • 1 OtherP52100021544 · Xrbia Dhanori Ph 2_Future Buildings.pdf · uploaded 3 Jul 2019Source
  • 2 OtherP52100021544 · Proposed Larger Layout.pdf · uploaded 3 Jul 2019Source
  • 1 Details of encumbrancesP52100021752 · Xrbia Dhanori Ph 3_Encumbarances.pdf · uploaded 3 Jul 2019Source
  • 1 Declaration in FORM BP52100021752 · Form B_Xrbia Dhanori Ph 3.pdf · uploaded 3 Jul 2019Source
  • 1 Certificates of CA (Form 3)P52100021752 · CA Certificate_Form 3_Xrbia Dhanori Ph 3.pdf · uploaded 3 Jul 2019Source
  • 2 OtherP52100021752 · Xrbia Dhanori Ph 3_Future Buildings.pdf · uploaded 3 Jul 2019Source
  • 1 Copy of the legal title reportP52100021543 · TSR.pdf · uploaded 3 Jul 2019Source
  • 1 Details of encumbrancesP52100021543 · Xrbia Dhanori Ph 1_Encumbarances.pdf · uploaded 3 Jul 2019Source
  • 1 Copy of Layout Approval (in case of layout)P52100021543 · Sanction Plan_Compressed.pdf · uploaded 3 Jul 2019Source
  • 1 Building Plan Approval (IOD)P52100021543 · Comencement Certificate.pdf · uploaded 3 Jul 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100021543 · Comencement Certificate.pdf · uploaded 3 Jul 2019Source
  • 1 Declaration in FORM BP52100021543 · Form B_Xrbia Dhanori Ph 1.pdf · uploaded 3 Jul 2019Source
  • 1 Certificates of CA (Form 3)P52100021543 · CA Certificate_Form 3_Xrbia Dhanori Ph 1.pdf · uploaded 3 Jul 2019Source
  • 1 Proforma of Allotment letterP52100021543 · Xrbia Dhanori Ph 1_Agreement Declaration.pdf · uploaded 3 Jul 2019Source
  • 1 OtherP52100021543 · Proposed Larger Layout.pdf · uploaded 3 Jul 2019Source
  • 2 OtherP52100021543 · Xrbia Dhanori Ph 1_Future Buildings.pdf · uploaded 3 Jul 2019Source
  • 1 Proforma of Allotment letterP52100021752 · Proforma Allotment Letter.pdf · uploaded 16 Jul 2019Source
  • 2 Proforma of Allotment letterP52100021752 · Draft Agreement.pdf · uploaded 16 Jul 2019Source
  • 2 Building Plan Approval (IOD)P52100021544 · 1-24.pdf · uploaded 13 Nov 2019Source
  • 2 Commencement Certificates / NA Order for plotted developmentP52100021544 · Commencement Certificate 29082019.pdf · uploaded 13 Nov 2019Source
  • 2 Building Plan Approval (IOD)P52100021752 · 1-24.pdf · uploaded 13 Nov 2019Source
  • 2 Commencement Certificates / NA Order for plotted developmentP52100021752 · Commencement Certificate 29082019.pdf · uploaded 13 Nov 2019Source
  • 2 Building Plan Approval (IOD)P52100021543 · 1-24.pdf · uploaded 13 Nov 2019Source
  • 2 Commencement Certificates / NA Order for plotted developmentP52100021543 · Commencement Certificate 29082019.pdf · uploaded 13 Nov 2019Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021544 · Form 2A_Declaration_SingaPune Ph 2_Sep19.pdf · uploaded 12 Mar 2020Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021544 · Form 2A_Declaration_SingaPune Ph 2_Dec19.pdf · uploaded 12 Mar 2020Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021752 · Form 2A_Declaration_SingaPune Ph 3_Sep19.pdf · uploaded 12 Mar 2020Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021752 · Form 2A_Declaration_SingaPune Ph 3_Dec19.pdf · uploaded 12 Mar 2020Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021543 · Form 2A_Declaration_SingaPune Ph 1_Sep19.pdf · uploaded 12 Mar 2020Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021543 · Form 2A_Declaration_SingaPune Ph 1_Dec19.pdf · uploaded 12 Mar 2020Source
  • 2 Details of encumbrancesP52100021544 · Xrbia Dhanori_Ph 2_Details of encumbrances_SBI.pdf · uploaded 17 Mar 2020Source
  • 2 Details of encumbrancesP52100021752 · Xrbia Dhanori_Ph 3_Details of encumbrances_SBI.pdf · uploaded 17 Mar 2020Source
  • 2 Details of encumbrancesP52100021543 · Xrbia Dhanori_Ph 1_Details of encumbrances_SBI.pdf · uploaded 17 Mar 2020Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021544 · Form 2A_Declaration_SingaPune Ph 2_March2020.pdf · uploaded 6 Apr 2020Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021752 · Form 2A_Declaration_SingaPune Ph 3_March2020.pdf · uploaded 6 Apr 2020Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021543 · Form 2A_Declaration_SingaPune Ph 1_March2020.pdf · uploaded 6 Apr 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100021544 · Singapune Form 5_Ph 2_31032020.pdf · uploaded 20 May 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100021752 · Singapune Form 5_Ph 3_31032020.pdf · uploaded 20 May 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100021543 · Singapune Form 5_Ph 1_31032020.pdf · uploaded 20 May 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100021544 · Form 2A_Declaration_SingaPune Ph 2_June2020.pdf · uploaded 3 Jul 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100021544 · Form 2A_Declaration_SingaPune Ph 2_September2020.pdf · uploaded 3 Jul 2021Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100021544 · Form 2A_Declaration_SingaPune Ph 2_December2020.pdf · uploaded 3 Jul 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100021752 · Form 2A_Declaration_SingaPune Ph 3_June2020.pdf · uploaded 3 Jul 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100021752 · Form 2A_Declaration_SingaPune Ph 3_September2020.pdf · uploaded 3 Jul 2021Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100021752 · Form 2A_Declaration_SingaPune Ph 3_December2020.pdf · uploaded 3 Jul 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100021543 · Form 2A_Declaration_SingaPune Ph 1_June2020.pdf · uploaded 3 Jul 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100021543 · Form 2A_Declaration_SingaPune Ph 1_September2020.pdf · uploaded 3 Jul 2021Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100021543 · Form 2A_Declaration_SingaPune Ph 1_December2020.pdf · uploaded 3 Jul 2021Source
  • 1 Declaration about Commencement CertificateP52100021544 · SingaPune_CC Declaration.pdf · uploaded 15 Aug 2021Source
  • 1 Disclosure of sold/ booked inventoryP52100021544 · SingaPune_Ph2_Sold Unit Declaration_090821.pdf · uploaded 15 Aug 2021Source
  • 1 Declaration about Commencement CertificateP52100021752 · SingaPune_CC Declaration.pdf · uploaded 15 Aug 2021Source
  • 1 Disclosure of sold/ booked inventoryP52100021752 · SingaPune_Ph3_Sold Unit Declaration_090821.pdf · uploaded 15 Aug 2021Source
  • 1 Declaration about Commencement CertificateP52100021543 · SingaPune_CC Declaration.pdf · uploaded 15 Aug 2021Source
  • 1 Disclosure of sold/ booked inventoryP52100021543 · SingaPune_Ph1_Sold Unit Declaration_090821.pdf · uploaded 15 Aug 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100021544 · Form 5SingaPune Ph 2310321.pdf · uploaded 21 Jan 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100021752 · Form 5SingaPune Ph 3310321.pdf · uploaded 21 Jan 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100021543 · Form 5SingaPune Ph 1310321.pdf · uploaded 21 Jan 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021544 · SingaPune_Ph_2_Architect's_Qtr 3_21-22.pdf · uploaded 10 Mar 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021544 · SingaPune_Ph_2_Architect's_Qtr 4_21-22.pdf · uploaded 10 Mar 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021544 · SingaPune_Ph 2_Eng Cert_Qtr 3_ 21-22.pdf · uploaded 10 Mar 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021544 · SingaPune_Ph_2_Engineer's_Qtr 4_ 21-22.pdf · uploaded 10 Mar 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021544 · SingaPune_Ph_2_Engineer's_Qtr 1_2022-23.pdf · uploaded 10 Mar 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021544 · SingaPune_Ph_2_Engineer's_Qtr 2_2022-23.pdf · uploaded 10 Mar 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021544 · SingaPune_Ph_2_Engineer's_Qtr 3_2022-23.pdf · uploaded 10 Mar 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021752 · SingaPune_Ph_3_Architect's_Qtr 3_21-22.pdf · uploaded 10 Mar 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021752 · SingaPune_Ph_3_Architect's_Qtr 4_21-22.pdf · uploaded 10 Mar 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021752 · SingaPune_Ph 3_Eng Cert_ Qtr 3_ 21-22.pdf · uploaded 10 Mar 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021752 · SingaPune_Ph_3_Engineer's_Qtr 4_ 21-22.pdf · uploaded 10 Mar 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021752 · SingaPune_Ph_3_Engineer's_Qtr 1_2022-23.pdf · uploaded 10 Mar 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021752 · SingaPune_Ph_3_Engineer's_Qtr 2_2022-23.pdf · uploaded 10 Mar 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021752 · SingaPune_Ph_3_Engineer's_Qtr 3_2022-23.pdf · uploaded 10 Mar 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021543 · SingaPune_Ph_1_Architect's_Qtr 3_ 21-22.pdf · uploaded 10 Mar 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021543 · SingaPune_Ph_1_Architect's_Qtr 4_ 21-22.pdf · uploaded 10 Mar 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021543 · SingaPune_Ph 1_Eng Cert_Qtr 3_ 21-22.pdf · uploaded 10 Mar 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021543 · SingaPune_Ph_1_Architect's_Qtr 4_ 21-22.pdf · uploaded 10 Mar 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021543 · SingaPune_Ph_1_Engineer's_Qtr 1_2022-23.pdf · uploaded 10 Mar 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021543 · SingaPune_Ph_1_Engineer's_Qtr 2_2022-23.pdf · uploaded 10 Mar 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021543 · SingaPune_Ph_1_Engineer's_Qtr 3_2022-23.pdf · uploaded 10 Mar 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021544 · SingaPune_Ph_2_Architect's_Qtr 1_2022-23.pdf · uploaded 18 Mar 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021544 · SingaPune_Ph_2_Architect's_Qtr 2_2022-23.pdf · uploaded 18 Mar 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021544 · SingaPune_Ph_2_Architect's_Qtr 3_2022-23.pdf · uploaded 18 Mar 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021752 · SingaPune_Ph_3_Architect's_Qtr 1_2022-23.pdf · uploaded 18 Mar 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021752 · SingaPune_Ph_3_Architect's_Qtr 2_2022-23.pdf · uploaded 18 Mar 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021752 · SingaPune_Ph_3_Architect's_Qtr 3_2022-23.pdf · uploaded 18 Mar 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021543 · SingaPune_Ph_1_Architect's_Qtr 1_2022-23.pdf · uploaded 18 Mar 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021543 · SingaPune_Ph_1_Architect's_Qtr 2_2022-23.pdf · uploaded 18 Mar 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021543 · SingaPune_Ph_1_Architect's_Qtr 3_2022-23.pdf · uploaded 18 Mar 2023Source
  • 2 Certificates of CA (Form 3)P52100021544 · Form 3_SingaPune Ph 2_310321.pdf · uploaded 31 Mar 2023Source
  • 3 Certificates of CA (Form 3)P52100021544 · SingaPune Ph 2_Form 3_310322.pdf · uploaded 31 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100021544 · SingaPune_Ph 2_ FORM 5_310322.pdf · uploaded 31 Mar 2023Source
  • 2 Certificates of CA (Form 3)P52100021752 · Form 3_SingaPune Ph 3_310321.pdf · uploaded 31 Mar 2023Source
  • 3 Certificates of CA (Form 3)P52100021752 · SingaPune Ph 3_Form 3_310322.pdf · uploaded 31 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100021752 · SingaPune_Ph 3_ FORM 5_310322.pdf · uploaded 31 Mar 2023Source
  • 2 Certificates of CA (Form 3)P52100021543 · Form 3_SingaPune Ph 1_310321.pdf · uploaded 31 Mar 2023Source
  • 3 Certificates of CA (Form 3)P52100021543 · SingaPune Ph 1_Form 3_310322.pdf · uploaded 31 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100021543 · SingaPune_Ph 1_ FORM 5_310322.pdf · uploaded 31 Mar 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100021544 · 2_Form2a_SingaPune_Ph 2_Qtr 3_ 21-22.pdf · uploaded 5 Apr 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100021544 · 5_Form2a_SingaPune_Ph 2_Qtr 4_ 21-22.pdf · uploaded 5 Apr 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100021752 · 3_Form2a_SingaPune_Ph 3_Qtr 3_ 21-22.pdf · uploaded 5 Apr 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100021752 · 6_Form2a_SingaPune_Ph 3_Qtr 4_ 21-22.pdf · uploaded 5 Apr 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100021543 · 1_Form2a_SingaPune_Ph 1_Qtr 3_ 21-22.pdf · uploaded 5 Apr 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100021543 · 4_Form2a_SingaPune_Ph 1_Qtr 4_ 21-22.pdf · uploaded 5 Apr 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021544 · SingaPune_Ph_2_Architect's_Qtr 4_2022-23.pdf · uploaded 26 Jun 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021544 · SingaPune_Ph_2_Engineer's_Qtr 4_2022-23.pdf · uploaded 26 Jun 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021752 · SingaPune_Ph_3_Architect's_Qtr 4_2022-23.pdf · uploaded 26 Jun 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021752 · SingaPune_Ph_3_Engineer's_Qtr 4_2022-23.pdf · uploaded 26 Jun 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021543 · SingaPune_Ph_1_Architect's_Qtr 4_2022-23.pdf · uploaded 26 Jun 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021543 · SingaPune_Ph_1_Engineer's_Qtr 4_2022-23.pdf · uploaded 26 Jun 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021544 · SingaPune_Ph_2_Architect's_Qtr 4_2022-23.pdf · uploaded 2 Aug 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021544 · SingaPune_Ph_2_Engineer's_Qtr 4_2022-23.pdf · uploaded 2 Aug 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100021544 · SingaPune P2-5 FY 22-23.pdf · uploaded 2 Aug 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021752 · SingaPune_Ph_3_Architect's_Qtr 4_2022-23.pdf · uploaded 2 Aug 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021752 · SingaPune_Ph_3_Engineer's_Qtr 4_2022-23.pdf · uploaded 2 Aug 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100021752 · SingaPune P3-5 FY 22-23.pdf · uploaded 2 Aug 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021543 · SingaPune_Ph_1_Architect's_Qtr 4_2022-23.pdf · uploaded 2 Aug 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021543 · SingaPune_Ph_1_Engineer's_Qtr 4_2022-23.pdf · uploaded 2 Aug 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100021543 · SingaPune P1-5 FY 22-23.pdf · uploaded 2 Aug 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100021544 · Form2a_SingaPune_Ph 2_Qtr 1_ 22-23.pdf · uploaded 25 Sep 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100021544 · Form2a_SingaPune_Ph 2_Qtr 2_ 22-23.pdf · uploaded 25 Sep 2023Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100021544 · Form2a_SingaPune_Ph 2_Qtr 3_ 22-23.pdf · uploaded 25 Sep 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100021752 · Form2a_SingaPune_Ph 3_Qtr 1_ 22-23.pdf · uploaded 25 Sep 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100021752 · Form2a_SingaPune_Ph 3_Qtr 2_ 22-23.pdf · uploaded 25 Sep 2023Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100021752 · Form2a_SingaPune_Ph 3_Qtr 3_ 22-23.pdf · uploaded 25 Sep 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021543 · SingaPune_Ph_1_Architect's_Qtr 2_2022-23.pdf · uploaded 25 Sep 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100021543 · Form2a_SingaPune_Ph 1_Qtr 1_ 22-23.pdf · uploaded 25 Sep 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100021543 · Form2a_SingaPune_Ph 1_Qtr 2_ 22-23.pdf · uploaded 25 Sep 2023Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100021543 · Form2a_SingaPune_Ph 1_Qtr 3_ 22-23.pdf · uploaded 25 Sep 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021544 · SingaPune_Ph_2_Architect's_Qtr 1_2023-24.pdf · uploaded 29 Sep 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021544 · SingaPune_Ph_2_Architect's_Qtr 2_2023-24.pdf · uploaded 29 Sep 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021544 · SingaPune_Ph_2_Engineer's_Qtr 1_2023-24.pdf · uploaded 29 Sep 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021544 · SingaPune_Ph_2_Engineer's_Qtr 2_2023-24.pdf · uploaded 29 Sep 2023Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100021544 · Form 2a_ Singapune Ph2_Qtr4_22-23.pdf · uploaded 29 Sep 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021752 · SingaPune_Ph_3_Architect's_Qtr 1_2023-24.pdf · uploaded 29 Sep 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021752 · SingaPune_Ph_3_Architect's_Qtr 2_2023-24.pdf · uploaded 29 Sep 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021752 · SingaPune_Ph_3_Engineer's_Qtr 1_2023-24.pdf · uploaded 29 Sep 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021752 · SingaPune_Ph_3_Engineer's_Qtr 2_2023-24.pdf · uploaded 29 Sep 2023Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100021752 · Form 2a_ Singapune Ph3_Qtr4_22-23.pdf · uploaded 29 Sep 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021543 · SingaPune_Ph_1_Architect's_Qtr 1_2023-24.pdf · uploaded 29 Sep 2023Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021543 · SingaPune_Ph_1_Architect's_Qtr 2_2023-24.pdf · uploaded 29 Sep 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021543 · SingaPune_Ph_1_Engineer's_Qtr 1_2023-24.pdf · uploaded 29 Sep 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021543 · SingaPune_Ph_1_Engineer's_Qtr 2_2023-24.pdf · uploaded 29 Sep 2023Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100021543 · Form 2a_ Singapune Ph1_Qtr4_22-23.pdf · uploaded 29 Sep 2023Source
  • 2 Disclosure of sold/ booked inventoryP52100021544 · 2_311221_.pdf · uploaded 10 Oct 2023Source
  • 3 Disclosure of sold/ booked inventoryP52100021544 · 2_310322_.pdf · uploaded 10 Oct 2023Source
  • 4 Disclosure of sold/ booked inventoryP52100021544 · 2_300622_.pdf · uploaded 10 Oct 2023Source
  • 5 Disclosure of sold/ booked inventoryP52100021544 · 2_300922_.pdf · uploaded 10 Oct 2023Source
  • 6 Disclosure of sold/ booked inventoryP52100021544 · 2_311222_.pdf · uploaded 10 Oct 2023Source
  • 7 Disclosure of sold/ booked inventoryP52100021544 · 2_310323_.pdf · uploaded 10 Oct 2023Source
  • 8 Disclosure of sold/ booked inventoryP52100021544 · 2_300623_.pdf · uploaded 10 Oct 2023Source
  • 9 Disclosure of sold/ booked inventoryP52100021544 · 2_300923_.pdf · uploaded 10 Oct 2023Source
  • 2 Disclosure of sold/ booked inventoryP52100021752 · 3_311221_.pdf · uploaded 10 Oct 2023Source
  • 3 Disclosure of sold/ booked inventoryP52100021752 · 3_310322_.pdf · uploaded 10 Oct 2023Source
  • 4 Disclosure of sold/ booked inventoryP52100021752 · 3_300623_.pdf · uploaded 10 Oct 2023Source
  • 5 Disclosure of sold/ booked inventoryP52100021752 · 3_300622_.pdf · uploaded 10 Oct 2023Source
  • 6 Disclosure of sold/ booked inventoryP52100021752 · 3_300922_.pdf · uploaded 10 Oct 2023Source
  • 7 Disclosure of sold/ booked inventoryP52100021752 · 3_311222_.pdf · uploaded 10 Oct 2023Source
  • 8 Disclosure of sold/ booked inventoryP52100021752 · 3_310323_.pdf · uploaded 10 Oct 2023Source
  • 9 Disclosure of sold/ booked inventoryP52100021752 · 3_300923_.pdf · uploaded 10 Oct 2023Source
  • 2 Disclosure of sold/ booked inventoryP52100021543 · 1_311221_.pdf · uploaded 10 Oct 2023Source
  • 3 Disclosure of sold/ booked inventoryP52100021543 · 1_310322_.pdf · uploaded 10 Oct 2023Source
  • 4 Disclosure of sold/ booked inventoryP52100021543 · 1_300622_.pdf · uploaded 10 Oct 2023Source
  • 5 Disclosure of sold/ booked inventoryP52100021543 · 1_300922_.pdf · uploaded 10 Oct 2023Source
  • 6 Disclosure of sold/ booked inventoryP52100021543 · 1_311222_.pdf · uploaded 10 Oct 2023Source
  • 7 Disclosure of sold/ booked inventoryP52100021543 · 1_310323_.pdf · uploaded 10 Oct 2023Source
  • 8 Disclosure of sold/ booked inventoryP52100021543 · 1_300623_.pdf · uploaded 10 Oct 2023Source
  • 9 Disclosure of sold/ booked inventoryP52100021543 · 1_300923_.pdf · uploaded 10 Oct 2023Source
  • 4 Certificates of CA (Form 3)P52100021544 · Singapune Form 3_Ph 2_31032020.pdf · uploaded 11 Oct 2023Source
  • 5 Certificates of CA (Form 3)P52100021544 · SingaPuneP2- Form3.pdf · uploaded 11 Oct 2023Source
  • 4 Certificates of CA (Form 3)P52100021752 · Singapune Form 3_Ph 3_31032020.pdf · uploaded 11 Oct 2023Source
  • 5 Certificates of CA (Form 3)P52100021752 · SingaPuneP3- Form3.pdf · uploaded 11 Oct 2023Source
  • 4 Certificates of CA (Form 3)P52100021543 · Singapune Form 3_Ph 1_31032020.pdf · uploaded 11 Oct 2023Source
  • 5 Certificates of CA (Form 3)P52100021543 · SingaPuneP1- Form3.pdf · uploaded 11 Oct 2023Source
  • 10 Disclosure of sold/ booked inventoryP52100021544 · SingaPune_Ph 2_Sold_311223.pdf · uploaded 21 Mar 2024Source
  • 10 Disclosure of sold/ booked inventoryP52100021752 · SingaPune_Ph 3_Sold_311223.pdf · uploaded 21 Mar 2024Source
  • 10 Disclosure of sold/ booked inventoryP52100021543 · SingaPune_Ph 1_Sold_311223.pdf · uploaded 21 Mar 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021544 · SingaPune_Ph_2_Architect's_Qtr 3_2023-24_.pdf · uploaded 1 Apr 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021752 · SingaPune_Ph_3_Architect's_Qtr 3_2023-24_.pdf · uploaded 1 Apr 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021543 · SingaPune_Ph_1_Architect's_Qtr 3_2023-24_.pdf · uploaded 1 Apr 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021544 · SingaPune_Ph_2_Architect's_Qtr 4_2023-24.pdf · uploaded 6 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021544 · SingaPune_Ph_2_Architect's_Qtr 1_2024-25.pdf · uploaded 6 Feb 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021544 · SingaPune_Ph_2_Architect's_Qtr 2_2024-25.pdf · uploaded 6 Feb 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021544 · SingaPune_Ph_2_Architect's_Qtr 3_2024-25.pdf · uploaded 6 Feb 2025Source
  • 1 Certificates of CA (Form 3)P52100021544 · SingaPune_Ph 2_Form 3_310324.pdf · uploaded 6 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021544 · SingaPune Form 2-Ph 2_31122023.pdf · uploaded 6 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021544 · SingaPune Form 2-Ph 2_31032024.pdf · uploaded 6 Feb 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021544 · SingaPune Form 2-Ph 2_30062024.pdf · uploaded 6 Feb 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021544 · SingaPune Form 2-Ph 2_30092024.pdf · uploaded 6 Feb 2025Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021544 · SingaPune Form 2-Ph 2_31122024.pdf · uploaded 6 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021752 · SingaPune_Ph_3_Architect's_Qtr 4_2023-24.pdf · uploaded 6 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021752 · SingaPune_Ph_3_Architect's_Qtr 1_2024-25.pdf · uploaded 6 Feb 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021752 · SingaPune_Ph_3_Architect's_Qtr 2_2024-25.pdf · uploaded 6 Feb 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021752 · SingaPune_Ph_3_Architect's_Qtr 3_2024-25.pdf · uploaded 6 Feb 2025Source
  • 1 Certificates of CA (Form 3)P52100021752 · SingaPune_Ph 3_Form 3_310324.pdf · uploaded 6 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021752 · SingaPune Form 2-Ph 3_31122023.pdf · uploaded 6 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021752 · SingaPune Form 2-Ph 3_31032024.pdf · uploaded 6 Feb 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021752 · SingaPune Form 2-Ph 3_30062024.pdf · uploaded 6 Feb 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021752 · SingaPune Form 2-Ph 3_30092024.pdf · uploaded 6 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021543 · SingaPune Form 2-Ph 1_31032024.pdf · uploaded 6 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021543 · SingaPune Form 2-Ph 1_30062024.pdf · uploaded 6 Feb 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021543 · SingaPune Form 2-Ph 1_30092024.pdf · uploaded 6 Feb 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021543 · SingaPune Form 2-Ph 1_31122024.pdf · uploaded 6 Feb 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021543 · SingaPune_Ph_1_Architect's_Qtr 4_2023-24.pdf · uploaded 6 Feb 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021543 · SingaPune_Ph_1_Architect's_Qtr 1_2024-25.pdf · uploaded 6 Feb 2025Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021543 · SingaPune_Ph_1_Architect's_Qtr 2_2024-25.pdf · uploaded 6 Feb 2025Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100021543 · SingaPune_Ph_1_Architect's_Qtr 3_2024-25.pdf · uploaded 6 Feb 2025Source
  • 1 Certificates of CA (Form 3)P52100021543 · SingaPune_Ph 1_Form 3_310324.pdf · uploaded 6 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021543 · SingaPune Form 2-Ph 1_31122023.pdf · uploaded 6 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021543 · SingaPune Form 2-Ph 1_31032024.pdf · uploaded 6 Feb 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021543 · SingaPune Form 2-Ph 1_30062024.pdf · uploaded 6 Feb 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021543 · SingaPune Form 2-Ph 1_30092024.pdf · uploaded 6 Feb 2025Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100021543 · SingaPune Form 2-Ph 1_31122024.pdf · uploaded 6 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100021544 · SingaPune_Ph 2_Form 5_310324.pdf · uploaded 12 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100021752 · SingaPune_Ph 3_Form 5_310324.pdf · uploaded 12 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100021543 · SingaPune_Ph 1_Form 5_310324.pdf · uploaded 12 Feb 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021544 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021544 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021544 · inventory Singapune-Ph 2 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021752 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021752 · Inventory Singa pune Ph-3 30-06-2025_11zon (1).pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021543 · Form 1.pdf · uploaded 25 Jul 2025Source
  • Form 2P52100021543 · Form 2.pdf · uploaded 25 Jul 2025Source
  • Form 3P52100021543 · Form 3.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100021543 · Inventory Ph-1 - 30-06-2025.pdf · uploaded 25 Jul 2025Source
  • Form 1P52100021544 · Form 1 Phase 2.pdf · uploaded 20 Jan 2026Source
  • Form 2P52100021544 · FORM 2 SINGAPUNE PHASE 2.pdf · uploaded 20 Jan 2026Source
  • Form 3P52100021544 · Form 3 Phase 2.pdf · uploaded 20 Jan 2026Source
  • Disclosure of Sold and Booked InventoryP52100021544 · DISCLOSURE OF SOLD OR BOOKED INVENTORY SINGAPUNE PHASE 2.pdf · uploaded 20 Jan 2026Source
  • Form 1P52100021544 · Form 1 Phase 2.pdf · uploaded 20 Jan 2026Source
  • Form 2P52100021544 · FORM 2 SINGAPUNE PHASE 2.pdf · uploaded 20 Jan 2026Source
  • Form 3P52100021544 · Form 3 Phase 2.pdf · uploaded 20 Jan 2026Source
  • Disclosure of Sold and Booked InventoryP52100021544 · DISCLOSURE OF SOLD OR BOOKED INVENTORY SINGAPUNE PHASE 2.pdf · uploaded 20 Jan 2026Source
  • Form 1P52100021752 · Form 1 Phase 3.pdf · uploaded 20 Jan 2026Source
  • Form 2P52100021752 · FORM 2 SINGAPUNE PHASE 3.pdf · uploaded 20 Jan 2026Source
  • Form 3P52100021752 · Form 3 Phase 3.pdf · uploaded 20 Jan 2026Source
  • Disclosure of Sold and Booked InventoryP52100021752 · DISCLOSURE OF SOLD OR BOOKED INVENTORY SINGAPUNE PHASE 3.pdf · uploaded 20 Jan 2026Source
  • Form 1P52100021752 · Form 1 Phase 3.pdf · uploaded 20 Jan 2026Source
  • Form 2P52100021752 · FORM 2 SINGAPUNE PHASE 3.pdf · uploaded 20 Jan 2026Source
  • Form 3P52100021752 · Form 3 Phase 3.pdf · uploaded 20 Jan 2026Source
  • Disclosure of Sold and Booked InventoryP52100021752 · DISCLOSURE OF SOLD OR BOOKED INVENTORY SINGAPUNE PHASE 3.pdf · uploaded 20 Jan 2026Source
  • Form 1P52100021543 · Form 1 Phase 1.pdf · uploaded 20 Jan 2026Source
  • Form 2P52100021543 · FORM 2 SINGAPUNE PHASE 1.pdf · uploaded 20 Jan 2026Source
  • Form 3P52100021543 · Form 3 Phase 1.pdf · uploaded 20 Jan 2026Source
  • Disclosure of Sold and Booked InventoryP52100021543 · DISCLOSURE OF SOLD OR BOOKED INVENTORY SINGAPUNE PHASE 1.pdf · uploaded 20 Jan 2026Source
  • Form 1P52100021543 · Form 1 Phase 1.pdf · uploaded 20 Jan 2026Source
  • Form 2P52100021543 · FORM 2 SINGAPUNE PHASE 1.pdf · uploaded 20 Jan 2026Source
  • Form 3P52100021543 · Form 3 Phase 1.pdf · uploaded 20 Jan 2026Source
  • Disclosure of Sold and Booked InventoryP52100021543 · DISCLOSURE OF SOLD OR BOOKED INVENTORY SINGAPUNE PHASE 1.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1P52100021544 · Form 1 (1).pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2P52100021544 · Form 2.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3P52100021544 · Form 3 New.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 1P52100021543 · Form 1.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2P52100021543 · Form 2.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3P52100021543 · Form 3.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 1P52100021544 · Form 1 (2).pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2P52100021544 · Form 2 .pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3P52100021544 · Form 3 (1).pdf · uploaded 20 Jul 2026Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 20 Jul 2026Source
  • Form 2P52100021752 · Form 2 .pdf · uploaded 20 Jul 2026Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP52100021752 · inventory .pdf · uploaded 20 Jul 2026Source
  • Form 1P52100021752 · Form 1.pdf · uploaded 20 Jul 2026Source
  • Form 2P52100021752 · Form 2 .pdf · uploaded 20 Jul 2026Source
  • Form 3P52100021752 · Form 3.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP52100021752 · inventory .pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 1P52100021543 · Form 1 (2).pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2P52100021543 · Form 2.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3P52100021543 · Form 3.pdf · uploaded 20 Jul 2026Source

Technical

  • DocumentP52100021752 · Sanction Plan_Compressed.pdf · uploaded 25 Jun 2019Source
  • DocumentP52100021752 · Sanction Plan_Compressed.pdf · uploaded 25 Jun 2019Source
  • DocumentP52100021544 · Sanction Plan_Compressed.pdf · uploaded 3 Jul 2019Source
  • DocumentP52100021544 · Comencement Certificate.pdf · uploaded 3 Jul 2019Source
  • DocumentP52100021543 · Sanction Plan_Compressed.pdf · uploaded 3 Jul 2019Source
  • DocumentP52100021543 · Comencement Certificate.pdf · uploaded 3 Jul 2019Source
  • DocumentP52100021544 · 1-24.pdf · uploaded 13 Nov 2019Source
  • DocumentP52100021752 · 1-24.pdf · uploaded 13 Nov 2019Source
  • DocumentP52100021543 · 1-24.pdf · uploaded 13 Nov 2019Source

Technical (Architect)

  • DocumentP52100021752 · SingaPune_Ph_3_Architect's_Qtr 3_2023-24_.pdf · uploaded 1 Apr 2024Source
  • DocumentP52100021544 · SingaPune_Ph_2_Architect's_Qtr 4_2023-24.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021544 · SingaPune_Ph_2_Architect's_Qtr 1_2024-25.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021544 · SingaPune_Ph_2_Architect's_Qtr 2_2024-25.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021544 · SingaPune_Ph_2_Architect's_Qtr 3_2024-25.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021752 · SingaPune_Ph_3_Architect's_Qtr 4_2023-24.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021752 · SingaPune_Ph_3_Architect's_Qtr 1_2024-25.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021752 · SingaPune_Ph_3_Architect's_Qtr 2_2024-25.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021752 · SingaPune_Ph_3_Architect's_Qtr 3_2024-25.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021543 · SingaPune Form 2-Ph 1_31032024.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021543 · SingaPune Form 2-Ph 1_30062024.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021543 · SingaPune Form 2-Ph 1_30092024.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021543 · SingaPune Form 2-Ph 1_31122024.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021543 · SingaPune_Ph_1_Architect's_Qtr 4_2023-24.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021543 · SingaPune_Ph_1_Architect's_Qtr 1_2024-25.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021543 · SingaPune_Ph_1_Architect's_Qtr 2_2024-25.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021543 · SingaPune_Ph_1_Architect's_Qtr 3_2024-25.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021544 · Form 1 (2).pdf · uploaded 20 Jul 2026Source
  • DocumentP52100021543 · Form 1 (2).pdf · uploaded 20 Jul 2026Source

Technical (Engineer)

  • DocumentP52100021752 · SingaPune_Ph_3_Engineer's_Qtr 2_2023-24.pdf · uploaded 29 Sep 2023Source
  • DocumentP52100021544 · SingaPune Form 2-Ph 2_31122023.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021544 · SingaPune Form 2-Ph 2_31032024.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021544 · SingaPune Form 2-Ph 2_30062024.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021544 · SingaPune Form 2-Ph 2_30092024.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021544 · SingaPune Form 2-Ph 2_31122024.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021752 · SingaPune Form 2-Ph 3_31122023.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021752 · SingaPune Form 2-Ph 3_31032024.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021752 · SingaPune Form 2-Ph 3_30062024.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021752 · SingaPune Form 2-Ph 3_30092024.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021543 · SingaPune Form 2-Ph 1_31122023.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021543 · SingaPune Form 2-Ph 1_31032024.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021543 · SingaPune Form 2-Ph 1_30062024.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021543 · SingaPune Form 2-Ph 1_30092024.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021543 · SingaPune Form 2-Ph 1_31122024.pdf · uploaded 6 Feb 2025Source
  • DocumentP52100021544 · Form 2 .pdf · uploaded 20 Jul 2026Source
  • DocumentP52100021543 · Form 2.pdf · uploaded 20 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel Sr No 309/1, Sr No 309/2

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Phases
3
Unit types
1 RK, Shop 1, Shop 2, Shop 3, 1 BHK, Shop, 2 BHK2,283 units in all
Address
Sr No 309/1 and Sr No 309/2, Proposed DP Road, Charoli BudrukPIN 412105
Village
Charholi, Haveli taluka
Land area for this project
1,532 sq m (16,490 sq ft)
Permissible built-up area
19,122 sq m (2,05,827 sq ft)
Sanctioned built-up area
13,936 sq m (1,50,006 sq ft)
Recreational open space
4,827 sq m (51,957 sq ft)
Designated bank account
171
Developed in phases
Yes
Also registered as
SingaPune Ph 1, SingaPune Ph 2, SingaPune Ph 3

Survey, CTS, gat or plot numbers

Sr No 309/1Sr No 309/2

Land as published on MahaRERA's project page

Sr No 309/1 and Sr No 309/2

Boundaries

North
Sr No 307 Sr No 308 and Road
South
Sr No310
East
Sr No 309 Part
West
Sr No305 and 309 Part

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking2,283 units

734 of 2,283 units booked (32%), as the promoter reported to MahaRERA

1 RK · 606 unitsShop 1 · 22 unitsShop 2 · 2 unitsShop 3 · 2 units1 BHK · 1,211 unitsShop · 14 units2 BHK · 426 units
RERABuildingTypeCarpet areaUnitsBooked
P52100021543A11 RK18.13 sq m · 195 sq ft303187
P52100021543A1Shop 120.1 sq m · 216 sq ft110
P52100021543A1Shop 220.46 sq m · 220 sq ft10
P52100021543A1Shop 326.88 sq m · 289 sq ft10
P52100021544A21 RK18.13 sq m · 195 sq ft303168
P52100021544A2Shop 120.1 sq m · 216 sq ft110
P52100021544A2Shop 220.46 sq m · 220 sq ft10
P52100021544A2Shop 326.88 sq m · 289 sq ft10
Show all 18 unit rowsShow fewer unit rows
RERABuildingTypeCarpet areaUnitsBooked
P52100021544B11 BHK28.11 sq m · 303 sq ft302114
P52100021543B21 BHK28.11 sq m · 303 sq ft32233
P52100021752B31 BHK28.11 sq m · 303 sq ft3260
P52100021752B41 BHK28.11 sq m · 303 sq ft261109
P52100021752B4Shop20.13 sq m · 217 sq ft52
P52100021752B4Shop21.66 sq m · 233 sq ft64
P52100021752B4Shop24.75 sq m · 266 sq ft33
P52100021544C22 BHK42.47 sq m · 457 sq ft1420
P52100021752C42 BHK42.47 sq m · 457 sq ft14260
P52100021752C52 BHK42.47 sq m · 457 sq ft14254

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals20

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectAjay Gade—P52100021543
ArchitectAjay Gade—P52100021752
ArchitectAjay Gade—P52100021544
ArchitectDattatray M Parshuram—P52100021544
Chartered accountantDevesh Navasalkar—P52100021544
Chartered accountantDevesh Navasalkar—P52100021752
Chartered accountantDevesh Navasalkar—P52100021543
Chartered accountantHuzaifa Snawadwala—P52100021544
Show all 20 professionalsShow fewer professionals
RoleNameRegistration no.RERA
EngineerBhushan Patil—P52100021543
EngineerBhushan Patil—P52100021544
EngineerBhushan Patil—P52100021752
EngineerDattatray M Parshuram—P52100021544
EngineerShailesh Bhosale—P52100021752
EngineerShailesh Bhosale—P52100021544
EngineerShailesh Bhosale—P52100021543
OtherBhushan Patil—P52100021752
OtherEiffel India Infraprojects Pvt Ltd—P52100021543
OtherEiffel India Infraprojects Pvt Ltd—P52100021752
OtherEiffel India Infraprojects Pvt Ltd—P52100021544
OtherShailesh Bhosale—P52100021752

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology